Skip to content
Qanoon Digest

Details of Demands for Grants and Appropriations - Vol-IV (Development), part 5

FY 2026-27Details of demandsPages 401 to 500 of 515

The Details of Demands for Grants and Appropriations - Vol-IV (Development) is part of the federal budget for FY 2026-27. This page reproduces the text of its 515 PDF pages, extracted automatically from the official PDF published by the Finance Division, Government of Pakistan.

Go to a page or part

This text was extracted automatically from the PDF's text layer. Tables may lose their column alignment, and a page with no text layer is marked rather than guessed. Check the official PDF before relying on any figure.

Page 401

NO. 125.- EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF COMMUNICATION    DEMANDS FOR GRANTS
         DIVISION
                                DEMAND NO. 125
                                                                            ( FC12N10 )
           EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF COMMUNICATION DIVISION

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2027 for EXTERNAL DEVELOPMENT
LOANS AND ADVANCES OF COMMUNICATION DIVISION.

                                Voted           Rs. 59,255,000,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF COMMUNICATIONS  .

                                                           2025-2026         2025-2026         2026-2027
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
014    Transfers                                                 54,856,200,000        49,370,580,000        59,250,000,000
045    Construction and Transport                                                                                 5,000,000
               Total                                              54,856,200,000        49,370,580,000        59,255,000,000
     OBJECT CLASSIFICATION
A03   Operating Expenses                                                                             2,000,000
A08   Loans and Advances                               54,856,200,000      49,370,580,000      59,250,000,000
A09   Physical Assets                                                                                 3,000,000
               Total                                        54,856,200,000      49,370,580,000      59,255,000,000
                  (In Foreign Exchange)                             (54,856,200,000)                             (59,255,000,000)
            (Own Resources)
               (Foreign Aid)                                      (54,856,200,000)                             (59,255,000,000)
                  (In Local Currency)                                                       (49,370,580,000)
                                                  __________________________________________________

Page 402

NO. 125.- FC12N10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF          DEMANDS FOR GRANTS
              COMMUNICATION DIVISION
III.  - DETAILS are as follows :-
                                 No of Posts        2025-2026         2025-2026       2026-2027
                                       2025-26 2026-27       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
01     General Public Service:
014    Transfers:
0142   Transfers (Others):
014202 Trasfer To Non-financial institutions  :
IB3836 CAREC CORRIDOR DEVELOPMENT INVESTMENT PROGRAMME TRANCHE-I PROJECTS ADB
014202- A08    Loans and Advances                            1,000,000,000         2,500,000,000
014202- A085   Loans to Non Financial Institutions                1,000,000,000         2,500,000,000
        Total- CAREC CORRIDOR DEVELOPMENT           1,000,000,000       2,500,000,000
           INVESTMENT PROGRAMME TRANCHE-I
          PROJECTS ADB
                  (In Foreign Exchange)                          (1,000,000,000)
               (Foreign Aid)                                   (1,000,000,000)
                  (In Local Currency)                                                  (2,500,000,000)
                                                  __________________________________________________
IB3837 CONSTRUCTION OF ADDITIONAL CARRIAGE WAY SHIKARPUR-RANJANPUR SECTION ON N-55 CAREC
CORRIDOR (ADB)
014202- A08    Loans and Advances                            8,120,000,000         9,620,000,000         4,000,000,000
014202- A085   Loans to Non Financial Institutions                8,120,000,000         9,620,000,000         4,000,000,000
        Total- CONSTRUCTION OF ADDITIONAL             8,120,000,000       9,620,000,000       4,000,000,000
           CARRIAGE WAY
           SHIKARPUR-RANJANPUR SECTION ON
             N-55 CAREC CORRIDOR (ADB)
                  (In Foreign Exchange)                          (8,120,000,000)                          (4,000,000,000)
               (Foreign Aid)                                   (8,120,000,000)                          (4,000,000,000)
                  (In Local Currency)                                                  (9,620,000,000)
                                                  __________________________________________________
IB3838 CONSTRUCTION OF RAJANPUR-DG KHAN AS A 4-LANE HIGHWAY (ADB)
014202- A08    Loans and Advances                            6,000,000,000         6,000,000,000         4,500,000,000
014202- A085   Loans to Non Financial Institutions                6,000,000,000         6,000,000,000         4,500,000,000
        Total- CONSTRUCTION OF RAJANPUR-DG          6,000,000,000       6,000,000,000       4,500,000,000
          KHAN AS A 4-LANE HIGHWAY (ADB)
                  (In Foreign Exchange)                          (6,000,000,000)                          (4,500,000,000)
               (Foreign Aid)                                   (6,000,000,000)                          (4,500,000,000)
                  (In Local Currency)                                                  (6,000,000,000)
                                                  __________________________________________________

Page 403

NO. 125.- FC12N10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF          DEMANDS FOR GRANTS
              COMMUNICATION DIVISION
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB3839 D.G KHAN-D.I KHAN (ACW) (N-55)-245 KMS CAREC CORRIDOR ADB
014202- A08    Loans and Advances                            6,730,000,000         6,730,000,000         4,000,000,000
014202- A085   Loans to Non Financial Institutions                6,730,000,000         6,730,000,000         4,000,000,000
        Total- D.G KHAN-D.I KHAN (ACW) (N-55)-245         6,730,000,000       6,730,000,000       4,000,000,000
          KMS CAREC CORRIDOR ADB
                  (In Foreign Exchange)                          (6,730,000,000)                          (4,000,000,000)
               (Foreign Aid)                                   (6,730,000,000)                          (4,000,000,000)
                  (In Local Currency)                                                  (6,730,000,000)
                                                  __________________________________________________
IB3840 IMPROVEMENT AND WIDENING OF N-45 (130.22 KM)
014202- A08    Loans and Advances                             649,600,000          263,980,000          450,000,000
014202- A085   Loans to Non Financial Institutions                 649,600,000          263,980,000          450,000,000
        Total- IMPROVEMENT AND WIDENING OF N-45        649,600,000        263,980,000        450,000,000
               (130.22 KM)
                  (In Foreign Exchange)                           (649,600,000)                            (450,000,000)
               (Foreign Aid)                                    (649,600,000)                            (450,000,000)
                  (In Local Currency)                                                   (263,980,000)
                                                  __________________________________________________
IB3841 KHYBER PASS ECONOMIC CORRIDOR PROJECT REVISED WORLD BANK
014202- A08    Loans and Advances                            4,000,000,000         2,000,000,000         2,200,000,000
014202- A085   Loans to Non Financial Institutions                4,000,000,000         2,000,000,000         2,200,000,000
        Total- KHYBER PASS ECONOMIC CORRIDOR        4,000,000,000       2,000,000,000       2,200,000,000
          PROJECT REVISED WORLD BANK
                  (In Foreign Exchange)                          (4,000,000,000)                          (2,200,000,000)
               (Foreign Aid)                                   (4,000,000,000)                          (2,200,000,000)
                  (In Local Currency)                                                  (2,000,000,000)
                                                  __________________________________________________
IB3842 CONSTRUCTION OF CHAKDARA CHITRAL ROAD PROJECT (N-45) SECTION III KALKATAK CHITRAL (48KM)
014202- A08    Loans and Advances                            3,056,600,000          156,600,000          450,000,000
014202- A085   Loans to Non Financial Institutions                3,056,600,000          156,600,000          450,000,000
        Total- CONSTRUCTION OF CHAKDARA              3,056,600,000        156,600,000        450,000,000
           CHITRAL ROAD PROJECT (N-45)
           SECTION III KALKATAK CHITRAL
             (48KM)
                  (In Foreign Exchange)                          (3,056,600,000)                            (450,000,000)
               (Foreign Aid)                                   (3,056,600,000)                            (450,000,000)
                   (In Local Currency)                                                   (156,600,000)
                                                  __________________________________________________

Page 404

NO. 125.- FC12N10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF          DEMANDS FOR GRANTS
              COMMUNICATION DIVISION
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB3843 RELOCATION OF KARAKORUM HIGHWAY BETWEEN THAKOT & RAIKOT DUE TO CONSTRUCTION OF
DAMS ON RIVER
014202- A08    Loans and Advances                            6,000,000,000          300,000,000          500,000,000
014202- A085   Loans to Non Financial Institutions                6,000,000,000          300,000,000          500,000,000
        Total- RELOCATION OF KARAKORUM               6,000,000,000        300,000,000        500,000,000
          HIGHWAY BETWEEN THAKOT &
           RAIKOT DUE TO CONSTRUCTION OF
          DAMS ON RIVER
                  (In Foreign Exchange)                          (6,000,000,000)                            (500,000,000)
               (Foreign Aid)                                   (6,000,000,000)                            (500,000,000)
                  (In Local Currency)                                                   (300,000,000)
                                                  __________________________________________________
IB3844 CONSTRUCTION OF MUZAFFARABAD - MANSEHRA ROAD (26.6 KM APPROX)
014202- A08    Loans and Advances                            1,800,000,000         1,800,000,000          900,000,000
014202- A085   Loans to Non Financial Institutions                1,800,000,000         1,800,000,000          900,000,000
        Total- CONSTRUCTION OF MUZAFFARABAD -       1,800,000,000       1,800,000,000        900,000,000
          MANSEHRA ROAD (26.6 KM APPROX)
                  (In Foreign Exchange)                          (1,800,000,000)                            (900,000,000)
               (Foreign Aid)                                   (1,800,000,000)                            (900,000,000)
                  (In Local Currency)                                                  (1,800,000,000)
                                                  __________________________________________________
IB3845 REHABILITATION & RECONSTRUCTION OF N-5 FROM MORO TO RANIPUR KM. 318-404 (NBC/SBC) & 32 X
DAMAGED BRIDGES
014202- A08    Loans and Advances                            2,000,000,000         4,500,000,000         7,250,000,000
014202- A085   Loans to Non Financial Institutions                2,000,000,000         4,500,000,000         7,250,000,000
        Total- REHABILITATION & RECONSTRUCTION       2,000,000,000       4,500,000,000       7,250,000,000
          OF N-5 FROM MORO TO RANIPUR KM.
              318-404 (NBC/SBC) & 32 X DAMAGED
           BRIDGES
                  (In Foreign Exchange)                          (2,000,000,000)                          (7,250,000,000)
               (Foreign Aid)                                   (2,000,000,000)                          (7,250,000,000)
                  (In Local Currency)                                                  (4,500,000,000)
                                                  __________________________________________________

Page 405

NO. 125.- FC12N10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF          DEMANDS FOR GRANTS
              COMMUNICATION DIVISION
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB3846 CHINA AIDED PROJECTS OF PAKISTAN NATIONAL HIGHWAY N-5 SECTIONAL REHABILITATION
HALA-MORO 66 KM
014202- A08    Loans and Advances                            1,500,000,000         1,500,000,000         2,000,000,000
014202- A085   Loans to Non Financial Institutions                1,500,000,000         1,500,000,000         2,000,000,000
        Total- CHINA AIDED PROJECTS OF PAKISTAN       1,500,000,000       1,500,000,000       2,000,000,000
           NATIONAL HIGHWAY N-5 SECTIONAL
            REHABILITATION HALA-MORO 66 KM
                  (In Foreign Exchange)                          (1,500,000,000)                          (2,000,000,000)
               (Foreign Aid)                                   (1,500,000,000)                          (2,000,000,000)
                  (In Local Currency)                                                  (1,500,000,000)
                                                  __________________________________________________
IB3847 CONSTRUCTION OF HYDERABAD -SUKKUR (306 KM) 6-LANE DIVIDED FENCED MOTORWAY ON BUILD
OPERATE TRANSFER (BOT)
014202- A08    Loans and Advances                           14,000,000,000        14,000,000,000        28,000,000,000
014202- A085   Loans to Non Financial Institutions               14,000,000,000        14,000,000,000        28,000,000,000
        Total- CONSTRUCTION OF HYDERABAD           14,000,000,000      14,000,000,000      28,000,000,000
           -SUKKUR (306 KM) 6-LANE DIVIDED
          FENCED MOTORWAY ON BUILD
          OPERATE TRANSFER (BOT)
                  (In Foreign Exchange)                         (14,000,000,000)                         (28,000,000,000)
               (Foreign Aid)                                 (14,000,000,000)                         (28,000,000,000)
                  (In Local Currency)                                                (14,000,000,000)
                                                  __________________________________________________
IB4903 WIDENING AND IMPROVEMENT OF PRIORITY SECTIONS ON N5(PHASE I)(210 KM) PHASEI-A SECTION 2
RANIPUR SUKKUR
014202- A08    Loans and Advances                                                                        5,000,000,000
014202- A085   Loans to Non Financial Institutions                                                            5,000,000,000
        Total- WIDENING AND IMPROVEMENT OF                                                   5,000,000,000
            PRIORITY SECTIONS ON N5(PHASE
                I)(210 KM) PHASEI-A SECTION 2
           RANIPUR SUKKUR
                  (In Foreign Exchange)                                                                    (5,000,000,000)
               (Foreign Aid)                                                                            (5,000,000,000)
                                                  __________________________________________________
     014202   Total-  Trasfer To Non-financial institutions      54,856,200,000      49,370,580,000      59,250,000,000
     0142     Total-  Transfers (Others)                     54,856,200,000      49,370,580,000      59,250,000,000

Page 406

NO. 125.- FC12N10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF          DEMANDS FOR GRANTS
              COMMUNICATION DIVISION
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

     014      Total-  Transfers                             54,856,200,000      49,370,580,000      59,250,000,000
     01        Total-  General Public Service                 54,856,200,000      49,370,580,000      59,250,000,000
04     Economic Affairs:
045    Construction and Transport:
0452   Road Transport:
045201 Administration  :
IB4906 AUTOMATION OF POST OFFICE
045201- A03    Operating Expenses                                                                             2,000,000
045201- A031   Fees                                                                                           500,000
045201- A037   Consultancy and Contractual Work                                                               1,500,000
045201- A09    Physical Assets                                                                                 3,000,000
045201- A092   Computer Equipment                                                                             3,000,000
        Total- AUTOMATION OF POST OFFICE                                                          5,000,000
                  (In Foreign Exchange)                                                                         (5,000,000)
               (Foreign Aid)                                                                                  (5,000,000)
                                                  __________________________________________________
     045201   Total-  Administration                                                                     5,000,000
     0452     Total-  Road Transport                                                                    5,000,000
     045      Total-  Construction and Transport                                                         5,000,000
     04        Total-  Economic Affairs                                                                   5,000,000
               Total- ACCOUNTANT GENERAL                54,856,200,000        49,370,580,000        59,255,000,000
                PAKISTAN REVENUES
                       (In Foreign Exchange)                         (54,856,200,000)                             (59,255,000,000)
               (Own Resources)
                   (Foreign Aid)                                  (54,856,200,000)                             (59,255,000,000)
                       (In Local Currency)                                                  (49,370,580,000)
          TOTAL - DEMAND                           54,856,200,000      49,370,580,000      59,255,000,000
                  (In Foreign Exchange)                         (54,856,200,000)                         (59,255,000,000)
            (Own Resources)
               (Foreign Aid)                                 (54,856,200,000)                         (59,255,000,000)
                  (In Local Currency)                                                (49,370,580,000)
                                                  __________________________________________________

Page 407

                                   SECTION III

                                 MINISTRY OF ENERGY
                                                            **********
                                                                                  2026-2027
                                                                             Budget
                                                                                    Estimate

                                                                      (Rupees in Thousand)

Demands presented on behalf of the
Ministry of Energy

Development Expenditure on Capital Account.
             126.  Capital Outlay on Petroleum Division                                      311,800
             127.  External Development Loans and Advances                              76,607,502
                    of Power Division

                                                                          Total :             76,919,302

Page 408

No text layer on this page, see the official PDF.

Page 409

NO. 126.- CAPITAL OUTLAY ON PETROLEUM DIVISION                        DEMANDS FOR GRANTS
                                DEMAND NO. 126
                                                                            ( FC12C50 )
                           CAPITAL OUTLAY ON PETROLEUM DIVISION

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2027 to defray the Salaries and Other
Expenses of the CAPITAL OUTLAY ON PETROLEUM DIVISION.

                                Voted           Rs. 311,800,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF ENERGY  .

                                                           2025-2026         2025-2026         2026-2027
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
041    General Economic,Commercial & Labour Affairs              718,580,000          368,287,000          311,800,000
043    Fuel and Energy                                                                  244,426,000
               Total                                                718,580,000          612,713,000          311,800,000
     OBJECT CLASSIFICATION
A01   Employees Related Expenses                           90,000,000         70,167,000         37,000,000
A011  Pay                                                          65,000,000            50,167,000            30,000,000
A011-1 Pay of Officers                                                 (65,000,000)           (50,167,000)           (30,000,000)
A012  Allowances                                                   25,000,000            20,000,000             7,000,000
A012-1 Regular Allowances                                            (15,000,000)           (15,000,000)            (5,000,000)
A012-2 Other Allowances (Excluding TA)                              (10,000,000)            (5,000,000)            (2,000,000)
A03   Operating Expenses                                  358,980,000        218,346,000        123,764,000
A09   Physical Assets                                      266,200,000        310,607,000        144,700,000
A12    Civil works                                                                  6,193,000
A13   Repairs and Maintenance                                3,400,000           7,400,000           6,336,000
               Total                                          718,580,000        612,713,000        311,800,000

Page 410

NO. 126.- FC12C50 CAPITAL OUTLAY ON PETROLEUM DIVISION                  DEMANDS FOR GRANTS

III.  - DETAILS are as follows :-
                                 No of Posts        2025-2026         2025-2026       2026-2027
                                       2025-26 2026-27       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
04     Economic Affairs:
043    Fuel and Energy:
0432   Petroleum and Natural Gas:
043202 PETROLEUM AND NATURAL GAS  :
ID9681 EXPAN. & UPGRADATION OF PAKISTAN PETROLEUM CORE HONE (PETCORE) FOR ITS SUSTAINABLE
OPERATIONS TO
043202- A09    Physical Assets                                                        238,233,000
043202- A096   Purchase of Plant and Machinery                                        238,233,000
043202- A12     Civil works                                                                 6,193,000
043202- A124    Building and Structures                                                     6,193,000
        Total- EXPAN. & UPGRADATION OF PAKISTAN                           244,426,000
          PETROLEUM CORE HONE (PETCORE)
          FOR ITS SUSTAINABLE OPERATIONS
          TO
     043202   Total-  PETROLEUM AND NATURAL                               244,426,000
               GAS
     0432     Total-  Petroleum and Natural Gas                                   244,426,000
     043      Total-  Fuel and Energy                                            244,426,000
     04        Total-  Economic Affairs                                            244,426,000
               Total- ACCOUNTANT GENERAL                                        244,426,000
                PAKISTAN REVENUES

Page 411

NO. 126.- FC12C50 CAPITAL OUTLAY ON PETROLEUM DIVISION                  DEMANDS FOR GRANTS
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

04     Economic Affairs:
041    General Economic,Commercial & Labour Affairs:
0411   General Economic Affairs:
041103 Geological Survey  :
QA0702 ACCELERATED GEOLOGICAL MAPPING USING MODERN SATELLITE IMAGING- BASED TECHNOLOGIES
FOR UNMAPPED AREAS IN
041103- A01    Employees Related Expenses                      90,000,000            70,167,000            37,000,000
041103- A011   Pay                      32     32           65,000,000            50,167,000            30,000,000
041103- A011-1 Pay of Officers               (32)    (32)         (65,000,000)         (50,167,000)         (30,000,000)
041103- A012   Allowances                                         25,000,000            20,000,000             7,000,000
041103- A012-1  Regular Allowances                             (15,000,000)         (15,000,000)          (5,000,000)
041103- A012-2  Other Allowances (Excluding TA)                 (10,000,000)          (5,000,000)          (2,000,000)
041103- A03    Operating Expenses                              358,980,000          218,346,000          123,764,000
041103- A032   Communications                                     1,850,000              850,000             1,600,000
041103- A033     Utilities                                               1,200,000             1,300,000             1,500,000
041103- A034   Occupancy Costs                                                           1,620,000
041103- A036   Motor Vehicles                                                             2,670,000             1,500,000
041103- A038    Travel & Transportation                            169,600,000            65,143,000            11,200,000
041103- A039   General                                           186,330,000          146,763,000          107,964,000
041103- A09    Physical Assets                                   266,200,000            72,374,000          144,700,000
041103- A092   Computer Equipment                              110,000,000            30,060,000            94,500,000
041103- A095   Purchase of Transport                              24,000,000                                   200,000
041103- A096   Purchase of Plant and Machinery                  132,000,000            41,514,000            50,000,000
041103- A097   Purchase of Furniture and Fixture                     200,000              800,000
041103- A13    Repairs and Maintenance                            3,400,000             7,400,000             6,336,000
041103- A130    Transport                                             1,000,000             5,000,000             5,000,000
041103- A131   Machinery and Equipment                            1,000,000             1,000,000             1,000,000
041103- A132    Furniture and Fixture                                  500,000              500,000
041103- A137   Computer Equipment                                 900,000              900,000              336,000
        Total- ACCELERATED GEOLOGICAL MAPPING        718,580,000        368,287,000        311,800,000
           USING MODERN SATELLITE IMAGING-
          BASED TECHNOLOGIES FOR
          UNMAPPED AREAS IN

Page 412

NO. 126.- FC12C50 CAPITAL OUTLAY ON PETROLEUM DIVISION                  DEMANDS FOR GRANTS
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

     041103   Total-  Geological Survey                       718,580,000        368,287,000        311,800,000
     0411     Total-  General Economic Affairs                 718,580,000        368,287,000        311,800,000
     041      Total-  General Economic,Commercial &          718,580,000        368,287,000        311,800,000
                     Labour Affairs
     04        Total-  Economic Affairs                        718,580,000        368,287,000        311,800,000
               Total- ACCOUNTANT GENERAL                  718,580,000          368,287,000          311,800,000
                PAKISTAN REVENUES
                  SUB-OFFICE, QUETTA
          TOTAL - DEMAND                              718,580,000        612,713,000        311,800,000

Page 413

NO. 127.- EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER DIVISION    DEMANDS FOR GRANTS
                                DEMAND NO. 127
                                                                            ( FC12P10 )
              EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER DIVISION

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2027 for EXTERNAL DEVELOPMENT
LOANS AND ADVANCES OF POWER DIVISION.

                                Voted           Rs. 76,607,502,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF ENERGY  .

