Skip to content
Qanoon Digest

Details of Demands for Grants and Appropriations - Vol-IV (Development), part 6

FY 2025-26Details of demandsPages 501 to 600 of 671

The Details of Demands for Grants and Appropriations - Vol-IV (Development) is part of the federal budget for FY 2025-26. This page reproduces the text of its 671 PDF pages, extracted automatically from the official PDF published by the Finance Division, Government of Pakistan.

Go to a page or part

This text was extracted automatically from the PDF's text layer. Tables may lose their column alignment, and a page with no text layer is marked rather than guessed. Check the official PDF before relying on any figure.

Page 501

NO. 128.- FC12P10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER    DEMANDS FOR GRANTS
                 DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB3869 DI KHAN-ZHOB T/L AND ZHOB S/S
014202- A08    Loans and Advances                                                                        418,000,000
014202- A085   Loans to Non Financial Institutions                                                            418,000,000
        Total-  DI KHAN-ZHOB T/L AND ZHOB S/S                                                    418,000,000
                  (In Foreign Exchange)                                                                    (418,000,000)
               (Foreign Aid)                                                                             (418,000,000)
                                                  __________________________________________________
IB3870 220KV MIRPUR KHAS G/S & T/L
014202- A08    Loans and Advances                                                                        3,000,000,000
014202- A085   Loans to Non Financial Institutions                                                            3,000,000,000
        Total- 220KV MIRPUR KHAS G/S & T/L                                                       3,000,000,000
                  (In Foreign Exchange)                                                                    (3,000,000,000)
               (Foreign Aid)                                                                            (3,000,000,000)
                                                  __________________________________________________
IB3872 UPGRADATION OF NTDC SCADA SYSTEM
014202- A08    Loans and Advances                                                                        998,000,000
014202- A085   Loans to Non Financial Institutions                                                            998,000,000
        Total- UPGRADATION OF NTDC SCADA                                                     998,000,000
          SYSTEM
                  (In Foreign Exchange)                                                                    (998,000,000)
               (Foreign Aid)                                                                             (998,000,000)
                                                  __________________________________________________
IB3873 EVACUATION OF POWER FROM 500 MW WIND POWER PLANTS JHIMPIR & GHARO CLUSTERS
014202- A08    Loans and Advances                                                                        800,000,000
014202- A085   Loans to Non Financial Institutions                                                            800,000,000
        Total- EVACUATION OF POWER FROM 500 MW                                              800,000,000
           WIND POWER PLANTS JHIMPIR &
          GHARO CLUSTERS
                  (In Foreign Exchange)                                                                    (800,000,000)
               (Foreign Aid)                                                                             (800,000,000)
                                                  __________________________________________________
IB3874 ADVANCE METERING PROJECT FOR IESCO
014202- A08    Loans and Advances                                                                        2,940,000,000
014202- A085   Loans to Non Financial Institutions                                                            2,940,000,000
        Total- ADVANCE METERING PROJECT FOR                                                 2,940,000,000
           IESCO

Page 502

NO. 128.- FC12P10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER    DEMANDS FOR GRANTS
                 DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

                  (In Foreign Exchange)                                                                    (2,940,000,000)
               (Foreign Aid)                                                                            (2,940,000,000)
                                                  __________________________________________________
IB3875 200 KV JAUHARABAD G/S
014202- A08    Loans and Advances                                                                        1,500,000,000
014202- A085   Loans to Non Financial Institutions                                                            1,500,000,000
        Total- 200 KV JAUHARABAD G/S                                                            1,500,000,000
                  (In Foreign Exchange)                                                                    (1,500,000,000)
               (Foreign Aid)                                                                            (1,500,000,000)
                                                  __________________________________________________
IB3876 500 KV LAHORE NORTH
014202- A08    Loans and Advances                                                                        1,000,000,000
014202- A085   Loans to Non Financial Institutions                                                            1,000,000,000
        Total- 500 KV LAHORE NORTH                                                              1,000,000,000
                  (In Foreign Exchange)                                                                    (1,000,000,000)
               (Foreign Aid)                                                                            (1,000,000,000)
                                                  __________________________________________________
IB3877 ELECTRICITY TRANS & TRADE PRO CASA
014202- A08    Loans and Advances                                                                        3,000,000,000
014202- A085   Loans to Non Financial Institutions                                                            3,000,000,000
        Total- ELECTRICITY TRANS & TRADE PRO                                                  3,000,000,000
          CASA
                  (In Foreign Exchange)                                                                    (3,000,000,000)
               (Foreign Aid)                                                                            (3,000,000,000)
                                                  __________________________________________________
IB3878 220 KV TRANSMISSION LINE REINFORCEMENT OF ISLAMABAD BURHAN TRANSMISSION LINE
014202- A08    Loans and Advances                                                                        1,200,000,000
014202- A085   Loans to Non Financial Institutions                                                            1,200,000,000
        Total- 220 KV TRANSMISSION LINE                                                         1,200,000,000
           REINFORCEMENT OF ISLAMABAD
          BURHAN TRANSMISSION LINE
                  (In Foreign Exchange)                                                                    (1,200,000,000)
               (Foreign Aid)                                                                            (1,200,000,000)
                                                  __________________________________________________
IB3879 500 KV CHAKWAL G/S ALONG WITH ALLIED T/LS
014202- A08    Loans and Advances                                                                        200,000,000

Page 503

NO. 128.- FC12P10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER    DEMANDS FOR GRANTS
                 DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

014202- A085   Loans to Non Financial Institutions                                                            200,000,000
        Total- 500 KV CHAKWAL G/S ALONG WITH                                                  200,000,000
            ALLIED T/LS
                  (In Foreign Exchange)                                                                    (200,000,000)
               (Foreign Aid)                                                                             (200,000,000)
                                                  __________________________________________________
IB3880 EVACUATION OF POWER FROM TERBELLA 5TH EXTENSION
014202- A08    Loans and Advances                                                                        840,000,000
014202- A085   Loans to Non Financial Institutions                                                            840,000,000
        Total- EVACUATION OF POWER FROM                                                      840,000,000
           TERBELLA 5TH EXTENSION
                  (In Foreign Exchange)                                                                    (840,000,000)
               (Foreign Aid)                                                                             (840,000,000)
                                                  __________________________________________________
IB3881 500 KV ISLAMABAD WEST
014202- A08    Loans and Advances                                                                        5,000,000,000
014202- A085   Loans to Non Financial Institutions                                                            5,000,000,000
        Total- 500 KV ISLAMABAD WEST                                                            5,000,000,000
                  (In Foreign Exchange)                                                                    (5,000,000,000)
               (Foreign Aid)                                                                            (5,000,000,000)
                                                  __________________________________________________
IB3882 ENHANCEMENT IN TRANSFORMATION CAPACITY OF NTDC SYSTEM BY EXTENSION & AUGMENTATION
OF EXISTING GRID
014202- A08    Loans and Advances                                                                        2,500,000,000
014202- A085   Loans to Non Financial Institutions                                                            2,500,000,000
        Total- ENHANCEMENT IN TRANSFORMATION                                               2,500,000,000
           CAPACITY OF NTDC SYSTEM BY
           EXTENSION & AUGMENTATION OF
            EXISTING GRID
                  (In Foreign Exchange)                                                                    (2,500,000,000)
               (Foreign Aid)                                                                            (2,500,000,000)
                                                  __________________________________________________
IB3883 ENTERPRISE RESOURCE PLANNING AUTOMATION
014202- A08    Loans and Advances                                                                        1,629,614,000
014202- A085   Loans to Non Financial Institutions                                                            1,629,614,000
        Total- ENTERPRISE RESOURCE PLANNING                                                 1,629,614,000
           AUTOMATION

Page 504

NO. 128.- FC12P10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER    DEMANDS FOR GRANTS
                 DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

                  (In Foreign Exchange)                                                                    (1,629,614,000)
               (Foreign Aid)                                                                            (1,629,614,000)
                                                  __________________________________________________
IB3884 EVACUATION OF POWER FROM 2160MW DASU HPP STAGE I
014202- A08    Loans and Advances                                                                       10,970,000,000
014202- A085   Loans to Non Financial Institutions                                                          10,970,000,000
        Total- EVACUATION OF POWER FROM                                                    10,970,000,000
           2160MW DASU HPP STAGE I
                  (In Foreign Exchange)                                                                  (10,970,000,000)
               (Foreign Aid)                                                                          (10,970,000,000)
                                                  __________________________________________________
IB3885 220 KV ARIFWALA SUBSTATION
014202- A08    Loans and Advances                                                                        1,200,000,000
014202- A085   Loans to Non Financial Institutions                                                            1,200,000,000
        Total- 220 KV ARIFWALA SUBSTATION                                                      1,200,000,000
                  (In Foreign Exchange)                                                                    (1,200,000,000)
               (Foreign Aid)                                                                            (1,200,000,000)
                                                  __________________________________________________
IB3886 500 KV VEHARI GRID STATION
014202- A08    Loans and Advances                                                                        2,000,000,000
014202- A085   Loans to Non Financial Institutions                                                            2,000,000,000
        Total- 500 KV VEHARI GRID STATION                                                       2,000,000,000
                  (In Foreign Exchange)                                                                    (2,000,000,000)
               (Foreign Aid)                                                                            (2,000,000,000)
                                                  __________________________________________________
IB3887 INSTALLATION OF PILOT BATTERY ENERGY STORAGE SYSTEM BESS AT 220 KV JHIMPIR G/STATION
014202- A08    Loans and Advances                                                                        1,700,000,000
014202- A085   Loans to Non Financial Institutions                                                            1,700,000,000
        Total- INSTALLATION OF PILOT BATTERY                                                   1,700,000,000
          ENERGY STORAGE SYSTEM BESS AT
             220 KV JHIMPIR G/STATION
                  (In Foreign Exchange)                                                                    (1,700,000,000)
               (Foreign Aid)                                                                            (1,700,000,000)
                                                  __________________________________________________

Page 505

NO. 128.- FC12P10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER    DEMANDS FOR GRANTS
                 DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB3888 EVACUATION OF POWER FROM SUKI KINARI KOHALA MAHAL HPPS NTDC
014202- A08    Loans and Advances                                                                        3,500,000,000
014202- A085   Loans to Non Financial Institutions                                                            3,500,000,000
        Total- EVACUATION OF POWER FROM SUKI                                                 3,500,000,000
            KINARI KOHALA MAHAL HPPS NTDC
                  (In Foreign Exchange)                                                                    (3,500,000,000)
               (Foreign Aid)                                                                            (3,500,000,000)
                                                  __________________________________________________
IB3889 500 220 KV SIALKOT SUB STATION NTDC
014202- A08    Loans and Advances                                                                        2,500,000,000
014202- A085   Loans to Non Financial Institutions                                                            2,500,000,000
        Total- 500 220 KV SIALKOT SUB STATION                                                   2,500,000,000
          NTDC
                  (In Foreign Exchange)                                                                    (2,500,000,000)
               (Foreign Aid)                                                                            (2,500,000,000)
                                                  __________________________________________________
IB3890 220KV DHARKI RAHIM YAR KHAN BHAWALPUR D/C T/L NTDC
014202- A08    Loans and Advances                                                                        5,000,000,000
014202- A085   Loans to Non Financial Institutions                                                            5,000,000,000
        Total- 220KV DHARKI RAHIM YAR KHAN                                                    5,000,000,000
          BHAWALPUR D/C T/L NTDC
                  (In Foreign Exchange)                                                                    (5,000,000,000)
               (Foreign Aid)                                                                            (5,000,000,000)
                                                  __________________________________________________
IB3891 ELECTRICITY DISTRIBUTION EFFICIENCY ELECTRICITY DISTRIBU IMPROVEMENT PROJECT
014202- A08    Loans and Advances                                                                        3,150,000,000
014202- A085   Loans to Non Financial Institutions                                                            3,150,000,000
        Total- ELECTRICITY DISTRIBUTION                                                         3,150,000,000
            EFFICIENCY ELECTRICITY DISTRIBU
          IMPROVEMENT PROJECT
                  (In Foreign Exchange)                                                                    (3,150,000,000)
               (Foreign Aid)                                                                            (3,150,000,000)
                                                  __________________________________________________
IB3893 220-KV JAMRUD G/S ALONGWITH ALLIED T/LS
014202- A08    Loans and Advances                                                                        1,500,000,000
014202- A085   Loans to Non Financial Institutions                                                            1,500,000,000
        Total- 220-KV JAMRUD G/S ALONGWITH                                                    1,500,000,000
           ALLIED T/LS

Page 506

NO. 128.- FC12P10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER    DEMANDS FOR GRANTS
                 DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

                  (In Foreign Exchange)                                                                    (1,500,000,000)
               (Foreign Aid)                                                                            (1,500,000,000)
                                                  __________________________________________________
IB3894 EVACUATION OF POWER FROM 816 MW MOHMAND DAM
014202- A08    Loans and Advances                                                                        2,000,000,000
014202- A085   Loans to Non Financial Institutions                                                            2,000,000,000
        Total- EVACUATION OF POWER FROM 816 MW                                              2,000,000,000
         MOHMAND DAM
                  (In Foreign Exchange)                                                                    (2,000,000,000)
               (Foreign Aid)                                                                            (2,000,000,000)
                                                  __________________________________________________
     014202   Total-  Trasfer To Non-financial institutions                                             65,719,614,000

     0142     Total-  Transfers (Others)                                                            65,719,614,000
     014      Total-  Transfers                                                                    65,719,614,000
     01        Total-  General Public Service                                                        65,719,614,000
               Total- ACCOUNTANT GENERAL                                                            65,719,614,000
                PAKISTAN REVENUES
                       (In Foreign Exchange)                                                                      (65,719,614,000)
               (Own Resources)
                   (Foreign Aid)                                                                               (65,719,614,000)

Page 507

NO. 128.- FC12P10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER    DEMANDS FOR GRANTS
                 DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

01     General Public Service:
014    Transfers:
0142   Transfers (Others):
014202 Trasfer To Non-financial institutions  :
MN0148 ELECTRICITY DISTRIBUTION EFFICIENCY IMPROVEMENT PROJECT
014202- A08    Loans and Advances                                                                        1,770,000,000
014202- A085   Loans to Non Financial Institutions                                                            1,770,000,000
        Total- ELECTRICITY DISTRIBUTION                                                         1,770,000,000
            EFFICIENCY IMPROVEMENT PROJECT
                  (In Foreign Exchange)                                                                    (1,770,000,000)
               (Foreign Aid)                                                                            (1,770,000,000)
                                                  __________________________________________________
     014202   Total-  Trasfer To Non-financial institutions                                              1,770,000,000
     0142     Total-  Transfers (Others)                                                              1,770,000,000
     014      Total-  Transfers                                                                      1,770,000,000
     01        Total-  General Public Service                                                          1,770,000,000
               Total- ACCOUNTANT GENERAL                                                             1,770,000,000
                PAKISTAN REVENUES
                  SUB-OFFICE, LAHORE
                       (In Foreign Exchange)                                                                        (1,770,000,000)
               (Own Resources)
                   (Foreign Aid)                                                                                 (1,770,000,000)

Page 508

NO. 128.- FC12P10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER    DEMANDS FOR GRANTS
                 DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

              ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR

01     General Public Service:
014    Transfers:
0142   Transfers (Others):
014202 Trasfer To Non-financial institutions  :
PR1183 ELECTRIC DISTRIBUTION EFFICIENCY IMPROVEMENT PROJECT
014202- A08    Loans and Advances                                                                        2,427,300,000
014202- A085   Loans to Non Financial Institutions                                                            2,427,300,000
        Total- ELECTRIC DISTRIBUTION EFFICIENCY                                                2,427,300,000
          IMPROVEMENT PROJECT
                  (In Foreign Exchange)                                                                    (2,427,300,000)
               (Foreign Aid)                                                                            (2,427,300,000)
                                                  __________________________________________________
     014202   Total-  Trasfer To Non-financial institutions                                              2,427,300,000

     0142     Total-  Transfers (Others)                                                              2,427,300,000
     014      Total-  Transfers                                                                      2,427,300,000
     01        Total-  General Public Service                                                          2,427,300,000
               Total- ACCOUNTANT GENERAL                                                             2,427,300,000
                PAKISTAN REVENUES
                  SUB-OFFICE, PESHAWAR
                       (In Foreign Exchange)                                                                        (2,427,300,000)
               (Own Resources)
                   (Foreign Aid)                                                                                 (2,427,300,000)

Page 509

NO. 128.- FC12P10 EXTERNAL DEVELOPMENT LOANS AND ADVANCES OF POWER    DEMANDS FOR GRANTS
                 DIVISION
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

01     General Public Service:
014    Transfers:
0142   Transfers (Others):
014202 Trasfer To Non-financial institutions  :
HD0238 ELECTRICITY DISTRIBUTION EFFICIENCY IMPROVEMENT PROJECT
014202- A08    Loans and Advances                                                                        1,890,000,000
014202- A085   Loans to Non Financial Institutions                                                            1,890,000,000
        Total- ELECTRICITY DISTRIBUTION                                                         1,890,000,000
            EFFICIENCY IMPROVEMENT PROJECT
                  (In Foreign Exchange)                                                                    (1,890,000,000)
               (Foreign Aid)                                                                            (1,890,000,000)
                                                  __________________________________________________
KA1467 500 KV MATIARI-MORO-RAHIM YAR KHAN T/L
014202- A08    Loans and Advances                                                                        300,000,000
014202- A085   Loans to Non Financial Institutions                                                            300,000,000
        Total- 500 KV MATIARI-MORO-RAHIM YAR                                                   300,000,000
          KHAN T/L
                  (In Foreign Exchange)                                                                    (300,000,000)
               (Foreign Aid)                                                                             (300,000,000)
                                                  __________________________________________________
     014202   Total-  Trasfer To Non-financial institutions                                              2,190,000,000
     0142     Total-  Transfers (Others)                                                              2,190,000,000
     014      Total-  Transfers                                                                      2,190,000,000
     01        Total-  General Public Service                                                          2,190,000,000
               Total- ACCOUNTANT GENERAL                                                             2,190,000,000
                PAKISTAN REVENUES
                  SUB-OFFICE, KARACHI
                       (In Foreign Exchange)                                                                        (2,190,000,000)
               (Own Resources)
                   (Foreign Aid)                                                                                 (2,190,000,000)
          TOTAL - DEMAND                                                                   72,106,914,000
                  (In Foreign Exchange)                                                                  (72,106,914,000)
            (Own Resources)
               (Foreign Aid)                                                                          (72,106,914,000)
                                                  __________________________________________________

Page 510

No text layer on this page, see the official PDF.

Page 511

                                   SECTION IV

                          MINISTRY OF FINANCE AND REVENUE
                                                            **********
                                                                                  2025-2026
                                                                             Budget
                                                                                    Estimate

                                                                     (Rupees in Thousand)

Demands presented on behalf of the Ministry of Finance
And Revenue.

Development Expenditure on Capital Account.