                                                           2025-2026         2025-2026         2026-2027
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
014    Transfers                                                 72,106,914,000        63,131,336,000        76,607,502,000
               Total                                              72,106,914,000        63,131,336,000        76,607,502,000
     OBJECT CLASSIFICATION
A08   Loans and Advances                               72,106,914,000      63,131,336,000      76,607,502,000
               Total                                        72,106,914,000      63,131,336,000      76,607,502,000
                  (In Foreign Exchange)                             (72,106,914,000)
            (Own Resources)
               (Foreign Aid)                                      (72,106,914,000)
                  (In Local Currency)                                                       (63,131,336,000)       (76,607,502,000)
                                                  __________________________________________________

Page 414

NO. 127.- FC12P10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER    DEMANDS FOR GRANTS
                 DIVISION
III.  - DETAILS are as follows :-
                                 No of Posts        2025-2026         2025-2026       2026-2027
                                       2025-26 2026-27       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
01     General Public Service:
014    Transfers:
0142   Transfers (Others):
014202 Trasfer To Non-financial institutions  :
IB3866 INSTALLATION OF ASSETS PERFORMANCE MANAGEMENT SYSTEM ON 100K AND 200KV DISTRIBUTION
TRANSFORMERS
014202- A08    Loans and Advances                            1,599,000,000         1,599,000,000
014202- A085   Loans to Non Financial Institutions                1,599,000,000         1,599,000,000
        Total- INSTALLATION OF ASSETS                   1,599,000,000       1,599,000,000
          PERFORMANCE MANAGEMENT
          SYSTEM ON 100K AND 200KV
            DISTRIBUTION TRANSFORMERS
                  (In Foreign Exchange)                          (1,599,000,000)
               (Foreign Aid)                                   (1,599,000,000)
                  (In Local Currency)                                                  (1,599,000,000)
                                                  __________________________________________________
IB3867 EXTENSION AND AUGMENTATION OF 500KV AND 2 KV TRANSFORMERS AT THE EXISTING GRID STATION
FOR REMOVAL OF NTDC
014202- A08    Loans and Advances                            4,000,000,000         4,000,000,000         2,438,560,000
014202- A085   Loans to Non Financial Institutions                4,000,000,000         4,000,000,000         2,438,560,000
        Total- EXTENSION AND AUGMENTATION OF         4,000,000,000       4,000,000,000       2,438,560,000
            500KV AND 2 KV TRANSFORMERS AT
           THE EXISTING GRID STATION FOR
          REMOVAL OF NTDC
                  (In Foreign Exchange)                          (4,000,000,000)
               (Foreign Aid)                                   (4,000,000,000)
                  (In Local Currency)                                                  (4,000,000,000)      (2,438,560,000)
                                                  __________________________________________________
IB3868 THERMAL FOR INSTALLATION OF NEW COAL FIRED POWER PLANT HAVING CAPACITY 2X660 MW AT
JAMSHORO
014202- A08    Loans and Advances                            1,575,000,000
014202- A085   Loans to Non Financial Institutions                1,575,000,000
        Total- THERMAL FOR INSTALLATION OF NEW       1,575,000,000
          COAL FIRED POWER PLANT HAVING
           CAPACITY 2X660 MW AT JAMSHORO
                  (In Foreign Exchange)                          (1,575,000,000)

Page 415

NO. 127.- FC12P10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER    DEMANDS FOR GRANTS
                 DIVISION
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

               (Foreign Aid)                                   (1,575,000,000)
                                                  __________________________________________________
IB3869 DI KHAN-ZHOB T/L AND ZHOB S/S
014202- A08    Loans and Advances                             418,000,000          418,000,000          100,000,000
014202- A085   Loans to Non Financial Institutions                 418,000,000          418,000,000          100,000,000
        Total-  DI KHAN-ZHOB T/L AND ZHOB S/S             418,000,000        418,000,000        100,000,000
                  (In Foreign Exchange)                           (418,000,000)
               (Foreign Aid)                                    (418,000,000)
                  (In Local Currency)                                                   (418,000,000)       (100,000,000)
                                                  __________________________________________________
IB3870 220KV MIRPUR KHAS G/S & T/L
014202- A08    Loans and Advances                            3,000,000,000         3,000,000,000         2,150,000,000
014202- A085   Loans to Non Financial Institutions                3,000,000,000         3,000,000,000         2,150,000,000
        Total- 220KV MIRPUR KHAS G/S & T/L               3,000,000,000       3,000,000,000       2,150,000,000
                  (In Foreign Exchange)                          (3,000,000,000)
               (Foreign Aid)                                   (3,000,000,000)
                  (In Local Currency)                                                  (3,000,000,000)      (2,150,000,000)
                                                  __________________________________________________
IB3872 UPGRADATION OF NTDC SCADA SYSTEM
014202- A08    Loans and Advances                             998,000,000          998,000,000         3,500,000,000
014202- A085   Loans to Non Financial Institutions                 998,000,000          998,000,000         3,500,000,000
        Total- UPGRADATION OF NTDC SCADA               998,000,000        998,000,000       3,500,000,000
          SYSTEM
                  (In Foreign Exchange)                           (998,000,000)
               (Foreign Aid)                                    (998,000,000)
                  (In Local Currency)                                                   (998,000,000)      (3,500,000,000)
                                                  __________________________________________________
IB3873 EVACUATION OF POWER FROM 500 MW WIND POWER PLANTS JHIMPIR & GHARO CLUSTERS
014202- A08    Loans and Advances                             800,000,000          800,000,000          544,533,000
014202- A085   Loans to Non Financial Institutions                 800,000,000          800,000,000          544,533,000
        Total- EVACUATION OF POWER FROM 500 MW        800,000,000        800,000,000        544,533,000
           WIND POWER PLANTS JHIMPIR &
          GHARO CLUSTERS
                  (In Foreign Exchange)                           (800,000,000)
               (Foreign Aid)                                    (800,000,000)

Page 416

NO. 127.- FC12P10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER    DEMANDS FOR GRANTS
                 DIVISION
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

                  (In Local Currency)                                                   (800,000,000)       (544,533,000)
                                                  __________________________________________________
IB3874 ADVANCE METERING PROJECT FOR IESCO
014202- A08    Loans and Advances                            2,940,000,000          466,162,000
014202- A085   Loans to Non Financial Institutions                2,940,000,000          466,162,000
        Total- ADVANCE METERING PROJECT FOR         2,940,000,000        466,162,000
           IESCO
                  (In Foreign Exchange)                          (2,940,000,000)
               (Foreign Aid)                                   (2,940,000,000)
                  (In Local Currency)                                                   (466,162,000)
                                                  __________________________________________________
IB3875 200 KV JAUHARABAD G/S
014202- A08    Loans and Advances                            1,500,000,000         1,500,000,000         1,150,000,000
014202- A085   Loans to Non Financial Institutions                1,500,000,000         1,500,000,000         1,150,000,000
        Total- 200 KV JAUHARABAD G/S                    1,500,000,000       1,500,000,000       1,150,000,000
                  (In Foreign Exchange)                          (1,500,000,000)
               (Foreign Aid)                                   (1,500,000,000)
                  (In Local Currency)                                                  (1,500,000,000)      (1,150,000,000)
                                                  __________________________________________________
IB3876 500 KV LAHORE NORTH
014202- A08    Loans and Advances                            1,000,000,000         1,000,000,000          700,000,000
014202- A085   Loans to Non Financial Institutions                1,000,000,000         1,000,000,000          700,000,000
        Total- 500 KV LAHORE NORTH                      1,000,000,000       1,000,000,000        700,000,000
                  (In Foreign Exchange)                          (1,000,000,000)
               (Foreign Aid)                                   (1,000,000,000)
                  (In Local Currency)                                                  (1,000,000,000)       (700,000,000)
                                                  __________________________________________________
IB3877 ELECTRICITY TRANS & TRADE PRO CASA
014202- A08    Loans and Advances                            3,000,000,000         3,000,000,000         5,113,510,000
014202- A085   Loans to Non Financial Institutions                3,000,000,000         3,000,000,000         5,113,510,000
        Total- ELECTRICITY TRANS & TRADE PRO          3,000,000,000       3,000,000,000       5,113,510,000
          CASA
                  (In Foreign Exchange)                          (3,000,000,000)
               (Foreign Aid)                                   (3,000,000,000)
                  (In Local Currency)                                                  (3,000,000,000)      (5,113,510,000)
                                                  __________________________________________________

Page 417

NO. 127.- FC12P10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER    DEMANDS FOR GRANTS
                 DIVISION
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB3878 220 KV TRANSMISSION LINE REINFORCEMENT OF ISLAMABAD BURHAN TRANSMISSION LINE
014202- A08    Loans and Advances                            1,200,000,000          800,000,000          959,155,000
014202- A085   Loans to Non Financial Institutions                1,200,000,000          800,000,000          959,155,000
        Total- 220 KV TRANSMISSION LINE                  1,200,000,000        800,000,000        959,155,000
           REINFORCEMENT OF ISLAMABAD
          BURHAN TRANSMISSION LINE
                  (In Foreign Exchange)                          (1,200,000,000)
               (Foreign Aid)                                   (1,200,000,000)
                  (In Local Currency)                                                   (800,000,000)       (959,155,000)
                                                  __________________________________________________
IB3879 500 KV CHAKWAL G/S ALONG WITH ALLIED T/LS
014202- A08    Loans and Advances                             200,000,000          100,000,000            77,227,000
014202- A085   Loans to Non Financial Institutions                 200,000,000          100,000,000            77,227,000
        Total- 500 KV CHAKWAL G/S ALONG WITH            200,000,000        100,000,000          77,227,000
            ALLIED T/LS
                  (In Foreign Exchange)                           (200,000,000)
               (Foreign Aid)                                    (200,000,000)
                  (In Local Currency)                                                   (100,000,000)         (77,227,000)
                                                  __________________________________________________
IB3880 EVACUATION OF POWER FROM TERBELLA 5TH EXTENSION
014202- A08    Loans and Advances                             840,000,000          840,000,000          442,000,000
014202- A085   Loans to Non Financial Institutions                 840,000,000          840,000,000          442,000,000
        Total- EVACUATION OF POWER FROM               840,000,000        840,000,000        442,000,000
           TERBELLA 5TH EXTENSION
                  (In Foreign Exchange)                           (840,000,000)
               (Foreign Aid)                                    (840,000,000)
                  (In Local Currency)                                                   (840,000,000)       (442,000,000)
                                                  __________________________________________________
IB3881 500 KV ISLAMABAD WEST
014202- A08    Loans and Advances                            5,000,000,000         5,000,000,000         4,382,868,000
014202- A085   Loans to Non Financial Institutions                5,000,000,000         5,000,000,000         4,382,868,000
        Total- 500 KV ISLAMABAD WEST                    5,000,000,000       5,000,000,000       4,382,868,000
                  (In Foreign Exchange)                          (5,000,000,000)
               (Foreign Aid)                                   (5,000,000,000)
                  (In Local Currency)                                                  (5,000,000,000)      (4,382,868,000)
                                                  __________________________________________________

Page 418

NO. 127.- FC12P10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER    DEMANDS FOR GRANTS
                 DIVISION
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB3882 ENHANCEMENT IN TRANSFORMATION CAPACITY OF NTDC SYSTEM BY EXTENSION & AUGMENTATION
OF EXISTING GRID
014202- A08    Loans and Advances                            2,500,000,000         2,500,000,000
014202- A085   Loans to Non Financial Institutions                2,500,000,000         2,500,000,000
        Total- ENHANCEMENT IN TRANSFORMATION       2,500,000,000       2,500,000,000
           CAPACITY OF NTDC SYSTEM BY
           EXTENSION & AUGMENTATION OF
            EXISTING GRID
                  (In Foreign Exchange)                          (2,500,000,000)
               (Foreign Aid)                                   (2,500,000,000)
                  (In Local Currency)                                                  (2,500,000,000)
                                                  __________________________________________________
IB3883 ENTERPRISE RESOURCE PLANNING AUTOMATION
014202- A08    Loans and Advances                            1,629,614,000         1,341,484,000          492,150,000
014202- A085   Loans to Non Financial Institutions                1,629,614,000         1,341,484,000          492,150,000
        Total- ENTERPRISE RESOURCE PLANNING         1,629,614,000       1,341,484,000        492,150,000
          AUTOMATION
                  (In Foreign Exchange)                          (1,629,614,000)
               (Foreign Aid)                                   (1,629,614,000)
                  (In Local Currency)                                                  (1,341,484,000)       (492,150,000)
                                                  __________________________________________________
IB3884 EVACUATION OF POWER FROM 2160MW DASU HPP STAGE I
014202- A08    Loans and Advances                           10,970,000,000        10,970,000,000         5,828,513,000
014202- A085   Loans to Non Financial Institutions               10,970,000,000        10,970,000,000         5,828,513,000
        Total- EVACUATION OF POWER FROM             10,970,000,000      10,970,000,000       5,828,513,000
           2160MW DASU HPP STAGE I
                  (In Foreign Exchange)                         (10,970,000,000)
               (Foreign Aid)                                 (10,970,000,000)
                  (In Local Currency)                                                (10,970,000,000)      (5,828,513,000)
                                                  __________________________________________________
IB3885 220 KV ARIFWALA SUBSTATION
014202- A08    Loans and Advances                            1,200,000,000         1,200,000,000          984,640,000
014202- A085   Loans to Non Financial Institutions                1,200,000,000         1,200,000,000          984,640,000
        Total- 220 KV ARIFWALA SUBSTATION              1,200,000,000       1,200,000,000        984,640,000
                  (In Foreign Exchange)                          (1,200,000,000)

Page 419

NO. 127.- FC12P10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER    DEMANDS FOR GRANTS
                 DIVISION
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

               (Foreign Aid)                                   (1,200,000,000)
                  (In Local Currency)                                                  (1,200,000,000)       (984,640,000)
                                                  __________________________________________________
IB3886 500 KV VEHARI GRID STATION
014202- A08    Loans and Advances                            2,000,000,000         2,000,000,000         1,392,053,000
014202- A085   Loans to Non Financial Institutions                2,000,000,000         2,000,000,000         1,392,053,000
        Total- 500 KV VEHARI GRID STATION                2,000,000,000       2,000,000,000       1,392,053,000
                  (In Foreign Exchange)                          (2,000,000,000)
               (Foreign Aid)                                   (2,000,000,000)
                  (In Local Currency)                                                  (2,000,000,000)      (1,392,053,000)
                                                  __________________________________________________
IB3887 INSTALLATION OF PILOT BATTERY ENERGY STORAGE SYSTEM BESS AT 220 KV JHIMPIR G/STATION
014202- A08    Loans and Advances                            1,700,000,000         1,700,000,000          500,000,000
014202- A085   Loans to Non Financial Institutions                1,700,000,000         1,700,000,000          500,000,000
        Total- INSTALLATION OF PILOT BATTERY           1,700,000,000       1,700,000,000        500,000,000
          ENERGY STORAGE SYSTEM BESS AT
             220 KV JHIMPIR G/STATION
                  (In Foreign Exchange)                          (1,700,000,000)
               (Foreign Aid)                                   (1,700,000,000)
                  (In Local Currency)                                                  (1,700,000,000)       (500,000,000)
                                                  __________________________________________________
IB3888 EVACUATION OF POWER FROM SUKI KINARI KOHALA MAHAL HPPS NTDC
014202- A08    Loans and Advances                            3,500,000,000         3,500,000,000         3,000,000,000
014202- A085   Loans to Non Financial Institutions                3,500,000,000         3,500,000,000         3,000,000,000
        Total- EVACUATION OF POWER FROM SUKI         3,500,000,000       3,500,000,000       3,000,000,000
            KINARI KOHALA MAHAL HPPS NTDC
                  (In Foreign Exchange)                          (3,500,000,000)
               (Foreign Aid)                                   (3,500,000,000)
                  (In Local Currency)                                                  (3,500,000,000)      (3,000,000,000)
                                                  __________________________________________________
IB3889 500 220 KV SIALKOT SUB STATION NTDC
014202- A08    Loans and Advances                            2,500,000,000         2,500,000,000         4,741,547,000
014202- A085   Loans to Non Financial Institutions                2,500,000,000         2,500,000,000         4,741,547,000
        Total- 500 220 KV SIALKOT SUB STATION           2,500,000,000       2,500,000,000       4,741,547,000
          NTDC
                  (In Foreign Exchange)                          (2,500,000,000)

Page 420

NO. 127.- FC12P10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER    DEMANDS FOR GRANTS
                 DIVISION
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

               (Foreign Aid)                                   (2,500,000,000)
                  (In Local Currency)                                                  (2,500,000,000)      (4,741,547,000)
                                                  __________________________________________________
IB3890 220KV DHARKI RAHIM YAR KHAN BHAWALPUR D/C T/L NTDC
014202- A08    Loans and Advances                            5,000,000,000         5,000,000,000         1,044,533,000
014202- A085   Loans to Non Financial Institutions                5,000,000,000         5,000,000,000         1,044,533,000
        Total- 220KV DHARKI RAHIM YAR KHAN             5,000,000,000       5,000,000,000       1,044,533,000
          BHAWALPUR D/C T/L NTDC
                  (In Foreign Exchange)                          (5,000,000,000)
               (Foreign Aid)                                   (5,000,000,000)
                  (In Local Currency)                                                  (5,000,000,000)      (1,044,533,000)
                                                  __________________________________________________
IB3891 ELECTRICITY DISTRIBUTION EFFICIENCY ELECTRICITY DISTRIBU IMPROVEMENT PROJECT
014202- A08    Loans and Advances                            3,150,000,000         1,260,000,000          965,333,000
014202- A085   Loans to Non Financial Institutions                3,150,000,000         1,260,000,000          965,333,000
        Total- ELECTRICITY DISTRIBUTION                 3,150,000,000       1,260,000,000        965,333,000
            EFFICIENCY ELECTRICITY DISTRIBU
          IMPROVEMENT PROJECT
                  (In Foreign Exchange)                          (3,150,000,000)
               (Foreign Aid)                                   (3,150,000,000)
                  (In Local Currency)                                                  (1,260,000,000)       (965,333,000)
                                                  __________________________________________________
IB3893 220-KV JAMRUD G/S ALONGWITH ALLIED T/LS
014202- A08    Loans and Advances                            1,500,000,000          200,000,000
014202- A085   Loans to Non Financial Institutions                1,500,000,000          200,000,000
        Total- 220-KV JAMRUD G/S ALONGWITH            1,500,000,000        200,000,000
            ALLIED T/LS
                  (In Foreign Exchange)                          (1,500,000,000)
               (Foreign Aid)                                   (1,500,000,000)
                  (In Local Currency)                                                   (200,000,000)
                                                  __________________________________________________
IB3894 EVACUATION OF POWER FROM 816 MW MOHMAND DAM
014202- A08    Loans and Advances                            2,000,000,000         2,000,000,000         3,900,000,000
014202- A085   Loans to Non Financial Institutions                2,000,000,000         2,000,000,000         3,900,000,000
        Total- EVACUATION OF POWER FROM 816 MW      2,000,000,000       2,000,000,000       3,900,000,000
         MOHMAND DAM

Page 421

NO. 127.- FC12P10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER    DEMANDS FOR GRANTS
                 DIVISION
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

                  (In Foreign Exchange)                          (2,000,000,000)
               (Foreign Aid)                                   (2,000,000,000)
                  (In Local Currency)                                                  (2,000,000,000)      (3,900,000,000)
                                                  __________________________________________________
     014202   Total-  Trasfer To Non-financial institutions      65,719,614,000      57,692,646,000      44,406,622,000

     0142     Total-  Transfers (Others)                     65,719,614,000      57,692,646,000      44,406,622,000
     014      Total-  Transfers                             65,719,614,000      57,692,646,000      44,406,622,000
     01        Total-  General Public Service                 65,719,614,000      57,692,646,000      44,406,622,000
               Total- ACCOUNTANT GENERAL                65,719,614,000        57,692,646,000        44,406,622,000
                PAKISTAN REVENUES
                       (In Foreign Exchange)                         (65,719,614,000)
               (Own Resources)
                   (Foreign Aid)                                  (65,719,614,000)
                       (In Local Currency)                                                  (57,692,646,000)       (44,406,622,000)

Page 422

NO. 127.- FC12P10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER    DEMANDS FOR GRANTS
                 DIVISION
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                              Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

01     General Public Service:
014    Transfers:
0142   Transfers (Others):
014202 Trasfer To Non-financial institutions  :
LO1675 POWER DISTRIBUTION STRENTHENING PROJECT (LESCO)
014202- A08    Loans and Advances                                                                        2,595,330,000
014202- A085   Loans to Non Financial Institutions                                                            2,595,330,000
        Total- POWER DISTRIBUTION STRENTHENING                                              2,595,330,000
           PROJECT (LESCO)
LO1676 SUPPLY. INSTALLATION TESTING & COMMISSIONING OF ASSET PERFORMANCE MANAGENMENT
SYSTENMS (APMS) FOR
014202- A08    Loans and Advances                                                                        1,223,270,000
014202- A085   Loans to Non Financial Institutions                                                            1,223,270,000
        Total- SUPPLY. INSTALLATION TESTING &                                                  1,223,270,000
           COMMISSIONING OF ASSET
          PERFORMANCE MANAGENMENT
           SYSTENMS (APMS) FOR
LO1677 500KV DOUBLE CIRCUIT TRANSMISSION LINE FROM GHAZI BROTHA TO FAISALABAD WEST
014202- A08    Loans and Advances                                                                        2,608,061,000
014202- A085   Loans to Non Financial Institutions                                                            2,608,061,000
        Total- 500KV DOUBLE CIRCUIT                                                             2,608,061,000
           TRANSMISSION LINE FROM GHAZI
          BROTHA TO FAISALABAD WEST
LO1678 INSTALLATION OF REACTIVE POWER COMPENSATION DEVICES (STATCOM) IN NGC NETWORK
014202- A08    Loans and Advances                                                                       10,233,119,000
014202- A085   Loans to Non Financial Institutions                                                          10,233,119,000
        Total- INSTALLATION OF REACTIVE POWER                                               10,233,119,000
           COMPENSATION DEVICES (STATCOM)
               IN NGC NETWORK
LO1679 BESS FOR FREQUENCY REGULATION
014202- A08    Loans and Advances                                                                        3,027,286,000
014202- A085   Loans to Non Financial Institutions                                                            3,027,286,000
        Total- BESS FOR FREQUENCY REGULATION                                                3,027,286,000
LO1680 CAPACITY BUILDING FOR PREPARATION AND IMPLEMENTATION OF THE BOOSTING ENERGY SECURITY
THROUGH
014202- A08    Loans and Advances                                                                        550,163,000
014202- A085   Loans to Non Financial Institutions                                                            550,163,000

Page 423

NO. 127.- FC12P10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER    DEMANDS FOR GRANTS
                 DIVISION
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE
        Total- CAPACITY BUILDING FOR                                                            550,163,000
           PREPARATION AND IMPLEMENTATION
          OF THE BOOSTING ENERGY SECURITY
          THROUGH
LO1681 SUPPLY FOR THREE PHASE AMI METERS UNDER ADB POWER DISTRIBUTION STRENGTHENING
PROJECT-LL (LESCO)
014202- A08    Loans and Advances                                                                        599,515,000
014202- A085   Loans to Non Financial Institutions                                                            599,515,000
        Total- SUPPLY FOR THREE PHASE AMI                                                     599,515,000
          METERS UNDER ADB POWER
            DISTRIBUTION STRENGTHENING
           PROJECT-LL (LESCO)
MN0148 ELECTRICITY DISTRIBUTION EFFICIENCY IMPROVEMENT PROJECT
014202- A08    Loans and Advances                            1,770,000,000         1,770,000,000         3,189,462,000
014202- A085   Loans to Non Financial Institutions                1,770,000,000         1,770,000,000         3,189,462,000
        Total- ELECTRICITY DISTRIBUTION                 1,770,000,000       1,770,000,000       3,189,462,000
            EFFICIENCY IMPROVEMENT PROJECT
                  (In Foreign Exchange)                          (1,770,000,000)
               (Foreign Aid)                                   (1,770,000,000)
                  (In Local Currency)                                                  (1,770,000,000)      (3,189,462,000)
                                                  __________________________________________________
MN0377 POWER DISTRIBUTION STRENTHENING PROJECT (MEPCO)
014202- A08    Loans and Advances                                                                        1,892,053,000
014202- A085   Loans to Non Financial Institutions                                                            1,892,053,000
        Total- POWER DISTRIBUTION STRENTHENING                                              1,892,053,000
          PROJECT (MEPCO)
     014202   Total-  Trasfer To Non-financial institutions       1,770,000,000       1,770,000,000      25,918,259,000
     0142     Total-  Transfers (Others)                      1,770,000,000       1,770,000,000      25,918,259,000
     014      Total-  Transfers                              1,770,000,000       1,770,000,000      25,918,259,000
     01        Total-  General Public Service                  1,770,000,000       1,770,000,000      25,918,259,000
               Total- ACCOUNTANT GENERAL                 1,770,000,000         1,770,000,000        25,918,259,000
                PAKISTAN REVENUES
                  SUB-OFFICE, LAHORE
                       (In Foreign Exchange)                          (1,770,000,000)
               (Own Resources)
                   (Foreign Aid)                                    (1,770,000,000)
                       (In Local Currency)                                                    (1,770,000,000)       (25,918,259,000)