             129.  Capital Outlay on Federal Investments                                    1,489,920

             130. Development Loans and Advances                                    183,758,219
                by the Federal Government

             131.  External Development Loans and Advances                            777,053,280
                by the Federal Government

                                                                          Total :            962,301,419

Page 512

No text layer on this page, see the official PDF.

Page 513

NO. 129.- CAPITAL OUTLAY ON FEDERAL INVESTMENTS                      DEMANDS FOR GRANTS
                                DEMAND NO. 129
                                                                            ( FC12C39 )
                          CAPITAL OUTLAY ON FEDERAL INVESTMENTS

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2026 for CAPITAL OUTLAY ON FEDERAL
INVESTMENTS.

                                Voted           Rs. 1,489,920,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF FINANCE AND REVENUE  .

                                                           2024-2025         2024-2025         2025-2026
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
014    Transfers                                                   324,209,000          864,209,000         1,489,920,000
               Total                                                324,209,000          864,209,000         1,489,920,000
     OBJECT CLASSIFICATION
A03   Operating Expenses                                  324,209,000        864,209,000       1,489,920,000
               Total                                          324,209,000        864,209,000       1,489,920,000
                  (In Foreign Exchange)                                                                            (1,063,520,000)
            (Own Resources)                                                                                 (1,063,520,000)
               (Foreign Aid)
                  (In Local Currency)                                   (324,209,000)         (864,209,000)         (426,400,000)
                                                  __________________________________________________

Page 514

NO. 129.- FC12C39 CAPITAL OUTLAY ON FEDERAL INVESTMENTS                DEMANDS FOR GRANTS

III.  - DETAILS are as follows :-
                                 No of Posts        2024-2025         2024-2025       2025-2026
                                       2024-25 2025-26       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
01     General Public Service:
014    Transfers:
0143   Investments:
014302 Non-Financial Institutions  :
IB3711 REVAMPING OF PTVC
014302- A03    Operating Expenses                                                    540,000,000         1,489,920,000
014302- A039   General                                                                540,000,000         1,489,920,000
        Total- REVAMPING OF PTVC                                            540,000,000       1,489,920,000
                  (In Foreign Exchange)                                                                    (1,063,520,000)
            (Own Resources)                                                                        (1,063,520,000)
                  (In Local Currency)                                                   (540,000,000)       (426,400,000)
                                                  __________________________________________________
IB5492 FILM INSTITUTE AT PTV ACADEMY
014302- A03    Operating Expenses                              324,209,000          324,209,000
014302- A039   General                                           324,209,000          324,209,000
        Total- FILM INSTITUTE AT PTV ACADEMY             324,209,000        324,209,000
     014302   Total-  Non-Financial Institutions                 324,209,000        864,209,000       1,489,920,000
     0143     Total-  Investments                             324,209,000        864,209,000       1,489,920,000
     014      Total-  Transfers                               324,209,000        864,209,000       1,489,920,000
     01        Total-  General Public Service                   324,209,000        864,209,000       1,489,920,000
               Total- ACCOUNTANT GENERAL                  324,209,000          864,209,000         1,489,920,000
                PAKISTAN REVENUES
                       (In Foreign Exchange)                                                                        (1,063,520,000)
               (Own Resources)                                                                             (1,063,520,000)
                   (Foreign Aid)
                       (In Local Currency)                               (324,209,000)         (864,209,000)         (426,400,000)
          TOTAL - DEMAND                              324,209,000        864,209,000       1,489,920,000
                  (In Foreign Exchange)                                                                    (1,063,520,000)
            (Own Resources)                                                                        (1,063,520,000)
               (Foreign Aid)
                  (In Local Currency)                              (324,209,000)       (864,209,000)       (426,400,000)
                                                  __________________________________________________

Page 515

NO. 130.- DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT    DEMANDS FOR GRANTS
                                DEMAND NO. 130
                                                                            ( FC12D36 )
              DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2026 for DEVELOPMENT LOANS AND
ADVANCES BY THE FEDERAL GOVERNMENT.

                                Voted           Rs. 183,758,219,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF FINANCE AND REVENUE  .

                                                           2024-2025         2024-2025         2025-2026
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
014    Transfers                                                206,661,413,000       154,859,334,000       183,758,219,000
083    Broadcasting and Publishing                                 250,000,000          534,628,000
               Total                                            206,911,413,000       155,393,962,000       183,758,219,000
     OBJECT CLASSIFICATION
A08   Loans and Advances                              206,911,413,000    155,393,962,000    183,758,219,000
               Total                                      206,911,413,000    155,393,962,000    183,758,219,000
                  (In Foreign Exchange)                              (2,605,615,000)                                (928,326,000)
            (Own Resources)                                   (2,605,615,000)                                (928,326,000)
               (Foreign Aid)
                  (In Local Currency)                               (204,305,798,000)     (155,393,962,000)     (182,829,893,000)
                                                  __________________________________________________

Page 516

NO. 130.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
III.  - DETAILS are as follows :-
                                 No of Posts        2024-2025         2024-2025       2025-2026
                                       2024-25 2025-26       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
01     General Public Service:
014    Transfers:
0141   Transfers (Inter-Governmental):
014102 To district governments  :
IB0816 CAREC CORRIDOR DEVELOPMENT INVESTMENT PROGRAMME TRANCHE-I PROJECTS ADB
014102- A08    Loans and Advances                            2,500,000,000         2,300,000,000          323,000,000
014102- A083    District Government / TMAs                       2,500,000,000         2,300,000,000          323,000,000
        Total- CAREC CORRIDOR DEVELOPMENT           2,500,000,000       2,300,000,000        323,000,000
           INVESTMENT PROGRAMME TRANCHE-I
          PROJECTS ADB
IB0817 CONSTRUCTION OF 02 LANE HIGHWAY FROM BASIMA TO KHUZDAR (LENGTH 106 KM)
014102- A08    Loans and Advances                               45,550,000          555,550,000         2,500,000,000
014102- A083    District Government / TMAs                         45,550,000          555,550,000         2,500,000,000
        Total- CONSTRUCTION OF 02 LANE HIGHWAY         45,550,000        555,550,000       2,500,000,000
          FROM BASIMA TO KHUZDAR (LENGTH
             106 KM)
IB0830 CONSTRUCTION OF BRIDGE ON RIVER RAVI AT SYED WALA (NANKANA SAHIB)
014102- A08    Loans and Advances                               10,000,000            80,000,000          323,602,000
014102- A083    District Government / TMAs                         10,000,000            80,000,000          323,602,000
        Total- CONSTRUCTION OF BRIDGE ON RIVER          10,000,000         80,000,000        323,602,000
            RAVI AT SYED WALA (NANKANA
            SAHIB)
IB0835 CONSTRUCTION OF MOTORWAY FROM BURHAN - HAKLA ON M-I TO DERA ISMAIL KHAN
014102- A08    Loans and Advances                            1,000,000,000          500,000,000          500,000,000
014102- A083    District Government / TMAs                       1,000,000,000          500,000,000          500,000,000
        Total- CONSTRUCTION OF MOTORWAY FROM       1,000,000,000        500,000,000        500,000,000
          BURHAN - HAKLA ON M-I TO DERA
             ISMAIL KHAN
IB0837 DESIGN AND FEASIBILITIES STUDIES
014102- A08    Loans and Advances                             500,000,000          500,000,000
014102- A083    District Government / TMAs                        500,000,000          500,000,000
        Total- DESIGN AND FEASIBILITIES STUDIES          500,000,000        500,000,000

Page 517

NO. 130.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB0838 DUALIZATION & IMPROVEMENT OF OLD BANNU ROAD FROM KM 1040+000 - 1050+000 & KM 1088+000 -
1167+000
014102- A08    Loans and Advances                            1,782,907,000         2,997,907,000          988,150,000
014102- A083    District Government / TMAs                       1,782,907,000         2,997,907,000          988,150,000
        Total- DUALIZATION & IMPROVEMENT OF           1,782,907,000       2,997,907,000        988,150,000
          OLD BANNU ROAD FROM KM 1040+000
                      - 1050+000 & KM 1088+000 - 1167+000
IB0839 DUALIZATION & IMPROVEMENT OF PINDIGHEB- KOHAT ROAD
014102- A08    Loans and Advances                            1,867,268,000         1,767,268,000          800,000,000
014102- A083    District Government / TMAs                       1,867,268,000         1,767,268,000          800,000,000
        Total- DUALIZATION & IMPROVEMENT OF           1,867,268,000       1,767,268,000        800,000,000
            PINDIGHEB- KOHAT ROAD
IB0840 DUALIZATION OF INDUS HIGHWAY (N-55) SARAI GAMBILA TO KOHAT SECTION
014102- A08    Loans and Advances                            2,000,000,000         1,500,000,000         1,500,000,000
014102- A083    District Government / TMAs                       2,000,000,000         1,500,000,000         1,500,000,000
        Total- DUALIZATION OF INDUS HIGHWAY           2,000,000,000       1,500,000,000       1,500,000,000
               (N-55) SARAI GAMBILA TO KOHAT
           SECTION
IB0841 IMPROVEMENT AND WIDENING OF ADDITIONAL 2-LANES ON EITHER SIDE OF THOKAR NIAZ BAIG TO
HUDYIARA DRAIN MULTAN
014102- A08    Loans and Advances                                                   249,780,000
014102- A083    District Government / TMAs                                             249,780,000
        Total- IMPROVEMENT AND WIDENING OF                                249,780,000
            ADDITIONAL 2-LANES ON EITHER SIDE
          OF THOKAR NIAZ BAIG TO HUDYIARA
           DRAIN MULTAN
IB0842 IMPROVEMENT UPGRADATION AND WIDENING OF JAGLOT - SKARDU ROAD (S-1 167 KM) REVISED
014102- A08    Loans and Advances                            2,500,000,000          500,000,000         1,000,000,000
014102- A083    District Government / TMAs                       2,500,000,000          500,000,000         1,000,000,000
        Total- IMPROVEMENT UPGRADATION AND          2,500,000,000        500,000,000       1,000,000,000
           WIDENING OF JAGLOT - SKARDU ROAD
               (S-1 167 KM) REVISED
IB0843 KARACHI - LAHORE MOTORWAY (LAND ACQUISITION) (CPEC)-LAHORE ABDUL HAKEEM-MULTAN
SUKKUR-SUKKUR
014102- A08    Loans and Advances                             300,000,000          300,000,000          500,000,000
014102- A083    District Government / TMAs                        300,000,000          300,000,000          500,000,000
        Total- KARACHI - LAHORE MOTORWAY (LAND        300,000,000        300,000,000        500,000,000
            ACQUISITION) (CPEC)-LAHORE ABDUL
          HAKEEM-MULTAN SUKKUR-SUKKUR

Page 518

NO. 130.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB0844 LAHORE-MULTAN MOTORWAY (M-3 SECTION) OF KARACHI - LAHORE MOTORWAY
014102- A08    Loans and Advances                             500,000,000         1,300,000,000         1,000,000,000
014102- A083    District Government / TMAs                        500,000,000         1,300,000,000         1,000,000,000
        Total- LAHORE-MULTAN MOTORWAY (M-3            500,000,000       1,300,000,000       1,000,000,000
            SECTION) OF KARACHI - LAHORE
         MOTORWAY
IB0853 PESHAWAR NORTHERN BYPASS (32.2 KM) (REVISED)
014102- A08    Loans and Advances                            3,500,000,000         3,600,000,000          500,000,000
014102- A083    District Government / TMAs                       3,500,000,000         3,600,000,000          500,000,000
        Total- PESHAWAR NORTHERN BYPASS (32.2        3,500,000,000       3,600,000,000        500,000,000
           KM) (REVISED)
IB0856 CONSTRUCTION FOR IMPROVEMENT AND WIDENING CHITRAL-AYUN-BUMBORATE ROAD (48 KM)
DEPOSIT WORK
014102- A08    Loans and Advances                             700,000,000          140,000,000          750,000,000
014102- A083    District Government / TMAs                        700,000,000          140,000,000          750,000,000
        Total- CONSTRUCTION FOR IMPROVEMENT          700,000,000        140,000,000        750,000,000
          AND WIDENING
           CHITRAL-AYUN-BUMBORATE ROAD (48
           KM) DEPOSIT WORK
IB0857 CONSTRUCTION OF ADDITIONAL CARRIAGE WAY SHIKARPUR-RAJANPUR SECTION OF N-55 CAREC
CORRIDOR (ADB)
014102- A08    Loans and Advances                            1,500,000,000         1,500,000,000          500,000,000
014102- A083    District Government / TMAs                       1,500,000,000         1,500,000,000          500,000,000
        Total- CONSTRUCTION OF ADDITIONAL             1,500,000,000       1,500,000,000        500,000,000
           CARRIAGE WAY
           SHIKARPUR-RAJANPUR SECTION OF
             N-55 CAREC CORRIDOR (ADB)
IB0858 CONSTRUCTION OF ATHMUQAM - SHARDA-KEL - TAOBAT ROAD SECTION (109.2 KM) INCLUDING TWO
TUNNELS AT KAHORI/
014102- A08    Loans and Advances                               50,000,000            50,000,000
014102- A083    District Government / TMAs                         50,000,000            50,000,000
        Total- CONSTRUCTION OF ATHMUQAM -               50,000,000         50,000,000
           SHARDA-KEL - TAOBAT ROAD
           SECTION (109.2 KM) INCLUDING TWO
           TUNNELS AT KAHORI/

Page 519

NO. 130.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB0859 CONSTRUCTION OF BRIDGE OVER RIVER INDUS AT GHAZI GHAT ON N-70
014102- A08    Loans and Advances                                5,000,000             5,000,000
014102- A083    District Government / TMAs                           5,000,000             5,000,000
        Total- CONSTRUCTION OF BRIDGE OVER               5,000,000           5,000,000
            RIVER INDUS AT GHAZI GHAT ON N-70
IB0861 CONSTRUCTION OF DERA MURAD JAMALI BYPASS
014102- A08    Loans and Advances                             500,000,000            10,000,000
014102- A083    District Government / TMAs                        500,000,000            10,000,000
        Total- CONSTRUCTION OF DERA MURAD             500,000,000         10,000,000
           JAMALI BYPASS
IB0863 CONSTRUCTION OF HOSHAB-AWARAN SECTION OF M-8 (146 KM)
014102- A08    Loans and Advances                            3,000,000,000         3,000,000,000         3,734,813,000
014102- A083    District Government / TMAs                       3,000,000,000         3,000,000,000         3,734,813,000
        Total- CONSTRUCTION OF HOSHAB-AWARAN       3,000,000,000       3,000,000,000       3,734,813,000
           SECTION OF M-8 (146 KM)
IB0864 CONSTRUCTION OF MALAKAND TUNNEL (PHASE-I)
014102- A08    Loans and Advances                               10,000,000            10,000,000
014102- A083    District Government / TMAs                         10,000,000            10,000,000
        Total- CONSTRUCTION OF MALAKAND                10,000,000         10,000,000
          TUNNEL (PHASE-I)
IB0865 CONSTRUCTION OF RAJANPUR-DG KHAN AS A 4-LANE HIGHWAY (ADB)
014102- A08    Loans and Advances                            2,000,000,000          500,000,000          200,000,000
014102- A083    District Government / TMAs                       2,000,000,000          500,000,000          200,000,000
        Total- CONSTRUCTION OF RAJANPUR-DG          2,000,000,000        500,000,000        200,000,000
          KHAN AS A 4-LANE HIGHWAY (ADB)
IB0866 CONSTRUCTION OF ZIARAT MOR - KECH - HARNAI ROAD (107.2 KM) AND HARNAI  - SANJAVI ROAD (55.1
KM) (DEPOSIT
014102- A08    Loans and Advances                                1,000,000            11,000,000          200,000,000
014102- A083    District Government / TMAs                           1,000,000            11,000,000          200,000,000
        Total- CONSTRUCTION OF ZIARAT MOR -               1,000,000         11,000,000        200,000,000
          KECH - HARNAI ROAD (107.2 KM) AND
           HARNAI - SANJAVI ROAD (55.1 KM)
            (DEPOSIT

Page 520

NO. 130.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB0867 D.G. KHAN # D.I. KHAN (ACW) (N-55) - 245 KMS (CAREC CORRIDOR ADB)
014102- A08    Loans and Advances                            2,000,000,000          500,000,000          500,000,000
014102- A083    District Government / TMAs                       2,000,000,000          500,000,000          500,000,000
        Total-  D.G. KHAN # D.I. KHAN (ACW) (N-55) -         2,000,000,000        500,000,000        500,000,000
             245 KMS (CAREC CORRIDOR ADB)
IB0868 DUALIZATION & IMPROVEMENT OF EXISTING N-50 FROM YARIK - SAGU - ZHOB INCLUDING ZHOB BYPASS
(210 KM)
014102- A08    Loans and Advances                            1,000,000,000         2,495,000,000         1,000,000,000
014102- A083    District Government / TMAs                       1,000,000,000         2,495,000,000         1,000,000,000
        Total- DUALIZATION & IMPROVEMENT OF           1,000,000,000       2,495,000,000       1,000,000,000
            EXISTING N-50 FROM YARIK - SAGU -
          ZHOB INCLUDING ZHOB BYPASS (210
           KM)
IB0869 IMPROVEMENT AND WIDENING OF CHITRAL-BOONI-MASTUJ-SHANDUR (CPEC)
014102- A08    Loans and Advances                            2,000,000,000         2,000,000,000         1,500,000,000
014102- A083    District Government / TMAs                       2,000,000,000         2,000,000,000         1,500,000,000
        Total- IMPROVEMENT AND WIDENING OF           2,000,000,000       2,000,000,000       1,500,000,000
           CHITRAL-BOONI-MASTUJ-SHANDUR
            (CPEC)
IB0870 IMPROVEMENT AND WIDENING OF N-45 (130.22 KM)
014102- A08    Loans and Advances                               50,000,000            50,000,000          100,000,000
014102- A083    District Government / TMAs                         50,000,000            50,000,000          100,000,000
        Total- IMPROVEMENT AND WIDENING OF N-45         50,000,000         50,000,000        100,000,000
               (130.22 KM)
IB0871 JHAL JAHO-BELA SECTION (82 KM) (DEPOSIT WORK)
014102- A08    Loans and Advances                            1,000,000,000         3,610,000,000         3,834,261,000
014102- A083    District Government / TMAs                       1,000,000,000         3,610,000,000         3,834,261,000
        Total- JHAL JAHO-BELA SECTION (82 KM)           1,000,000,000       3,610,000,000       3,834,261,000
            (DEPOSIT WORK)

Page 521

NO. 130.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB0872 KHYBER PASS ECONOMIC CORRIDOR PROJECT (REVISED) (WORLD BANK)
014102- A08    Loans and Advances                            1,000,000,000          250,000,000          500,000,000
014102- A083    District Government / TMAs                       1,000,000,000          250,000,000          500,000,000
        Total- KHYBER PASS ECONOMIC CORRIDOR        1,000,000,000        250,000,000        500,000,000
           PROJECT (REVISED) (WORLD BANK)
IB0873 NOKUNDI- MASHKHEL ROAD CPEC (DEPOSIT WORK)
014102- A08    Loans and Advances                            3,500,000,000         2,000,000,000          700,000,000
014102- A083    District Government / TMAs                       3,500,000,000         2,000,000,000          700,000,000
        Total- NOKUNDI- MASHKHEL ROAD CPEC           3,500,000,000       2,000,000,000        700,000,000
            (DEPOSIT WORK)
IB0874 QUETTA WESTERN BYPASS(23 KM)
014102- A08    Loans and Advances                            1,365,241,000         1,365,241,000          900,000,000
014102- A083    District Government / TMAs                       1,365,241,000         1,365,241,000          900,000,000
        Total- QUETTA WESTERN BYPASS(23 KM)          1,365,241,000       1,365,241,000        900,000,000
IB0877 WIDENING & IMPROVEMENT OF LODHRAN-MULTAN SECTION OF N-5 (SP)
014102- A08    Loans and Advances                            1,000,000,000          200,000,000
014102- A083    District Government / TMAs                       1,000,000,000          200,000,000
        Total- WIDENING & IMPROVEMENT OF              1,000,000,000        200,000,000
           LODHRAN-MULTAN SECTION OF N-5
              (SP)
IB0878 ZHOB TO KUCHLAK ROAD CPEC WESTERN CORRIDOR
014102- A08    Loans and Advances                            3,500,000,000         1,050,000,000         4,500,000,000
014102- A083    District Government / TMAs                       3,500,000,000         1,050,000,000         4,500,000,000
        Total- ZHOB TO KUCHLAK ROAD CPEC             3,500,000,000       1,050,000,000       4,500,000,000
          WESTERN CORRIDOR
IB0882 CONSTRUCTION OF KOT PINDI DAS INTERCHANGE M-2
014102- A08    Loans and Advances                             300,000,000          560,000,000          251,291,000
014102- A083    District Government / TMAs                        300,000,000          560,000,000          251,291,000
        Total- CONSTRUCTION OF KOT PINDI DAS            300,000,000        560,000,000        251,291,000
           INTERCHANGE M-2
IB0883 DUALIZATION OF KHUZDAR - KUCHLAK SECTION OF NATIONAL HIGHWAY (N-25) 330KM
014102- A08    Loans and Advances                            7,000,000,000         7,000,000,000        34,000,000,000
014102- A083    District Government / TMAs                       7,000,000,000         7,000,000,000        34,000,000,000
        Total- DUALIZATION OF KHUZDAR - KUCHLAK      7,000,000,000       7,000,000,000      34,000,000,000
            SECTION OF NATIONAL HIGHWAY
                (N-25) 330KM

Page 522

NO. 130.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB0884 CONSTRUCTION OF HOSHAB # AWARAN # KHUZDAR SECTION OF M-8 SECTION-2 AWARAN # NAAL (168
KM)
014102- A08    Loans and Advances                            5,000,000,000        11,530,000,000         6,000,000,000
014102- A083    District Government / TMAs                       5,000,000,000        11,530,000,000         6,000,000,000
        Total- CONSTRUCTION OF HOSHAB #               5,000,000,000      11,530,000,000       6,000,000,000
         AWARAN # KHUZDAR SECTION OF M-8
            SECTION-2 AWARAN # NAAL (168 KM)
IB0885 REHABILITATION & UPGRADATION OF AWARAN-JHALIJAO ROAD (548 KM)
014102- A08    Loans and Advances                            1,000,000,000         4,220,000,000         1,047,943,000
014102- A083    District Government / TMAs                       1,000,000,000         4,220,000,000         1,047,943,000
        Total- REHABILITATION & UPGRADATION OF       1,000,000,000       4,220,000,000       1,047,943,000
           AWARAN-JHALIJAO ROAD (548 KM)
IB3079 CONSTRUCTION OF ROAD LINK FROM RAMAK (N-55) TO DARABAN (N-50) (LENGTH: 66 KM) (D.I KHAN)
014102- A08    Loans and Advances                               50,000,000            10,000,000
014102- A083    District Government / TMAs                         50,000,000            10,000,000
        Total- CONSTRUCTION OF ROAD LINK FROM          50,000,000         10,000,000
         RAMAK (N-55) TO DARABAN (N-50)
            (LENGTH: 66 KM) (D.I KHAN)
IB3080 CONSTRUCTION OF ROAD FROM DALBANTIN TO ZIARAT BALANOSH (77KM) DISTRICT CHAGHI (DEPOSIT
WORK)
014102- A08    Loans and Advances                               50,000,000            50,000,000            50,000,000
014102- A083    District Government / TMAs                         50,000,000            50,000,000            50,000,000
        Total- CONSTRUCTION OF ROAD FROM               50,000,000         50,000,000          50,000,000
           DALBANTIN TO ZIARAT BALANOSH
             (77KM) DISTRICT CHAGHI (DEPOSIT
          WORK)
IB3081 CONSTRUCTION OF INTER DISTRICT BRIDGE AT RIVER CHENAB ALONG WITH LINK ROADS FROM
JALALPUR PIRWALA (M-5
014102- A08    Loans and Advances                                1,000,000             1,000,000
014102- A083    District Government / TMAs                           1,000,000             1,000,000
        Total- CONSTRUCTION OF INTER DISTRICT             1,000,000           1,000,000
           BRIDGE AT RIVER CHENAB ALONG
           WITH LINK ROADS FROM JALALPUR
           PIRWALA (M-5

Page 523

NO. 130.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB3082 CONSTRUCTION OF NEW MOTORWAY FROM MANSEHRA-NARAN-JALKHAD-CHILAS 240 KM) FEASIBILITY
STUDY)
014102- A08    Loans and Advances                             120,000,000            68,000,000
014102- A083    District Government / TMAs                        120,000,000            68,000,000
        Total- CONSTRUCTION OF NEW MOTORWAY         120,000,000         68,000,000
          FROM
           MANSEHRA-NARAN-JALKHAD-CHILAS
             240 KM) FEASIBILITY STUDY)
IB3083 CONSTRUCTION OF CHAKDARA - CHITRAL ROAD PROJECT (N-45) SECTION III: KALKATAK - CHITRAL
(48KM)
014102- A08    Loans and Advances                             400,000,000          150,220,000          500,000,000
014102- A083    District Government / TMAs                        400,000,000          150,220,000          500,000,000
        Total- CONSTRUCTION OF CHAKDARA -              400,000,000        150,220,000        500,000,000
           CHITRAL ROAD PROJECT (N-45)
           SECTION III: KALKATAK - CHITRAL
             (48KM)
IB3084 CONSTRUCTION OF INTERCHANGE AT MAURUSIPUR ON M-3 NEAR MURIDWALA (FEASIBILITY)
014102- A08    Loans and Advances                                1,000,000             1,000,000
014102- A083    District Government / TMAs                           1,000,000             1,000,000
        Total- CONSTRUCTION OF INTERCHANGE AT           1,000,000           1,000,000
          MAURUSIPUR ON M-3 NEAR
          MURIDWALA (FEASIBILITY)
IB3085 RELOCATION OF KARAKORUM HIGHWAY BETWEEN THAKOT & RAIKOT DUE TO CONSTRUCTION OF
DAMS ON RIVER
014102- A08    Loans and Advances                             500,000,000            50,000,000          500,000,000
014102- A083    District Government / TMAs                        500,000,000            50,000,000          500,000,000
        Total- RELOCATION OF KARAKORUM                500,000,000         50,000,000        500,000,000
          HIGHWAY BETWEEN THAKOT &
           RAIKOT DUE TO CONSTRUCTION OF
          DAMS ON RIVER

Page 524

NO. 130.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
IB3086 LAND ACQUISITION FOR RELOCATION OF KARAKORUM HIGHWAY BETWEEN THAKOT & RAIKOT DUE TO
CONSTRUCTION OF DAMS
014102- A08    Loans and Advances                            3,500,000,000          500,000,000          633,900,000
014102- A083    District Government / TMAs                       3,500,000,000          500,000,000          633,900,000
        Total- LAND ACQUISITION FOR RELOCATION       3,500,000,000        500,000,000        633,900,000
          OF KARAKORUM HIGHWAY BETWEEN
          THAKOT & RAIKOT DUE TO
           CONSTRUCTION OF DAMS
IB3087 CONSTRUCTION OF MASHKHEL # PANJGOOR ROAD (191.6 KM)
014102- A08    Loans and Advances                             500,000,000                                 50,000,000
014102- A083    District Government / TMAs                        500,000,000                                 50,000,000
        Total- CONSTRUCTION OF MASHKHEL #              500,000,000                             50,000,000
          PANJGOOR ROAD (191.6 KM)
IB3088 DUALIZATION/ STRENGTHENING OF N-65 FROM QUETTA - DHADAR 110 KMS (FEASIBILITY STUDY)
014102- A08    Loans and Advances                                5,000,000             5,000,000             5,000,000
014102- A083    District Government / TMAs                           5,000,000             5,000,000             5,000,000
        Total- DUALIZATION/ STRENGTHENING OF              5,000,000           5,000,000           5,000,000
             N-65 FROM QUETTA - DHADAR 110 KMS
             (FEASIBILITY STUDY)
IB3089 REHABILITATION & UPGRADATION OF TARAP INTERCHANGE # TARAP CITY ROAD (5.8 KM) - D.I. KHAN
DEVELOPMENT
014102- A08    Loans and Advances                                1,000,000             1,000,000
014102- A083    District Government / TMAs                           1,000,000             1,000,000
        Total- REHABILITATION & UPGRADATION OF           1,000,000           1,000,000
          TARAP INTERCHANGE # TARAP CITY
          ROAD (5.8 KM) - D.I. KHAN
          DEVELOPMENT
IB3090 CONSTRUCTION OF NEW ROAD FROM ESA KHEL INTERCHANGE (ON MOTORWAY M-14) TO BANNU LINK
ROAD (ON INDUS HIGHWAY
014102- A08    Loans and Advances                                1,000,000             1,000,000
014102- A083    District Government / TMAs                           1,000,000             1,000,000
        Total- CONSTRUCTION OF NEW ROAD FROM            1,000,000           1,000,000
          ESA KHEL INTERCHANGE (ON
         MOTORWAY M-14) TO BANNU LINK
          ROAD (ON INDUS HIGHWAY

Page 525

NO. 130.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB3091 CONSTRUCTION OF ROAD & TUNNEL BETWEEN SHOUNTER (KEL) TO RATTU (GORIKOT) & TUNNEL AT
SHOUNTER (40 KMS)
014102- A08    Loans and Advances                                5,000,000             5,000,000
014102- A083    District Government / TMAs                           5,000,000             5,000,000
        Total- CONSTRUCTION OF ROAD & TUNNEL             5,000,000           5,000,000
          BETWEEN SHOUNTER (KEL) TO RATTU
            (GORIKOT) & TUNNEL AT SHOUNTER
               (40 KMS)
IB3386 CONSTRUCTION OF GILGIT # SHANDUR ROAD (216 KM)GBP
014102- A08    Loans and Advances                            5,000,000,000         9,500,000,000         3,000,000,000
014102- A083    District Government / TMAs                       5,000,000,000         9,500,000,000         3,000,000,000
        Total- CONSTRUCTION OF GILGIT # SHANDUR      5,000,000,000       9,500,000,000       3,000,000,000
          ROAD (216 KM)GBP
IB3434 CONSTRUCTION OF ROAD BAIKER TO MARRI TOP DERA BHUGTI (FEASIBILITY STUDY)
014102- A08    Loans and Advances                               20,000,000            20,000,000
014102- A083    District Government / TMAs                         20,000,000            20,000,000
        Total- CONSTRUCTION OF ROAD BAIKER TO          20,000,000         20,000,000
           MARRI TOP DERA BHUGTI
             (FEASIBILITY STUDY)
IB3848 DUAKIZATION OF SIALKOT EMINABAD ROAD UP KAMOKE INCLUDING LINK TO MOTOR WAY (LENGTH
65.1 KM) DISTRICT SIALKOT
014102- A08    Loans and Advances                                                                        500,000,000
014102- A083    District Government / TMAs                                                                   500,000,000
        Total- DUAKIZATION OF SIALKOT EMINABAD                                               500,000,000
          ROAD UP KAMOKE INCLUDING LINK TO
          MOTOR WAY (LENGTH 65.1 KM)
            DISTRICT SIALKOT
IB3849 WIDENING AND IMPROVEMENT OF PRIORITY SECTIONS ON N-5 (PHASE-IA & IB)(210 KM)
014102- A08    Loans and Advances                                                                        1,900,000,000
014102- A083    District Government / TMAs                                                                   1,900,000,000
        Total- WIDENING AND IMPROVEMENT OF                                                   1,900,000,000
            PRIORITY SECTIONS ON N-5 (PHASE-IA
          & IB)(210 KM)
IB3852 LALA MUSA BYPASS OF N-5
014102- A08    Loans and Advances                                                                        100,000,000

Page 526

NO. 130.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

014102- A083    District Government / TMAs                                                                   100,000,000
        Total- LALA MUSA BYPASS OF N-5                                                          100,000,000
IB5307 REHABILITATION OF MEDIUM WAVE SERVICES FROM KHAIRPUR
014102- A08    Loans and Advances                             550,000,000          634,173,000
014102- A083    District Government / TMAs                        550,000,000          634,173,000
        Total- REHABILITATION OF MEDIUM WAVE           550,000,000        634,173,000
           SERVICES FROM KHAIRPUR
                  (In Foreign Exchange)                           (411,435,000)
            (Own Resources)                                (411,435,000)
                  (In Local Currency)                              (138,565,000)       (634,173,000)
                                                  __________________________________________________
IB5373 GWADAR RATODERO ROAD PROJECT M-8
014102- A08    Loans and Advances                             500,000,000          560,000,000         3,000,000,000
014102- A083    District Government / TMAs                        500,000,000          560,000,000         3,000,000,000
        Total- GWADAR RATODERO ROAD PROJECT         500,000,000        560,000,000       3,000,000,000
            M-8
IB5375 LAND ACQUISITION AFFECTED PROPERTIES COMPENSATION AND RELOCATION OF UTILITIES FOR
DUALIZATION OF
014102- A08    Loans and Advances                            1,500,000,000         1,500,000,000         1,348,690,000
014102- A083    District Government / TMAs                       1,500,000,000         1,500,000,000         1,348,690,000
        Total- LAND ACQUISITION AFFECTED               1,500,000,000       1,500,000,000       1,348,690,000
           PROPERTIES COMPENSATION AND
           RELOCATION OF UTILITIES FOR
           DUALIZATION OF
IB5378 CONSTRUCTION OF LUNDIANWALA INTERCHANGE ON MOTORWAY M-3 (FEASIBILITY STUDY)
014102- A08    Loans and Advances                             100,000,000            10,000,000
014102- A083    District Government / TMAs                        100,000,000            10,000,000
        Total- CONSTRUCTION OF LUNDIANWALA            100,000,000         10,000,000
           INTERCHANGE ON MOTORWAY M-3
             (FEASIBILITY STUDY)
IB5380 CONSTRUCTION OF 6 LANE OVERHEAD VRIDGE AT IMAMILA COLONY RAILWAY CROSSING SHAHDRA
014102- A08    Loans and Advances                               58,484,000          228,484,000          200,000,000
014102- A083    District Government / TMAs                         58,484,000          228,484,000          200,000,000
        Total- CONSTRUCTION OF 6 LANE OVERHEAD         58,484,000        228,484,000        200,000,000
            VRIDGE AT IMAMILA COLONY RAILWAY
           CROSSING SHAHDRA

Page 527

NO. 130.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB5381 CONSTRUCTION OF ADDITIONAL CARRIAGEWAY FOR APPROACH ROADS INCLUDING EXISTING BRIDGE
OVER RIVER CHENAB
014102- A08    Loans and Advances                                1,000,000             1,000,000
014102- A083    District Government / TMAs                           1,000,000             1,000,000
        Total- CONSTRUCTION OF ADDITIONAL                 1,000,000           1,000,000
          CARRIAGEWAY FOR APPROACH
          ROADS INCLUDING EXISTING BRIDGE
          OVER RIVER CHENAB
IB5382 CONSTRUCTION OF BABUSAR TUNNEL AND ITS LINK ROAD (N-15) FEASIBILITY STUDY
014102- A08    Loans and Advances                               98,690,000            48,690,000
014102- A083    District Government / TMAs                         98,690,000            48,690,000
        Total- CONSTRUCTION OF BABUSAR TUNNEL         98,690,000         48,690,000
          AND ITS LINK ROAD (N-15) FEASIBILITY
          STUDY
IB5384 CONSTRUCTION OF BHONG INTERCHANGE ON MOTORWAY M-5
014102- A08    Loans and Advances                             350,000,000          250,000,000             5,000,000
014102- A083    District Government / TMAs                        350,000,000          250,000,000             5,000,000
        Total- CONSTRUCTION OF BHONG                   350,000,000        250,000,000           5,000,000
           INTERCHANGE ON MOTORWAY M-5
IB5385 CONSTRUCTION OF DAUL CARRIAGEWAY FROM DEEPALPUR TO LAHORE - MULTAN MOTORWAY (M-3)
VIA OKARA (88 KM)
014102- A08    Loans and Advances                                1,000,000            11,000,000
014102- A083    District Government / TMAs                           1,000,000            11,000,000
        Total- CONSTRUCTION OF DAUL                        1,000,000         11,000,000
          CARRIAGEWAY FROM DEEPALPUR TO
          LAHORE - MULTAN MOTORWAY (M-3)
             VIA OKARA (88 KM)
IB5388 CONSTRUCTION OF FLYOVER AT THE JUNCTION OF N-5 AND N-65 AT SUKKUR
014102- A08    Loans and Advances                             300,000,000          675,000,000            50,000,000
014102- A083    District Government / TMAs                        300,000,000          675,000,000            50,000,000
         Total- CONSTRUCTION OF FLYOVER AT THE        300,000,000        675,000,000          50,000,000
           JUNCTION OF N-5 AND N-65 AT SUKKUR