Page 424

NO. 127.- FC12P10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER    DEMANDS FOR GRANTS
                 DIVISION
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

              ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR
01     General Public Service:
014    Transfers:
0142   Transfers (Others):
014202 Trasfer To Non-financial institutions  :
AD0122 SUPPLY. INSTALLATION TESTING & COMMISSIONING OF ASSET PERFORMANCE MANAGENMENT
SYSTENMS (APMS) FOR
014202- A08    Loans and Advances                                                                        197,998,000
014202- A085   Loans to Non Financial Institutions                                                            197,998,000
        Total- SUPPLY. INSTALLATION TESTING &                                                  197,998,000
           COMMISSIONING OF ASSET
          PERFORMANCE MANAGENMENT
          SYSTENMS (APMS) FOR
PR1183 ELECTRIC DISTRIBUTION EFFICIENCY IMPROVEMENT PROJECT
014202- A08    Loans and Advances                            2,427,300,000         2,427,300,000         2,244,291,000
014202- A085   Loans to Non Financial Institutions                2,427,300,000         2,427,300,000         2,244,291,000
        Total- ELECTRIC DISTRIBUTION EFFICIENCY        2,427,300,000       2,427,300,000       2,244,291,000
          IMPROVEMENT PROJECT
                  (In Foreign Exchange)                          (2,427,300,000)
               (Foreign Aid)                                   (2,427,300,000)
                  (In Local Currency)                                                  (2,427,300,000)      (2,244,291,000)
                                                  __________________________________________________
PR1188 SUPPLY. INSTALLATION TESTING & COMMISSIONING OF ASSET PERFORMANCE MANAGENMENT
SYSTENMS (APMS) FOR
014202- A08    Loans and Advances                                                                        306,976,000
014202- A085   Loans to Non Financial Institutions                                                            306,976,000
        Total- SUPPLY. INSTALLATION TESTING &                                                  306,976,000
           COMMISSIONING OF ASSET
          PERFORMANCE MANAGENMENT
          SYSTENMS (APMS) FOR
     014202   Total-  Trasfer To Non-financial institutions       2,427,300,000       2,427,300,000       2,749,265,000
     0142     Total-  Transfers (Others)                      2,427,300,000       2,427,300,000       2,749,265,000
     014      Total-  Transfers                              2,427,300,000       2,427,300,000       2,749,265,000
     01        Total-  General Public Service                  2,427,300,000       2,427,300,000       2,749,265,000
               Total- ACCOUNTANT GENERAL                 2,427,300,000         2,427,300,000         2,749,265,000
                PAKISTAN REVENUES
                  SUB-OFFICE, PESHAWAR
                      (In Foreign Exchange)                          (2,427,300,000)
              (Own Resources)
                  (Foreign Aid)                                    (2,427,300,000)
                      (In Local Currency)                                                    (2,427,300,000)        (2,749,265,000)

Page 425

NO. 127.- FC12P10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER    DEMANDS FOR GRANTS
                 DIVISION
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

01     General Public Service:
014    Transfers:
0142   Transfers (Others):
014202 Trasfer To Non-financial institutions  :
HD0238 ELECTRICITY DISTRIBUTION EFFICIENCY IMPROVEMENT PROJECT
014202- A08    Loans and Advances                            1,890,000,000         1,241,390,000         1,556,203,000
014202- A085   Loans to Non Financial Institutions                1,890,000,000         1,241,390,000         1,556,203,000
        Total- ELECTRICITY DISTRIBUTION                 1,890,000,000       1,241,390,000       1,556,203,000
            EFFICIENCY IMPROVEMENT PROJECT
                  (In Foreign Exchange)                          (1,890,000,000)
               (Foreign Aid)                                   (1,890,000,000)
                  (In Local Currency)                                                  (1,241,390,000)      (1,556,203,000)
                                                  __________________________________________________
KA1467 500 KV MATIARI-MORO-RAHIM YAR KHAN T/L
014202- A08    Loans and Advances                             300,000,000                                419,255,000
014202- A085   Loans to Non Financial Institutions                 300,000,000                                419,255,000
        Total- 500 KV MATIARI-MORO-RAHIM YAR            300,000,000                            419,255,000
          KHAN T/L
                  (In Foreign Exchange)                           (300,000,000)
               (Foreign Aid)                                    (300,000,000)
                  (In Local Currency)                                                                       (419,255,000)
                                                  __________________________________________________
SK0083 POWER DISTRIBUTION STRENTHENING PROJECT (SEPCO)
014202- A08    Loans and Advances                                                                        1,205,165,000
014202- A085   Loans to Non Financial Institutions                                                            1,205,165,000
        Total- POWER DISTRIBUTION STRENTHENING                                              1,205,165,000
          PROJECT (SEPCO)
SK0084 SUPPLY. INSTALLATION TESTING & COMMISSIONING OF ASSET PERFORMANCE MANAGENMENT
SYSTENMS (APMS) FOR
014202- A08    Loans and Advances                                                                        122,211,000
014202- A085   Loans to Non Financial Institutions                                                            122,211,000
        Total- SUPPLY. INSTALLATION TESTING &                                                  122,211,000
           COMMISSIONING OF ASSET
          PERFORMANCE MANAGENMENT
          SYSTENMS (APMS) FOR

Page 426

NO. 127.- FC12P10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER    DEMANDS FOR GRANTS
                 DIVISION
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

     014202   Total-  Trasfer To Non-financial institutions      2,190,000,000       1,241,390,000       3,302,834,000
     0142     Total-  Transfers (Others)                      2,190,000,000       1,241,390,000       3,302,834,000
     014      Total-  Transfers                              2,190,000,000       1,241,390,000       3,302,834,000
     01        Total-  General Public Service                  2,190,000,000       1,241,390,000       3,302,834,000
               Total- ACCOUNTANT GENERAL                 2,190,000,000         1,241,390,000         3,302,834,000
                PAKISTAN REVENUES
                  SUB-OFFICE, KARACHI
                       (In Foreign Exchange)                          (2,190,000,000)
               (Own Resources)
                   (Foreign Aid)                                    (2,190,000,000)
                       (In Local Currency)                                                    (1,241,390,000)        (3,302,834,000)

Page 427

NO. 127.- FC12P10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER    DEMANDS FOR GRANTS
                 DIVISION
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

01     General Public Service:
014    Transfers:
0142   Transfers (Others):
014202 Trasfer To Non-financial institutions  :
QA0708 SUPPLY. INSTALLATION TESTING & COMMISSIONING OF ASSET PERFORMANCE MANAGENMENT
SYSTENMS (APMS) FOR
014202- A08    Loans and Advances                                                                        230,522,000
014202- A085   Loans to Non Financial Institutions                                                            230,522,000
        Total- SUPPLY. INSTALLATION TESTING &                                                  230,522,000
           COMMISSIONING OF ASSET
          PERFORMANCE MANAGENMENT
          SYSTENMS (APMS) FOR
     014202   Total-  Trasfer To Non-financial institutions                                               230,522,000

     0142     Total-  Transfers (Others)                                                              230,522,000
     014      Total-  Transfers                                                                      230,522,000
     01        Total-  General Public Service                                                          230,522,000
               Total- ACCOUNTANT GENERAL                                                             230,522,000
                PAKISTAN REVENUES
                  SUB-OFFICE, QUETTA
          TOTAL - DEMAND                           72,106,914,000      63,131,336,000      76,607,502,000
                  (In Foreign Exchange)                         (72,106,914,000)
            (Own Resources)
               (Foreign Aid)                                 (72,106,914,000)
                  (In Local Currency)                                                (63,131,336,000)     (76,607,502,000)
                                                  __________________________________________________

Page 428

No text layer on this page, see the official PDF.

Page 429

                                   SECTION IV

                          MINISTRY OF FINANCE AND REVENUE
                                                            **********
                                                                                  2026-2027
                                                                             Budget
                                                                                    Estimate

                                                                     (Rupees in Thousand)

Demands presented on behalf of the Ministry of Finance
and Revenue.

Development Expenditure on Capital Account.
             128.  Capital Outlay on Federal Investments                                     2,359,678
             129. Development Loans and Advances                                     169,210,378
                by the Federal Government
             130.  External Development Loans and Advances                            609,608,690
                by the Federal Government

                                                                          Total :            781,178,746

Page 430

No text layer on this page, see the official PDF.

Page 431

NO. 128.- CAPITAL OUTLAY ON FEDERAL INVESTMENTS                      DEMANDS FOR GRANTS
                                DEMAND NO. 128
                                                                            ( FC12C39 )
                          CAPITAL OUTLAY ON FEDERAL INVESTMENTS

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2027 for CAPITAL OUTLAY ON FEDERAL
INVESTMENTS.

                                Voted           Rs. 2,359,678,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF FINANCE AND REVENUE  .

                                                           2025-2026         2025-2026         2026-2027
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
014    Transfers                                                   1,489,920,000         1,489,920,000         2,359,678,000
               Total                                               1,489,920,000         1,489,920,000         2,359,678,000
     OBJECT CLASSIFICATION
A03   Operating Expenses                                 1,489,920,000       1,489,920,000       2,359,678,000
               Total                                         1,489,920,000       1,489,920,000       2,359,678,000
                  (In Foreign Exchange)                              (1,063,520,000)                               (1,048,700,000)
            (Own Resources)                                   (1,063,520,000)                               (1,048,700,000)
               (Foreign Aid)
                  (In Local Currency)                                   (426,400,000)        (1,489,920,000)        (1,310,978,000)
                                                  __________________________________________________

Page 432

NO. 128.- FC12C39 CAPITAL OUTLAY ON FEDERAL INVESTMENTS                DEMANDS FOR GRANTS

III.  - DETAILS are as follows :-
                                 No of Posts        2025-2026         2025-2026       2026-2027
                                       2025-26 2026-27       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

01     General Public Service:
014    Transfers:
0143   Investments:
014302 Non-Financial Institutions  :
IB3711 REVAMPING OF PTVC
014302- A03    Operating Expenses                             1,489,920,000         1,489,920,000         2,359,678,000
014302- A039   General                                          1,489,920,000         1,489,920,000         2,359,678,000
        Total- REVAMPING OF PTVC                        1,489,920,000       1,489,920,000       2,359,678,000
                  (In Foreign Exchange)                          (1,063,520,000)                          (1,048,700,000)
            (Own Resources)                               (1,063,520,000)                          (1,048,700,000)
                  (In Local Currency)                              (426,400,000)      (1,489,920,000)      (1,310,978,000)
                                                  __________________________________________________
     014302   Total-  Non-Financial Institutions                1,489,920,000       1,489,920,000       2,359,678,000
     0143     Total-  Investments                            1,489,920,000       1,489,920,000       2,359,678,000
     014      Total-  Transfers                              1,489,920,000       1,489,920,000       2,359,678,000
     01        Total-  General Public Service                  1,489,920,000       1,489,920,000       2,359,678,000
               Total- ACCOUNTANT GENERAL                 1,489,920,000         1,489,920,000         2,359,678,000
                PAKISTAN REVENUES
                       (In Foreign Exchange)                          (1,063,520,000)                               (1,048,700,000)
               (Own Resources)                               (1,063,520,000)                               (1,048,700,000)
                   (Foreign Aid)
                       (In Local Currency)                               (426,400,000)        (1,489,920,000)        (1,310,978,000)
          TOTAL - DEMAND                             1,489,920,000       1,489,920,000       2,359,678,000
                  (In Foreign Exchange)                          (1,063,520,000)                          (1,048,700,000)
            (Own Resources)                               (1,063,520,000)                          (1,048,700,000)
               (Foreign Aid)
                  (In Local Currency)                              (426,400,000)      (1,489,920,000)      (1,310,978,000)
                                                  __________________________________________________

Page 433

NO. 129.- DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT    DEMANDS FOR GRANTS
                                DEMAND NO. 129
                                                                            ( FC12D36 )
              DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2027 for DEVELOPMENT LOANS AND
ADVANCES BY THE FEDERAL GOVERNMENT.

                                Voted           Rs. 169,210,378,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF FINANCE AND REVENUE  .

                                                           2025-2026         2025-2026         2026-2027
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
014    Transfers                                                183,758,219,000       163,916,654,000       169,210,378,000
               Total                                            183,758,219,000       163,916,654,000       169,210,378,000
     OBJECT CLASSIFICATION
A05   Grants, Subsidies and Write off Loans                                                        370,868,000
A08   Loans and Advances                              183,758,219,000    163,916,654,000    168,839,510,000
               Total                                      183,758,219,000    163,916,654,000    169,210,378,000
                  (In Foreign Exchange)                               (928,326,000)
            (Own Resources)                                    (928,326,000)
               (Foreign Aid)
                  (In Local Currency)                               (182,829,893,000)     (163,916,654,000)     (169,210,378,000)
                                                  __________________________________________________

Page 434

NO. 129.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
III.  - DETAILS are as follows :-
                                 No of Posts        2025-2026         2025-2026       2026-2027
                                       2025-26 2026-27       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
01     General Public Service:
014    Transfers:
0141   Transfers (Inter-Governmental):
014102 To district governments  :
IB0816 CAREC CORRIDOR DEVELOPMENT INVESTMENT PROGRAMME TRANCHE-I PROJECTS ADB
014102- A08    Loans and Advances                             323,000,000         1,323,000,000          830,000,000
014102- A083    District Government / TMAs                        323,000,000         1,323,000,000          830,000,000
        Total- CAREC CORRIDOR DEVELOPMENT            323,000,000       1,323,000,000        830,000,000
           INVESTMENT PROGRAMME TRANCHE-I
          PROJECTS ADB
IB0817 CONSTRUCTION OF 02 LANE HIGHWAY FROM BASIMA TO KHUZDAR (LENGTH 106 KM)
014102- A08    Loans and Advances                            2,500,000,000          925,000,000         1,000,000,000
014102- A083    District Government / TMAs                       2,500,000,000          925,000,000         1,000,000,000
        Total- CONSTRUCTION OF 02 LANE HIGHWAY       2,500,000,000        925,000,000       1,000,000,000
          FROM BASIMA TO KHUZDAR (LENGTH
             106 KM)
IB0830 CONSTRUCTION OF BRIDGE ON RIVER RAVI AT SYED WALA (NANKANA SAHIB)
014102- A08    Loans and Advances                             323,602,000            45,000,000            50,000,000
014102- A083    District Government / TMAs                        323,602,000            45,000,000            50,000,000
        Total- CONSTRUCTION OF BRIDGE ON RIVER         323,602,000         45,000,000          50,000,000
            RAVI AT SYED WALA (NANKANA
            SAHIB)
IB0835 CONSTRUCTION OF MOTORWAY FROM BURHAN - HAKLA ON M-I TO DERA ISMAIL KHAN
014102- A08    Loans and Advances                             500,000,000          880,000,000         1,000,000,000
014102- A083    District Government / TMAs                        500,000,000          880,000,000         1,000,000,000
        Total- CONSTRUCTION OF MOTORWAY FROM        500,000,000        880,000,000       1,000,000,000
          BURHAN - HAKLA ON M-I TO DERA
             ISMAIL KHAN
IB0838 DUALIZATION & IMPROVEMENT OF OLD BANNU ROAD FROM KM 1040+000 - 1050+000 & KM 1088+000 -
1167+000
014102- A08    Loans and Advances                             988,150,000          988,150,000          760,000,000
014102- A083    District Government / TMAs                        988,150,000          988,150,000          760,000,000
        Total- DUALIZATION & IMPROVEMENT OF            988,150,000        988,150,000        760,000,000
          OLD BANNU ROAD FROM KM 1040+000
                     - 1050+000 & KM 1088+000 - 1167+000

Page 435

NO. 129.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB0839 DUALIZATION & IMPROVEMENT OF PINDIGHEB- KOHAT ROAD
014102- A08    Loans and Advances                             800,000,000          800,000,000          500,000,000
014102- A083    District Government / TMAs                        800,000,000          800,000,000          500,000,000
        Total- DUALIZATION & IMPROVEMENT OF            800,000,000        800,000,000        500,000,000
            PINDIGHEB- KOHAT ROAD
IB0840 DUALIZATION OF INDUS HIGHWAY (N-55) SARAI GAMBILA TO KOHAT SECTION
014102- A08    Loans and Advances                            1,500,000,000         1,250,000,000         2,625,845,000
014102- A083    District Government / TMAs                       1,500,000,000         1,250,000,000         2,625,845,000
        Total- DUALIZATION OF INDUS HIGHWAY           1,500,000,000       1,250,000,000       2,625,845,000
               (N-55) SARAI GAMBILA TO KOHAT
           SECTION
IB0842 IMPROVEMENT UPGRADATION AND WIDENING OF JAGLOT - SKARDU ROAD (S-1 167 KM) REVISED
014102- A08    Loans and Advances                            1,000,000,000         2,260,000,000         1,000,000,000
014102- A083    District Government / TMAs                       1,000,000,000         2,260,000,000         1,000,000,000
        Total- IMPROVEMENT UPGRADATION AND          1,000,000,000       2,260,000,000       1,000,000,000
           WIDENING OF JAGLOT - SKARDU ROAD
               (S-1 167 KM) REVISED
IB0843 KARACHI - LAHORE MOTORWAY (LAND ACQUISITION) (CPEC)-LAHORE ABDUL HAKEEM-MULTAN
SUKKUR-SUKKUR
014102- A08    Loans and Advances                             500,000,000         1,260,000,000          800,000,000
014102- A083    District Government / TMAs                        500,000,000         1,260,000,000          800,000,000
        Total- KARACHI - LAHORE MOTORWAY (LAND        500,000,000       1,260,000,000        800,000,000
            ACQUISITION) (CPEC)-LAHORE ABDUL
          HAKEEM-MULTAN SUKKUR-SUKKUR
IB0844 LAHORE-MULTAN MOTORWAY (M-3 SECTION) OF KARACHI - LAHORE MOTORWAY
014102- A08    Loans and Advances                            1,000,000,000          250,000,000         1,000,000,000
014102- A083    District Government / TMAs                       1,000,000,000          250,000,000         1,000,000,000
        Total- LAHORE-MULTAN MOTORWAY (M-3          1,000,000,000        250,000,000       1,000,000,000
            SECTION) OF KARACHI - LAHORE
         MOTORWAY
IB0853 PESHAWAR NORTHERN BYPASS (32.2 KM) (REVISED)
014102- A08    Loans and Advances                             500,000,000         2,260,000,000         1,000,000,000
014102- A083    District Government / TMAs                        500,000,000         2,260,000,000         1,000,000,000
        Total- PESHAWAR NORTHERN BYPASS (32.2         500,000,000       2,260,000,000       1,000,000,000
           KM) (REVISED)

Page 436

NO. 129.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB0856 CONSTRUCTION FOR IMPROVEMENT AND WIDENING CHITRAL-AYUN-BUMBORATE ROAD (48 KM)
DEPOSIT WORK
014102- A08    Loans and Advances                             750,000,000            39,339,000          200,000,000
014102- A083    District Government / TMAs                        750,000,000            39,339,000          200,000,000
        Total- CONSTRUCTION FOR IMPROVEMENT          750,000,000         39,339,000        200,000,000
          AND WIDENING
           CHITRAL-AYUN-BUMBORATE ROAD (48
           KM) DEPOSIT WORK
IB0857 CONSTRUCTION OF ADDITIONAL CARRIAGE WAY SHIKARPUR-RAJANPUR SECTION OF N-55 CAREC
CORRIDOR (ADB)
014102- A08    Loans and Advances                             500,000,000         1,840,000,000         1,000,000,000
014102- A083    District Government / TMAs                        500,000,000         1,840,000,000         1,000,000,000
        Total- CONSTRUCTION OF ADDITIONAL              500,000,000       1,840,000,000       1,000,000,000
           CARRIAGE WAY
           SHIKARPUR-RAJANPUR SECTION OF
             N-55 CAREC CORRIDOR (ADB)
IB0863 CONSTRUCTION OF HOSHAB-AWARAN SECTION OF M-8 (146 KM)
014102- A08    Loans and Advances                            3,734,813,000         1,800,000,000         3,500,000,000
014102- A083    District Government / TMAs                       3,734,813,000         1,800,000,000         3,500,000,000
        Total- CONSTRUCTION OF HOSHAB-AWARAN       3,734,813,000       1,800,000,000       3,500,000,000
           SECTION OF M-8 (146 KM)
IB0865 CONSTRUCTION OF RAJANPUR-DG KHAN AS A 4-LANE HIGHWAY (ADB)
014102- A08    Loans and Advances                             200,000,000            50,000,000          500,000,000
014102- A083    District Government / TMAs                        200,000,000            50,000,000          500,000,000
        Total- CONSTRUCTION OF RAJANPUR-DG            200,000,000         50,000,000        500,000,000
          KHAN AS A 4-LANE HIGHWAY (ADB)
IB0866 CONSTRUCTION OF ZIARAT MOR - KECH - HARNAI ROAD (107.2 KM) AND HARNAI  - SANJAVI ROAD (55.1
KM) (DEPOSIT
014102- A08    Loans and Advances                             200,000,000             1,110,000         1,500,000,000
014102- A083    District Government / TMAs                        200,000,000             1,110,000         1,500,000,000
        Total- CONSTRUCTION OF ZIARAT MOR -             200,000,000           1,110,000       1,500,000,000
          KECH - HARNAI ROAD (107.2 KM) AND
           HARNAI - SANJAVI ROAD (55.1 KM)
            (DEPOSIT

Page 437

NO. 129.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB0867 D.G. KHAN # D.I. KHAN (ACW) (N-55) - 245 KMS (CAREC CORRIDOR ADB)
014102- A08    Loans and Advances                             500,000,000          550,000,000         1,000,000,000
014102- A083    District Government / TMAs                        500,000,000          550,000,000         1,000,000,000
        Total-  D.G. KHAN # D.I. KHAN (ACW) (N-55) -          500,000,000        550,000,000       1,000,000,000
             245 KMS (CAREC CORRIDOR ADB)
IB0868 DUALIZATION & IMPROVEMENT OF EXISTING N-50 FROM YARIK - SAGU - ZHOB INCLUDING ZHOB BYPASS
(210 KM)
014102- A08    Loans and Advances                            1,000,000,000          500,000,000          773,273,000
014102- A083    District Government / TMAs                       1,000,000,000          500,000,000          773,273,000
        Total- DUALIZATION & IMPROVEMENT OF           1,000,000,000        500,000,000        773,273,000
            EXISTING N-50 FROM YARIK - SAGU -
          ZHOB INCLUDING ZHOB BYPASS (210
           KM)
IB0869 IMPROVEMENT AND WIDENING OF CHITRAL-BOONI-MASTUJ-SHANDUR (CPEC)
014102- A08    Loans and Advances                            1,500,000,000         2,130,000,000         1,000,000,000
014102- A083    District Government / TMAs                       1,500,000,000         2,130,000,000         1,000,000,000
        Total- IMPROVEMENT AND WIDENING OF           1,500,000,000       2,130,000,000       1,000,000,000
           CHITRAL-BOONI-MASTUJ-SHANDUR
            (CPEC)
IB0870 IMPROVEMENT AND WIDENING OF N-45 (130.22 KM)
014102- A08    Loans and Advances                             100,000,000            10,000,000            50,000,000
014102- A083    District Government / TMAs                        100,000,000            10,000,000            50,000,000
        Total- IMPROVEMENT AND WIDENING OF N-45        100,000,000         10,000,000          50,000,000
               (130.22 KM)
IB0871 JHAL JAHO-BELA SECTION (82 KM) (DEPOSIT WORK)
014102- A08    Loans and Advances                            3,834,261,000         3,034,261,000          731,250,000
014102- A083    District Government / TMAs                       3,834,261,000         3,034,261,000          731,250,000
        Total- JHAL JAHO-BELA SECTION (82 KM)           3,834,261,000       3,034,261,000        731,250,000
            (DEPOSIT WORK)
IB0872 KHYBER PASS ECONOMIC CORRIDOR PROJECT (REVISED) (WORLD BANK)
014102- A08    Loans and Advances                             500,000,000            20,000,000          300,000,000
014102- A083    District Government / TMAs                        500,000,000            20,000,000          300,000,000
        Total- KHYBER PASS ECONOMIC CORRIDOR         500,000,000         20,000,000        300,000,000
          PROJECT (REVISED) (WORLD BANK)