Page 528

NO. 130.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB5389 CONSTRUCTION OF INTERCHANGE AT M- 3 ABDUL HAKEEM MOTORWAY AT ESSAN SHARAQPUR
DISTRICT SHEIKHUPURA 20
014102- A08    Loans and Advances                             500,000,000          750,000,000          500,000,000
014102- A083    District Government / TMAs                        500,000,000          750,000,000          500,000,000
        Total- CONSTRUCTION OF INTERCHANGE AT         500,000,000        750,000,000        500,000,000
            M- 3 ABDUL HAKEEM MOTORWAY AT
          ESSAN SHARAQPUR DISTRICT
           SHEIKHUPURA 20
IB5390 CONSTRUCTION OF INTERCHANGE ON HAZARA MOTORWAY TO CONNECT ABBOTTABAD AND
SHERWAN ROAD RIGHT AFTER THE FIRST
014102- A08    Loans and Advances                             350,000,000          150,000,000          800,000,000
014102- A083    District Government / TMAs                        350,000,000          150,000,000          800,000,000
        Total- CONSTRUCTION OF INTERCHANGE ON        350,000,000        150,000,000        800,000,000
          HAZARA MOTORWAY TO CONNECT
          ABBOTTABAD AND SHERWAN ROAD
           RIGHT AFTER THE FIRST
IB5391 CONSTRUCTION OF INTERCHANGE ON LAHORE - KARACHI MOTORWAY AT BUCHEKE - NANKANA ROAD
IN THE NAME OF RAI
014102- A08    Loans and Advances                             500,000,000            50,000,000          300,000,000
014102- A083    District Government / TMAs                        500,000,000            50,000,000          300,000,000
        Total- CONSTRUCTION OF INTERCHANGE ON        500,000,000         50,000,000        300,000,000
          LAHORE - KARACHI MOTORWAY AT
          BUCHEKE - NANKANA ROAD IN THE
          NAME OF RAI
IB5392 CONSTRUCTION OF KHARAN-BASIMA ROAD (124 KM) FEASIBILITY STUDY
014102- A08    Loans and Advances                                5,000,000            20,000,000             5,000,000
014102- A083    District Government / TMAs                           5,000,000            20,000,000             5,000,000
        Total- CONSTRUCTION OF KHARAN-BASIMA            5,000,000         20,000,000           5,000,000
          ROAD (124 KM) FEASIBILITY STUDY
IB5393 CONSTRUCTION OF LAHORE-SIALKOT MOTORWAY (LSM) LINK (4-LANE) VIA NARANG MANDI TO
NAROWAL (101.41KM)
014102- A08    Loans and Advances                            7,000,000,000         2,500,000,000         3,000,000,000
014102- A083    District Government / TMAs                       7,000,000,000         2,500,000,000         3,000,000,000
        Total- CONSTRUCTION OF LAHORE-SIALKOT       7,000,000,000       2,500,000,000       3,000,000,000
         MOTORWAY (LSM) LINK (4-LANE) VIA
          NARANG MANDI TO NAROWAL
             (101.41KM)

Page 529

NO. 130.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB5396 CONSTRUCTION OF MIRPUR MATHELO INTERCHANGE ON SUKKUR-MULTAN MOTORWAY (M-5) AND ITS
LINK WITH
014102- A08    Loans and Advances                               50,000,000            10,000,000          100,000,000
014102- A083    District Government / TMAs                         50,000,000            10,000,000          100,000,000
        Total- CONSTRUCTION OF MIRPUR MATHELO         50,000,000         10,000,000        100,000,000
           INTERCHANGE ON SUKKUR-MULTAN
         MOTORWAY (M-5) AND ITS LINK WITH
IB5397 CONSTRUCTION OF MOTORWAY FROM GHULAM KHAN TO ESA KHEL INTERCHANGE ((FEASIBILITY
STUDY)
014102- A08    Loans and Advances                                1,000,000            46,000,000
014102- A083    District Government / TMAs                           1,000,000            46,000,000
        Total- CONSTRUCTION OF MOTORWAY FROM           1,000,000         46,000,000
          GHULAM KHAN TO ESA KHEL
           INTERCHANGE ((FEASIBILITY STUDY)
IB5398 CONSTRUCTION OF MOTORWAY HUB-DUREJI-DADU (M-7) (FEASIBILITY STUDY)
014102- A08    Loans and Advances                                5,000,000            15,000,000
014102- A083    District Government / TMAs                           5,000,000            15,000,000
        Total- CONSTRUCTION OF MOTORWAY                 5,000,000         15,000,000
           HUB-DUREJI-DADU (M-7) (FEASIBILITY
           STUDY)
IB5401 CONSTRUCTION OF SALOKE INTERCHANGE ON LAHORE- SIALKOT MOTORWAY (LSM) (FEASIBILITY
STUDY)
014102- A08    Loans and Advances                             500,000,000            50,000,000
014102- A083    District Government / TMAs                        500,000,000            50,000,000
        Total- CONSTRUCTION OF SALOKE                  500,000,000         50,000,000
           INTERCHANGE ON LAHORE- SIALKOT
         MOTORWAY (LSM) (FEASIBILITY
           STUDY)
IB5405 CONSTRUCTION OF WANGU HILL TUNNEL ON M-8 (FEASIBILITY STUDY)
014102- A08    Loans and Advances                                5,000,000            20,000,000
014102- A083    District Government / TMAs                           5,000,000            20,000,000
        Total- CONSTRUCTION OF WANGU HILL                5,000,000         20,000,000
           TUNNEL ON M-8 (FEASIBILITY STUDY)

Page 530

NO. 130.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB5407 DUALIZATION / STRENGTHENING OF NATIONAL HIGHWAY N-65 FROM JACOBABAD TO DHADAR
(FEASIBILITY STUDY)
014102- A08    Loans and Advances                                5,000,000            20,000,000
014102- A083    District Government / TMAs                           5,000,000            20,000,000
        Total- DUALIZATION / STRENGTHENING OF             5,000,000         20,000,000
           NATIONAL HIGHWAY N-65 FROM
          JACOBABAD TO DHADAR (FEASIBILITY
           STUDY)
IB5408 DUALIZATION AND REHABILITATION OF KARACHI - KARARO (232 KMS) & WADH  - KHUZDAR (41 KMS)
(TOTAL LENGTH
014102- A08    Loans and Advances                            5,000,000,000         5,000,000,000        33,000,000,000
014102- A083    District Government / TMAs                       5,000,000,000         5,000,000,000        33,000,000,000
        Total- DUALIZATION AND REHABILITATION         5,000,000,000       5,000,000,000      33,000,000,000
          OF KARACHI - KARARO (232 KMS) &
         WADH - KHUZDAR (41 KMS) (TOTAL
          LENGTH
IB5409 DUALIZATION AND REHABILITATION OF KARARO - WADH (83 KMS) & KUCHLAK - CHAMAN (104 KMS)
(TOTAL LENGTH 187
014102- A08    Loans and Advances                            5,000,000,000         2,000,000,000        33,000,000,000
014102- A083    District Government / TMAs                       5,000,000,000         2,000,000,000        33,000,000,000
        Total- DUALIZATION AND REHABILITATION         5,000,000,000       2,000,000,000      33,000,000,000
          OF KARARO - WADH (83 KMS) &
          KUCHLAK - CHAMAN (104 KMS) (TOTAL
          LENGTH 187
IB5411 DUALIZATION OF RAWALPINDI - KAHUTA ROAD (28.4 KM) INCLUDING 4-LANE BRIDGE OVER SIHALA
RAILWAY PASS SIHALA
014102- A08    Loans and Advances                            3,000,000,000         3,000,000,000          800,000,000
014102- A083    District Government / TMAs                       3,000,000,000         3,000,000,000          800,000,000
        Total- DUALIZATION OF RAWALPINDI -              3,000,000,000       3,000,000,000        800,000,000
          KAHUTA ROAD (28.4 KM) INCLUDING
            4-LANE BRIDGE OVER SIHALA
           RAILWAY PASS SIHALA

Page 531

NO. 130.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB5412 ESTABLISHMENT OF INTERCHANGE AT TANDLIANWALA AREA DISTRICT FAISALABAD ON M-3 KARACHI -
LAHORE
014102- A08    Loans and Advances                                5,000,000             7,000,000
014102- A083    District Government / TMAs                           5,000,000             7,000,000
        Total- ESTABLISHMENT OF INTERCHANGE AT          5,000,000           7,000,000
          TANDLIANWALA AREA DISTRICT
           FAISALABAD ON M-3 KARACHI -
          LAHORE
IB5413 IMPROVEMENT AND WIDENING OF N-5(813 KM) (FEASIBILITY STUDY)
014102- A08    Loans and Advances                             100,000,000            10,000,000
014102- A083    District Government / TMAs                        100,000,000            10,000,000
        Total- IMPROVEMENT AND WIDENING OF             100,000,000         10,000,000
              N-5(813 KM) (FEASIBILITY STUDY)
IB5414 CONSTRUCTION OF MUZAFFARABAD-MANSEHRA ROAD (26.6 KM APPROX)
014102- A08    Loans and Advances                             580,000,000            80,000,000          200,000,000
014102- A083    District Government / TMAs                        580,000,000            80,000,000          200,000,000
        Total- CONSTRUCTION OF                           580,000,000         80,000,000        200,000,000
          MUZAFFARABAD-MANSEHRA ROAD
                (26.6 KM APPROX)
IB5421 LAND ACQUISITION AFFECTED PROPERTIES AND COMPENSATION FOR RAJANPUR-DG KHAN SECTION
AS 4- LANE HIGHWAY AND
014102- A08    Loans and Advances                            7,377,330,000         6,607,680,000         1,000,000,000
014102- A083    District Government / TMAs                       7,377,330,000         6,607,680,000         1,000,000,000
        Total- LAND ACQUISITION AFFECTED               7,377,330,000       6,607,680,000       1,000,000,000
           PROPERTIES AND COMPENSATION
          FOR RAJANPUR-DG KHAN SECTION AS
                4- LANE HIGHWAY AND
IB9343 UP-GRADATION OF HPT RAWAT TRANSMITTING STATION BY INSTALLING 1000 KW DRM-ENABLED
MEDIUM WAVE
014102- A08    Loans and Advances                            3,450,000,000            50,000,000
014102- A083    District Government / TMAs                       3,450,000,000            50,000,000
        Total- UP-GRADATION OF HPT RAWAT              3,450,000,000         50,000,000
           TRANSMITTING STATION BY
            INSTALLING 1000 KW DRM-ENABLED
          MEDIUM WAVE

Page 532

NO. 130.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

                  (In Foreign Exchange)                          (2,194,180,000)
            (Own Resources)                               (2,194,180,000)
                  (In Local Currency)                             (1,255,820,000)         (50,000,000)
                                                  __________________________________________________
IB9431 REHABILITATION & UPGRADATION OF PEZU # TANK ROAD (LENGTH: 38 KM)
014102- A08    Loans and Advances                             500,000,000          600,000,000          500,000,000
014102- A083    District Government / TMAs                        500,000,000          600,000,000          500,000,000
        Total- REHABILITATION & UPGRADATION OF         500,000,000        600,000,000        500,000,000
           PEZU # TANK ROAD (LENGTH: 38 KM)
IB9432 YARIK INTERCHANGE TO TANK ROAD (35 KM)
014102- A08    Loans and Advances                             500,000,000          600,000,000
014102- A083    District Government / TMAs                        500,000,000          600,000,000
        Total- YARIK INTERCHANGE TO TANK ROAD         500,000,000        600,000,000
               (35 KM)
IB9433 CONSTRUCTION OF TWO LANE D.I KHAN BY PASS (KM 14.9)
014102- A08    Loans and Advances                               50,000,000            10,000,000
014102- A083    District Government / TMAs                         50,000,000            10,000,000
        Total- CONSTRUCTION OF TWO LANE D.I              50,000,000         10,000,000
          KHAN BY PASS (KM 14.9)
IB9434 CONSTRUCTION OF ABDUL KHEL INTERCHANGE TO DHAKKI TO KALURKOT ROAD (45 KM)
014102- A08    Loans and Advances                               50,000,000            10,000,000
014102- A083    District Government / TMAs                         50,000,000            10,000,000
        Total- CONSTRUCTION OF ABDUL KHEL               50,000,000         10,000,000
           INTERCHANGE TO DHAKKI TO
          KALURKOT ROAD (45 KM)
IB9439 CONSTRUCTION OF PAHARPUR-SIDRA MORE (N-55) ROAD
014102- A08    Loans and Advances                                1,000,000             1,000,000
014102- A083    District Government / TMAs                           1,000,000             1,000,000
        Total- CONSTRUCTION OF PAHARPUR-SIDRA           1,000,000           1,000,000
         MORE (N-55) ROAD
IB9440 REHABILITATION & UPGRADATION OF KUNDAL INTERCHANGE TO LAKI MARWAT TO TAJAZAI ROAD
(LENGTH: 56 KM) D.I
014102- A08    Loans and Advances                                1,000,000             1,000,000

Page 533

NO. 130.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

014102- A083    District Government / TMAs                           1,000,000             1,000,000
        Total- REHABILITATION & UPGRADATION OF           1,000,000           1,000,000
          KUNDAL INTERCHANGE TO LAKI
         MARWAT TO TAJAZAI ROAD (LENGTH:
             56 KM) D.I
IB9441 CONSTRUCTION OF AN INTERCHANGE AT TARAY GARH ON LAHORE # ABDUL HAKEEM MOTORWAY TO
FACILITATE PEOPLE OF
014102- A08    Loans and Advances                             500,000,000            50,000,000
014102- A083    District Government / TMAs                        500,000,000            50,000,000
        Total- CONSTRUCTION OF AN INTERCHANGE        500,000,000         50,000,000
           AT TARAY GARH ON LAHORE # ABDUL
          HAKEEM MOTORWAY TO FACILITATE
          PEOPLE OF
IB9442 INTERCHANGE ON JAMALDIN WALI DISTRICT RAHIM YAR KHAN
014102- A08    Loans and Advances                                                                        100,000,000
014102- A083    District Government / TMAs                                                                   100,000,000
        Total- INTERCHANGE ON JAMALDIN WALI                                                  100,000,000
            DISTRICT RAHIM YAR KHAN
IB9443 CONSTRUCTION OF LAHORE - SAHIWAL - BAHAWALNAGAR MOTORWAY - PPP MODE
014102- A08    Loans and Advances                           18,000,000,000        18,000,000,000         4,000,000,000
014102- A083    District Government / TMAs                     18,000,000,000        18,000,000,000         4,000,000,000
        Total- CONSTRUCTION OF LAHORE -              18,000,000,000      18,000,000,000       4,000,000,000
           SAHIWAL - BAHAWALNAGAR
         MOTORWAY - PPP MODE
IB9444 CONSTRUCTION OF LAHORE BYPASS FROM KALASHAH KAKU EXIT TO KLM TO MULTAN ROAD NEAR
RADIO STATION
014102- A08    Loans and Advances                            8,000,000,000         8,000,000,000
014102- A083    District Government / TMAs                       8,000,000,000         8,000,000,000
        Total- CONSTRUCTION OF LAHORE BYPASS        8,000,000,000       8,000,000,000
          FROM KALASHAH KAKU EXIT TO KLM
          TO MULTAN ROAD NEAR RADIO
           STATION
IB9445 CONSTRUCTION OF BESHAM KHAWAZAKHELA EXPRESSWAY PROJECT (64 KM) PPP MODE
014102- A08    Loans and Advances                            1,000,000,000          200,000,000          500,000,000

Page 534

NO. 130.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

014102- A083    District Government / TMAs                       1,000,000,000          200,000,000          500,000,000
        Total- CONSTRUCTION OF BESHAM                 1,000,000,000        200,000,000        500,000,000
          KHAWAZAKHELA EXPRESSWAY
          PROJECT (64 KM) PPP MODE
IB9447 PC-I FOR LOWARI TUNNEL ELECTRICAL & MECHANICAL WORKS PLUS BRDIGES
014102- A08    Loans and Advances                            2,000,000,000          325,000,000         1,000,000,000
014102- A083    District Government / TMAs                       2,000,000,000          325,000,000         1,000,000,000
        Total-  PC-I FOR LOWARI TUNNEL                   2,000,000,000        325,000,000       1,000,000,000
           ELECTRICAL & MECHANICAL WORKS
           PLUS BRDIGES
IB9448 LINK ROAD M-I MOTORWAY TO MARGALLA AVENUE IN ICT
014102- A08    Loans and Advances                             188,530,000          188,530,000         3,250,000,000
014102- A083    District Government / TMAs                        188,530,000          188,530,000         3,250,000,000
        Total- LINK ROAD M-I MOTORWAY TO                188,530,000        188,530,000       3,250,000,000
          MARGALLA AVENUE IN ICT
IB9449 DUALIZATION OF ROAD FROM FAISALABAD BYPASS TO MOTORWAY M-3 VIA SATIANA (50:50 BASIS)
014102- A08    Loans and Advances                             500,000,000          500,000,000          500,000,000
014102- A083    District Government / TMAs                        500,000,000          500,000,000          500,000,000
        Total- DUALIZATION OF ROAD FROM                 500,000,000        500,000,000        500,000,000
           FAISALABAD BYPASS TO MOTORWAY
            M-3 VIA SATIANA (50:50 BASIS)
IB9451 EXTENSION OF KLM START POINT TO SAGGIAN ROAD AND MAIN RAVI BRIDGE (APPROX. LENGTH = 10
KM) (50:50 BASIS)
014102- A08    Loans and Advances                            7,500,000,000         7,500,000,000
014102- A083    District Government / TMAs                       7,500,000,000         7,500,000,000
        Total- EXTENSION OF KLM START POINT TO        7,500,000,000       7,500,000,000
           SAGGIAN ROAD AND MAIN RAVI
           BRIDGE (APPROX. LENGTH = 10 KM)
               (50:50 BASIS)
IB9452 CONSTRUCTION OF ROAD MORE KHUNDA TO HABO BY BALA DISTRICT NANKANA SAHIB
014102- A08    Loans and Advances                               50,000,000            50,000,000
014102- A083    District Government / TMAs                         50,000,000            50,000,000
        Total- CONSTRUCTION OF ROAD MORE               50,000,000         50,000,000
          KHUNDA TO HABO BY BALA DISTRICT
          NANKANA SAHIB

Page 535

NO. 130.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB9453 NEW MOTORWAY FROM KARACHI TO HYDERABAD PPP MODE - COMMERCIAL FEASIBILITY
014102- A08    Loans and Advances                                5,000,000             5,000,000            50,000,000
014102- A083    District Government / TMAs                           5,000,000             5,000,000            50,000,000
        Total- NEW MOTORWAY FROM KARACHI TO            5,000,000           5,000,000          50,000,000
          HYDERABAD PPP MODE -
          COMMERCIAL FEASIBILITY
IB9454 DUALIZATION OF ROAD FROM CHISHTIAN TO CHAK NO. 46/3R VIA DAHRNAWALA (41.15 KM) INCLUDING
2-LANE LINK
014102- A08    Loans and Advances                               50,000,000            50,000,000
014102- A083    District Government / TMAs                         50,000,000            50,000,000
        Total- DUALIZATION OF ROAD FROM                  50,000,000         50,000,000
            CHISHTIAN TO CHAK NO. 46/3R VIA
          DAHRNAWALA (41.15 KM) INCLUDING
            2-LANE LINK
IB9455 CONSTRUCTION OF TANAWAL INTERCHANGE ON HAZARA MOTORWAY AT VILLAGE POTHA DISTRICT
MANSEHRA
014102- A08    Loans and Advances                             280,000,000            10,000,000            10,000,000
014102- A083    District Government / TMAs                        280,000,000            10,000,000            10,000,000
        Total- CONSTRUCTION OF TANAWAL                280,000,000         10,000,000          10,000,000
           INTERCHANGE ON HAZARA
         MOTORWAY AT VILLAGE POTHA
            DISTRICT MANSEHRA
IB9456 CONSTRUCTION OF TUNNEL JOINING KHAKI WITH OGHI DISTRICT MANSEHRA (FEASIBILITY)
014102- A08    Loans and Advances                                5,000,000             5,000,000             5,000,000
014102- A083    District Government / TMAs                           5,000,000             5,000,000             5,000,000
        Total- CONSTRUCTION OF TUNNEL JOINING            5,000,000           5,000,000           5,000,000
           KHAKI WITH OGHI DISTRICT
          MANSEHRA (FEASIBILITY)
IB9457 INTERCHANGE AT NALHA- MAIRA SHARIF ON CPEC HAKLA D.I. KHAN SECTION ALONG WITH LINK
ROADS TO CHAB VILLAGE
014102- A08    Loans and Advances                               50,000,000            50,000,000
014102- A083    District Government / TMAs                         50,000,000            50,000,000
        Total- INTERCHANGE AT NALHA- MAIRA               50,000,000         50,000,000
            SHARIF ON CPEC HAKLA D.I. KHAN
           SECTION ALONG WITH LINK ROADS
          TO CHAB VILLAGE

Page 536

NO. 130.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB9458 CONSTRUCTION OF ROAD FROM M3 TO RAJANA TO CHISTIAN VIA CHICHAWATNI BUREWALA AND SAHU
KA PATTTAN
014102- A08    Loans and Advances                               50,000,000            50,000,000
014102- A083    District Government / TMAs                         50,000,000            50,000,000
        Total- CONSTRUCTION OF ROAD FROM M3 TO         50,000,000         50,000,000
          RAJANA TO CHISTIAN VIA
           CHICHAWATNI BUREWALA AND SAHU
          KA PATTTAN
IB9462 CONSTRUCTION OF ROAD FROM ESSA KHEL (ARSLA KHAN) TO BANNUKARAK LINK (D.I KHAN
DEVELOPMENT PACKAGE).
014102- A08    Loans and Advances                               50,000,000            50,000,000
014102- A083    District Government / TMAs                         50,000,000            50,000,000
        Total- CONSTRUCTION OF ROAD FROM ESSA         50,000,000         50,000,000
          KHEL (ARSLA KHAN) TO BANNUKARAK
            LINK (D.I KHAN DEVELOPMENT
           PACKAGE).
IB9467 REHABILITATION & RECONSTRUCTION OF N-5 FROM MORO TO RANIPUR KM. 318-404 (NBC/SBC) & 32 X
DAMAGED BRIDGES
014102- A08    Loans and Advances                             600,000,000          500,000,000          300,000,000
014102- A083    District Government / TMAs                        600,000,000          500,000,000          300,000,000
        Total- REHABILITATION & RECONSTRUCTION        600,000,000        500,000,000        300,000,000
          OF N-5 FROM MORO TO RANIPUR KM.
              318-404 (NBC/SBC) & 32 X DAMAGED
           BRIDGES
IB9468 CHINA AIDED PROJECTS OF PAKISTAN NATIONAL HIGHWAY N-5 SECTIONAL REHABILITATION
HALA-MORO 66 KM
014102- A08    Loans and Advances                                                                        200,000,000
014102- A083    District Government / TMAs                                                                   200,000,000
        Total- CHINA AIDED PROJECTS OF PAKISTAN                                               200,000,000
           NATIONAL HIGHWAY N-5 SECTIONAL
            REHABILITATION HALA-MORO 66 KM
     014102   Total-  To district governments               140,964,000,000    129,628,523,000    165,115,650,000

Page 537

NO. 130.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

014110 Others  :
IB3903 UPGRADATION & REPLACEMENT OF 300 KW-MW TRANSMITTER AT HPT KHUZDAR
014110- A08    Loans and Advances                                                                        1,390,000,000
014110- A083    District Government / TMAs                                                                   1,390,000,000
        Total- UPGRADATION & REPLACEMENT OF                                                 1,390,000,000
             300 KW-MW TRANSMITTER AT HPT
          KHUZDAR
                  (In Foreign Exchange)                                                                    (869,440,000)
            (Own Resources)                                                                         (869,440,000)
                  (In Local Currency)                                                                       (520,560,000)
                                                  __________________________________________________
IB3904 UPGRADATION & REPLACEMENT OF 100 KW-MW TRANSMITTER AT HPT-1 QUETTA
014110- A08    Loans and Advances                                                                        799,141,000
014110- A083    District Government / TMAs                                                                   799,141,000
        Total- UPGRADATION & REPLACEMENT OF                                                 799,141,000
             100 KW-MW TRANSMITTER AT HPT-1
          QUETTA
                  (In Foreign Exchange)                                                                      (58,886,000)
            (Own Resources)                                                                           (58,886,000)
                  (In Local Currency)                                                                       (740,255,000)
                                                  __________________________________________________
IB3905 REHABILIATION AND UP GRADATION OF GILGIT AND SKARDU RADIO STATIONS(REPLACEMENT OF
50KW MW
014110- A08    Loans and Advances                                                                        133,000,000
014110- A083    District Government / TMAs                                                                   133,000,000
        Total- REHABILIATION AND UP GRADATION                                                 133,000,000
          OF GILGIT AND SKARDU RADIO
           STATIONS(REPLACEMENT OF 50KW
        MW
IB3906 SAUTUL QURAN FM RADIO NETWORK PHASE IV(PESHAWAR KARACHI MOTORWAY)
014110- A08    Loans and Advances                                                                        598,595,000
014110- A083    District Government / TMAs                                                                   598,595,000
        Total- SAUTUL QURAN FM RADIO NETWORK                                                598,595,000
          PHASE IV(PESHAWAR KARACHI
          MOTORWAY)

Page 538

NO. 130.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

     014110   Total-  Others                                                                        2,920,736,000
     0141     Total-  Transfers (Inter-Governmental)        140,964,000,000    129,628,523,000    168,036,386,000
0142   Transfers (Others):
014202 Trasfer To Non-Financial Institutions  :
IB3244 INSTALLATION OF ASSETS PERFORMANCE MANAGEMENT SYSTEM ON 100K AND 200KV DISTRIBUTION
TRANSFORMERS
014202- A08    Loans and Advances                            4,000,000,000
014202- A085   Loans to Non Financial Institutions                4,000,000,000
        Total- INSTALLATION OF ASSETS                   4,000,000,000
          PERFORMANCE MANAGEMENT
          SYSTEM ON 100K AND 200KV
            DISTRIBUTION TRANSFORMERS
IB3483 220 KV HARIPUR SUBSTATION (NTDC)
014202- A08    Loans and Advances                            4,500,000,000         3,619,560,000          774,000,000
014202- A085   Loans to Non Financial Institutions                4,500,000,000         3,619,560,000          774,000,000
        Total- 220 KV HARIPUR SUBSTATION (NTDC)        4,500,000,000       3,619,560,000        774,000,000
IB3484 220 KV SWABI SUBSTATION (NTDC)
014202- A08    Loans and Advances                            6,000,000,000         4,675,583,000         1,439,000,000
014202- A085   Loans to Non Financial Institutions                6,000,000,000         4,675,583,000         1,439,000,000
        Total- 220 KV SWABI SUBSTATION (NTDC)          6,000,000,000       4,675,583,000       1,439,000,000
     014202   Total-  Trasfer To Non-Financial               14,500,000,000       8,295,143,000       2,213,000,000
                           Institutions
     0142     Total-  Transfers (Others)                     14,500,000,000       8,295,143,000       2,213,000,000
     014      Total-  Transfers                           155,464,000,000    137,923,666,000    170,249,386,000
     01        Total-  General Public Service               155,464,000,000    137,923,666,000    170,249,386,000
08     Recreation, Culture and Religion:
083    Broadcasting and Publishing:
0831   Broadcasting and Publishing:
083101 GRANTS FOR BROADCASTING AND PUBLISHING  :
IB3102 ESTABLISHMENT OF SAUTUL QURAN FM NETWORK PHASE-III FOR 30 MORE CITIES
083101- A08    Loans and Advances                             250,000,000          534,628,000
083101- A083    District Government / TMAs                        250,000,000          534,628,000
        Total- ESTABLISHMENT OF SAUTUL QURAN          250,000,000        534,628,000
          FM NETWORK PHASE-III FOR 30 MORE
             CITIES

Page 539

NO. 130.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

     083101   Total- GRANTS FOR BROADCASTING          250,000,000        534,628,000
               AND PUBLISHING
     0831     Total-  Broadcasting and Publishing              250,000,000        534,628,000
     083      Total-  Broadcasting and Publishing              250,000,000        534,628,000
     08        Total-  Recreation, Culture and Religion           250,000,000        534,628,000
               Total- ACCOUNTANT GENERAL               155,714,000,000       138,458,294,000       170,249,386,000
                PAKISTAN REVENUES
                       (In Foreign Exchange)                          (2,605,615,000)                                (928,326,000)
               (Own Resources)                               (2,605,615,000)                                (928,326,000)
                   (Foreign Aid)
                       (In Local Currency)                           (153,108,385,000)     (138,458,294,000)     (169,321,060,000)

Page 540

NO. 130.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

01     General Public Service:
014    Transfers:
0142   Transfers (Others):
014202 Trasfer To Non-Financial Institutions  :
LO5339 200 KV QUAID-E-AZAM APPAREL AND BUSINESS PARK (QABP) GRID STATION FOR PROVISION OF
ELECTRICITY TO
014202- A08    Loans and Advances                            4,536,225,000         3,086,353,000         1,118,000,000
014202- A085   Loans to Non Financial Institutions                4,536,225,000         3,086,353,000         1,118,000,000
        Total- 200 KV QUAID-E-AZAM APPAREL AND        4,536,225,000       3,086,353,000       1,118,000,000
           BUSINESS PARK (QABP) GRID STATION
          FOR PROVISION OF ELECTRICITY TO
LO5340 500 KV ALLAMA IQBAL INDUSTRIAL CITY FOR 600 MW DEMAND OF THE SPECIAL ECONOMIC ZONE IN
THE FIEDMC AREA
014202- A08    Loans and Advances                            6,500,000,000         4,198,137,000         4,440,658,000
014202- A085   Loans to Non Financial Institutions                6,500,000,000         4,198,137,000         4,440,658,000
        Total- 500 KV ALLAMA IQBAL INDUSTRIAL          6,500,000,000       4,198,137,000       4,440,658,000
            CITY FOR 600 MW DEMAND OF THE
           SPECIAL ECONOMIC ZONE IN THE
           FIEDMC AREA
LO9013 ACQUISITION OF LAND FOR INSTALLATION OF 1200 MW SOLAR POWER PLANT AT SHER GRAH TEHSIL
CHUBARA DISTRICT
014202- A08    Loans and Advances                            6,250,000,000
014202- A085   Loans to Non Financial Institutions                6,250,000,000
        Total- ACQUISITION OF LAND FOR                  6,250,000,000
            INSTALLATION OF 1200 MW SOLAR
         POWER PLANT AT SHER GRAH TEHSIL
          CHUBARA DISTRICT
LO9700 ACQUISITION OF LAND FOR SOLAR POWER PLANT AT MUZAFFARGRAG
014202- A08    Loans and Advances                             350,734,000
014202- A085   Loans to Non Financial Institutions                 350,734,000
        Total- ACQUISITION OF LAND FOR SOLAR            350,734,000
         POWER PLANT AT MUZAFFARGRAG

Page 541

NO. 130.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

LO9800 LAND ACQUISITION FOR INSTALLATION OF 600 MW SOLAR POWER PLANT AT TEHSIL ATHARA HAZARI
DISTT JHANG
014202- A08    Loans and Advances                             633,002,000            15,000,000
014202- A085   Loans to Non Financial Institutions                 633,002,000            15,000,000
        Total- LAND ACQUISITION FOR                      633,002,000         15,000,000
            INSTALLATION OF 600 MW SOLAR
         POWER PLANT AT TEHSIL ATHARA
           HAZARI DISTT JHANG
     014202   Total-  Trasfer To Non-Financial               18,269,961,000       7,299,490,000       5,558,658,000
                           Institutions
     0142     Total-  Transfers (Others)                     18,269,961,000       7,299,490,000       5,558,658,000
     014      Total-  Transfers                             18,269,961,000       7,299,490,000       5,558,658,000
     01        Total-  General Public Service                 18,269,961,000       7,299,490,000       5,558,658,000
               Total- ACCOUNTANT GENERAL                18,269,961,000         7,299,490,000         5,558,658,000
                PAKISTAN REVENUES
                  SUB-OFFICE, LAHORE

Page 542

NO. 130.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

              ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR

01     General Public Service:
014    Transfers:
0142   Transfers (Others):
014202 Trasfer To Non-Financial Institutions  :
PR3129 ELECTRIFICATION WORKS AT DIFFERENT VALLEYS OF DISTRICT CHITRAL (PESCO)
014202- A08    Loans and Advances                            1,824,360,000          134,871,000
014202- A085   Loans to Non Financial Institutions                1,824,360,000          134,871,000
        Total- ELECTRIFICATION WORKS AT                1,824,360,000        134,871,000
           DIFFERENT VALLEYS OF DISTRICT
           CHITRAL (PESCO)
PR3130 ESTAB OF 132 KV GRID SYS. ALONG WITH UPG RADIATION OF EXTG.33KV GRID SYS. TO 132KV IN DISTT.
CHITRAL (PESCO)
014202- A08    Loans and Advances                               10,001,000
014202- A085   Loans to Non Financial Institutions                  10,001,000
        Total- ESTAB OF 132 KV GRID SYS. ALONG            10,001,000
           WITH UPG RADIATION OF EXTG.33KV
           GRID SYS. TO 132KV IN DISTT. CHITRAL
            (PESCO)
PR3131 EVACUATION OF POWER FROM 220-KV/132-KV GRID STATION SAWABI (PESCO)
014202- A08    Loans and Advances                             110,793,000
014202- A085   Loans to Non Financial Institutions                 110,793,000
        Total- EVACUATION OF POWER FROM               110,793,000
             220-KV/132-KV GRID STATION SAWABI
            (PESCO)
PR7018 SUPPLY OF POWER TO RASHAKAI ECONOMIC ZONE KPK
014202- A08    Loans and Advances                             934,787,000          934,101,000          314,560,000
014202- A085   Loans to Non Financial Institutions                 934,787,000          934,101,000          314,560,000
        Total- SUPPLY OF POWER TO RASHAKAI             934,787,000        934,101,000        314,560,000
          ECONOMIC ZONE KPK
PR7019 SUPPLY OF POWER TO HATTAR SPECIAL ECONOMIC ZONE KPK
014202- A08    Loans and Advances                             340,011,000          424,892,000          174,615,000
014202- A085   Loans to Non Financial Institutions                 340,011,000          424,892,000          174,615,000
        Total- SUPPLY OF POWER TO HATTAR               340,011,000        424,892,000        174,615,000
           SPECIAL ECONOMIC ZONE KPK

Page 543

NO. 130.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

              ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR

     014202   Total-  Trasfer To Non-Financial                3,219,952,000       1,493,864,000        489,175,000
                           Institutions
     0142     Total-  Transfers (Others)                      3,219,952,000       1,493,864,000        489,175,000
     014      Total-  Transfers                              3,219,952,000       1,493,864,000        489,175,000
     01        Total-  General Public Service                  3,219,952,000       1,493,864,000        489,175,000
               Total- ACCOUNTANT GENERAL                 3,219,952,000         1,493,864,000          489,175,000
                PAKISTAN REVENUES
                  SUB-OFFICE, PESHAWAR

Page 544

NO. 130.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

01     General Public Service:
014    Transfers:
0142   Transfers (Others):
014202 Trasfer To Non-Financial Institutions  :
HD0201 INSTALLATION OF 2X600 MW (NET) COAL FIRED POWER PROJECT JAMSHORO (GENCO-I)
014202- A08    Loans and Advances                           11,000,000,000         7,934,814,000         2,675,000,000
014202- A085   Loans to Non Financial Institutions               11,000,000,000         7,934,814,000         2,675,000,000
        Total- INSTALLATION OF 2X600 MW (NET)          11,000,000,000       7,934,814,000       2,675,000,000
          COAL FIRED POWER PROJECT
          JAMSHORO (GENCO-I)
KA1386 500 KV MATIARI-MORO-R.Y.KHAN T/L
014202- A08    Loans and Advances                           16,000,000,000                                700,000,000
014202- A085   Loans to Non Financial Institutions               16,000,000,000                                700,000,000
        Total- 500 KV MATIARI-MORO-R.Y.KHAN T/L        16,000,000,000                            700,000,000
     014202   Total-  Trasfer To Non-Financial               27,000,000,000       7,934,814,000       3,375,000,000
                           Institutions
     0142     Total-  Transfers (Others)                     27,000,000,000       7,934,814,000       3,375,000,000
     014      Total-  Transfers                             27,000,000,000       7,934,814,000       3,375,000,000
     01        Total-  General Public Service                 27,000,000,000       7,934,814,000       3,375,000,000
               Total- ACCOUNTANT GENERAL                27,000,000,000         7,934,814,000         3,375,000,000
                PAKISTAN REVENUES
                  SUB-OFFICE, KARACHI

Page 545

NO. 130.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

01     General Public Service:
014    Transfers:
0142   Transfers (Others):
014202 Trasfer To Non-Financial Institutions  :
QA4101 CONSTRUCTION OF 132 KV GRID STATION ATKHAN MEHTERZAI WITH ALLIED T/LINE
014202- A08    Loans and Advances                             207,500,000          207,500,000            86,000,000
014202- A085   Loans to Non Financial Institutions                 207,500,000          207,500,000            86,000,000
        Total- CONSTRUCTION OF 132 KV GRID              207,500,000        207,500,000          86,000,000
           STATION ATKHAN MEHTERZAI WITH
            ALLIED T/LINE
QA4104 INTER CONNECTION OF ISOLATED MAKRAN NETWORK AT BASIMA VIA NAG G/STATION FROM
PANJGOOR G/STATION
014202- A08    Loans and Advances                            2,500,000,000                               4,000,000,000
014202- A085   Loans to Non Financial Institutions                2,500,000,000                               4,000,000,000
        Total- INTER CONNECTION OF ISOLATED           2,500,000,000                           4,000,000,000
          MAKRAN NETWORK AT BASIMA VIA
          NAG G/STATION FROM PANJGOOR
            G/STATION
     014202   Total-  Trasfer To Non-Financial                2,707,500,000        207,500,000       4,086,000,000
                           Institutions
     0142     Total-  Transfers (Others)                      2,707,500,000        207,500,000       4,086,000,000
     014      Total-  Transfers                              2,707,500,000        207,500,000       4,086,000,000
     01        Total-  General Public Service                  2,707,500,000        207,500,000       4,086,000,000
               Total- ACCOUNTANT GENERAL                 2,707,500,000          207,500,000         4,086,000,000
                PAKISTAN REVENUES
                  SUB-OFFICE, QUETTA
          TOTAL - DEMAND                          206,911,413,000    155,393,962,000    183,758,219,000
                  (In Foreign Exchange)                          (2,605,615,000)                            (928,326,000)
            (Own Resources)                               (2,605,615,000)                            (928,326,000)
               (Foreign Aid)
                  (In Local Currency)                          (204,305,798,000)   (155,393,962,000)   (182,829,893,000)
                                                  __________________________________________________

Page 546

NO. 131.- EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL      DEMANDS FOR GRANTS
       GOVERNMENT
                                DEMAND NO. 131
                                                                    ( FC12E14 / FC15E14 )
          EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2026 for EXTERNAL DEVELOPMENT
LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT.