Page 438

NO. 129.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB0873 NOKUNDI- MASHKHEL ROAD CPEC (DEPOSIT WORK)
014102- A08    Loans and Advances                             700,000,000         1,220,000,000          484,152,000
014102- A083    District Government / TMAs                        700,000,000         1,220,000,000          484,152,000
        Total- NOKUNDI- MASHKHEL ROAD CPEC            700,000,000       1,220,000,000        484,152,000
            (DEPOSIT WORK)
IB0874 QUETTA WESTERN BYPASS(23 KM)
014102- A08    Loans and Advances                             900,000,000          565,000,000         1,000,000,000
014102- A083    District Government / TMAs                        900,000,000          565,000,000         1,000,000,000
        Total- QUETTA WESTERN BYPASS(23 KM)            900,000,000        565,000,000       1,000,000,000
IB0878 ZHOB TO KUCHLAK ROAD CPEC WESTERN CORRIDOR
014102- A08    Loans and Advances                            4,500,000,000          375,000,000         3,000,000,000
014102- A083    District Government / TMAs                       4,500,000,000          375,000,000         3,000,000,000
        Total- ZHOB TO KUCHLAK ROAD CPEC             4,500,000,000        375,000,000       3,000,000,000
          WESTERN CORRIDOR
IB0882 CONSTRUCTION OF KOT PINDI DAS INTERCHANGE M-2
014102- A08    Loans and Advances                             251,291,000          301,291,000          100,000,000
014102- A083    District Government / TMAs                        251,291,000          301,291,000          100,000,000
        Total- CONSTRUCTION OF KOT PINDI DAS            251,291,000        301,291,000        100,000,000
           INTERCHANGE M-2
IB0883 DUALIZATION OF KHUZDAR - KUCHLAK SECTION OF NATIONAL HIGHWAY (N-25) 330KM
014102- A08    Loans and Advances                           34,000,000,000        31,919,410,000        22,000,000,000
014102- A083    District Government / TMAs                     34,000,000,000        31,919,410,000        22,000,000,000
        Total- DUALIZATION OF KHUZDAR - KUCHLAK     34,000,000,000      31,919,410,000      22,000,000,000
           SECTION OF NATIONAL HIGHWAY
               (N-25) 330KM
IB0884 CONSTRUCTION OF HOSHAB # AWARAN # KHUZDAR SECTION OF M-8 SECTION-2 AWARAN # NAAL (168
KM)
014102- A08    Loans and Advances                            6,000,000,000         6,860,000,000         3,000,000,000
014102- A083    District Government / TMAs                       6,000,000,000         6,860,000,000         3,000,000,000
        Total- CONSTRUCTION OF HOSHAB #               6,000,000,000       6,860,000,000       3,000,000,000
         AWARAN # KHUZDAR SECTION OF M-8
            SECTION-2 AWARAN # NAAL (168 KM)

Page 439

NO. 129.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB0885 REHABILITATION & UPGRADATION OF AWARAN-JHALIJAO ROAD (548 KM)
014102- A08    Loans and Advances                            1,047,943,000         1,047,943,000          500,000,000
014102- A083    District Government / TMAs                       1,047,943,000         1,047,943,000          500,000,000
        Total- REHABILITATION & UPGRADATION OF       1,047,943,000       1,047,943,000        500,000,000
           AWARAN-JHALIJAO ROAD (548 KM)
IB3080 CONSTRUCTION OF ROAD FROM DALBANTIN TO ZIARAT BALANOSH (77KM) DISTRICT CHAGHI (DEPOSIT
WORK)
014102- A08    Loans and Advances                               50,000,000                                100,000,000
014102- A083    District Government / TMAs                         50,000,000                                100,000,000
        Total- CONSTRUCTION OF ROAD FROM               50,000,000                            100,000,000
           DALBANTIN TO ZIARAT BALANOSH
             (77KM) DISTRICT CHAGHI (DEPOSIT
          WORK)
IB3083 CONSTRUCTION OF CHAKDARA - CHITRAL ROAD PROJECT (N-45) SECTION III: KALKATAK - CHITRAL
(48KM)
014102- A08    Loans and Advances                             500,000,000                                 50,000,000
014102- A083    District Government / TMAs                        500,000,000                                 50,000,000
        Total- CONSTRUCTION OF CHAKDARA -              500,000,000                             50,000,000
           CHITRAL ROAD PROJECT (N-45)
           SECTION III: KALKATAK - CHITRAL
             (48KM)
IB3085 RELOCATION OF KARAKORUM HIGHWAY BETWEEN THAKOT & RAIKOT DUE TO CONSTRUCTION OF
DAMS ON RIVER
014102- A08    Loans and Advances                             500,000,000                               4,500,000,000
014102- A083    District Government / TMAs                        500,000,000                               4,500,000,000
        Total- RELOCATION OF KARAKORUM                500,000,000                           4,500,000,000
          HIGHWAY BETWEEN THAKOT &
           RAIKOT DUE TO CONSTRUCTION OF
          DAMS ON RIVER
IB3086 LAND ACQUISITION FOR RELOCATION OF KARAKORUM HIGHWAY BETWEEN THAKOT & RAIKOT DUE TO
CONSTRUCTION OF DAMS
014102- A08    Loans and Advances                             633,900,000                                750,000,000
014102- A083    District Government / TMAs                        633,900,000                                750,000,000
        Total- LAND ACQUISITION FOR RELOCATION         633,900,000                            750,000,000
          OF KARAKORUM HIGHWAY BETWEEN
          THAKOT & RAIKOT DUE TO
           CONSTRUCTION OF DAMS

Page 440

NO. 129.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB3087 CONSTRUCTION OF MASHKHEL # PANJGOOR ROAD (191.6 KM)
014102- A08    Loans and Advances                               50,000,000                                750,000,000
014102- A083    District Government / TMAs                         50,000,000                                750,000,000
        Total- CONSTRUCTION OF MASHKHEL #               50,000,000                            750,000,000
          PANJGOOR ROAD (191.6 KM)
IB3088 DUALIZATION/ STRENGTHENING OF N-65 FROM QUETTA - DHADAR 110 KMS (FEASIBILITY STUDY)
014102- A08    Loans and Advances                                5,000,000
014102- A083    District Government / TMAs                           5,000,000
        Total- DUALIZATION/ STRENGTHENING OF              5,000,000
             N-65 FROM QUETTA - DHADAR 110 KMS
             (FEASIBILITY STUDY)
IB3386 CONSTRUCTION OF GILGIT # SHANDUR ROAD (216 KM)GBP
014102- A08    Loans and Advances                            3,000,000,000         7,300,000,000         1,000,000,000
014102- A083    District Government / TMAs                       3,000,000,000         7,300,000,000         1,000,000,000
        Total- CONSTRUCTION OF GILGIT # SHANDUR      3,000,000,000       7,300,000,000       1,000,000,000
          ROAD (216 KM)GBP
IB3848 DUAKIZATION OF SIALKOT EMINABAD ROAD UP KAMOKE INCLUDING LINK TO MOTOR WAY (LENGTH
65.1 KM) DISTRICT SIALKOT
014102- A08    Loans and Advances                             500,000,000                               2,000,000,000
014102- A083    District Government / TMAs                        500,000,000                               2,000,000,000
        Total- DUAKIZATION OF SIALKOT EMINABAD         500,000,000                           2,000,000,000
          ROAD UP KAMOKE INCLUDING LINK TO
          MOTOR WAY (LENGTH 65.1 KM)
            DISTRICT SIALKOT
IB3849 WIDENING AND IMPROVEMENT OF PRIORITY SECTIONS ON N-5 (PHASE-IA & IB)(210 KM)
014102- A08    Loans and Advances                            1,900,000,000          150,000,000         1,000,000,000
014102- A083    District Government / TMAs                       1,900,000,000          150,000,000         1,000,000,000
        Total- WIDENING AND IMPROVEMENT OF           1,900,000,000        150,000,000       1,000,000,000
            PRIORITY SECTIONS ON N-5 (PHASE-IA
          & IB)(210 KM)

Page 441

NO. 129.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB3852 LALA MUSA BYPASS OF N-5
014102- A08    Loans and Advances                             100,000,000                                100,000,000
014102- A083    District Government / TMAs                        100,000,000                                100,000,000
        Total- LALA MUSA BYPASS OF N-5                   100,000,000                            100,000,000
IB5373 GWADAR RATODERO ROAD PROJECT M-8
014102- A08    Loans and Advances                            3,000,000,000          800,000,000         1,000,000,000
014102- A083    District Government / TMAs                       3,000,000,000          800,000,000         1,000,000,000
        Total- GWADAR RATODERO ROAD PROJECT       3,000,000,000        800,000,000       1,000,000,000
            M-8
IB5375 LAND ACQUISITION AFFECTED PROPERTIES COMPENSATION AND RELOCATION OF UTILITIES FOR
DUALIZATION OF
014102- A08    Loans and Advances                            1,348,690,000          500,000,000          850,000,000
014102- A083    District Government / TMAs                       1,348,690,000          500,000,000          850,000,000
        Total- LAND ACQUISITION AFFECTED               1,348,690,000        500,000,000        850,000,000
           PROPERTIES COMPENSATION AND
           RELOCATION OF UTILITIES FOR
           DUALIZATION OF
IB5380 CONSTRUCTION OF 6 LANE OVERHEAD VRIDGE AT IMAMILA COLONY RAILWAY CROSSING SHAHDRA
014102- A08    Loans and Advances                             200,000,000          255,000,000          250,000,000
014102- A083    District Government / TMAs                        200,000,000          255,000,000          250,000,000
        Total- CONSTRUCTION OF 6 LANE OVERHEAD        200,000,000        255,000,000        250,000,000
           VRIDGE AT IMAMILA COLONY RAILWAY
           CROSSING SHAHDRA
IB5384 CONSTRUCTION OF BHONG INTERCHANGE ON MOTORWAY M-5
014102- A08    Loans and Advances                                5,000,000          355,000,000          100,000,000
014102- A083    District Government / TMAs                           5,000,000          355,000,000          100,000,000
        Total- CONSTRUCTION OF BHONG                      5,000,000        355,000,000        100,000,000
           INTERCHANGE ON MOTORWAY M-5
IB5388 CONSTRUCTION OF FLYOVER AT THE JUNCTION OF N-5 AND N-65 AT SUKKUR
014102- A08    Loans and Advances                               50,000,000          815,000,000         1,000,000,000
014102- A083    District Government / TMAs                         50,000,000          815,000,000         1,000,000,000
  Total- CONSTRUCTION OF FLYOVER AT THE                50,000,000        815,000,000       1,000,000,000
       JUNCTION OF N-5 AND N-65 AT
      SUKKUR

Page 442

NO. 129.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB5389 CONSTRUCTION OF INTERCHANGE AT M- 3 ABDUL HAKEEM MOTORWAY AT ESSAN SHARAQPUR
DISTRICT SHEIKHUPURA 20
014102- A08    Loans and Advances                             500,000,000          225,000,000          650,000,000
014102- A083    District Government / TMAs                        500,000,000          225,000,000          650,000,000
        Total- CONSTRUCTION OF INTERCHANGE AT         500,000,000        225,000,000        650,000,000
            M- 3 ABDUL HAKEEM MOTORWAY AT
          ESSAN SHARAQPUR DISTRICT
           SHEIKHUPURA 20
IB5390 CONSTRUCTION OF INTERCHANGE ON HAZARA MOTORWAY TO CONNECT ABBOTTABAD AND
SHERWAN ROAD RIGHT AFTER THE FIRST
014102- A08    Loans and Advances                             800,000,000             7,478,000          100,000,000
014102- A083    District Government / TMAs                        800,000,000             7,478,000          100,000,000
        Total- CONSTRUCTION OF INTERCHANGE ON        800,000,000           7,478,000        100,000,000
          HAZARA MOTORWAY TO CONNECT
          ABBOTTABAD AND SHERWAN ROAD
           RIGHT AFTER THE FIRST
IB5391 CONSTRUCTION OF INTERCHANGE ON LAHORE - KARACHI MOTORWAY AT BUCHEKE - NANKANA ROAD
IN THE NAME OF RAI
014102- A08    Loans and Advances                             300,000,000             2,000,000          100,000,000
014102- A083    District Government / TMAs                        300,000,000             2,000,000          100,000,000
        Total- CONSTRUCTION OF INTERCHANGE ON        300,000,000           2,000,000        100,000,000
          LAHORE - KARACHI MOTORWAY AT
          BUCHEKE - NANKANA ROAD IN THE
          NAME OF RAI
IB5392 CONSTRUCTION OF KHARAN-BASIMA ROAD (124 KM) FEASIBILITY STUDY
014102- A08    Loans and Advances                                5,000,000             5,188,000
014102- A083    District Government / TMAs                           5,000,000             5,188,000
        Total- CONSTRUCTION OF KHARAN-BASIMA            5,000,000           5,188,000
          ROAD (124 KM) FEASIBILITY STUDY
IB5393 CONSTRUCTION OF LAHORE-SIALKOT MOTORWAY (LSM) LINK (4-LANE) VIA NARANG MANDI TO
NAROWAL (101.41KM)
014102- A08    Loans and Advances                            3,000,000,000          500,000,000         2,000,000,000
014102- A083    District Government / TMAs                       3,000,000,000          500,000,000         2,000,000,000

Page 443

NO. 129.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

        Total- CONSTRUCTION OF LAHORE-SIALKOT       3,000,000,000        500,000,000       2,000,000,000
         MOTORWAY (LSM) LINK (4-LANE) VIA
          NARANG MANDI TO NAROWAL
             (101.41KM)
IB5396 CONSTRUCTION OF MIRPUR MATHELO INTERCHANGE ON SUKKUR-MULTAN MOTORWAY (M-5) AND ITS
LINK WITH
014102- A08    Loans and Advances                             100,000,000            16,194,000
014102- A083    District Government / TMAs                        100,000,000            16,194,000
        Total- CONSTRUCTION OF MIRPUR MATHELO        100,000,000         16,194,000
           INTERCHANGE ON SUKKUR-MULTAN
         MOTORWAY (M-5) AND ITS LINK WITH
IB5408 DUALIZATION AND REHABILITATION OF KARACHI - KARARO (232 KMS) & WADH  - KHUZDAR (41 KMS)
(TOTAL LENGTH
014102- A08    Loans and Advances                           33,000,000,000        31,868,972,000        30,000,000,000
014102- A083    District Government / TMAs                     33,000,000,000        31,868,972,000        30,000,000,000
        Total- DUALIZATION AND REHABILITATION        33,000,000,000      31,868,972,000      30,000,000,000
          OF KARACHI - KARARO (232 KMS) &
         WADH - KHUZDAR (41 KMS) (TOTAL
          LENGTH
IB5409 DUALIZATION AND REHABILITATION OF KARARO - WADH (83 KMS) & KUCHLAK - CHAMAN (104 KMS)
(TOTAL LENGTH 187
014102- A08    Loans and Advances                           33,000,000,000        31,724,846,000        48,000,000,000
014102- A083    District Government / TMAs                     33,000,000,000        31,724,846,000        48,000,000,000
        Total- DUALIZATION AND REHABILITATION        33,000,000,000      31,724,846,000      48,000,000,000
          OF KARARO - WADH (83 KMS) &
          KUCHLAK - CHAMAN (104 KMS) (TOTAL
          LENGTH 187
IB5411 DUALIZATION OF RAWALPINDI - KAHUTA ROAD (28.4 KM) INCLUDING 4-LANE BRIDGE OVER SIHALA
RAILWAY PASS SIHALA
014102- A08    Loans and Advances                             800,000,000         1,615,000,000         1,000,000,000
014102- A083    District Government / TMAs                        800,000,000         1,615,000,000         1,000,000,000
        Total- DUALIZATION OF RAWALPINDI -               800,000,000       1,615,000,000       1,000,000,000
          KAHUTA ROAD (28.4 KM) INCLUDING
            4-LANE BRIDGE OVER SIHALA
           RAILWAY PASS SIHALA

Page 444

NO. 129.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB5414 CONSTRUCTION OF MUZAFFARABAD-MANSEHRA ROAD (26.6 KM APPROX)
014102- A08    Loans and Advances                             200,000,000                                100,000,000
014102- A083    District Government / TMAs                        200,000,000                                100,000,000
        Total- CONSTRUCTION OF                           200,000,000                            100,000,000
          MUZAFFARABAD-MANSEHRA ROAD
                (26.6 KM APPROX)
IB5421 LAND ACQUISITION AFFECTED PROPERTIES AND COMPENSATION FOR RAJANPUR-DG KHAN SECTION
AS 4- LANE HIGHWAY AND
014102- A08    Loans and Advances                            1,000,000,000         2,000,000,000         1,300,000,000
014102- A083    District Government / TMAs                       1,000,000,000         2,000,000,000         1,300,000,000
        Total- LAND ACQUISITION AFFECTED               1,000,000,000       2,000,000,000       1,300,000,000
           PROPERTIES AND COMPENSATION
          FOR RAJANPUR-DG KHAN SECTION AS
                4- LANE HIGHWAY AND
IB9431 REHABILITATION & UPGRADATION OF PEZU # TANK ROAD (LENGTH: 38 KM)
014102- A08    Loans and Advances                             500,000,000          258,375,000          500,000,000
014102- A083    District Government / TMAs                        500,000,000          258,375,000          500,000,000
        Total- REHABILITATION & UPGRADATION OF         500,000,000        258,375,000        500,000,000
           PEZU # TANK ROAD (LENGTH: 38 KM)
IB9442 INTERCHANGE ON JAMALDIN WALI DISTRICT RAHIM YAR KHAN
014102- A08    Loans and Advances                             100,000,000              224,000          750,000,000
014102- A083    District Government / TMAs                        100,000,000              224,000          750,000,000
        Total- INTERCHANGE ON JAMALDIN WALI            100,000,000            224,000        750,000,000
            DISTRICT RAHIM YAR KHAN
IB9443 CONSTRUCTION OF LAHORE - SAHIWAL - BAHAWALNAGAR MOTORWAY - PPP MODE
014102- A08    Loans and Advances                            4,000,000,000          525,000,000         2,000,000,000
014102- A083    District Government / TMAs                       4,000,000,000          525,000,000         2,000,000,000
        Total- CONSTRUCTION OF LAHORE -                4,000,000,000        525,000,000       2,000,000,000
           SAHIWAL - BAHAWALNAGAR
         MOTORWAY - PPP MODE
IB9445 CONSTRUCTION OF BESHAM KHAWAZAKHELA EXPRESSWAY PROJECT (64 KM) PPP MODE
014102- A08    Loans and Advances                             500,000,000                               1,000,000,000
014102- A083    District Government / TMAs                        500,000,000                               1,000,000,000
       Total- CONSTRUCTION OF BESHAM                  500,000,000                           1,000,000,000
         KHAWAZAKHELA EXPRESSWAY
          PROJECT (64 KM) PPP MODE

Page 445

NO. 129.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                              Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB9447 PC-I FOR LOWARI TUNNEL ELECTRICAL & MECHANICAL WORKS PLUS BRDIGES
 014102- A08    Loans and Advances                            1,000,000,000          100,000,000         2,000,000,000
 014102- A083    District Government / TMAs                       1,000,000,000          100,000,000         2,000,000,000
        Total-  PC-I FOR LOWARI TUNNEL                   1,000,000,000        100,000,000       2,000,000,000
            ELECTRICAL & MECHANICAL WORKS
           PLUS BRDIGES
IB9448 LINK ROAD M-I MOTORWAY TO MARGALLA AVENUE IN ICT
 014102- A08    Loans and Advances                            3,250,000,000         1,076,183,000         4,517,677,000
 014102- A083    District Government / TMAs                       3,250,000,000         1,076,183,000         4,517,677,000
        Total- LINK ROAD M-I MOTORWAY TO               3,250,000,000       1,076,183,000       4,517,677,000
          MARGALLA AVENUE IN ICT
IB9449 DUALIZATION OF ROAD FROM FAISALABAD BYPASS TO MOTORWAY M-3 VIA SATIANA (50:50 BASIS)
 014102- A08    Loans and Advances                             500,000,000
 014102- A083    District Government / TMAs                        500,000,000
        Total- DUALIZATION OF ROAD FROM                 500,000,000
           FAISALABAD BYPASS TO MOTORWAY
             M-3 VIA SATIANA (50:50 BASIS)
IB9453 NEW MOTORWAY FROM KARACHI TO HYDERABAD PPP MODE - COMMERCIAL FEASIBILITY
 014102- A08    Loans and Advances                               50,000,000                                 75,000,000
 014102- A083    District Government / TMAs                         50,000,000                                 75,000,000
        Total- NEW MOTORWAY FROM KARACHI TO           50,000,000                             75,000,000
          HYDERABAD PPP MODE -
           COMMERCIAL FEASIBILITY
IB9455 CONSTRUCTION OF TANAWAL INTERCHANGE ON HAZARA MOTORWAY AT VILLAGE POTHA DISTRICT
MANSEHRA
 014102- A08    Loans and Advances                               10,000,000              121,000
 014102- A083    District Government / TMAs                         10,000,000              121,000
        Total- CONSTRUCTION OF TANAWAL                  10,000,000            121,000
           INTERCHANGE ON HAZARA
          MOTORWAY AT VILLAGE POTHA
             DISTRICT MANSEHRA
IB9456 CONSTRUCTION OF TUNNEL JOINING KHAKI WITH OGHI DISTRICT MANSEHRA (FEASIBILITY)
014102- A08    Loans and Advances                                5,000,000                                 17,313,000
014102- A083    District Government / TMAs                           5,000,000                                 17,313,000
        Total- CONSTRUCTION OF TUNNEL JOINING            5,000,000                             17,313,000
           KHAKI WITH OGHI DISTRICT
          MANSEHRA (FEASIBILITY)

Page 446

NO. 129.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
IB9467 REHABILITATION & RECONSTRUCTION OF N-5 FROM MORO TO RANIPUR KM. 318-404 (NBC/SBC) & 32 X
DAMAGED BRIDGES
014102- A08    Loans and Advances                             300,000,000          670,000,000         1,750,000,000
014102- A083    District Government / TMAs                        300,000,000          670,000,000         1,750,000,000
        Total- REHABILITATION & RECONSTRUCTION        300,000,000        670,000,000       1,750,000,000
          OF N-5 FROM MORO TO RANIPUR KM.
              318-404 (NBC/SBC) & 32 X DAMAGED
           BRIDGES
IB9468 CHINA AIDED PROJECTS OF PAKISTAN NATIONAL HIGHWAY N-5 SECTIONAL REHABILITATION
HALA-MORO 66 KM
014102- A08    Loans and Advances                             200,000,000                                500,000,000
014102- A083    District Government / TMAs                        200,000,000                                500,000,000
        Total- CHINA AIDED PROJECTS OF PAKISTAN        200,000,000                            500,000,000
           NATIONAL HIGHWAY N-5 SECTIONAL
            REHABILITATION HALA-MORO 66 KM
     014102   Total-  To district governments               165,115,650,000    145,274,085,000    161,014,510,000
014110 Others  :
IB3903 UPGRADATION & REPLACEMENT OF 300 KW-MW TRANSMITTER AT HPT KHUZDAR
014110- A08    Loans and Advances                            1,390,000,000         1,390,000,000
014110- A083    District Government / TMAs                       1,390,000,000         1,390,000,000
        Total- UPGRADATION & REPLACEMENT OF         1,390,000,000       1,390,000,000
             300 KW-MW TRANSMITTER AT HPT
          KHUZDAR
                  (In Foreign Exchange)                           (869,440,000)
            (Own Resources)                                (869,440,000)
                  (In Local Currency)                              (520,560,000)      (1,390,000,000)
                                                  __________________________________________________
IB3904 UPGRADATION & REPLACEMENT OF 100 KW-MW TRANSMITTER AT HPT-1 QUETTA
014110- A08    Loans and Advances                             799,141,000          799,141,000
014110- A083    District Government / TMAs                        799,141,000          799,141,000
        Total- UPGRADATION & REPLACEMENT OF           799,141,000        799,141,000
             100 KW-MW TRANSMITTER AT HPT-1
           QUETTA
                   (In Foreign Exchange)                             (58,886,000)
            (Own Resources)                                 (58,886,000)
                   (In Local Currency)                              (740,255,000)       (799,141,000)
                                                   __________________________________________________