                                        Total                Rs.    777,053,280,000
                                      (Charged)            Rs.    774,953,280,000
                                         (Voted)               Rs.    2,100,000,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF FINANCE AND REVENUE  .

                                                           2024-2025         2024-2025         2025-2026
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
014    Transfers                                                745,317,642,000       708,595,046,000       777,053,280,000
               Total                                            745,317,642,000       708,595,046,000       777,053,280,000
              (Charged)                                  617,000,000,000    617,000,000,000    774,953,280,000
               (Voted)                                    128,317,642,000      91,595,046,000       2,100,000,000
                                                  __________________________________________________
     OBJECT CLASSIFICATION
A08   Loans and Advances                              745,317,642,000    708,595,046,000    777,053,280,000
       (Charged)                                         617,000,000,000    617,000,000,000    774,953,280,000
        (Voted)                                           128,317,642,000      91,595,046,000       2,100,000,000
               Total                                      745,317,642,000    708,595,046,000    777,053,280,000
              (Charged)                                       617,000,000,000       617,000,000,000       774,953,280,000
               (Voted)                                          128,317,642,000        91,595,046,000         2,100,000,000
                                                  __________________________________________________
                  (In Foreign Exchange)                           (745,317,642,000)     (617,000,000,000)     (777,053,280,000)
            (Own Resources)
               (Foreign Aid)                                     (745,317,642,000)     (617,000,000,000)     (777,053,280,000)
                  (In Local Currency)                                                       (91,595,046,000)
                                                  __________________________________________________

Page 547

NO. 131.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
III.  - DETAILS are as follows :-
                                 No of Posts        2024-2025         2024-2025       2025-2026
                                       2024-25 2025-26       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
01     General Public Service:
014    Transfers:
0141   Transfers (Inter-Governmental):
014101 TO PROVINCES  :
IB3907 AJK BLOCK ALLOCATION (FOREIGN)
014101- A08    Loans and Advances                                                                        1,000,000,000
014101- A085   Loans to Non Financial Institutions                                                            1,000,000,000
        Total- AJK BLOCK ALLOCATION (FOREIGN)                                                 1,000,000,000
                  (In Foreign Exchange)                                                                    (1,000,000,000)
               (Foreign Aid)                                                                            (1,000,000,000)
                                                  __________________________________________________
IB3908 GB BLOCK ALLOCATION (FOREIGN)
014101- A08    Loans and Advances                                                                        500,000,000
014101- A085   Loans to Non Financial Institutions                                                            500,000,000
        Total- GB BLOCK ALLOCATION (FOREIGN)                                                  500,000,000
                  (In Foreign Exchange)                                                                    (500,000,000)
               (Foreign Aid)                                                                             (500,000,000)
                                                  __________________________________________________
ID8871 PUNJAB PROGRAMME LOAN
014101- A08    Loans and Advances                                                                       53,209,200,000
                (Charged)                                                                         53,209,200,000
014101- A082   Provinces                                                                                   53,209,200,000
                (Charged)                                                                         53,209,200,000
        Total- PUNJAB PROGRAMME LOAN                                                       53,209,200,000
                  (In Foreign Exchange)                                                                  (53,209,200,000)
               (Foreign Aid)                                                                          (53,209,200,000)
                                                  __________________________________________________
ID8873 KPK PROGRAMME LOAN
014101- A08    Loans and Advances                                                                       35,223,400,000
                (Charged)                                                                         35,223,400,000
014101- A082   Provinces                                                                                   35,223,400,000
                (Charged)                                                                         35,223,400,000
        Total- KPK PROGRAMME LOAN                                                           35,223,400,000
                  (In Foreign Exchange)                                                                  (35,223,400,000)
               (Foreign Aid)                                                                          (35,223,400,000)

Page 548

NO. 131.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

ID8986 SINDH
014101- A08    Loans and Advances                          334,000,000,000       334,000,000,000       359,616,730,000
                (Charged)                                334,000,000,000    334,000,000,000    359,616,730,000
014101- A082   Provinces                                      334,000,000,000       334,000,000,000       359,616,730,000
                (Charged)                                334,000,000,000    334,000,000,000    359,616,730,000
        Total- SINDH                                     334,000,000,000    334,000,000,000     359,616,730,000
                  (In Foreign Exchange)                       (334,000,000,000)   (334,000,000,000)   (359,616,730,000)
               (Foreign Aid)                                (334,000,000,000)   (334,000,000,000)   (359,616,730,000)
                                                  __________________________________________________
ID8987 PUNJAB
014101- A08    Loans and Advances                          123,000,000,000       123,000,000,000       123,824,490,000
                (Charged)                                123,000,000,000    123,000,000,000    123,824,490,000
014101- A082   Provinces                                      123,000,000,000       123,000,000,000       123,824,490,000
                (Charged)                                123,000,000,000    123,000,000,000    123,824,490,000
        Total- PUNJAB                                   123,000,000,000    123,000,000,000     123,824,490,000
                  (In Foreign Exchange)                       (123,000,000,000)   (123,000,000,000)   (123,824,490,000)
               (Foreign Aid)                                (123,000,000,000)   (123,000,000,000)   (123,824,490,000)
                                                  __________________________________________________
ID8988 KHYBER PAKHTUNKHWA
014101- A08    Loans and Advances                          131,000,000,000       131,000,000,000       170,802,460,000
                (Charged)                                131,000,000,000    131,000,000,000    170,802,460,000
014101- A082   Provinces                                      131,000,000,000       131,000,000,000       170,802,460,000
                (Charged)                                131,000,000,000    131,000,000,000    170,802,460,000
        Total- KHYBER PAKHTUNKHWA                  131,000,000,000    131,000,000,000     170,802,460,000
                  (In Foreign Exchange)                       (131,000,000,000)   (131,000,000,000)   (170,802,460,000)
               (Foreign Aid)                                (131,000,000,000)   (131,000,000,000)   (170,802,460,000)
                                                  __________________________________________________
ID8989 BALOCHISTAN
014101- A08    Loans and Advances                           29,000,000,000        29,000,000,000        32,277,000,000
                (Charged)                                  29,000,000,000      29,000,000,000      32,277,000,000
014101- A082   Provinces                                       29,000,000,000        29,000,000,000        32,277,000,000

Page 549

NO. 131.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

                (Charged)                                  29,000,000,000     29,000,000,000      32,277,000,000
        Total- BALOCHISTAN                              29,000,000,000     29,000,000,000      32,277,000,000
                  (In Foreign Exchange)                         (29,000,000,000)    (29,000,000,000)     (32,277,000,000)
               (Foreign Aid)                                 (29,000,000,000)    (29,000,000,000)     (32,277,000,000)
                                                  __________________________________________________
     014101   Total- TO PROVINCES                     617,000,000,000     617,000,000,000    776,453,280,000
014110 OTHERS  :
IB0688 40 MW DOWARIAN
014110- A08    Loans and Advances                               10,000,000            10,000,000            10,753,000
014110- A086   Loans to Others                                     10,000,000            10,000,000            10,753,000
        Total- 40 MW DOWARIAN                              10,000,000         10,000,000          10,753,000
                  (In Foreign Exchange)                             (10,000,000)                             (10,753,000)
               (Foreign Aid)                                      (10,000,000)                             (10,753,000)
                  (In Local Currency)                                                     (10,000,000)
                                                  __________________________________________________
ID8222 48 MW JAGRAN HYDRO POWER PROJECT AJK
014110- A08    Loans and Advances                             450,000,000          450,000,000          589,247,000
014110- A086   Loans to Others                                   450,000,000          450,000,000          589,247,000
        Total- 48 MW JAGRAN HYDRO POWER               450,000,000        450,000,000        589,247,000
          PROJECT AJK
                  (In Foreign Exchange)                           (450,000,000)                            (589,247,000)
               (Foreign Aid)                                    (450,000,000)                            (589,247,000)
                  (In Local Currency)                                                   (450,000,000)
                                                  __________________________________________________
     014110   Total- OTHERS                               460,000,000        460,000,000        600,000,000
     0141     Total-  Transfers (Inter-Governmental)        617,460,000,000     617,460,000,000    777,053,280,000
0142   Transfers (Others):
014202 Trasfer To Non-Financial Institutions  :
IB0783 CAREC CORRIDOR DEVELOPMENT INVESTMENT PROGRAMME TRANCHE-I PROJECTS ADB
014202- A08    Loans and Advances                            2,000,000,000         2,000,000,000
014202- A085   Loans to Non Financial Institutions                2,000,000,000         2,000,000,000
        Total- CAREC CORRIDOR DEVELOPMENT           2,000,000,000       2,000,000,000
           INVESTMENT PROGRAMME TRANCHE-I
          PROJECTS ADB

Page 550

NO. 131.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

                  (In Foreign Exchange)                          (2,000,000,000)
               (Foreign Aid)                                   (2,000,000,000)
                  (In Local Currency)                                                  (2,000,000,000)
                                                  __________________________________________________
IB0788 CONSTRUCTION OF ADDITIONAL CARRIAGE WAY SHIKARPUR-RANJANPUR SECTION ON N-55 CAREC
CORRIDOR (ADB)
014202- A08    Loans and Advances                            7,500,000,000         4,500,000,000
014202- A085   Loans to Non Financial Institutions                7,500,000,000         4,500,000,000
        Total- CONSTRUCTION OF ADDITIONAL             7,500,000,000       4,500,000,000
           CARRIAGE WAY
           SHIKARPUR-RANJANPUR SECTION ON
             N-55 CAREC CORRIDOR (ADB)
                  (In Foreign Exchange)                          (7,500,000,000)
               (Foreign Aid)                                   (7,500,000,000)
                  (In Local Currency)                                                  (4,500,000,000)
                                                  __________________________________________________
IB0789 CONSTRUCTION OF ATHMUQAM- SHARDRA KEL TAOBAT ROAD SECTION (109.2 KM) INCLUDING TWO
TUNNELS AT KAHORI
014202- A08    Loans and Advances                             200,000,000          200,000,000
014202- A085   Loans to Non Financial Institutions                 200,000,000          200,000,000
        Total- CONSTRUCTION OF ATHMUQAM-              200,000,000        200,000,000
          SHARDRA KEL TAOBAT ROAD
           SECTION (109.2 KM) INCLUDING TWO
          TUNNELS AT KAHORI
                  (In Foreign Exchange)                           (200,000,000)
               (Foreign Aid)                                    (200,000,000)
                  (In Local Currency)                                                   (200,000,000)
                                                  __________________________________________________
IB0800 CONSTRUCTION OF MALAKAND TUNNEL (PHASE-I)
014202- A08    Loans and Advances                             100,000,000          100,000,000
014202- A085   Loans to Non Financial Institutions                 100,000,000          100,000,000
        Total- CONSTRUCTION OF MALAKAND               100,000,000        100,000,000
          TUNNEL (PHASE-I)
                  (In Foreign Exchange)                           (100,000,000)
               (Foreign Aid)                                    (100,000,000)
                  (In Local Currency)                                                   (100,000,000)

Page 551

NO. 131.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB0801 CONSTRUCTION OF RAJANPUR-DG KHAN AS A 4-LANE HIGHWAY (ADB)
014202- A08    Loans and Advances                            3,000,000,000         1,500,000,000
014202- A085   Loans to Non Financial Institutions                3,000,000,000         1,500,000,000
        Total- CONSTRUCTION OF RAJANPUR-DG          3,000,000,000       1,500,000,000
          KHAN AS A 4-LANE HIGHWAY (ADB)
                  (In Foreign Exchange)                          (3,000,000,000)
               (Foreign Aid)                                   (3,000,000,000)
                  (In Local Currency)                                                  (1,500,000,000)
                                                  __________________________________________________
IB0802 D.G KHAN-D.I KHAN (ACW) (N-55)-245 KMS CAREC CORRIDOR ADB
014202- A08    Loans and Advances                            3,000,000,000         1,500,000,000
014202- A085   Loans to Non Financial Institutions                3,000,000,000         1,500,000,000
        Total- D.G KHAN-D.I KHAN (ACW) (N-55)-245         3,000,000,000       1,500,000,000
          KMS CAREC CORRIDOR ADB
                  (In Foreign Exchange)                          (3,000,000,000)
               (Foreign Aid)                                   (3,000,000,000)
                  (In Local Currency)                                                  (1,500,000,000)
                                                  __________________________________________________
IB0804 IMPROVEMENT AND WIDENING OF N-45 (130.22 KM)
014202- A08    Loans and Advances                             100,000,000          100,000,000
014202- A085   Loans to Non Financial Institutions                 100,000,000          100,000,000
        Total- IMPROVEMENT AND WIDENING OF N-45        100,000,000        100,000,000
               (130.22 KM)
                  (In Foreign Exchange)                           (100,000,000)
               (Foreign Aid)                                    (100,000,000)
                  (In Local Currency)                                                   (100,000,000)
                                                  __________________________________________________
IB0805 KHYBER PASS ECONOMIC CORRIDOR PROJECT REVISED WORLD BANK
014202- A08    Loans and Advances                            3,000,000,000         2,000,000,000
014202- A085   Loans to Non Financial Institutions                3,000,000,000         2,000,000,000
        Total- KHYBER PASS ECONOMIC CORRIDOR        3,000,000,000       2,000,000,000
           PROJECT REVISED WORLD BANK
                  (In Foreign Exchange)                          (3,000,000,000)
               (Foreign Aid)                                   (3,000,000,000)
                  (In Local Currency)                                                  (2,000,000,000)

Page 552

NO. 131.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB3287 CONSTRUCTION OF CHAKDARA CHITRAL ROAD PROJECT (N-45) SECTION III KALKATAK CHITRAL (48KM)
014202- A08    Loans and Advances                             100,000,000          100,000,000
014202- A085   Loans to Non Financial Institutions                 100,000,000          100,000,000
        Total- CONSTRUCTION OF CHAKDARA               100,000,000        100,000,000
           CHITRAL ROAD PROJECT (N-45)
           SECTION III KALKATAK CHITRAL
             (48KM)
                  (In Foreign Exchange)                           (100,000,000)
               (Foreign Aid)                                    (100,000,000)
                  (In Local Currency)                                                   (100,000,000)
                                                  __________________________________________________
IB3294 RELOCATION OF KARAKORUM HIGHWAY BETWEEN THAKOT & RAIKOT DUE TO CONSTRUCTION OF
DAMS ON RIVER
014202- A08    Loans and Advances                            5,000,000,000         5,000,000,000
014202- A085   Loans to Non Financial Institutions                5,000,000,000         5,000,000,000
        Total- RELOCATION OF KARAKORUM               5,000,000,000       5,000,000,000
          HIGHWAY BETWEEN THAKOT &
           RAIKOT DUE TO CONSTRUCTION OF
          DAMS ON RIVER
                  (In Foreign Exchange)                          (5,000,000,000)
               (Foreign Aid)                                   (5,000,000,000)
                  (In Local Currency)                                                  (5,000,000,000)
                                                  __________________________________________________
IB3623 EXTENSION AND AUGMENTATION OF 500KV AND 2 KV TRANSFORMERS AT THE EXISTING GRID STATION
FOR REMOVAL OF NTDC
014202- A08    Loans and Advances                            3,500,000,000          672,620,000
014202- A085   Loans to Non Financial Institutions                3,500,000,000          672,620,000
        Total- EXTENSION AND AUGMENTATION OF         3,500,000,000        672,620,000
            500KV AND 2 KV TRANSFORMERS AT
           THE EXISTING GRID STATION FOR
          REMOVAL OF NTDC
                  (In Foreign Exchange)                          (3,500,000,000)
               (Foreign Aid)                                   (3,500,000,000)
                  (In Local Currency)                                                   (672,620,000)
                                                  __________________________________________________

Page 553

NO. 131.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB3624 220 KV GUJRANWALA-II SUBSTATION
014202- A08    Loans and Advances                               50,000,000
014202- A085   Loans to Non Financial Institutions                  50,000,000
        Total- 220 KV GUJRANWALA-II SUBSTATION           50,000,000
                  (In Foreign Exchange)                             (50,000,000)
               (Foreign Aid)                                      (50,000,000)
                                                  __________________________________________________
IB3625 600 MW SOLAR POWER PLANT NEAR MUZAFFARGARH
014202- A08    Loans and Advances                               20,000,000
014202- A085   Loans to Non Financial Institutions                  20,000,000
        Total- 600 MW SOLAR POWER PLANT NEAR           20,000,000
          MUZAFFARGARH
                  (In Foreign Exchange)                             (20,000,000)
               (Foreign Aid)                                      (20,000,000)
                                                  __________________________________________________
IB3626 600 MW SOLAR POWER PLANT NEAR TRIMMUR JHANG
014202- A08    Loans and Advances                               20,000,000
014202- A085   Loans to Non Financial Institutions                  20,000,000
        Total- 600 MW SOLAR POWER PLANT NEAR           20,000,000
           TRIMMUR JHANG
                  (In Foreign Exchange)                             (20,000,000)
               (Foreign Aid)                                      (20,000,000)
                                                  __________________________________________________
IB3627 1200 MW SOLAR POWER PLANT NEAR HAVELLI BHADUR SHAH
014202- A08    Loans and Advances                               10,000,000
014202- A085   Loans to Non Financial Institutions                  10,000,000
        Total- 1200 MW SOLAR POWER PLANT NEAR          10,000,000
            HAVELLI BHADUR SHAH
                  (In Foreign Exchange)                             (10,000,000)
               (Foreign Aid)                                      (10,000,000)
                                                  __________________________________________________
IB3628 220 KV NAG SHAH GRID STATION
014202- A08    Loans and Advances                               50,000,000
014202- A085   Loans to Non Financial Institutions                  50,000,000
        Total- 220 KV NAG SHAH GRID STATION               50,000,000
                  (In Foreign Exchange)                             (50,000,000)

Page 554

NO. 131.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

               (Foreign Aid)                                      (50,000,000)
                                                  __________________________________________________
IB3629 INSTITUTION OF SVCS AT 220 KV INDUSTRIAL (REVISED NAME 250 MVR SVS AT 132 KV QUETTA
INDUSTRIAL)
014202- A08    Loans and Advances                               10,000,000
014202- A085   Loans to Non Financial Institutions                  10,000,000
        Total- INSTITUTION OF SVCS AT 220 KV               10,000,000
            INDUSTRIAL (REVISED NAME 250 MVR
           SVS AT 132 KV QUETTA INDUSTRIAL)
                  (In Foreign Exchange)                             (10,000,000)
               (Foreign Aid)                                      (10,000,000)
                                                  __________________________________________________
IB3630 INTERLINKING OF 765 KV MANSEHRA WITH 220 KV MANSEHRA
014202- A08    Loans and Advances                               10,000,000
014202- A085   Loans to Non Financial Institutions                  10,000,000
        Total- INTERLINKING OF 765 KV MANSEHRA           10,000,000
           WITH 220 KV MANSEHRA
                  (In Foreign Exchange)                             (10,000,000)
               (Foreign Aid)                                      (10,000,000)
                                                  __________________________________________________
IB3631 REINFORCEMENT OF SAHIWAL ALONGWITH 2X 500 KV LINE BAY
014202- A08    Loans and Advances                               10,000,000
014202- A085   Loans to Non Financial Institutions                  10,000,000
        Total- REINFORCEMENT OF SAHIWAL                 10,000,000
          ALONGWITH 2X 500 KV LINE BAY
                  (In Foreign Exchange)                             (10,000,000)
               (Foreign Aid)                                      (10,000,000)
                                                  __________________________________________________
IB3632 2ND SOURCE OF SUPPLY TO 500 KV SHEIKH MUHAMMADI
014202- A08    Loans and Advances                               10,000,000
014202- A085   Loans to Non Financial Institutions                  10,000,000
        Total- 2ND SOURCE OF SUPPLY TO 500 KV            10,000,000
           SHEIKH MUHAMMADI
                  (In Foreign Exchange)                             (10,000,000)
               (Foreign Aid)                                      (10,000,000)
                                                  __________________________________________________

Page 555

NO. 131.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB3633 220 MVAR SVS AT 132 KV KHUZDAR
014202- A08    Loans and Advances                               10,000,000
014202- A085   Loans to Non Financial Institutions                  10,000,000
        Total- 220 MVAR SVS AT 132 KV KHUZDAR             10,000,000
                  (In Foreign Exchange)                             (10,000,000)
               (Foreign Aid)                                      (10,000,000)
                                                  __________________________________________________
IB3634 AUGMENTATION OF REMAINING 2X 160 MVA TRANSFORMERS WITH 2X 250 MVA YOUSAF WALA
014202- A08    Loans and Advances                               10,000,000
014202- A085   Loans to Non Financial Institutions                  10,000,000
        Total- AUGMENTATION OF REMAINING 2X 160         10,000,000
          MVA TRANSFORMERS WITH 2X 250
          MVA YOUSAF WALA
                  (In Foreign Exchange)                             (10,000,000)
               (Foreign Aid)                                      (10,000,000)
                                                  __________________________________________________
IB3635 AFD SUPPORT TO PPIB FOR TARIFF BASED BIDDING AND REVIEW OF FEASIBILITY STUDIES AND
CAPACITY BUILDING
014202- A08    Loans and Advances                               51,000,000            51,000,000
014202- A085   Loans to Non Financial Institutions                  51,000,000            51,000,000
        Total- AFD SUPPORT TO PPIB FOR TARIFF            51,000,000         51,000,000
          BASED BIDDING AND REVIEW OF
             FEASIBILITY STUDIES AND CAPACITY
            BUILDING
                  (In Foreign Exchange)                             (51,000,000)
               (Foreign Aid)                                      (51,000,000)
                  (In Local Currency)                                                     (51,000,000)
                                                  __________________________________________________
IB5431 THERMAL FOR INSTALLATION OF NEW COAL FIRED POWER PLANT HAVING CAPACITY 2X660 MW AT
JAMSHORO
014202- A08    Loans and Advances                           12,000,000,000        12,000,000,000
014202- A085   Loans to Non Financial Institutions               12,000,000,000        12,000,000,000
        Total- THERMAL FOR INSTALLATION OF NEW      12,000,000,000      12,000,000,000
          COAL FIRED POWER PLANT HAVING
           CAPACITY 2X660 MW AT JAMSHORO
                  (In Foreign Exchange)                         (12,000,000,000)
               (Foreign Aid)                                 (12,000,000,000)
                   (In Local Currency)                                                (12,000,000,000)

Page 556

NO. 131.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB5432 500 KV FAISALABAD NEW 2X750 NOW 500 KV FAISALABAD WEST
014202- A08    Loans and Advances                               10,000,000             7,404,000
014202- A085   Loans to Non Financial Institutions                  10,000,000             7,404,000
        Total- 500 KV FAISALABAD NEW 2X750 NOW           10,000,000           7,404,000
             500 KV FAISALABAD WEST
                  (In Foreign Exchange)                             (10,000,000)
               (Foreign Aid)                                      (10,000,000)
                  (In Local Currency)                                                       (7,404,000)
                                                  __________________________________________________
IB5433 DI KHAN-ZHOB T/L AND ZHOB S/S
014202- A08    Loans and Advances                             900,000,000          900,000,000
014202- A085   Loans to Non Financial Institutions                 900,000,000          900,000,000
        Total-  DI KHAN-ZHOB T/L AND ZHOB S/S             900,000,000        900,000,000
                  (In Foreign Exchange)                           (900,000,000)
               (Foreign Aid)                                    (900,000,000)
                  (In Local Currency)                                                   (900,000,000)
                                                  __________________________________________________
IB5434 220KV MIRPUR KHAS G/S & T/L
014202- A08    Loans and Advances                            1,700,000,000         1,700,000,000
014202- A085   Loans to Non Financial Institutions                1,700,000,000         1,700,000,000
        Total- 220KV MIRPUR KHAS G/S & T/L               1,700,000,000       1,700,000,000
                  (In Foreign Exchange)                          (1,700,000,000)
               (Foreign Aid)                                   (1,700,000,000)
                  (In Local Currency)                                                  (1,700,000,000)
                                                  __________________________________________________
IB5435 GUDDU-SIBBI T/L
014202- A08    Loans and Advances                             300,000,000          300,000,000
014202- A085   Loans to Non Financial Institutions                 300,000,000          300,000,000
        Total- GUDDU-SIBBI T/L                              300,000,000        300,000,000
                  (In Foreign Exchange)                           (300,000,000)
               (Foreign Aid)                                    (300,000,000)
                  (In Local Currency)                                                   (300,000,000)
                                                  __________________________________________________

Page 557

NO. 131.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB5436 UPGRADATION OF NTDC SCADA SYSTEM
014202- A08    Loans and Advances                            7,000,000,000         1,000,000,000
014202- A085   Loans to Non Financial Institutions                7,000,000,000         1,000,000,000
        Total- UPGRADATION OF NTDC SCADA             7,000,000,000       1,000,000,000
          SYSTEM
                  (In Foreign Exchange)                          (7,000,000,000)
               (Foreign Aid)                                   (7,000,000,000)
                  (In Local Currency)                                                  (1,000,000,000)
                                                  __________________________________________________
IB5437 EVACUATION OF POWER FROM 500 MW WIND POWER PLANTS JHIMPIR & GHARO CLUSTERS
014202- A08    Loans and Advances                             400,000,000          400,000,000
014202- A085   Loans to Non Financial Institutions                 400,000,000          400,000,000
        Total- EVACUATION OF POWER FROM 500 MW        400,000,000        400,000,000
           WIND POWER PLANTS JHIMPIR &
          GHARO CLUSTERS
                  (In Foreign Exchange)                           (400,000,000)
               (Foreign Aid)                                    (400,000,000)
                  (In Local Currency)                                                   (400,000,000)
                                                  __________________________________________________
IB5438 ADVANCE METERING PROJECT FOR IESCO
014202- A08    Loans and Advances                            3,808,000,000         3,808,000,000
014202- A085   Loans to Non Financial Institutions                3,808,000,000         3,808,000,000
        Total- ADVANCE METERING PROJECT FOR         3,808,000,000       3,808,000,000
           IESCO
                  (In Foreign Exchange)                          (3,808,000,000)
               (Foreign Aid)                                   (3,808,000,000)
                  (In Local Currency)                                                  (3,808,000,000)
                                                  __________________________________________________
IB5439 200 KV JAUHARABAD G/S
014202- A08    Loans and Advances                            1,800,000,000         1,800,000,000
014202- A085   Loans to Non Financial Institutions                1,800,000,000         1,800,000,000
        Total- 200 KV JAUHARABAD G/S                    1,800,000,000       1,800,000,000
                  (In Foreign Exchange)                          (1,800,000,000)
               (Foreign Aid)                                   (1,800,000,000)
                  (In Local Currency)                                                  (1,800,000,000)
                                                  __________________________________________________

Page 558

NO. 131.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB5440 500 KV LAHORE NORTH
014202- A08    Loans and Advances                            6,000,000,000         2,000,000,000
014202- A085   Loans to Non Financial Institutions                6,000,000,000         2,000,000,000
        Total- 500 KV LAHORE NORTH                      6,000,000,000       2,000,000,000
                  (In Foreign Exchange)                          (6,000,000,000)
               (Foreign Aid)                                   (6,000,000,000)
                  (In Local Currency)                                                  (2,000,000,000)
                                                  __________________________________________________
IB5442 ELECTRICITY TRANS & TRADE PRO CASA
014202- A08    Loans and Advances                            3,500,000,000         1,500,000,000
014202- A085   Loans to Non Financial Institutions                3,500,000,000         1,500,000,000
        Total- ELECTRICITY TRANS & TRADE PRO          3,500,000,000       1,500,000,000
          CASA
                  (In Foreign Exchange)                          (3,500,000,000)
               (Foreign Aid)                                   (3,500,000,000)
                  (In Local Currency)                                                  (1,500,000,000)
                                                  __________________________________________________
IB5443 220 KV TRANSMISSION LINE REINFORCEMENT OF ISLAMABAD BURHAN TRANSMISSION LINE
014202- A08    Loans and Advances                            1,500,000,000         1,500,000,000
014202- A085   Loans to Non Financial Institutions                1,500,000,000         1,500,000,000
        Total- 220 KV TRANSMISSION LINE                  1,500,000,000       1,500,000,000
           REINFORCEMENT OF ISLAMABAD
          BURHAN TRANSMISSION LINE
                  (In Foreign Exchange)                          (1,500,000,000)
               (Foreign Aid)                                   (1,500,000,000)
                  (In Local Currency)                                                  (1,500,000,000)
                                                  __________________________________________________
IB5446 EVACUATION OF POWER FROM TERBELLA 5TH EXTENSION
014202- A08    Loans and Advances                            1,500,000,000         1,500,000,000
014202- A085   Loans to Non Financial Institutions                1,500,000,000         1,500,000,000
        Total- EVACUATION OF POWER FROM              1,500,000,000       1,500,000,000
           TERBELLA 5TH EXTENSION
                  (In Foreign Exchange)                          (1,500,000,000)
               (Foreign Aid)                                   (1,500,000,000)
                  (In Local Currency)                                                  (1,500,000,000)
                                                  __________________________________________________

Page 559

NO. 131.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB5449 220 KV BUND ROAD
014202- A08    Loans and Advances                             100,000,000
014202- A085   Loans to Non Financial Institutions                 100,000,000
        Total- 220 KV BUND ROAD                           100,000,000
                  (In Foreign Exchange)                           (100,000,000)
               (Foreign Aid)                                    (100,000,000)
                                                  __________________________________________________
IB5452 500 KV ISLAMABAD WEST
014202- A08    Loans and Advances                            3,500,000,000         3,500,000,000
014202- A085   Loans to Non Financial Institutions                3,500,000,000         3,500,000,000
        Total- 500 KV ISLAMABAD WEST                    3,500,000,000       3,500,000,000
                  (In Foreign Exchange)                          (3,500,000,000)
               (Foreign Aid)                                   (3,500,000,000)
                  (In Local Currency)                                                  (3,500,000,000)
                                                  __________________________________________________
IB5453 ENHANCEMENT IN TRANSFORMATION CAPACITY OF NTDC SYSTEM BY EXTENSION & AUGMENTATION
OF EXISTING GRID
014202- A08    Loans and Advances                            3,500,000,000         3,500,000,000
014202- A085   Loans to Non Financial Institutions                3,500,000,000         3,500,000,000
        Total- ENHANCEMENT IN TRANSFORMATION       3,500,000,000       3,500,000,000
           CAPACITY OF NTDC SYSTEM BY
           EXTENSION & AUGMENTATION OF
            EXISTING GRID
                  (In Foreign Exchange)                          (3,500,000,000)
               (Foreign Aid)                                   (3,500,000,000)
                  (In Local Currency)                                                  (3,500,000,000)
                                                  __________________________________________________
IB5454 ENTERPRISE RESOURCE PLANNING AUTOMATION
014202- A08    Loans and Advances                            2,000,000,000         2,000,000,000
014202- A085   Loans to Non Financial Institutions                2,000,000,000         2,000,000,000
        Total- ENTERPRISE RESOURCE PLANNING         2,000,000,000       2,000,000,000
           AUTOMATION
                  (In Foreign Exchange)                          (2,000,000,000)
               (Foreign Aid)                                   (2,000,000,000)
                  (In Local Currency)                                                  (2,000,000,000)
                                                  __________________________________________________

Page 560

NO. 131.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB5456 EVACUATION OF POWER FROM 2160MW DASU HPP STAGE I
014202- A08    Loans and Advances                           18,973,642,000        12,543,642,000
014202- A085   Loans to Non Financial Institutions               18,973,642,000        12,543,642,000
        Total- EVACUATION OF POWER FROM             18,973,642,000      12,543,642,000
           2160MW DASU HPP STAGE I
                  (In Foreign Exchange)                         (18,973,642,000)
               (Foreign Aid)                                 (18,973,642,000)
                  (In Local Currency)                                                (12,543,642,000)
                                                  __________________________________________________
IB5458 220 KV ARIFWALA SUBSTATION
014202- A08    Loans and Advances                            2,000,000,000         2,000,000,000
014202- A085   Loans to Non Financial Institutions                2,000,000,000         2,000,000,000
        Total- 220 KV ARIFWALA SUBSTATION              2,000,000,000       2,000,000,000
                  (In Foreign Exchange)                          (2,000,000,000)
               (Foreign Aid)                                   (2,000,000,000)
                  (In Local Currency)                                                  (2,000,000,000)
                                                  __________________________________________________
IB5459 220 KV HEAD FAQIRAN G/S ALONG WITH ALLIED T/L
014202- A08    Loans and Advances                               20,000,000            20,000,000
014202- A085   Loans to Non Financial Institutions                  20,000,000            20,000,000
        Total- 220 KV HEAD FAQIRAN G/S ALONG             20,000,000         20,000,000
           WITH ALLIED T/L
                  (In Foreign Exchange)                             (20,000,000)
               (Foreign Aid)                                      (20,000,000)
                  (In Local Currency)                                                     (20,000,000)
                                                  __________________________________________________
IB5460 220 KV LARKANA SUBSTATION
014202- A08    Loans and Advances                               25,000,000            25,000,000
014202- A085   Loans to Non Financial Institutions                  25,000,000            25,000,000
        Total- 220 KV LARKANA SUBSTATION                 25,000,000         25,000,000
                  (In Foreign Exchange)                             (25,000,000)
               (Foreign Aid)                                      (25,000,000)
                  (In Local Currency)                                                     (25,000,000)
                                                  __________________________________________________
IB5461 220 KV MASTUNG G/S ALONG WITH ALLIED T/LS
014202- A08    Loans and Advances                               25,000,000            25,000,000

Page 561

NO. 131.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

014202- A085   Loans to Non Financial Institutions                  25,000,000            25,000,000
        Total- 220 KV MASTUNG G/S ALONG WITH             25,000,000         25,000,000
            ALLIED T/LS
                  (In Foreign Exchange)                             (25,000,000)
               (Foreign Aid)                                      (25,000,000)
                  (In Local Currency)                                                     (25,000,000)
                                                  __________________________________________________
IB5462 500 KV VEHARI GRID STATION
014202- A08    Loans and Advances                             815,000,000          815,000,000
014202- A085   Loans to Non Financial Institutions                 815,000,000          815,000,000
        Total- 500 KV VEHARI GRID STATION                 815,000,000        815,000,000
                  (In Foreign Exchange)                           (815,000,000)
               (Foreign Aid)                                    (815,000,000)
                  (In Local Currency)                                                   (815,000,000)
                                                  __________________________________________________
IB5463 INSTALLATION OF PILOT BATTERY ENERGY STORAGE SYSTEM BESS AT 220 KV JHIMPIR G/STATION
014202- A08    Loans and Advances                            2,000,000,000          827,380,000
014202- A085   Loans to Non Financial Institutions                2,000,000,000          827,380,000
        Total- INSTALLATION OF PILOT BATTERY           2,000,000,000        827,380,000
          ENERGY STORAGE SYSTEM BESS AT
             220 KV JHIMPIR G/STATION
                  (In Foreign Exchange)                          (2,000,000,000)
               (Foreign Aid)                                   (2,000,000,000)
                  (In Local Currency)                                                   (827,380,000)
                                                  __________________________________________________
IB5464 EVACUATION OF POWER FROM SUKI KINARI KOHALA MAHAL HPPS NTDC
014202- A08    Loans and Advances                            5,000,000,000         4,000,000,000
014202- A085   Loans to Non Financial Institutions                5,000,000,000         4,000,000,000
        Total- EVACUATION OF POWER FROM SUKI         5,000,000,000       4,000,000,000
            KINARI KOHALA MAHAL HPPS NTDC
                  (In Foreign Exchange)                          (5,000,000,000)
               (Foreign Aid)                                   (5,000,000,000)
                  (In Local Currency)                                                  (4,000,000,000)
                                                  __________________________________________________
IB5467 500 220 KV SIALKOT SUB STATION NTDC
014202- A08    Loans and Advances                            2,500,000,000         1,520,000,000

Page 562

NO. 131.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

014202- A085   Loans to Non Financial Institutions                2,500,000,000         1,520,000,000
        Total- 500 220 KV SIALKOT SUB STATION           2,500,000,000       1,520,000,000
          NTDC
                  (In Foreign Exchange)                          (2,500,000,000)
               (Foreign Aid)                                   (2,500,000,000)
                  (In Local Currency)                                                  (1,520,000,000)
                                                  __________________________________________________
IB5468 220KV DHARKI RAHIM YAR KHAN BHAWALPUR D/C T/L NTDC
014202- A08    Loans and Advances                            3,000,000,000         2,000,000,000
014202- A085   Loans to Non Financial Institutions                3,000,000,000         2,000,000,000
        Total- 220KV DHARKI RAHIM YAR KHAN             3,000,000,000       2,000,000,000
          BHAWALPUR D/C T/L NTDC
                  (In Foreign Exchange)                          (3,000,000,000)
               (Foreign Aid)                                   (3,000,000,000)
                  (In Local Currency)                                                  (2,000,000,000)
                                                  __________________________________________________
IB5469 CONSTRUCTION OF MUZAFFARABAD - MANSEHRA ROAD (26.6 KM APPROX)
014202- A08    Loans and Advances                            5,220,000,000         2,220,000,000
014202- A085   Loans to Non Financial Institutions                5,220,000,000         2,220,000,000
        Total- CONSTRUCTION OF MUZAFFARABAD -       5,220,000,000       2,220,000,000
          MANSEHRA ROAD (26.6 KM APPROX)
                  (In Foreign Exchange)                          (5,220,000,000)
               (Foreign Aid)                                   (5,220,000,000)
                  (In Local Currency)                                                  (2,220,000,000)
                                                  __________________________________________________
IB9407 PROVISION FOR DEVELOPMENT EXPENDITURE OF DEVELOPMENT LOANS AND ADVANCES BY THE
FEDERAL GOVERNMENT
014202- A08    Loans and Advances                            4,000,000,000         4,000,000,000
014202- A085   Loans to Non Financial Institutions                4,000,000,000         4,000,000,000
        Total- PROVISION FOR DEVELOPMENT              4,000,000,000       4,000,000,000
           EXPENDITURE OF DEVELOPMENT
          LOANS AND ADVANCES BY THE
          FEDERAL GOVERNMENT
                  (In Foreign Exchange)                          (4,000,000,000)
               (Foreign Aid)                                   (4,000,000,000)