Page 447

NO. 129.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB3905 REHABILIATION AND UP GRADATION OF GILGIT AND SKARDU RADIO STATIONS(REPLACEMENT OF
50KW MW
014110- A08    Loans and Advances                             133,000,000          133,000,000
014110- A083    District Government / TMAs                        133,000,000          133,000,000
        Total- REHABILIATION AND UP GRADATION          133,000,000        133,000,000
          OF GILGIT AND SKARDU RADIO
           STATIONS(REPLACEMENT OF 50KW
        MW
IB3906 SAUTUL QURAN FM RADIO NETWORK PHASE IV(PESHAWAR KARACHI MOTORWAY)
014110- A08    Loans and Advances                             598,595,000          598,595,000
014110- A083    District Government / TMAs                        598,595,000          598,595,000
        Total- SAUTUL QURAN FM RADIO NETWORK         598,595,000        598,595,000
          PHASE IV(PESHAWAR KARACHI
          MOTORWAY)
     014110   Total-  Others                                 2,920,736,000       2,920,736,000
     0141     Total-  Transfers (Inter-Governmental)        168,036,386,000    148,194,821,000    161,014,510,000
0142   Transfers (Others):
014202 Trasfer To Non-Financial Institutions  :
IB3483 220 KV HARIPUR SUBSTATION (NTDC)
014202- A08    Loans and Advances                             774,000,000         1,905,398,000         1,100,000,000
014202- A085   Loans to Non Financial Institutions                 774,000,000         1,905,398,000         1,100,000,000
        Total- 220 KV HARIPUR SUBSTATION (NTDC)         774,000,000       1,905,398,000       1,100,000,000
IB3484 220 KV SWABI SUBSTATION (NTDC)
014202- A08    Loans and Advances                            1,439,000,000         2,117,664,000         1,450,000,000
014202- A085   Loans to Non Financial Institutions                1,439,000,000         2,117,664,000         1,450,000,000
        Total- 220 KV SWABI SUBSTATION (NTDC)          1,439,000,000       2,117,664,000       1,450,000,000
    014202   Total-  Trasfer To Non-Financial                2,213,000,000       4,023,062,000       2,550,000,000
                          Institutions
    0142     Total-  Transfers (Others)                      2,213,000,000       4,023,062,000       2,550,000,000
    014      Total-  Transfers                           170,249,386,000    152,217,883,000    163,564,510,000
    01        Total-  General Public Service               170,249,386,000    152,217,883,000    163,564,510,000
               Total- ACCOUNTANT GENERAL               170,249,386,000       152,217,883,000       163,564,510,000
                PAKISTAN REVENUES
                      (In Foreign Exchange)                           (928,326,000)
              (Own Resources)                                (928,326,000)
                  (Foreign Aid)
                      (In Local Currency)                           (169,321,060,000)     (152,217,883,000)     (163,564,510,000)

Page 448

NO. 129.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

01     General Public Service:
014    Transfers:
0142   Transfers (Others):
014202 Trasfer To Non-Financial Institutions  :
LO5339 200 KV QUAID-E-AZAM APPAREL AND BUSINESS PARK (QABP) GRID STATION FOR PROVISION OF
ELECTRICITY TO
014202- A08    Loans and Advances                            1,118,000,000         1,907,938,000         1,400,000,000
014202- A085   Loans to Non Financial Institutions                1,118,000,000         1,907,938,000         1,400,000,000
        Total- 200 KV QUAID-E-AZAM APPAREL AND        1,118,000,000       1,907,938,000       1,400,000,000
           BUSINESS PARK (QABP) GRID STATION
          FOR PROVISION OF ELECTRICITY TO
LO5340 500 KV ALLAMA IQBAL INDUSTRIAL CITY FOR 600 MW DEMAND OF THE SPECIAL ECONOMIC ZONE IN
THE FIEDMC AREA
014202- A08    Loans and Advances                            4,440,658,000         4,440,658,000         1,243,000,000
014202- A085   Loans to Non Financial Institutions                4,440,658,000         4,440,658,000         1,243,000,000
        Total- 500 KV ALLAMA IQBAL INDUSTRIAL          4,440,658,000       4,440,658,000       1,243,000,000
            CITY FOR 600 MW DEMAND OF THE
           SPECIAL ECONOMIC ZONE IN THE
           FIEDMC AREA
     014202   Total-  Trasfer To Non-Financial                5,558,658,000       6,348,596,000       2,643,000,000
                           Institutions
     0142     Total-  Transfers (Others)                      5,558,658,000       6,348,596,000       2,643,000,000
     014      Total-  Transfers                              5,558,658,000       6,348,596,000       2,643,000,000
     01        Total-  General Public Service                  5,558,658,000       6,348,596,000       2,643,000,000
               Total- ACCOUNTANT GENERAL                 5,558,658,000         6,348,596,000         2,643,000,000
                PAKISTAN REVENUES
                  SUB-OFFICE, LAHORE

Page 449

NO. 129.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

              ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR

01     General Public Service:
014    Transfers:
0142   Transfers (Others):
014202 Trasfer To Non-Financial Institutions  :
PR7018 SUPPLY OF POWER TO RASHAKAI ECONOMIC ZONE KPK
014202- A08    Loans and Advances                             314,560,000          314,560,000
014202- A085   Loans to Non Financial Institutions                 314,560,000          314,560,000
        Total- SUPPLY OF POWER TO RASHAKAI             314,560,000        314,560,000
          ECONOMIC ZONE KPK
PR7019 SUPPLY OF POWER TO HATTAR SPECIAL ECONOMIC ZONE KPK
014202- A08    Loans and Advances                             174,615,000          174,615,000
014202- A085   Loans to Non Financial Institutions                 174,615,000          174,615,000
        Total- SUPPLY OF POWER TO HATTAR               174,615,000        174,615,000
           SPECIAL ECONOMIC ZONE KPK
     014202   Total-  Trasfer To Non-Financial                 489,175,000        489,175,000
                           Institutions
     0142     Total-  Transfers (Others)                       489,175,000        489,175,000
     014      Total-  Transfers                               489,175,000        489,175,000
     01        Total-  General Public Service                   489,175,000        489,175,000
               Total- ACCOUNTANT GENERAL                  489,175,000          489,175,000
                PAKISTAN REVENUES
                  SUB-OFFICE, PESHAWAR

Page 450

NO. 129.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

01     General Public Service:
014    Transfers:
0142   Transfers (Others):
014202 Trasfer To Non-Financial Institutions  :
HD0201 INSTALLATION OF 2X600 MW (NET) COAL FIRED POWER PROJECT JAMSHORO (GENCO-I)
014202- A08    Loans and Advances                            2,675,000,000            75,000,000
014202- A085   Loans to Non Financial Institutions                2,675,000,000            75,000,000
        Total- INSTALLATION OF 2X600 MW (NET)           2,675,000,000         75,000,000
          COAL FIRED POWER PROJECT
          JAMSHORO (GENCO-I)
KA1386 500 KV MATIARI-MORO-R.Y.KHAN T/L
014202- A05    Grants, Subsidies and Write off Loans                                                      370,868,000
014202- A052   Grants Domestic                                                                             370,868,000
014202- A08    Loans and Advances                             700,000,000          700,000,000
014202- A085   Loans to Non Financial Institutions                 700,000,000          700,000,000
        Total- 500 KV MATIARI-MORO-R.Y.KHAN T/L          700,000,000        700,000,000        370,868,000
     014202   Total-  Trasfer To Non-Financial                3,375,000,000        775,000,000        370,868,000
                           Institutions
     0142     Total-  Transfers (Others)                      3,375,000,000        775,000,000        370,868,000
     014      Total-  Transfers                              3,375,000,000        775,000,000        370,868,000
     01        Total-  General Public Service                  3,375,000,000        775,000,000        370,868,000
               Total- ACCOUNTANT GENERAL                 3,375,000,000          775,000,000          370,868,000
                PAKISTAN REVENUES
                  SUB-OFFICE, KARACHI

Page 451

NO. 129.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

01     General Public Service:
014    Transfers:
0142   Transfers (Others):
014202 Trasfer To Non-Financial Institutions  :
QA4101 CONSTRUCTION OF 132 KV GRID STATION ATKHAN MEHTERZAI WITH ALLIED T/LINE
014202- A08    Loans and Advances                               86,000,000            86,000,000
014202- A085   Loans to Non Financial Institutions                  86,000,000            86,000,000
        Total- CONSTRUCTION OF 132 KV GRID                86,000,000         86,000,000
           STATION ATKHAN MEHTERZAI WITH
            ALLIED T/LINE
QA4104 INTER CONNECTION OF ISOLATED MAKRAN NETWORK AT BASIMA VIA NAG G/STATION FROM
PANJGOOR G/STATION
014202- A08    Loans and Advances                            4,000,000,000         4,000,000,000         2,632,000,000
014202- A085   Loans to Non Financial Institutions                4,000,000,000         4,000,000,000         2,632,000,000
        Total- INTER CONNECTION OF ISOLATED           4,000,000,000       4,000,000,000       2,632,000,000
          MAKRAN NETWORK AT BASIMA VIA
          NAG G/STATION FROM PANJGOOR
            G/STATION
     014202   Total-  Trasfer To Non-Financial                4,086,000,000       4,086,000,000       2,632,000,000
                           Institutions
     0142     Total-  Transfers (Others)                      4,086,000,000       4,086,000,000       2,632,000,000
     014      Total-  Transfers                              4,086,000,000       4,086,000,000       2,632,000,000
     01        Total-  General Public Service                  4,086,000,000       4,086,000,000       2,632,000,000
               Total- ACCOUNTANT GENERAL                 4,086,000,000         4,086,000,000         2,632,000,000
                PAKISTAN REVENUES
                  SUB-OFFICE, QUETTA
          TOTAL - DEMAND                          183,758,219,000    163,916,654,000    169,210,378,000
                  (In Foreign Exchange)                           (928,326,000)
            (Own Resources)                                (928,326,000)
               (Foreign Aid)
                  (In Local Currency)                          (182,829,893,000)   (163,916,654,000)   (169,210,378,000)
                                                  __________________________________________________

Page 452

NO. 130.- EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL      DEMANDS FOR GRANTS
       GOVERNMENT
                                DEMAND NO. 130
                                                                    ( FC12E14 / FC15E14 )
          EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2027 for EXTERNAL DEVELOPMENT
LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT.

                                        Total                Rs.    609,608,690,000
                                      (Charged)            Rs.    607,308,690,000
                                         (Voted)               Rs.    2,300,000,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF FINANCE AND REVENUE  .

                                                           2025-2026         2025-2026         2026-2027
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
014    Transfers                                                777,053,280,000       777,053,280,000       609,608,690,000
               Total                                            777,053,280,000       777,053,280,000       609,608,690,000
              (Charged)                                  774,953,280,000    774,953,280,000    607,308,690,000
               (Voted)                                       2,100,000,000       2,100,000,000       2,300,000,000
                                                  __________________________________________________
     OBJECT CLASSIFICATION
A08   Loans and Advances                              777,053,280,000    777,053,280,000    609,608,690,000
       (Charged)                                         774,953,280,000    774,953,280,000    607,308,690,000
        (Voted)                                              2,100,000,000       2,100,000,000       2,300,000,000
               Total                                      777,053,280,000    777,053,280,000    609,608,690,000
              (Charged)                                       774,953,280,000       774,953,280,000       607,308,690,000
               (Voted)                                             2,100,000,000         2,100,000,000         2,300,000,000
                                                  __________________________________________________
                  (In Foreign Exchange)                           (777,053,280,000)     (777,053,280,000)     (609,608,690,000)
            (Own Resources)
               (Foreign Aid)                                     (777,053,280,000)     (777,053,280,000)     (609,608,690,000)
                                                  __________________________________________________

Page 453

NO. 130.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
III.  - DETAILS are as follows :-
                                 No of Posts        2025-2026         2025-2026       2026-2027
                                       2025-26 2026-27       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
01     General Public Service:
014    Transfers:
0141   Transfers (Inter-Governmental):
014101 TO PROVINCES  :
IB3907 AJK BLOCK ALLOCATION (FOREIGN)
014101- A08    Loans and Advances                            1,000,000,000         1,000,000,000         1,000,000,000
014101- A085   Loans to Non Financial Institutions                1,000,000,000         1,000,000,000         1,000,000,000
        Total- AJK BLOCK ALLOCATION (FOREIGN)         1,000,000,000       1,000,000,000       1,000,000,000
                  (In Foreign Exchange)                          (1,000,000,000)      (1,000,000,000)      (1,000,000,000)
               (Foreign Aid)                                   (1,000,000,000)      (1,000,000,000)      (1,000,000,000)
                                                  __________________________________________________
IB3908 GB BLOCK ALLOCATION (FOREIGN)
014101- A08    Loans and Advances                             500,000,000          500,000,000          300,000,000
014101- A085   Loans to Non Financial Institutions                 500,000,000          500,000,000          300,000,000
        Total- GB BLOCK ALLOCATION (FOREIGN)           500,000,000        500,000,000        300,000,000
                  (In Foreign Exchange)                           (500,000,000)       (500,000,000)       (300,000,000)
               (Foreign Aid)                                    (500,000,000)       (500,000,000)       (300,000,000)
                                                  __________________________________________________
ID8871 PUNJAB PROGRAMME LOAN
014101- A08    Loans and Advances                           53,209,200,000        53,209,200,000        49,665,980,000
                (Charged)                                  53,209,200,000      53,209,200,000      49,665,980,000
014101- A082   Provinces                                       53,209,200,000        53,209,200,000        49,665,980,000
                (Charged)                                  53,209,200,000      53,209,200,000      49,665,980,000
        Total- PUNJAB PROGRAMME LOAN                53,209,200,000      53,209,200,000      49,665,980,000
                  (In Foreign Exchange)                         (53,209,200,000)     (53,209,200,000)     (49,665,980,000)
               (Foreign Aid)                                 (53,209,200,000)     (53,209,200,000)     (49,665,980,000)
                                                  __________________________________________________
ID8872 SINDH PROGRAMME LOAN
014101- A08    Loans and Advances                                                                        5,800,000,000
                (Charged)                                                                           5,800,000,000
014101- A082   Provinces                                                                                     5,800,000,000
                (Charged)                                                                           5,800,000,000
        Total- SINDH PROGRAMME LOAN                                                           5,800,000,000
                  (In Foreign Exchange)                                                                    (5,800,000,000)
               (Foreign Aid)                                                                            (5,800,000,000)
ID8873 KPK PROGRAMME LOAN
014101- A08    Loans and Advances                           35,223,400,000        35,223,400,000        27,245,500,000
                (Charged)                                  35,223,400,000      35,223,400,000      27,245,500,000
014101- A082   Provinces                                       35,223,400,000        35,223,400,000        27,245,500,000

Page 454

NO. 130.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

                (Charged)                                  35,223,400,000      35,223,400,000      27,245,500,000
        Total- KPK PROGRAMME LOAN                    35,223,400,000      35,223,400,000      27,245,500,000
                  (In Foreign Exchange)                         (35,223,400,000)     (35,223,400,000)     (27,245,500,000)
               (Foreign Aid)                                 (35,223,400,000)     (35,223,400,000)     (27,245,500,000)
                                                  __________________________________________________
ID8986 SINDH
014101- A08    Loans and Advances                          359,616,730,000       359,616,730,000       252,005,910,000
                (Charged)                                359,616,730,000    359,616,730,000    252,005,910,000
014101- A082   Provinces                                      359,616,730,000       359,616,730,000       252,005,910,000
                (Charged)                                359,616,730,000    359,616,730,000    252,005,910,000
        Total- SINDH                                     359,616,730,000    359,616,730,000     252,005,910,000
                  (In Foreign Exchange)                       (359,616,730,000)   (359,616,730,000)   (252,005,910,000)
               (Foreign Aid)                                (359,616,730,000)   (359,616,730,000)   (252,005,910,000)
                                                  __________________________________________________
ID8987 PUNJAB
014101- A08    Loans and Advances                          123,824,490,000       123,824,490,000       139,733,600,000
                (Charged)                                123,824,490,000    123,824,490,000    139,733,600,000
014101- A082   Provinces                                      123,824,490,000       123,824,490,000       139,733,600,000
                (Charged)                                123,824,490,000    123,824,490,000    139,733,600,000
        Total- PUNJAB                                   123,824,490,000    123,824,490,000     139,733,600,000
                  (In Foreign Exchange)                       (123,824,490,000)   (123,824,490,000)   (139,733,600,000)
               (Foreign Aid)                                (123,824,490,000)   (123,824,490,000)   (139,733,600,000)
                                                  __________________________________________________
ID8988 KHYBER PAKHTUNKHWA
014101- A08    Loans and Advances                          170,802,460,000       170,802,460,000       104,324,600,000
                (Charged)                                170,802,460,000    170,802,460,000    104,324,600,000
014101- A082   Provinces                                      170,802,460,000       170,802,460,000       104,324,600,000
                (Charged)                                170,802,460,000    170,802,460,000    104,324,600,000
        Total- KHYBER PAKHTUNKHWA                  170,802,460,000    170,802,460,000     104,324,600,000
                  (In Foreign Exchange)                       (170,802,460,000)   (170,802,460,000)   (104,324,600,000)
               (Foreign Aid)                                (170,802,460,000)   (170,802,460,000)   (104,324,600,000)
                                                  __________________________________________________
ID8989 BALOCHISTAN
014101- A08    Loans and Advances                           32,277,000,000        32,277,000,000        28,533,100,000
                (Charged)                                  32,277,000,000      32,277,000,000      28,533,100,000
014101- A082   Provinces                                       32,277,000,000        32,277,000,000        28,533,100,000
                (Charged)                                  32,277,000,000      32,277,000,000      28,533,100,000
        Total- BALOCHISTAN                              32,277,000,000      32,277,000,000      28,533,100,000

Page 455

NO. 130.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

                  (In Foreign Exchange)                         (32,277,000,000)     (32,277,000,000)     (28,533,100,000)
               (Foreign Aid)                                 (32,277,000,000)     (32,277,000,000)     (28,533,100,000)
                                                  __________________________________________________
     014101   Total- TO PROVINCES                     776,453,280,000    776,453,280,000    608,608,690,000
014110 OTHERS  :
IB0688 40 MW DOWARIAN
014110- A08    Loans and Advances                               10,753,000            10,753,000          199,743,000
014110- A086   Loans to Others                                     10,753,000            10,753,000          199,743,000
        Total- 40 MW DOWARIAN                              10,753,000         10,753,000        199,743,000
                  (In Foreign Exchange)                             (10,753,000)         (10,753,000)       (199,743,000)
               (Foreign Aid)                                      (10,753,000)         (10,753,000)       (199,743,000)
                                                  __________________________________________________
ID8222 48 MW JAGRAN HYDRO POWER PROJECT AJK
014110- A08    Loans and Advances                             589,247,000          589,247,000          800,257,000
014110- A086   Loans to Others                                   589,247,000          589,247,000          800,257,000
        Total- 48 MW JAGRAN HYDRO POWER               589,247,000        589,247,000        800,257,000
          PROJECT AJK
                  (In Foreign Exchange)                           (589,247,000)       (589,247,000)       (800,257,000)
               (Foreign Aid)                                    (589,247,000)       (589,247,000)       (800,257,000)
                                                  __________________________________________________
     014110   Total- OTHERS                               600,000,000        600,000,000       1,000,000,000
     0141     Total-  Transfers (Inter-Governmental)        777,053,280,000    777,053,280,000    609,608,690,000
     014      Total-  Transfers                           777,053,280,000    777,053,280,000    609,608,690,000
     01        Total-  General Public Service               777,053,280,000    777,053,280,000    609,608,690,000
               Total- ACCOUNTANT GENERAL               777,053,280,000       777,053,280,000       609,608,690,000
                PAKISTAN REVENUES
              (Charged)                                        774,953,280,000       774,953,280,000       607,308,690,000
               (Voted)                                              2,100,000,000         2,100,000,000         2,300,000,000
                       (In Foreign Exchange)                       (777,053,280,000)     (777,053,280,000)     (609,608,690,000)
               (Own Resources)
                   (Foreign Aid)                                 (777,053,280,000)     (777,053,280,000)     (609,608,690,000)
          TOTAL - DEMAND                          777,053,280,000    777,053,280,000    609,608,690,000
              (Charged)                                  774,953,280,000    774,953,280,000    607,308,690,000
               (Voted)                                        2,100,000,000       2,100,000,000       2,300,000,000
                                                  __________________________________________________
                  (In Foreign Exchange)                       (777,053,280,000)   (777,053,280,000)   (609,608,690,000)
            (Own Resources)
               (Foreign Aid)                                (777,053,280,000)   (777,053,280,000)   (609,608,690,000)
                                                  __________________________________________________

Page 456

No text layer on this page, see the official PDF.

Page 457

                               SECTION V

                       MINISTRY OF HOUSING AND WORKS

                                                                   **********
                                                                                  2026-2027
                                                                             Budget
                                                                                    Estimate

                                                                      (Rupees in Thousand)

Demand presented on behalf of the
Ministry of Housing and Works

Development Expenditure on Capital Account
             131.  Capital Outlay on Civil Works                                           16,394,700

                                                                          Total :             16,394,700

Page 458

No text layer on this page, see the official PDF.

Page 459

NO. 131.- CAPITAL OUTLAY ON CIVIL WORKS                              DEMANDS FOR GRANTS
                                DEMAND NO. 131
                                                                            ( FC12C28 )
                               CAPITAL OUTLAY ON CIVIL WORKS

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2027 for CAPITAL OUTLAY ON CIVIL
WORKS.

                                Voted           Rs. 16,394,700,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF HOUSING AND WORKS  .

                                                           2025-2026         2025-2026         2026-2027
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
045    Construction and Transport                                15,005,801,000        20,471,720,000        16,394,700,000
               Total                                              15,005,801,000        20,471,720,000        16,394,700,000
     OBJECT CLASSIFICATION
A03   Operating Expenses                                  151,492,000        132,472,000
A05   Grants, Subsidies and Write off Loans                  185,000,000        185,000,000
A12    Civil works                                         14,669,309,000      20,154,248,000      16,394,700,000
               Total                                        15,005,801,000      20,471,720,000      16,394,700,000

Page 460

NO. 131.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS

III.  - DETAILS are as follows :-
                                 No of Posts        2025-2026         2025-2026       2026-2027
                                       2025-26 2026-27       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
04     Economic Affairs:
045    Construction and Transport:
0457   Construction (Works):
045702 Buildings and Structures  :
IB2244 REPLACEMENT OF OLD AND UNSERVICEABLE ELEVATORS WITH NEW ELEVATORS AT
SHAHEED-E-MILLAT SECRETARIAT
045702- A12     Civil works                                         53,631,000            53,631,000              101,000
045702- A124    Building and Structures                             53,631,000            53,631,000              101,000
        Total- REPLACEMENT OF OLD AND                    53,631,000         53,631,000            101,000
           UNSERVICEABLE ELEVATORS WITH
         NEW ELEVATORS AT
           SHAHEED-E-MILLAT SECRETARIAT
IB3250 CONSTRUCTION OF OFFICE BUILDING OF IB IN DIPLOMATIC ENCLAVE ISLAMABAD
045702- A12     Civil works                                        100,000,000          100,000,000          100,000,000
045702- A124    Building and Structures                            100,000,000          100,000,000          100,000,000
        Total- CONSTRUCTION OF OFFICE BUILDING         100,000,000        100,000,000        100,000,000
          OF IB IN DIPLOMATIC ENCLAVE
           ISLAMABAD
IB3274 CONSTRUCTION OF 12 NOS. APARTMENTS IN MINISTER'S ENCLAVE ISLAMABAD
045702- A12     Civil works                                        132,722,000          132,722,000            53,080,000
045702- A124    Building and Structures                            132,722,000          132,722,000            53,080,000
        Total- CONSTRUCTION OF 12 NOS.                   132,722,000        132,722,000          53,080,000
          APARTMENTS IN MINISTER'S ENCLAVE
           ISLAMABAD
IB3621 CONSTRUCTION OF ELECTION ACADEMY AND OTHER OFFICES OF ELECTION COMMISSION OF
PAKISTAN
045702- A12     Civil works                                        100,000,000          100,000,000          100,000,000
045702- A124    Building and Structures                            100,000,000          100,000,000          100,000,000
        Total- CONSTRUCTION OF ELECTION                100,000,000        100,000,000        100,000,000
          ACADEMY AND OTHER OFFICES OF
           ELECTION COMMISSION OF PAKISTAN
     045702   Total-  Buildings and Structures                  386,353,000        386,353,000        253,181,000
045720 Others  :

Page 461

NO. 131.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB3527 REFURBISHMENT AND REHABILITATION OF GOVERNMENT OWNED BUILDINGS AT ISLAMABAD
045720- A12     Civil works                                         90,000,000            90,000,000          100,000,000
045720- A124    Building and Structures                             90,000,000            90,000,000          100,000,000
        Total- REFURBISHMENT AND                          90,000,000         90,000,000        100,000,000
            REHABILITATION OF GOVERNMENT
         OWNED BUILDINGS AT ISLAMABAD
IB3528 REFURBISHMENT OF EXISTING FACILITIES & PROVISION OF ADDITIONAL FACILITIES AT PM STAFF
COLONY ISLAMABAD
045720- A12     Civil works                                         55,000,000            55,000,000            80,000,000
045720- A124    Building and Structures                             55,000,000            55,000,000            80,000,000
        Total- REFURBISHMENT OF EXISTING                 55,000,000         55,000,000          80,000,000
             FACILITIES & PROVISION OF
           ADDITIONAL FACILITIES AT PM STAFF
          COLONY ISLAMABAD
IB3529 REFURBISHMENT OF PM OFFICE ISLAMABAD
045720- A12     Civil works                                         65,000,000            65,000,000          153,380,000
045720- A124    Building and Structures                             65,000,000            65,000,000          153,380,000
        Total- REFURBISHMENT OF PM OFFICE                65,000,000         65,000,000        153,380,000
           ISLAMABAD
     045720   Total-  Others                                 210,000,000        210,000,000        333,380,000
     0457     Total-  Construction (Works)                     596,353,000        596,353,000        586,561,000
     045      Total-  Construction and Transport               596,353,000        596,353,000        586,561,000
     04        Total-  Economic Affairs                        596,353,000        596,353,000        586,561,000
               Total- ACCOUNTANT GENERAL                  596,353,000          596,353,000          586,561,000
                PAKISTAN REVENUES

Page 462

NO. 131.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

04     Economic Affairs:
045    Construction and Transport:
0452   Road Transport:
045202 Highways.Roads and Bridges  :
KA1392 GREELINE BUS RAPID TRANSPORT SYSTEM (BRTS) KARACHI
045202- A12     Civil works                                       3,000,000,000         2,760,560,000         1,984,049,000
045202- A121   Roads Highways and Bridges                     3,000,000,000         2,760,560,000
045202- A124    Building and Structures                                                                       1,984,049,000
        Total- GREELINE BUS RAPID TRANSPORT          3,000,000,000       2,760,560,000       1,984,049,000
          SYSTEM (BRTS) KARACHI
KA1393 OPERATIONLIZATION OF GREENLINE BRTS AND INSTALLATION OF INTEGRATED INTELLIGENT
TRANSPORT SYSTEM
045202- A05    Grants, Subsidies and Write off Loans            185,000,000          185,000,000
045202- A052   Grants Domestic                                  185,000,000          185,000,000
        Total- OPERATIONLIZATION OF GREENLINE          185,000,000        185,000,000
          BRTS AND INSTALLATION OF
           INTEGRATED INTELLIGENT
          TRANSPORT SYSTEM
KA1394 DEVELOPMENT SCHEMES UNDER PMS PROGRAMS IN SINDH HYDERABAD & MIRPURKHAS DIVISIONS
045202- A03    Operating Expenses                               32,575,000            32,575,000
045202- A039   General                                             32,575,000            32,575,000
045202- A12     Civil works                                         22,425,000            22,425,000          200,000,000
045202- A124    Building and Structures                             22,425,000            22,425,000          200,000,000
        Total- DEVELOPMENT SCHEMES UNDER PMS          55,000,000         55,000,000        200,000,000
          PROGRAMS IN SINDH HYDERABAD &
          MIRPURKHAS DIVISIONS
KA1395 IMPROVEMENT /REHABILITATION OF DIFFERENT ROADS/STREETS INCLUDING WATER AND SEWERAGE
SYSTEM AT
045202- A03    Operating Expenses                               32,575,000            32,575,000
045202- A039   General                                             32,575,000            32,575,000
045202- A12     Civil works                                         37,425,000            37,425,000          345,260,000
045202- A124    Building and Structures                             37,425,000            37,425,000          345,260,000
        Total- IMPROVEMENT /REHABILITATION OF            70,000,000         70,000,000        345,260,000
           DIFFERENT ROADS/STREETS
            INCLUDING WATER AND SEWERAGE
          SYSTEM AT

Page 463

NO. 131.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

KA1396 IMPROVEMENT / REHABILITATION OF DIFFERENT ROADS / STREET INCLUDING WATER & SEWERAGE
SYSTEM IN VARIOUS
045202- A03    Operating Expenses                               32,575,000            27,114,000
045202- A039   General                                             32,575,000            27,114,000
045202- A12     Civil works                                         42,425,000            17,885,000            45,000,000
045202- A124    Building and Structures                             42,425,000            17,885,000            45,000,000
        Total- IMPROVEMENT / REHABILITATION OF           75,000,000         44,999,000          45,000,000
           DIFFERENT ROADS / STREET
           INCLUDING WATER & SEWERAGE
          SYSTEM IN VARIOUS
KA1397 IMPROVEMENT / REHABILITATION OF DIFFERENT ROADS / STREETS INCLUDING WATER SEWERAGE
SYSTEM IN
045202- A03    Operating Expenses                                 6,000,000              900,000
045202- A039   General                                              6,000,000              900,000
045202- A12     Civil works                                         69,000,000             3,476,000
045202- A124    Building and Structures                             69,000,000             3,476,000
        Total- IMPROVEMENT / REHABILITATION OF           75,000,000           4,376,000
           DIFFERENT ROADS / STREETS
           INCLUDING WATER SEWERAGE
          SYSTEM IN
KA1398 IMPROVEMENT/REHABILITATION OF DIFFERENT ROADS/ STREETS INCLUDING WATER & SEWERAGE
SYSTEM IN VARIOUS UNION
045202- A03    Operating Expenses                                 3,000,000             2,085,000
045202- A039   General                                              3,000,000             2,085,000
045202- A12     Civil works                                         47,000,000            32,915,000            50,000,000
045202- A124    Building and Structures                             47,000,000            32,915,000            50,000,000
        Total- IMPROVEMENT/REHABILITATION OF            50,000,000         35,000,000          50,000,000
           DIFFERENT ROADS/ STREETS
           INCLUDING WATER & SEWERAGE
          SYSTEM IN VARIOUS UNION
KA1399 IMPROVEMENT / REHABILITATION OF ROADS / STREETS INCLUDING WATER & SEWERAGE SYSTEM IN
VARIOUS UNION COUNCIL OF
045202- A03    Operating Expenses                                 4,500,000

Page 464

NO. 131.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

045202- A039   General                                              4,500,000
045202- A12     Civil works                                         70,500,000
045202- A124    Building and Structures                             70,500,000
        Total- IMPROVEMENT / REHABILITATION OF           75,000,000
          ROADS / STREETS INCLUDING WATER
          & SEWERAGE SYSTEM IN VARIOUS
           UNION COUNCIL OF
KA1400 PROVIDING WATER SUPPLY SEWERAGE LINES CC TOPPING SOLAR LIGHTS IN VARIOUS WARDS/UCS
OF NAWABSHAH MIRPURKHAS
045202- A03    Operating Expenses                                 2,400,000             2,400,000
045202- A039   General                                              2,400,000             2,400,000
045202- A12     Civil works                                         37,600,000            37,600,000            35,688,000
045202- A124    Building and Structures                             37,600,000            37,600,000            35,688,000
        Total- PROVIDING WATER SUPPLY                    40,000,000         40,000,000          35,688,000
          SEWERAGE LINES CC TOPPING SOLAR
            LIGHTS IN VARIOUS WARDS/UCS OF
          NAWABSHAH MIRPURKHAS
KA1401 REHABILITATION/CONSTRUCTION OF ROADS AT LATIFABAD AT HYDERABAD CITY(06 NUMBER
SCHEME)
045202- A03    Operating Expenses                                 5,100,000            10,294,000
045202- A039   General                                              5,100,000            10,294,000
045202- A12     Civil works                                         79,900,000          159,806,000          200,000,000
045202- A124    Building and Structures                             79,900,000          159,806,000          200,000,000
        Total- REHABILITATION/CONSTRUCTION OF           85,000,000        170,100,000        200,000,000
          ROADS AT LATIFABAD AT HYDERABAD
             CITY(06 NUMBER SCHEME)
KA1402 CONSTRUCTION OF CAR BAZAR UC .06 DISTRICT CENTRAL KARACHI
045202- A03    Operating Expenses                                 4,800,000
045202- A039   General                                              4,800,000
045202- A12     Civil works                                         75,200,000
045202- A124    Building and Structures                             75,200,000
        Total- CONSTRUCTION OF CAR BAZAR UC .06         80,000,000
            DISTRICT CENTRAL KARACHI

Page 465

NO. 131.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
KA1403 CONSTRUCTION OF PAK ASIAN FOOTBALL GROUND UC 07 DISTRICT CENTRAL KARACHI
045202- A03    Operating Expenses                                 5,967,000
045202- A039   General                                              5,967,000
045202- A12     Civil works                                         93,481,000
045202- A124    Building and Structures                             93,481,000
        Total- CONSTRUCTION OF PAK ASIAN                 99,448,000
          FOOTBALL GROUND UC 07 DISTRICT
          CENTRAL KARACHI
KA1411 CONSTRUCTION OF WATER SUPPLY LINE (24 INCH) DIA FROM HUSSAINABAD FILTER PLANT TO
KOHSAR PUMPING STATION
045202- A03    Operating Expenses                                 6,200,000            11,386,000
045202- A039   General                                              6,200,000            11,386,000
045202- A12     Civil works                                         73,800,000          153,586,000          250,000,000
045202- A124    Building and Structures                             73,800,000          153,586,000          250,000,000
        Total- CONSTRUCTION OF WATER SUPPLY            80,000,000        164,972,000        250,000,000
            LINE (24 INCH) DIA FROM
           HUSSAINABAD FILTER PLANT TO
          KOHSAR PUMPING STATION
KA1412 REHABILITATION OF INFRASTRUCTURE WORKS (CONSTRUCTION OF ROAD WATER LINE SEWERAGE
PARKS AND PLAYGROUND
045202- A03    Operating Expenses                                 5,000,000             2,343,000
045202- A039   General                                              5,000,000             2,343,000
045202- A12     Civil works                                         75,000,000            34,117,000          245,457,000
045202- A124    Building and Structures                             75,000,000            34,117,000          245,457,000
        Total- REHABILITATION OF                            80,000,000         36,460,000        245,457,000
           INFRASTRUCTURE WORKS
           (CONSTRUCTION OF ROAD WATER
            LINE SEWERAGE PARKS AND
          PLAYGROUND
KA1413 REHABILITATION OF INFRASTRUCTURE WORKS(CONSTRUCTION OF ROADS FOOT PATHS WATER
SUPPLY SEWERAGE PUBLIC
045202- A03    Operating Expenses                                 5,200,000             5,200,000
045202- A039   General                                              5,200,000             5,200,000
045202- A12     Civil works                                         74,800,000            74,800,000
045202- A124    Building and Structures                             74,800,000            74,800,000
        Total- REHABILITATION OF                            80,000,000         80,000,000
           INFRASTRUCTURE
          WORKS(CONSTRUCTION OF ROADS
          FOOT PATHS WATER SUPPLY
          SEWERAGE PUBLIC

Page 466

NO. 131.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
KA1414 IMPROVEMENT / REHABILITATION OF DIFFERENT ROADS WATER SUPPLY SEWERAGE PARKS AND
PLAYGROUNDS IN
045202- A03    Operating Expenses                                 5,600,000             5,600,000
045202- A039   General                                              5,600,000             5,600,000
045202- A12     Civil works                                         74,400,000            74,400,000          200,000,000
045202- A124    Building and Structures                             74,400,000            74,400,000          200,000,000
        Total- IMPROVEMENT / REHABILITATION OF           80,000,000         80,000,000        200,000,000
           DIFFERENT ROADS WATER SUPPLY
          SEWERAGE PARKS AND
          PLAYGROUNDS IN
KA1473 06 NOS. DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT
PROGRAMME SAP
045202- A12     Civil works                                                             250,000,000
045202- A124    Building and Structures                                                  250,000,000
        Total- 06 NOS. DEVELOPMENT SCHEMES                                250,000,000
          UNDER SUSTAINABLE DEVELOPMENT
          GOALS ACHIEVEMENT PROGRAMME
          SAP
KA1474 06 NOS. DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT
PROGRAMME SAP
045202- A12     Civil works                                                             250,000,000
045202- A124    Building and Structures                                                  250,000,000
        Total- 06 NOS. DEVELOPMENT SCHEMES                                250,000,000
          UNDER SUSTAINABLE DEVELOPMENT
          GOALS ACHIEVEMENT PROGRAMME
          SAP
KA1475 10 NOS. DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT
PROGRAMME SAP FOR
045202- A12     Civil works                                                             250,000,000
045202- A124    Building and Structures                                                  250,000,000
        Total- 10 NOS. DEVELOPMENT SCHEMES                                250,000,000
          UNDER SUSTAINABLE DEVELOPMENT
          GOALS ACHIEVEMENT PROGRAMME
          SAP FOR

Page 467

NO. 131.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

KA1476 DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME
SAP FOR
045202- A12     Civil works                                                             250,000,000
045202- A124    Building and Structures                                                  250,000,000
        Total- DEVELOPMENT SCHEMES UNDER                                250,000,000
           SUSTAINABLE DEVELOPMENT GOALS
           ACHIEVEMENT PROGRAMME SAP FOR
KA1477 DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME
SAP FOR
045202- A12     Civil works                                                             250,000,000
045202- A124    Building and Structures                                                  250,000,000
        Total- DEVELOPMENT SCHEMES UNDER                                250,000,000
           SUSTAINABLE DEVELOPMENT GOALS
           ACHIEVEMENT PROGRAMME SAP FOR
KA1478 07 NOS DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT
PROGRAMME SAP FOR
045202- A12     Civil works                                                             250,000,000
045202- A124    Building and Structures                                                  250,000,000
        Total- 07 NOS DEVELOPMENT SCHEMES                                 250,000,000
          UNDER SUSTAINABLE DEVELOPMENT
          GOALS ACHIEVEMENT PROGRAMME
          SAP FOR
KA1479 10 NOS DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT
PROGRAMME SAP FOR
045202- A12     Civil works                                                             250,000,000
045202- A124    Building and Structures                                                  250,000,000
        Total- 10 NOS DEVELOPMENT SCHEMES                                 250,000,000
          UNDER SUSTAINABLE DEVELOPMENT
          GOALS ACHIEVEMENT PROGRAMME
          SAP FOR

Page 468

NO. 131.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

KA1480 09 NOS DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT
PROGRAMME SAP FOR
045202- A12     Civil works                                                             250,000,000
045202- A124    Building and Structures                                                  250,000,000
        Total- 09 NOS DEVELOPMENT SCHEMES                                 250,000,000
          UNDER SUSTAINABLE DEVELOPMENT
          GOALS ACHIEVEMENT PROGRAMME
          SAP FOR
KA1481 10 NOS DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT
PROGRAMME SAP FOR
045202- A12     Civil works                                                             250,000,000
045202- A124    Building and Structures                                                  250,000,000
        Total- 10 NOS DEVELOPMENT SCHEMES                                 250,000,000
          UNDER SUSTAINABLE DEVELOPMENT
          GOALS ACHIEVEMENT PROGRAMME
          SAP FOR
KA1482 09 NOS DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT
PROGRAMME SAP FOR
045202- A12     Civil works                                                             250,000,000
045202- A124    Building and Structures                                                  250,000,000
        Total- 09 NOS DEVELOPMENT SCHEMES                                 250,000,000
          UNDER SUSTAINABLE DEVELOPMENT
          GOALS ACHIEVEMENT PROGRAMME
          SAP FOR
KA1483 DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME
SAP FOR
045202- A12     Civil works                                                             250,000,000
045202- A124    Building and Structures                                                  250,000,000
        Total- DEVELOPMENT SCHEMES UNDER                                250,000,000
           SUSTAINABLE DEVELOPMENT GOALS
           ACHIEVEMENT PROGRAMME SAP FOR
KA1484 DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME
SAP FOR
045202- A12     Civil works                                                             250,000,000
045202- A124    Building and Structures                                                  250,000,000
        Total- DEVELOPMENT SCHEMES UNDER                                250,000,000
           SUSTAINABLE DEVELOPMENT GOALS
           ACHIEVEMENT PROGRAMME SAP
          FOR

Page 469

NO. 131.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

KA1485 07 NOS. DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT
PROGRAMME SAP FOR
045202- A12     Civil works                                                             250,000,000
045202- A124    Building and Structures                                                  250,000,000
        Total- 07 NOS. DEVELOPMENT SCHEMES                                250,000,000
          UNDER SUSTAINABLE DEVELOPMENT
          GOALS ACHIEVEMENT PROGRAMME
          SAP FOR
KA1486 08 NOS. DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT
PROGRAMME SAP FOR
045202- A12     Civil works                                                             250,000,000
045202- A124    Building and Structures                                                  250,000,000
        Total- 08 NOS. DEVELOPMENT SCHEMES                                250,000,000
          UNDER SUSTAINABLE DEVELOPMENT
          GOALS ACHIEVEMENT PROGRAMME
          SAP FOR
KA1487 08 NOS. DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT
PROGRAMME SAP FOR
045202- A12     Civil works                                                             250,000,000
045202- A124    Building and Structures                                                  250,000,000
        Total- 08 NOS. DEVELOPMENT SCHEMES                                250,000,000
          UNDER SUSTAINABLE DEVELOPMENT
          GOALS ACHIEVEMENT PROGRAMME
          SAP FOR
KA1488 10 NOS. DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT
PROGRAMME SAP FOR
045202- A12     Civil works                                                             250,000,000
045202- A124    Building and Structures                                                  250,000,000
        Total- 10 NOS. DEVELOPMENT SCHEMES                                250,000,000
          UNDER SUSTAINABLE DEVELOPMENT
          GOALS ACHIEVEMENT PROGRAMME
          SAP FOR

Page 470

NO. 131.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

KA1489 09 NOS. DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT
PROGRAMME SAP FOR
045202- A12     Civil works                                                             250,000,000
045202- A124    Building and Structures                                                  250,000,000
        Total- 09 NOS. DEVELOPMENT SCHEMES                                250,000,000
          UNDER SUSTAINABLE DEVELOPMENT
          GOALS ACHIEVEMENT PROGRAMME
          SAP FOR
KA1490 DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME
SAP FOR BAJAUR FOR THE
045202- A12     Civil works                                                             250,000,000
045202- A124    Building and Structures                                                  250,000,000
        Total- DEVELOPMENT SCHEMES UNDER                                250,000,000
           SUSTAINABLE DEVELOPMENT GOALS
           ACHIEVEMENT PROGRAMME SAP FOR
          BAJAUR FOR THE
KA1491 DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME
SAP FOR SHANGLA FOR THE
045202- A12     Civil works                                                             250,000,000
045202- A124    Building and Structures                                                  250,000,000
        Total- DEVELOPMENT SCHEMES UNDER                                250,000,000
           SUSTAINABLE DEVELOPMENT GOALS
           ACHIEVEMENT PROGRAMME SAP FOR
          SHANGLA FOR THE
KA1492 DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME
SAP FOR KOHISTAN UPPER
045202- A12     Civil works                                                             250,000,000
045202- A124    Building and Structures                                                  250,000,000
        Total- DEVELOPMENT SCHEMES UNDER                                250,000,000
           SUSTAINABLE DEVELOPMENT GOALS
           ACHIEVEMENT PROGRAMME SAP FOR
           KOHISTAN UPPER
KA1493 06 NOS. DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT
PROGRAMME SAP FORD I
045202- A12     Civil works                                                             190,000,000
045202- A124    Building and Structures                                                  190,000,000
        Total- 06 NOS. DEVELOPMENT SCHEMES                                190,000,000
          UNDER SUSTAINABLE DEVELOPMENT
          GOALS ACHIEVEMENT PROGRAMME
          SAP FORD I

Page 471

NO. 131.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
KA1505 DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME
YEAR 2025-26 DISTRICT
045202- A12     Civil works                                                             500,000,000
045202- A124    Building and Structures                                                  500,000,000
        Total- DEVELOPMENT SCHEMES UNDER                                500,000,000
           SUSTAINABLE DEVELOPMENT GOALS
           ACHIEVEMENT PROGRAMME YEAR
              2025-26 DISTRICT
KA1506 DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME
YEAR 2025-26 DISTRICT
045202- A12     Civil works                                                             1,000,000,000
045202- A124    Building and Structures                                                 1,000,000,000
        Total- DEVELOPMENT SCHEMES UNDER                                1,000,000,000
           SUSTAINABLE DEVELOPMENT GOALS
           ACHIEVEMENT PROGRAMME YEAR
              2025-26 DISTRICT
KA1507 DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME
YEAR 2025-26 DISTRICT
045202- A12     Civil works                                                               50,000,000
045202- A124    Building and Structures                                                   50,000,000
        Total- DEVELOPMENT SCHEMES UNDER                                  50,000,000
           SUSTAINABLE DEVELOPMENT GOALS
           ACHIEVEMENT PROGRAMME YEAR
              2025-26 DISTRICT
KA1508 DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME
YEAR 2025-26 DISTRICT
045202- A12     Civil works                                                             200,000,000
045202- A124    Building and Structures                                                  200,000,000
        Total- DEVELOPMENT SCHEMES UNDER                                200,000,000
           SUSTAINABLE DEVELOPMENT GOALS
           ACHIEVEMENT PROGRAMME YEAR
              2025-26 DISTRICT

Page 472

NO. 131.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

KA1509 DEVELOPMENT SCHEMES UNDER SUSTAINABLE DEVELOPMENT GOALS ACHIEVEMENT PROGRAMME
YEAR 2025-26 DISTRICT
045202- A12     Civil works                                                             150,000,000
045202- A124    Building and Structures                                                  150,000,000
        Total- DEVELOPMENT SCHEMES UNDER                                150,000,000
           SUSTAINABLE DEVELOPMENT GOALS
           ACHIEVEMENT PROGRAMME YEAR
              2025-26 DISTRICT
KA1511 KARACHI URBAN INFRASTRUCTURE DEVELOPMENT PACKAGE - II
045202- A12     Civil works                                                                                   7,500,000,000
045202- A124    Building and Structures                                                                       7,500,000,000
        Total- KARACHI URBAN INFRASTRUCTURE                                                 7,500,000,000
          DEVELOPMENT PACKAGE - II
KA1512 HYDERABAD URBAN INFRASTRUCTURE DEVELOPMENT PACKAGE - II
045202- A12     Civil works                                                                                   2,500,000,000
045202- A124    Building and Structures                                                                       2,500,000,000
        Total- HYDERABAD URBAN                                                                 2,500,000,000
           INFRASTRUCTURE DEVELOPMENT
          PACKAGE - II
KA1513 NATIONAL IQBAL LIBARARY AND MONUMENT
045202- A12     Civil works                                                                                   1,200,000,000
045202- A124    Building and Structures                                                                       1,200,000,000
        Total- NATIONAL IQBAL LIBARARY AND                                                    1,200,000,000
          MONUMENT
KA1514 CONSTRUCTION OF IB OFFICE MITHI RS.50.0 M
045202- A12     Civil works                                                                                     50,000,000
045202- A124    Building and Structures                                                                         50,000,000
        Total- CONSTRUCTION OF IB OFFICE MITHI                                                   50,000,000
              RS.50.0 M
KA1515 CONSTRUCTION OF I B OFFICE SWAT
045202- A12     Civil works                                                                                     50,000,000
045202- A124    Building and Structures                                                                         50,000,000
        Total- CONSTRUCTION OF I B OFFICE SWAT                                                  50,000,000

Page 473

NO. 131.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

KA1516 REHABILITATION OF MAIN EXISTING NALA FROM STTAR SHAH PARK TO ODIAN PLAZA VIA NISHAT
COWK HYDERABAD
045202- A12     Civil works                                                                                   150,000,000
045202- A124    Building and Structures                                                                       150,000,000
        Total- REHABILITATION OF MAIN EXISTING                                                 150,000,000
          NALA FROM STTAR SHAH PARK TO
           ODIAN PLAZA VIA NISHAT COWK
          HYDERABAD
KA1517 CONSTRUCTION OF GOVERNMENT GIRLS DEGREE COLLEGE BUILDING & LIBRARY WITH FURNITURE AT
GOVERNMENT BOYS
045202- A12     Civil works                                                                                   100,000,000
045202- A124    Building and Structures                                                                       100,000,000
        Total- CONSTRUCTION OF GOVERNMENT                                                   100,000,000
            GIRLS DEGREE COLLEGE BUILDING &
           LIBRARY WITH FURNITURE AT
          GOVERNMENT BOYS
KA1520 REHABILITATION OF INFRASTRUCTURE WORKS (CONST. OF ROAD-FOOTPATH-WATER
SUPPLY-SWEARAGE-PUBLIC PARK-PLAY
045202- A12     Civil works                                                                                   220,000,000
045202- A124    Building and Structures                                                                       220,000,000
        Total- REHABILITATION OF                                                                 220,000,000
           INFRASTRUCTURE WORKS (CONST. OF
           ROAD-FOOTPATH-WATER
           SUPPLY-SWEARAGE-PUBLIC
           PARK-PLAY
KA9982 KARACHI URBAN INFRASTRUCTRE DEVELOPMENT PACKAGE
045202- A12     Civil works                                       7,500,000,000         6,560,690,000
045202- A124    Building and Structures                           7,500,000,000         6,560,690,000
        Total- KARACHI URBAN INFRASTRUCTRE           7,500,000,000       6,560,690,000
          DEVELOPMENT PACKAGE
KA9983 HYDERABAD URBAN INFRASTRUCTRE DEVELOPMENT PACKAGE(REVAMPING AND REHABILIATION)
045202- A12     Civil works                                       2,500,000,000         2,198,210,000
045202- A124    Building and Structures                           2,500,000,000         2,198,210,000
        Total- HYDERABAD URBAN INFRASTRUCTRE       2,500,000,000       2,198,210,000
          DEVELOPMENT PACKAGE(REVAMPING
          AND REHABILIATION)

Page 474

NO. 131.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

KA9984 CONSTRUCTION OF RCC PRE STRESSED BRIDGE MARI SAFDAR SHAH AT SIREN RIVER UC BEHKUND
TEHSIL AND DISTRICT
045202- A12     Civil works                                        100,000,000          150,000,000          250,375,000
045202- A124    Building and Structures                            100,000,000          150,000,000          250,375,000
        Total- CONSTRUCTION OF RCC PRE                  100,000,000        150,000,000        250,375,000
           STRESSED BRIDGE MARI SAFDAR
          SHAH AT SIREN RIVER UC BEHKUND
            TEHSIL AND DISTRICT
KA9985 CONSTRUCTION OF RCC PRE STRESSED BRIDGE AT SHAH DA PANJA AT SIREN RIVER UC BEHKUND
TEHSIL AND DISTRICT
045202- A12     Civil works                                        100,000,000          150,000,000          232,310,000
045202- A124    Building and Structures                            100,000,000          150,000,000          232,310,000
        Total- CONSTRUCTION OF RCC PRE                  100,000,000        150,000,000        232,310,000
           STRESSED BRIDGE AT SHAH DA
           PANJA AT SIREN RIVER UC BEHKUND
            TEHSIL AND DISTRICT
     045202   Total-  Highways.Roads and Bridges           14,409,448,000      19,875,367,000      15,808,139,000
     0452     Total-  Road Transport                       14,409,448,000      19,875,367,000      15,808,139,000
     045      Total-  Construction and Transport             14,409,448,000      19,875,367,000      15,808,139,000
     04        Total-  Economic Affairs                      14,409,448,000      19,875,367,000      15,808,139,000
               Total- ACCOUNTANT GENERAL                14,409,448,000        19,875,367,000        15,808,139,000
                PAKISTAN REVENUES
                  SUB-OFFICE, KARACHI
          TOTAL - DEMAND                           15,005,801,000      20,471,720,000      16,394,700,000

Page 475

                                   SECTION VI

                       MINISTRY OF INDUSTRIES AND PRODUCTION
                                                            **********

                                                                                  2026-2027
                                                                             Budget
                                                                                    Estimate

                                                                      (Rupees in Thousand)

Demands presented on behalf of the Ministry of
Industries and Production

Development Expendiutre on Capital Account.
             132.  Capital Outlay on Industrial Development                                  6,657,650

                                                                          Total :              6,657,650

Page 476

No text layer on this page, see the official PDF.

Page 477

NO. 132.- CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT                    DEMANDS FOR GRANTS
                                DEMAND NO. 132
                                                                            ( FC12C32 )
                         CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2027 to defray the Salaries and Other
Expenses of the CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT.

                                Voted           Rs. 6,657,650,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF INDUSTRIES AND PRODUCTION  .

                                                           2025-2026         2025-2026         2026-2027
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
044    Mining and Manufacturing                                   1,904,281,000         1,713,853,000         6,657,650,000
               Total                                               1,904,281,000         1,713,853,000         6,657,650,000
     OBJECT CLASSIFICATION
A01   Employees Related Expenses                         149,759,000        149,759,000        244,820,000
A011  Pay                                                        149,759,000          149,759,000          244,820,000
A011-1 Pay of Officers                                                 (95,048,000)           (95,048,000)         (164,360,000)
A011-2 Pay of Other Staff                                              (54,711,000)           (54,711,000)           (80,460,000)
A03   Operating Expenses                                  165,389,000        119,087,000        350,691,000
A05   Grants, Subsidies and Write off Loans                  235,970,000        233,520,000
A09   Physical Assets                                      468,371,000        387,171,000       2,413,808,000
A12    Civil works                                           884,792,000        824,316,000       3,647,331,000
A13   Repairs and Maintenance                                                                        1,000,000
               Total                                         1,904,281,000       1,713,853,000       6,657,650,000

Page 478

NO. 132.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS

III.  - DETAILS are as follows :-
                                 No of Posts        2025-2026         2025-2026       2026-2027
                                       2025-26 2026-27       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
04     Economic Affairs:
044    Mining and Manufacturing:
0441   Manufacturing:
044101 Support for Industrial Development  :
IB5262 SUPPORT FOR INDUSTRIAL DEVELOPMENT STRENGTHENING THE ENGINEERING INDUSTRY
044101- A01    Employees Related Expenses                      74,000,000            74,000,000          108,000,000
044101- A011   Pay                      19                   74,000,000            74,000,000          108,000,000
044101- A011-1 Pay of Officers               (13)                (56,000,000)         (56,000,000)         (96,000,000)
044101- A011-2 Pay of Other Staff               (6)                (18,000,000)         (18,000,000)         (12,000,000)
044101- A03    Operating Expenses                               70,500,000            33,000,000          149,237,000
044101- A032   Communications                                     500,000              240,000              500,000
044101- A037   Consultancy and Contractual Work                  25,500,000             9,375,000            68,368,000
044101- A038    Travel & Transportation                               6,500,000             5,125,000             6,000,000
044101- A039   General                                             38,000,000            18,260,000            74,369,000
044101- A09    Physical Assets                                      5,500,000              500,000
044101- A092   Computer Equipment                                 4,500,000              500,000
044101- A097   Purchase of Furniture and Fixture                     1,000,000
        Total- SUPPORT FOR INDUSTRIAL                   150,000,000        107,500,000        257,237,000
          DEVELOPMENT STRENGTHENING THE
           ENGINEERING INDUSTRY
     044101   Total-  Support for Industrial Development         150,000,000        107,500,000        257,237,000

     0441     Total-  Manufacturing                           150,000,000        107,500,000        257,237,000
     044      Total-  Mining and Manufacturing                 150,000,000        107,500,000        257,237,000
     04        Total-  Economic Affairs                        150,000,000        107,500,000        257,237,000
               Total- ACCOUNTANT GENERAL                  150,000,000          107,500,000          257,237,000
                PAKISTAN REVENUES

Page 479

NO. 132.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

04     Economic Affairs:
044    Mining and Manufacturing:
0441   Manufacturing:
044101 Support for Industrial Development  :
LO1180 PRODUCT DEV. CENTRE FOR COMPOSITES BASED SPORTS GOOD SIALKOT
044101- A01    Employees Related Expenses                      29,721,000            29,721,000            33,426,000
044101- A011   Pay                      56                   29,721,000            29,721,000            33,426,000
044101- A011-1 Pay of Officers                  (4)                  (4,755,000)          (4,755,000)          (5,634,000)
044101- A011-2 Pay of Other Staff            (52)                (24,966,000)         (24,966,000)         (27,792,000)
044101- A03    Operating Expenses                               25,089,000            25,089,000            26,943,000
044101- A039   General                                             25,089,000            25,089,000            26,943,000
044101- A09    Physical Assets                                    36,807,000            36,807,000            17,608,000
044101- A096   Purchase of Plant and Machinery                    15,680,000            15,680,000            13,608,000
044101- A098   Purchase of Other Assets                           21,127,000            21,127,000             4,000,000
        Total- PRODUCT DEV. CENTRE FOR                   91,617,000         91,617,000          77,977,000
           COMPOSITES BASED SPORTS GOOD
           SIALKOT
LO1280 INDUSTRIAL DESIGN AND AUTOMATION CENTRE
044101- A01    Employees Related Expenses                      14,000,000            14,000,000            21,000,000
044101- A011   Pay                      18                   14,000,000            14,000,000            21,000,000
044101- A011-1 Pay of Officers                  (5)                  (9,000,000)          (9,000,000)          (9,000,000)
044101- A011-2 Pay of Other Staff            (13)                  (5,000,000)          (5,000,000)         (12,000,000)
044101- A03    Operating Expenses                                 8,000,000             3,500,000            20,200,000
044101- A039   General                                              8,000,000             3,500,000            20,200,000
044101- A05    Grants, Subsidies and Write off Loans              5,000,000             2,550,000
044101- A052   Grants Domestic                                     5,000,000             2,550,000
044101- A09    Physical Assets                                   108,000,000            31,800,000          102,900,000
044101- A091   Purchase of Building                                  1,800,000             1,800,000              550,000
044101- A092   Computer Equipment                               25,000,000                                 27,500,000
044101- A096   Purchase of Plant and Machinery                    77,000,000            30,000,000            72,350,000
044101- A097   Purchase of Furniture and Fixture                     4,200,000                                   2,500,000
044101- A12     Civil works                                        150,000,000          100,000,000            55,900,000
044101- A124    Building and Structures                            150,000,000          100,000,000            55,900,000
        Total- INDUSTRIAL DESIGN AND                     285,000,000        151,850,000        200,000,000
          AUTOMATION CENTRE

Page 480

NO. 132.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

LO1299 1000 INDUSTRIAL STITCHING UNITS ALL ACROSS PAKISTAN
044101- A01    Employees Related Expenses                      21,270,000            21,270,000            31,047,000
044101- A011   Pay                      14                   21,270,000            21,270,000            31,047,000
044101- A011-1 Pay of Officers                  (9)                (18,645,000)         (18,645,000)         (27,397,000)
044101- A011-2 Pay of Other Staff               (5)                  (2,625,000)          (2,625,000)          (3,650,000)
044101- A03    Operating Expenses                               32,000,000            32,000,000            15,000,000
044101- A039   General                                             32,000,000            32,000,000            15,000,000
044101- A05    Grants, Subsidies and Write off Loans            194,730,000          194,730,000
044101- A052   Grants Domestic                                  194,730,000          194,730,000
044101- A09    Physical Assets                                      2,000,000             2,000,000          253,953,000
044101- A092   Computer Equipment                                 2,000,000             2,000,000             2,000,000
044101- A096   Purchase of Plant and Machinery                                                             251,953,000
        Total- 1000 INDUSTRIAL STITCHING UNITS            250,000,000        250,000,000        300,000,000
           ALL ACROSS PAKISTAN
LO1303 ACQUISITION OF LAND FOR ESTABLISHMENT OF SME FACILITATION CENTRES AT VARIOUS LOCATIONS
044101- A01    Employees Related Expenses                        760,000              760,000            10,339,000
044101- A011   Pay                       2                     760,000              760,000            10,339,000
044101- A011-1 Pay of Officers                  (1)                   (240,000)            (240,000)          (8,921,000)
044101- A011-2 Pay of Other Staff               (1)                   (520,000)            (520,000)          (1,418,000)
044101- A03    Operating Expenses                                 4,000,000             4,000,000            16,000,000
044101- A039   General                                              4,000,000             4,000,000            16,000,000
044101- A05    Grants, Subsidies and Write off Loans              1,240,000             1,240,000
044101- A052   Grants Domestic                                     1,240,000             1,240,000
044101- A12     Civil works                                         44,000,000            44,000,000          273,661,000
044101- A124    Building and Structures                             44,000,000            44,000,000          273,661,000
        Total- ACQUISITION OF LAND FOR                     50,000,000         50,000,000        300,000,000
           ESTABLISHMENT OF SME
            FACILITATION CENTRES AT VARIOUS
           LOCATIONS
LO1644 SUPPORT CENTRE FOR DENTAL AND SURGICAL EQUIPMENT'S (SCDS) SIALKOT
044101- A01    Employees Related Expenses                       9,000,000             9,000,000            12,000,000
044101- A011   Pay                      18                    9,000,000             9,000,000            12,000,000

Page 481

NO. 132.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

044101- A011-1 Pay of Officers                  (5)                  (6,000,000)          (6,000,000)          (7,000,000)
044101- A011-2 Pay of Other Staff            (13)                  (3,000,000)          (3,000,000)          (5,000,000)
044101- A03    Operating Expenses                                 6,000,000             6,000,000            12,257,000
044101- A039   General                                              6,000,000             6,000,000            12,257,000
044101- A05    Grants, Subsidies and Write off Loans              5,000,000             5,000,000
044101- A052   Grants Domestic                                     5,000,000             5,000,000
044101- A09    Physical Assets                                   128,400,000          128,400,000            37,600,000
044101- A092   Computer Equipment                               18,000,000            18,000,000             2,450,000
044101- A096   Purchase of Plant and Machinery                  104,950,000          104,950,000            35,150,000
044101- A097   Purchase of Furniture and Fixture                     5,450,000             5,450,000
044101- A12     Civil works                                         76,600,000            76,600,000              200,000
044101- A124    Building and Structures                             76,600,000            76,600,000              200,000
        Total- SUPPORT CENTRE FOR DENTAL AND          225,000,000        225,000,000          62,057,000
           SURGICAL EQUIPMENT'S (SCDS)
           SIALKOT
LO9644 NATIONAL STRATEGIC PROGRAM FOR ACQUISITION OF IND TECH-NSPAIT INCLUDING FEASIBILITY-
KNOWLEDGE
044101- A01    Employees Related Expenses                                                                 28,000,000
044101- A011   Pay                                                                                            28,000,000
044101- A011-1 Pay of Officers                                                                            (10,000,000)
044101- A011-2 Pay of Other Staff                                                                         (18,000,000)
044101- A03    Operating Expenses                                                                           37,000,000
044101- A039   General                                                                                        37,000,000
044101- A09    Physical Assets                                                                             228,311,000
044101- A092   Computer Equipment                                                                             3,400,000
044101- A096   Purchase of Plant and Machinery                                                             223,411,000
044101- A098   Purchase of Other Assets                                                                        1,500,000
044101- A13    Repairs and Maintenance                                                                       1,000,000
044101- A133    Buildings and Structure                                                                           1,000,000
        Total- NATIONAL STRATEGIC PROGRAM FOR                                               294,311,000
            ACQUISITION OF IND TECH-NSPAIT
           INCLUDING FEASIBILITY- KNOWLEDGE
     044101   Total-  Support for Industrial Development         901,617,000        768,467,000       1,234,345,000
     0441     Total-  Manufacturing                           901,617,000        768,467,000       1,234,345,000
     044      Total-  Mining and Manufacturing                 901,617,000        768,467,000       1,234,345,000
     04        Total-  Economic Affairs                        901,617,000        768,467,000       1,234,345,000
               Total- ACCOUNTANT GENERAL                  901,617,000          768,467,000         1,234,345,000
                PAKISTAN REVENUES
                  SUB-OFFICE, LAHORE

Page 482

NO. 132.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

04     Economic Affairs:
044    Mining and Manufacturing:
0441   Manufacturing:
044101 Support for Industrial Development  :
KA1374 ESTABLISHMENT OF HIGH TENSILE SHEET METAL DIES MANUFACTURING AND TITANIUM COATING
SETUP AT KTDMC
044101- A03    Operating Expenses                                                                             8,052,000
044101- A037   Consultancy and Contractual Work                                                               3,750,000
044101- A039   General                                                                                          4,302,000
044101- A05    Grants, Subsidies and Write off Loans             30,000,000            30,000,000
044101- A052   Grants Domestic                                    30,000,000            30,000,000
044101- A09    Physical Assets                                                                             184,866,000
044101- A096   Purchase of Plant and Machinery                                                             183,350,000
044101- A097   Purchase of Furniture and Fixture                                                                 1,516,000
044101- A12     Civil works                                         40,000,000            40,000,000            42,000,000
044101- A124    Building and Structures                             40,000,000            40,000,000            42,000,000
        Total- ESTABLISHMENT OF HIGH TENSILE             70,000,000         70,000,000        234,918,000
           SHEET METAL DIES MANUFACTURING
          AND TITANIUM COATING SETUP AT
          KTDMC
KA7198 ESTABLISHMENT OF 132 KV GRID STATION AT BIN QASIM INDUSTRIAL PARK KARACHI
044101- A09    Physical Assets                                   182,664,000          182,664,000
044101- A096   Purchase of Plant and Machinery                  182,664,000          182,664,000
        Total- ESTABLISHMENT OF 132 KV GRID             182,664,000        182,664,000
           STATION AT BIN QASIM INDUSTRIAL
          PARK KARACHI
KA9988 DEVELOPMENT OF BLOCK A (500 ACRES) OF PHASE I OF KARACHI INDUSTRIAL PARK (FEDERAL SEZ)
ON STEEL MILL LAND
044101- A03    Operating Expenses                                 5,000,000             5,000,000            52,010,000
044101- A037   Consultancy and Contractual Work                   5,000,000             5,000,000            52,010,000
044101- A09    Physical Assets                                      5,000,000             5,000,000         1,588,570,000
044101- A096   Purchase of Plant and Machinery                     5,000,000             5,000,000         1,588,570,000
044101- A12     Civil works                                        490,000,000          490,000,000         3,240,570,000
044101- A125   Other Works                                      490,000,000          490,000,000         3,240,570,000

Page 483

NO. 132.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

        Total- DEVELOPMENT OF BLOCK A (500              500,000,000        500,000,000       4,881,150,000
           ACRES) OF PHASE I OF KARACHI
            INDUSTRIAL PARK (FEDERAL SEZ) ON
           STEEL MILL LAND
     044101   Total-  Support for Industrial Development         752,664,000        752,664,000       5,116,068,000

     0441     Total-  Manufacturing                           752,664,000        752,664,000       5,116,068,000
     044      Total-  Mining and Manufacturing                 752,664,000        752,664,000       5,116,068,000
     04        Total-  Economic Affairs                        752,664,000        752,664,000       5,116,068,000
               Total- ACCOUNTANT GENERAL                  752,664,000          752,664,000         5,116,068,000
                PAKISTAN REVENUES
                  SUB-OFFICE, KARACHI

Page 484

NO. 132.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

04     Economic Affairs:
044    Mining and Manufacturing:
0441   Manufacturing:
044101 Support for Industrial Development  :
LS0109 ESTABLISHMENT OF HUB SPECIAL ECONOMIC ZONE LASBELA
044101- A01    Employees Related Expenses                       1,008,000             1,008,000             1,008,000
044101- A011   Pay                      29                    1,008,000             1,008,000             1,008,000
044101- A011-1 Pay of Officers               (12)                   (408,000)            (408,000)            (408,000)
044101- A011-2 Pay of Other Staff            (17)                   (600,000)            (600,000)            (600,000)
044101- A03    Operating Expenses                               14,800,000            10,498,000            13,992,000
044101- A037   Consultancy and Contractual Work                   5,000,000             4,850,000             8,490,000
044101- A038    Travel & Transportation                               1,500,000             1,000,000             1,500,000
044101- A039   General                                              8,300,000             4,648,000             4,002,000
044101- A12     Civil works                                         84,192,000            73,716,000            35,000,000
044101- A121   Roads Highways and Bridges                       50,000,000            39,524,000            25,000,000
044101- A123   Embankment and Drainage Works                  34,192,000            34,192,000            10,000,000
        Total- ESTABLISHMENT OF HUB SPECIAL            100,000,000         85,222,000          50,000,000
          ECONOMIC ZONE LASBELA
     044101   Total-  Support for Industrial Development         100,000,000         85,222,000         50,000,000

     0441     Total-  Manufacturing                           100,000,000         85,222,000         50,000,000
     044      Total-  Mining and Manufacturing                 100,000,000         85,222,000         50,000,000
     04        Total-  Economic Affairs                        100,000,000         85,222,000         50,000,000
               Total- ACCOUNTANT GENERAL                  100,000,000            85,222,000            50,000,000
                PAKISTAN REVENUES
                  SUB-OFFICE, QUETTA
          TOTAL - DEMAND                             1,904,281,000       1,713,853,000       6,657,650,000

Page 485

                                   SECTION VII
                             MINISTRY OF MARITIME AFFAIRS
                                                             **********

                                                                                   2026-2027
                                                                              Budget
                                                                                     Estimate

                                                                       (Rupees in Thousand)

 Demand presented on behalf of the
Ministry of Maritime Affairs

 Development Expenditure on Capital Account.
              133.  Capital Outlay on Maritime Affairs Division                                1,780,000

                                                                          Total :              1,780,000

Page 486

No text layer on this page, see the official PDF.

Page 487

NO. 133.- CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION                   DEMANDS FOR GRANTS
                                DEMAND NO. 133
                                                                            ( FC12C51 )
                         CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2027 for CAPITAL OUTLAY ON MARITIME
AFFAIRS DIVISION.

                                Voted           Rs. 1,780,000,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF MARITIME AFFAIRS  .

                                                           2025-2026         2025-2026         2026-2027
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
045    Construction and Transport                                 2,224,000,000          837,110,000         1,280,000,000
046    Communications                                            1,241,000,000          632,460,000          500,000,000
               Total                                               3,465,000,000         1,469,570,000         1,780,000,000
     OBJECT CLASSIFICATION
A02    Project Pre-Investment Analysis                        15,000,000         15,000,000
A09   Physical Assets                                      1,115,565,000        507,025,000        500,000,000
A12    Civil works                                          2,334,435,000        947,545,000       1,280,000,000
               Total                                         3,465,000,000       1,469,570,000       1,780,000,000

Page 488

NO. 133.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION             DEMANDS FOR GRANTS

III.  - DETAILS are as follows :-
                                 No of Posts        2025-2026         2025-2026       2026-2027
                                       2025-26 2026-27       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
04     Economic Affairs:
045    Construction and Transport:
0453   Water Transport:
045301 PORT AND SHIPPPING  :
IB9975 GAWADAR BLUE ECONOMY CENTER PHASE-I
045301- A02     Project Pre-Investment Analysis                   15,000,000            15,000,000
045301- A021    Feasibility Studies                                   15,000,000            15,000,000
        Total- GAWADAR BLUE ECONOMY CENTER           15,000,000         15,000,000
            PHASE-I
     045301   Total- PORT AND SHIPPPING                   15,000,000         15,000,000
     0453     Total-  Water Transport                          15,000,000         15,000,000
     045      Total-  Construction and Transport                 15,000,000         15,000,000
     04        Total-  Economic Affairs                          15,000,000         15,000,000
               Total- ACCOUNTANT GENERAL                    15,000,000            15,000,000
                PAKISTAN REVENUES

Page 489

NO. 133.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION             DEMANDS FOR GRANTS
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

04     Economic Affairs:
045    Construction and Transport:
0453   Water Transport:
045301 PORT AND SHIPPPING  :
GR0093 CONSTRUCTION OF EASTBAY EXPRESSWAY PHASE-II (GRANT-IN-AID)
045301- A12     Civil works                                        200,000,000            22,507,000          250,000,000
045301- A124    Building and Structures                            200,000,000            22,507,000          250,000,000
        Total- CONSTRUCTION OF EASTBAY                 200,000,000         22,507,000        250,000,000
          EXPRESSWAY PHASE-II
             (GRANT-IN-AID)
GR0094 INFRASTRUCTURE WORKS OF OFF-DOCK TERMINAL AT GWADAR
045301- A12     Civil works                                        100,000,000          100,000,000          250,000,000
045301- A124    Building and Structures                            100,000,000          100,000,000          250,000,000
        Total- INFRASTRUCTURE WORKS OF                 100,000,000        100,000,000        250,000,000
           OFF-DOCK TERMINAL AT GWADAR
GR0135 MODERNIZATION AND UPGRADATION OF GADDANI SHIP BREAKING AND RECYCLING INDUSTRY
(MUGSBRI) AND
045301- A12     Civil works                                       1,909,000,000          699,603,000          780,000,000
045301- A125   Other Works                                      1,909,000,000          699,603,000          780,000,000
        Total- MODERNIZATION AND UPGRADATION        1,909,000,000        699,603,000        780,000,000
          OF GADDANI SHIP BREAKING AND
           RECYCLING INDUSTRY (MUGSBRI) AND
     045301   Total- PORT AND SHIPPPING                 2,209,000,000        822,110,000       1,280,000,000
     0453     Total-  Water Transport                        2,209,000,000        822,110,000       1,280,000,000
     045      Total-  Construction and Transport              2,209,000,000        822,110,000       1,280,000,000
046    Communications:
0461   Communications:
046101 ADMINISTRATION  :
GR0091 ANCILLARY FACILITIES IN GPA HOUSING COMPLEX GAWADAR
046101- A12     Civil works                                        125,435,000          125,435,000
046101- A124    Building and Structures                            125,435,000          125,435,000
        Total- ANCILLARY FACILITIES IN GPA                125,435,000        125,435,000
           HOUSING COMPLEX GAWADAR

Page 490

NO. 133.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION             DEMANDS FOR GRANTS
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

GR0092 LAND ACQUISITION AS PER GWADAR PLAN 750 ACRES AT GADANI JUNUBI
046101- A09    Physical Assets                                  1,115,565,000          507,025,000          500,000,000
046101- A091   Purchase of Building                              1,115,565,000          507,025,000          500,000,000
        Total- LAND ACQUISITION AS PER GWADAR        1,115,565,000        507,025,000        500,000,000
           PLAN 750 ACRES AT GADANI JUNUBI
     046101   Total-  ADMINISTRATION                     1,241,000,000        632,460,000        500,000,000
     0461     Total-  Communications                        1,241,000,000        632,460,000        500,000,000
     046      Total-  Communications                        1,241,000,000        632,460,000        500,000,000
     04        Total-  Economic Affairs                       3,450,000,000       1,454,570,000       1,780,000,000
               Total- ACCOUNTANT GENERAL                 3,450,000,000         1,454,570,000         1,780,000,000
                PAKISTAN REVENUES
                  SUB-OFFICE, QUETTA
           TOTAL - DEMAND                             3,465,000,000       1,469,570,000       1,780,000,000

Page 491

                                  SECTION VIII

                                MINISTRY OF RAILWAYS
                                                            **********

                                                                                  2026-2027
                                                                             Budget
                                                                                    Estimate

                                                                      (Rupees in Thousand)

Demand presented on behalf of the
Ministry of Railways

Development Expenditure on Capital Account.
             134.  Capital Outlay on Railways Division                                     40,657,870

                                                                          Total :             40,657,870

Page 492

No text layer on this page, see the official PDF.

Page 493

NO. 134.- CAPITAL OUTLAY ON RAILWAYS DIVISION                         DEMANDS FOR GRANTS
                                DEMAND NO. 134
                                                                            ( FC12C33 )
                            CAPITAL OUTLAY ON RAILWAYS DIVISION

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2027 for CAPITAL OUTLAY ON
RAILWAYS DIVISION.

                                Voted           Rs. 40,657,870,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF RAILWAYS  .

                                                           2025-2026         2025-2026         2026-2027
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
014    Transfers                                                 22,365,000,000        25,168,733,000        40,516,870,000
045    Construction and Transport                                   50,000,000                                141,000,000
               Total                                              22,415,000,000        25,168,733,000        40,657,870,000
     OBJECT CLASSIFICATION
A03   Operating Expenses                                  100,000,000
A11   Investments                                        22,315,000,000      25,168,733,000      40,657,870,000
               Total                                        22,415,000,000      25,168,733,000      40,657,870,000
                  (In Foreign Exchange)                             (10,438,000,000)                             (31,867,000,000)
            (Own Resources)                                  (10,338,000,000)                               (5,767,000,000)
               (Foreign Aid)                                         (100,000,000)                             (26,100,000,000)
                  (In Local Currency)                                (11,977,000,000)       (25,168,733,000)        (8,790,870,000)
                                                  __________________________________________________

Page 494

NO. 134.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION                   DEMANDS FOR GRANTS

III.  - DETAILS are as follows :-
                                 No of Posts        2025-2026         2025-2026       2026-2027
                                       2025-26 2026-27       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
01     General Public Service:
014    Transfers:
0143   Investments:
014302 Non-Financial Institutions  :
IB3639 STRENGTHENING OF PLANNING DEVELOPMENT MONITORING AND EVALUATION (PDANDME)
DIRECTORATE MINISTRY OF
014302- A11    Investments                                        50,000,000            50,000,000            50,000,000
014302- A111   Investment Local                                    50,000,000            50,000,000            50,000,000
        Total- STRENGTHENING OF PLANNING                50,000,000         50,000,000          50,000,000
          DEVELOPMENT MONITORING AND
           EVALUATION (PDANDME)
           DIRECTORATE MINISTRY OF
IB3640 COLLABORATION OF PAKISTAN RAILWAYS WITH DIFFERENT ACADEMIC INSTITUTES (TRIPLE HELIX
MODEL)
014302- A11    Investments                                        50,000,000            28,000,000            30,000,000
014302- A111   Investment Local                                    50,000,000            28,000,000            30,000,000
        Total- COLLABORATION OF PAKISTAN                50,000,000         28,000,000          30,000,000
           RAILWAYS WITH DIFFERENT
           ACADEMIC INSTITUTES (TRIPLE HELIX
           MODEL)
     014302   Total-  Non-Financial Institutions                 100,000,000         78,000,000         80,000,000
     0143     Total-  Investments                             100,000,000         78,000,000         80,000,000
     014      Total-  Transfers                               100,000,000         78,000,000         80,000,000
     01        Total-  General Public Service                   100,000,000         78,000,000         80,000,000
04     Economic Affairs:
045    Construction and Transport:
0454   Railway Trasport:
045401 Railway Trasport  :
IB3652 RENOVATION AND CONSTRUCTION OF OFFICES WOMENS BARRACKS AND MULTI PURPOSE TRAINING
ROOMS AT OFFICE OF THE
045401- A11    Investments                                        50,000,000                                141,000,000

Page 495

NO. 134.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION                   DEMANDS FOR GRANTS
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                              Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045401- A111   Investment Local                                    50,000,000                                141,000,000
        Total- RENOVATION AND CONSTRUCTION OF          50,000,000                            141,000,000
           OFFICES WOMENS BARRACKS AND
            MULTI PURPOSE TRAINING ROOMS AT
            OFFICE OF THE
     045401   Total-  Railway Trasport                          50,000,000                            141,000,000
     0454     Total-  Railway Trasport                          50,000,000                            141,000,000
     045      Total-  Construction and Transport                 50,000,000                            141,000,000
     04        Total-  Economic Affairs                          50,000,000                            141,000,000
                Total- ACCOUNTANT GENERAL                  150,000,000            78,000,000          221,000,000
                 PAKISTAN REVENUES

Page 496

NO. 134.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION                   DEMANDS FOR GRANTS
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

01     General Public Service:
014    Transfers:
0143   Investments:
014302 Non-Financial Institutions  :
LO1306 ESTABLISHMENT OF BUSINESS DEVELOPMENT AND HR SUPPORT UNIT AT PAKISTAN RAILWAYS
014302- A11    Investments                                        50,000,000            11,000,000            50,000,000
014302- A111   Investment Local                                    50,000,000            11,000,000            50,000,000
        Total- ESTABLISHMENT OF BUSINESS                 50,000,000         11,000,000          50,000,000
          DEVELOPMENT AND HR SUPPORT UNIT
           AT PAKISTAN RAILWAYS
LO1307 IMPROVEMENT OF TERMINAL FACILITIES AND ENHANCING SECURITY ARRANGEMENTS IN MARSHLING
YARD PIPRI KARACHI
014302- A11    Investments                                       100,000,000          143,000,000          150,000,000
014302- A111   Investment Local                                  100,000,000          143,000,000          150,000,000
        Total- IMPROVEMENT OF TERMINAL                 100,000,000        143,000,000        150,000,000
             FACILITIES AND ENHANCING
           SECURITY ARRANGEMENTS IN
           MARSHLING YARD PIPRI KARACHI
LO1308 INSTALLATION AND COMMISSIONING OF SOLAR SYSTEM AT 155 NOS RAILWAY STATIONS
014302- A11    Investments                                        50,000,000          294,000,000
014302- A111   Investment Local                                    50,000,000          294,000,000
        Total- INSTALLATION AND COMMISSIONING           50,000,000        294,000,000
          OF SOLAR SYSTEM AT 155 NOS
           RAILWAY STATIONS
LO1311 REHABILITATION OF TRACK BETWEEN SAMA SATTA- BAHAWALNAGAR ON SAMA SATTA- AMRUKA
SECTION
014302- A11    Investments                                        50,000,000                                 10,000,000
014302- A111   Investment Local                                    50,000,000                                 10,000,000
        Total- REHABILITATION OF TRACK BETWEEN         50,000,000                             10,000,000
          SAMA SATTA- BAHAWALNAGAR ON
          SAMA SATTA- AMRUKA SECTION
LO1312 REPLACEMENT OF ROOF MOUNTED AC PLANTS IN PASSENGER COACHES FOR BETTER SERVICE
DELIVERY
014302- A11    Investments                                       400,000,000          870,000,000          508,860,000

Page 497

NO. 134.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION                   DEMANDS FOR GRANTS
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

014302- A111   Investment Local                                  400,000,000          870,000,000          508,860,000
        Total- REPLACEMENT OF ROOF MOUNTED AC        400,000,000        870,000,000        508,860,000
           PLANTS IN PASSENGER COACHES FOR
           BETTER SERVICE DELIVERY
                  (In Foreign Exchange)                           (380,000,000)                            (455,000,000)
            (Own Resources)                                (380,000,000)                            (455,000,000)
                  (In Local Currency)                                (20,000,000)       (870,000,000)         (53,860,000)
                                                  __________________________________________________
LO1313 REHABILITATION AND IMPROVEMENT OF KOTRI JAMSHORO RAIL LINK / PC-1 OF REHABILITATION OF
TRACK BETWEEN
014302- A11    Investments                                        50,000,000          104,000,000          477,942,000
014302- A111   Investment Local                                    50,000,000          104,000,000          477,942,000
        Total- REHABILITATION AND IMPROVEMENT           50,000,000        104,000,000        477,942,000
          OF KOTRI JAMSHORO RAIL LINK / PC-1
          OF REHABILITATION OF TRACK
          BETWEEN
                  (In Foreign Exchange)                             (40,000,000)
            (Own Resources)                                 (40,000,000)
                  (In Local Currency)                                (10,000,000)       (104,000,000)       (477,942,000)
                                                  __________________________________________________
LO1314 IMMEDIATE TRACK SAFETY WORK ON TDM-ROH SECTION
014302- A11    Investments                                        50,000,000         1,155,000,000
014302- A111   Investment Local                                    50,000,000         1,155,000,000
        Total- IMMEDIATE TRACK SAFETY WORK ON          50,000,000       1,155,000,000
           TDM-ROH SECTION
                  (In Foreign Exchange)                             (40,000,000)
            (Own Resources)                                 (40,000,000)
                  (In Local Currency)                                (10,000,000)      (1,155,000,000)
                                                  __________________________________________________
LO1315 IMMEDIATE TRACK SAFETY WORK ON ROH-KPR SECTION
014302- A11    Investments                                        50,000,000          844,000,000          500,000,000
014302- A111   Investment Local                                    50,000,000          844,000,000          500,000,000
        Total- IMMEDIATE TRACK SAFETY WORK ON          50,000,000        844,000,000        500,000,000
           ROH-KPR SECTION
                  (In Foreign Exchange)                             (40,000,000)                            (250,000,000)
            (Own Resources)                                 (40,000,000)                            (250,000,000)

Page 498

NO. 134.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION                   DEMANDS FOR GRANTS
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

                  (In Local Currency)                                (10,000,000)       (844,000,000)       (250,000,000)
                                                  __________________________________________________
LO1316 IMPROVE SAFETY THROUGH BETTER COMMUNICATION SYSTEM
014302- A11    Investments                                        20,000,000            20,000,000          809,017,000
014302- A111   Investment Local                                    20,000,000            20,000,000          809,017,000
        Total- IMPROVE SAFETY THROUGH BETTER           20,000,000         20,000,000        809,017,000
           COMMUNICATION SYSTEM
LO1318 UP-GRADATION OF THE SIGNALLING SYSTEM BY PROVIDING COMPUTER BASED INTER LOCKING AT
SARHAD JUMMA GOTHBADAL
014302- A11    Investments                                        10,000,000            10,000,000            50,000,000
014302- A111   Investment Local                                    10,000,000            10,000,000            50,000,000
        Total- UP-GRADATION OF THE SIGNALLING           10,000,000         10,000,000          50,000,000
          SYSTEM BY PROVIDING COMPUTER
          BASED INTER LOCKING AT SARHAD
          JUMMA GOTHBADAL
                  (In Foreign Exchange)                               (8,000,000)
            (Own Resources)                                   (8,000,000)
                  (In Local Currency)                                  (2,000,000)         (10,000,000)         (50,000,000)
                                                  __________________________________________________
LO1319 ESSENTIAL TRACK SAFETY WORK ON SHERSHAH # KUNDIAN SECTION IN MULTAN DIVISION
014302- A11    Investments                                        50,000,000            25,000,000          200,000,000
014302- A111   Investment Local                                    50,000,000            25,000,000          200,000,000
        Total- ESSENTIAL TRACK SAFETY WORK ON          50,000,000         25,000,000        200,000,000
          SHERSHAH # KUNDIAN SECTION IN
          MULTAN DIVISION
LO1320 ESSENTIAL TRACK SAFETY WORK ON ROHRI # SIBI SECTION IN SUKKUR DIVISION
014302- A11    Investments                                        50,000,000          150,000,000          400,000,000
014302- A111   Investment Local                                    50,000,000          150,000,000          400,000,000
        Total- ESSENTIAL TRACK SAFETY WORK ON          50,000,000        150,000,000        400,000,000
           ROHRI # SIBI SECTION IN SUKKUR
             DIVISION
                  (In Foreign Exchange)                                                                    (200,000,000)
            (Own Resources)                                                                         (200,000,000)
                  (In Local Currency)                                (50,000,000)       (150,000,000)       (200,000,000)
                                                  __________________________________________________

Page 499

NO. 134.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION                   DEMANDS FOR GRANTS
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

LO1328 REPLACEMENT OF OLD AND OBSOLETE SIGNAL GEAR FROM LODHRAN- MULTAN #KHANEWAL-
SHAHDARA BAGH MAINLINE
014302- A11    Investments                                        50,000,000          200,000,000          454,088,000
014302- A111   Investment Local                                    50,000,000          200,000,000          454,088,000
        Total- REPLACEMENT OF OLD AND                    50,000,000        200,000,000        454,088,000
          OBSOLETE SIGNAL GEAR FROM
           LODHRAN- MULTAN #KHANEWAL-
          SHAHDARA BAGH MAINLINE
                   (In Foreign Exchange)                             (40,000,000)                            (200,000,000)
            (Own Resources)                                 (40,000,000)                            (200,000,000)
                   (In Local Currency)                                (10,000,000)       (200,000,000)       (254,088,000)
                                                  __________________________________________________
LO1329 ESSENTIAL TRACK SAFETY WORK ON KHANEWAL-SHORKOT- FAISALABAD- QILA SHEIKHUPURA-
SHAHDARA SECTION IN
014302- A11    Investments                                        50,000,000          335,000,000          200,000,000
014302- A111   Investment Local                                    50,000,000          335,000,000          200,000,000
        Total- ESSENTIAL TRACK SAFETY WORK ON          50,000,000        335,000,000        200,000,000
           KHANEWAL-SHORKOT- FAISALABAD-
            QILA SHEIKHUPURA- SHAHDARA
           SECTION IN
                   (In Foreign Exchange)                             (40,000,000)
            (Own Resources)                                 (40,000,000)
                   (In Local Currency)                                (10,000,000)       (335,000,000)       (200,000,000)
                                                  __________________________________________________
LO1332 ESTABLISHMENT OF PROJECT MANAGEMENT UNIT (PMU) IN MINISTRY OF RAILWAYS (3RD REVISED)
014302- A11    Investments                                        10,000,000            90,000,000          200,000,000
014302- A111   Investment Local                                    10,000,000            90,000,000          200,000,000
        Total- ESTABLISHMENT OF PROJECT                 10,000,000         90,000,000        200,000,000
          MANAGEMENT UNIT (PMU) IN MINISTRY
          OF RAILWAYS (3RD REVISED)
LO1333 PROCUREMENT / MANUFACTURING OF 820 HIGH CAPACITY BOGIE FREIGHT WAGONS AND 230
PASSENGER COACHES
014302- A11    Investments                                      7,000,000,000         6,033,733,000         1,500,000,000
014302- A111   Investment Local                                 7,000,000,000         6,033,733,000         1,500,000,000
        Total- PROCUREMENT / MANUFACTURING OF       7,000,000,000       6,033,733,000       1,500,000,000
             820 HIGH CAPACITY BOGIE FREIGHT
         WAGONS AND 230 PASSENGER
          COACHES

Page 500

NO. 134.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION                   DEMANDS FOR GRANTS
                                 No of Posts        2025-2026         2025-2026        2026-2027
                                       2025-26 2026-27       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

                  (In Foreign Exchange)                          (6,890,000,000)                          (1,400,000,000)
            (Own Resources)                               (6,890,000,000)                          (1,400,000,000)
                  (In Local Currency)                              (110,000,000)      (6,033,733,000)       (100,000,000)
                                                  __________________________________________________
LO1334 REHABILITATION AND OVERHAULING OF TRACK MAINTENANCE MACHINES /CRANES
014302- A11    Investments                                      2,725,000,000          508,000,000         1,840,000,000
014302- A111   Investment Local                                 2,725,000,000          508,000,000         1,840,000,000
        Total- REHABILITATION AND OVERHAULING        2,725,000,000        508,000,000       1,840,000,000
          OF TRACK MAINTENANCE MACHINES
           /CRANES
                  (In Foreign Exchange)                          (1,660,000,000)                          (1,740,000,000)
            (Own Resources)                               (1,660,000,000)                          (1,740,000,000)
                  (In Local Currency)                             (1,065,000,000)       (508,000,000)       (100,000,000)
                                                  __________________________________________________
LO1336 REHABILITATION AND STRENGTHENING OF WEAK BRIDGES ON PAKISTAN RAILWAYS SYSTEM
014302- A11    Investments                                        50,000,000          200,000,000          408,963,000
014302- A111   Investment Local                                    50,000,000          200,000,000          408,963,000
        Total- REHABILITATION AND                          50,000,000        200,000,000        408,963,000
           STRENGTHENING OF WEAK BRIDGES
         ON PAKISTAN RAILWAYS SYSTEM
LO1337 CHINA PAKISTAN ECONOMIC CORRIDOR (CPEC) SUPPORT PROJECT AT MOR (1ST REVISED)
014302- A11    Investments                                        50,000,000            50,000,000            50,000,000
014302- A111   Investment Local                                    50,000,000            50,000,000            50,000,000
        Total- CHINA PAKISTAN ECONOMIC                   50,000,000         50,000,000          50,000,000
          CORRIDOR (CPEC) SUPPORT PROJECT
           AT MOR (1ST REVISED)
LO1338 PRELIMINARY DESIGN AND DRAWING FOR UP GRADATION /REHABILITATION OF MAIN LINE (ML-1)AND
ESTABLISHMENT OF
014302- A11    Investments                                                              20,000,000         1,056,000,000
014302- A111   Investment Local                                                         20,000,000         1,056,000,000
        Total- PRELIMINARY DESIGN AND DRAWING                              20,000,000       1,056,000,000
          FOR UP GRADATION /REHABILITATION
          OF MAIN LINE (ML-1)AND
           ESTABLISHMENT OF