Page 563

NO. 131.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

                  (In Local Currency)                                                  (4,000,000,000)
                                                  __________________________________________________
IB9436 REHABILITATION & RECONSTRUCTION OF N-5 FROM MORO TO RANIPUR KM. 318-404 (NBC/SBC) & 32 X
DAMAGED BRIDGES
014202- A08    Loans and Advances                            6,000,000,000         5,000,000,000
014202- A085   Loans to Non Financial Institutions                6,000,000,000         5,000,000,000
        Total- REHABILITATION & RECONSTRUCTION       6,000,000,000       5,000,000,000
          OF N-5 FROM MORO TO RANIPUR KM.
              318-404 (NBC/SBC) & 32 X DAMAGED
           BRIDGES
                  (In Foreign Exchange)                          (6,000,000,000)
               (Foreign Aid)                                   (6,000,000,000)
                  (In Local Currency)                                                  (5,000,000,000)
                                                  __________________________________________________
IB9446 CHINA AIDED PROJECTS OF PAKISTAN NATIONAL HIGHWAY N-5 SECTIONAL REHABILITATION
HALA-MORO 66 KM
014202- A08    Loans and Advances                            1,000,000,000         1,000,000,000
014202- A085   Loans to Non Financial Institutions                1,000,000,000         1,000,000,000
        Total- CHINA AIDED PROJECTS OF PAKISTAN       1,000,000,000       1,000,000,000
           NATIONAL HIGHWAY N-5 SECTIONAL
            REHABILITATION HALA-MORO 66 KM
                  (In Foreign Exchange)                          (1,000,000,000)
               (Foreign Aid)                                   (1,000,000,000)
                  (In Local Currency)                                                  (1,000,000,000)
                                                  __________________________________________________
     014202   Total-  Trasfer To Non-Financial              127,857,642,000      91,135,046,000
                           Institutions
     0142     Total-  Transfers (Others)                    127,857,642,000      91,135,046,000
     014      Total-  Transfers                           745,317,642,000     708,595,046,000    777,053,280,000
     01        Total-  General Public Service               745,317,642,000    708,595,046,000     777,053,280,000
               Total- ACCOUNTANT GENERAL               745,317,642,000       708,595,046,000       777,053,280,000
                PAKISTAN REVENUES
              (Charged)                                        617,000,000,000      617,000,000,000        774,953,280,000
               (Voted)                                           128,317,642,000        91,595,046,000         2,100,000,000
                       (In Foreign Exchange)                       (745,317,642,000)     (617,000,000,000)     (777,053,280,000)
               (Own Resources)

Page 564

NO. 131.- FC12E14 EXTERNAL DEVELOPMENT LOANS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

                   (Foreign Aid)                                 (745,317,642,000)     (617,000,000,000)      (777,053,280,000)
                       (In Local Currency)                                                 (91,595,046,000)
          TOTAL - DEMAND                          745,317,642,000    708,595,046,000     777,053,280,000
              (Charged)                                  617,000,000,000    617,000,000,000     774,953,280,000
               (Voted)                                     128,317,642,000      91,595,046,000       2,100,000,000
                                                  __________________________________________________
                  (In Foreign Exchange)                       (745,317,642,000)   (617,000,000,000)   (777,053,280,000)
            (Own Resources)
               (Foreign Aid)                                (745,317,642,000)   (617,000,000,000)   (777,053,280,000)
                  (In Local Currency)                                               (91,595,046,000)
                                                   _________________________________________________

Page 565

                               SECTION V

                       MINISTRY OF HOUSING AND WORKS

                                                                   **********
                                                                                  2025-2026
                                                                             Budget
                                                                                    Estimate

                                                                      (Rupees in Thousand)

Demand presented on behalf of the
Ministry of Housing and Works

Development Expenditure on Capital Account

             132.  Capital Outlay on Civil Works                                           15,005,801

                                                                          Total :             15,005,801

Page 566

No text layer on this page, see the official PDF.

Page 567

NO. 132.- CAPITAL OUTLAY ON CIVIL WORKS                              DEMANDS FOR GRANTS
                                DEMAND NO. 132
                                                                            ( FC12C28 )
                               CAPITAL OUTLAY ON CIVIL WORKS

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2026 for CAPITAL OUTLAY ON CIVIL
WORKS.

                                Voted           Rs. 15,005,801,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF HOUSING AND WORKS  .

                                                           2024-2025         2024-2025         2025-2026
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
045    Construction and Transport                                28,188,072,000         9,278,583,000        15,005,801,000
               Total                                              28,188,072,000         9,278,583,000        15,005,801,000
     OBJECT CLASSIFICATION
A03   Operating Expenses                                 1,663,025,000        124,172,000        151,492,000
A05   Grants, Subsidies and Write off Loans                                                        185,000,000
A12    Civil works                                         26,525,047,000       9,154,411,000      14,669,309,000
               Total                                        28,188,072,000       9,278,583,000      15,005,801,000

Page 568

NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS

III.  - DETAILS are as follows :-
                                 No of Posts        2024-2025         2024-2025       2025-2026
                                       2024-25 2025-26       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
04     Economic Affairs:
045    Construction and Transport:
0457   Construction (Works):
045701 Administration  :
IB3524 CONSTRUCTION OF ADDITIONAL FLOORS PROVISION OF FACILITIES AND REHABILITATION OF PAK PWD
COMPLEX
045701- A03    Operating Expenses                               18,310,000             9,155,000
045701- A039   General                                             18,310,000             9,155,000
045701- A12     Civil works                                        281,690,000          140,845,000
045701- A124    Building and Structures                            281,690,000          140,845,000
        Total- CONSTRUCTION OF ADDITIONAL              300,000,000        150,000,000
          FLOORS PROVISION OF FACILITIES
          AND REHABILITATION OF PAK PWD
          COMPLEX
IB5317 CONSTRUCTION OF HAJJ COMPLEX LAHORE
045701- A03    Operating Expenses                               30,517,000
045701- A039   General                                             30,517,000
045701- A12     Civil works                                        469,483,000
045701- A124    Building and Structures                            469,483,000
        Total- CONSTRUCTION OF HAJJ COMPLEX           500,000,000
          LAHORE
IB5363 124 COL ON CIVIL WORK CONSTRUCTION OF CARPET ROAD FROM KOT SHER TO JAJOKI DISTRICT
GUJRANWALA
045701- A03    Operating Expenses                               23,670,000
045701- A039   General                                             23,670,000
045701- A12     Civil works                                        364,156,000
045701- A124    Building and Structures                            364,156,000
        Total- 124 COL ON CIVIL WORK                      387,826,000
           CONSTRUCTION OF CARPET ROAD
          FROM KOT SHER TO JAJOKI DISTRICT
          GUJRANWALA
IB5496 124-COL ON CIVIL WORK ROAD FROM LALAMUSA TO NOONA WALI BHAGO AND MALWANA WITH LINK
INFRASTRUCTURE
045701- A03    Operating Expenses                                 3,052,000

Page 569

NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045701- A039   General                                              3,052,000
045701- A12     Civil works                                         46,948,000
045701- A124    Building and Structures                             46,948,000
        Total- 124-COL ON CIVIL WORK ROAD FROM           50,000,000
          LALAMUSA TO NOONA WALI BHAGO
          AND MALWANA WITH LINK
           INFRASTRUCTURE
IB5497 124-COL ON CIVIL WORK CONSTRUCTION OF RAILWAY UNDERPASS GOJRA
045701- A03    Operating Expenses                               20,415,000
045701- A039   General                                             20,415,000
045701- A12     Civil works                                        314,070,000
045701- A124    Building and Structures                            314,070,000
        Total- 124-COL ON CIVIL WORK                      334,485,000
           CONSTRUCTION OF RAILWAY
          UNDERPASS GOJRA
     045701   Total-  Administration                          1,572,311,000        150,000,000
045702 Buildings and Structures  :
IB2232 CONSTRUCTION OF OFFICE OF THE NAB SUKKUR AT AIRPORT ROAD SUKKUR
045702- A03    Operating Expenses                               10,118,000
045702- A039   General                                             10,118,000
045702- A12     Civil works                                        155,667,000
045702- A124    Building and Structures                            155,667,000
        Total- CONSTRUCTION OF OFFICE OF THE           165,785,000
          NAB SUKKUR AT AIRPORT ROAD
          SUKKUR
IB2239 CONSTRUCTION OF OFFICES FOR INTELLIGENCE BUREAU ALONG-WITH CPEC
045702- A03    Operating Expenses                                 9,155,000
045702- A039   General                                              9,155,000
045702- A12     Civil works                                        140,845,000
045702- A124    Building and Structures                            140,845,000
        Total- CONSTRUCTION OF OFFICES FOR             150,000,000
            INTELLIGENCE BUREAU ALONG-WITH
          CPEC

Page 570

NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB2240 DUALIZATION AND IMPROVEMENT OF MANDRA TO CHAKWAL ROAD (64 KM)
045702- A12     Civil works                                        940,214,000
045702- A124    Building and Structures                            940,214,000
        Total- DUALIZATION AND IMPROVEMENT OF         940,214,000
          MANDRA TO CHAKWAL ROAD (64 KM)
IB2244 REPLACEMENT OF OLD AND UNSERVICEABLE ELEVATORS WITH NEW ELEVATORS AT
SHAHEED-E-MILLAT SECRETARIAT
045702- A03    Operating Expenses                                 3,273,000             3,273,000
045702- A039   General                                              3,273,000             3,273,000
045702- A12     Civil works                                         50,358,000            50,358,000            53,631,000
045702- A124    Building and Structures                             50,358,000            50,358,000            53,631,000
        Total- REPLACEMENT OF OLD AND                    53,631,000         53,631,000          53,631,000
           UNSERVICEABLE ELEVATORS WITH
         NEW ELEVATORS AT
            SHAHEED-E-MILLAT SECRETARIAT
IB2251 WIDENING / REHABILITATION / CONSTRUCTION OF 08 NOS ROADS IN UC MANDA KHEL UC QAMAR
MASHANI MC
045702- A03    Operating Expenses                                 3,052,000
045702- A039   General                                              3,052,000
045702- A12     Civil works                                         46,948,000
045702- A124    Building and Structures                             46,948,000
        Total- WIDENING / REHABILITATION /                  50,000,000
           CONSTRUCTION OF 08 NOS ROADS IN
          UC MANDA KHEL UC QAMAR MASHANI
         MC
IB2252 WIDENING / REHABILITATION / CONSTRUCTION OF 05 ROADS IN UC PAKI SHAH MARDIAN UC NAMAL UC
KOT
045702- A03    Operating Expenses                                 3,052,000
045702- A039   General                                              3,052,000
045702- A12     Civil works                                         46,948,000
045702- A124    Building and Structures                             46,948,000
        Total- WIDENING / REHABILITATION /                  50,000,000
           CONSTRUCTION OF 05 ROADS IN UC
            PAKI SHAH MARDIAN UC NAMAL UC
          KOT

Page 571

NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB2253 WIDENING / REHABILITATION / CONSTRUCTION OF 07 NOS ROADS IN UC SHAHBAZ KHEL UC ROKHRI UC
PAI KHEL
045702- A03    Operating Expenses                                 3,052,000
045702- A039   General                                              3,052,000
045702- A12     Civil works                                         46,948,000
045702- A124    Building and Structures                             46,948,000
        Total- WIDENING / REHABILITATION /                  50,000,000
           CONSTRUCTION OF 07 NOS ROADS IN
          UC SHAHBAZ KHEL UC ROKHRI UC PAI
          KHEL
IB2257 CONSTRUCTION OF OFFICER'S MESS AT NAB (L) |COMPLEX LAHORE
045702- A03    Operating Expenses                                 3,052,000
045702- A039   General                                              3,052,000
045702- A12     Civil works                                         46,948,000
045702- A124    Building and Structures                             46,948,000
        Total- CONSTRUCTION OF OFFICER'S MESS           50,000,000
           AT NAB (L) |COMPLEX LAHORE
IB2259 CONSTRUCTION OF INDUSTRIAL AREA ROAD FROM GT ROAD TO GHAZI CHAK INCLUDING BRIDGES ON
BHIMER NALLAH
045702- A03    Operating Expenses                               15,036,000
045702- A039   General                                             15,036,000
045702- A12     Civil works                                        231,317,000
045702- A124    Building and Structures                            231,317,000
        Total- CONSTRUCTION OF INDUSTRIAL AREA        246,353,000
          ROAD FROM GT ROAD TO GHAZI CHAK
            INCLUDING BRIDGES ON BHIMER
          NALLAH
IB2264 CONSTRUCTION OF SERVICE MORE FLYOVER AND INDUSTRIAL AREA LINK ROAD GUJRAT DISTRICT
GUJRAT-II
045702- A03    Operating Expenses                               13,724,000
045702- A039   General                                             13,724,000
045702- A12     Civil works                                        211,142,000
045702- A124    Building and Structures                            211,142,000
        Total- CONSTRUCTION OF SERVICE MORE           224,866,000
           FLYOVER AND INDUSTRIAL AREA LINK
          ROAD GUJRAT DISTRICT GUJRAT-II

Page 572

NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB2267 CONSTRUCTION OF 20 BEDDED HOSPITAL AT VILLAGE LATIFAL DISTRICT CHAKWAL
045702- A03    Operating Expenses                                 6,103,000
045702- A039   General                                              6,103,000
045702- A12     Civil works                                         93,897,000
045702- A124    Building and Structures                             93,897,000
        Total- CONSTRUCTION OF 20 BEDDED               100,000,000
           HOSPITAL AT VILLAGE LATIFAL
            DISTRICT CHAKWAL
IB2268 WIDENING/REHABILITATION OF ROAD FROM QUAIDABAD TO WARCHHA VIA FATEHPUR DISTRICT
KHUSHAB
045702- A03    Operating Expenses                                 9,155,000
045702- A039   General                                              9,155,000
045702- A12     Civil works                                        140,845,000
045702- A124    Building and Structures                            140,845,000
        Total- WIDENING/REHABILITATION OF ROAD         150,000,000
          FROM QUAIDABAD TO WARCHHA VIA
          FATEHPUR DISTRICT KHUSHAB
IB2271 CONSTRUCTION / REHABILITATION OF FLOOD AFFECTED ROAD DISTRICT MUZAFFARGARH-I
045702- A03    Operating Expenses                                 6,103,000
045702- A039   General                                              6,103,000
045702- A12     Civil works                                         93,897,000
045702- A124    Building and Structures                             93,897,000
        Total- CONSTRUCTION / REHABILITATION OF         100,000,000
          FLOOD AFFECTED ROAD DISTRICT
           MUZAFFARGARH-I
IB2285 CONSTRUCTION OF AUDITORIUM BACHELOR HOSTEL AND OFFICERS MESS FOR NAB (KP) AT
PESHAWAR
045702- A03    Operating Expenses                                 6,103,000
045702- A039   General                                              6,103,000
045702- A12     Civil works                                         93,897,000
045702- A124    Building and Structures                             93,897,000
        Total- CONSTRUCTION OF AUDITORIUM              100,000,000
          BACHELOR HOSTEL AND OFFICERS
          MESS FOR NAB (KP) AT PESHAWAR

Page 573

NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB2296 CONSTRUCTION OF BUILDING FOR GIRLS COLLEGE AT KACHI BAIG SARYAB ROAD QUETTA
045702- A03    Operating Expenses                               12,007,000
045702- A039   General                                             12,007,000
045702- A12     Civil works                                        184,720,000
045702- A124    Building and Structures                            184,720,000
        Total- CONSTRUCTION OF BUILDING FOR            196,727,000
            GIRLS COLLEGE AT KACHI BAIG
          SARYAB ROAD QUETTA
IB2360 CONSTRUCTION OF DHUDIAL BY PASS DISTRICT CHAKWAL
045702- A03    Operating Expenses                               21,715,000
045702- A039   General                                             21,715,000
045702- A12     Civil works                                        334,082,000
045702- A124    Building and Structures                            334,082,000
        Total- CONSTRUCTION OF DHUDIAL BY PASS        355,797,000
            DISTRICT CHAKWAL
IB3250 CONSTRUCTION OF OFFICE BUILDING OF IB IN DIPLOMATIC ENCLAVE ISLAMABAD
045702- A03    Operating Expenses                                 9,155,000             9,155,000
045702- A039   General                                              9,155,000             9,155,000
045702- A12     Civil works                                        140,845,000          140,845,000          100,000,000
045702- A124    Building and Structures                            140,845,000          140,845,000          100,000,000
        Total- CONSTRUCTION OF OFFICE BUILDING         150,000,000        150,000,000        100,000,000
          OF IB IN DIPLOMATIC ENCLAVE
           ISLAMABAD
IB3257 CONSTRUCTION OF OFFICE FOR IB AT DASSU
045702- A03    Operating Expenses                                 2,746,000
045702- A039   General                                              2,746,000
045702- A12     Civil works                                         42,254,000
045702- A124    Building and Structures                             42,254,000
        Total- CONSTRUCTION OF OFFICE FOR IB AT          45,000,000
          DASSU
IB3258 CONSTRUCTION OF OFFICE FOR IB AT MASTUNG
045702- A03    Operating Expenses                                 2,136,000
045702- A039   General                                              2,136,000

Page 574

NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A12     Civil works                                         32,864,000
045702- A124    Building and Structures                             32,864,000
        Total- CONSTRUCTION OF OFFICE FOR IB AT          35,000,000
          MASTUNG
IB3259 CONSTRUCTION OF OFFICE FOR IB AT PISHIN
045702- A03    Operating Expenses                                 1,526,000
045702- A039   General                                              1,526,000
045702- A12     Civil works                                         23,474,000
045702- A124    Building and Structures                             23,474,000
        Total- CONSTRUCTION OF OFFICE FOR IB AT          25,000,000
             PISHIN
IB3272 CONSTRUCTION OF OFFICE FOR IB AT DISTRICT CHAMAN
045702- A03    Operating Expenses                                 1,526,000
045702- A039   General                                              1,526,000
045702- A12     Civil works                                         23,474,000
045702- A124    Building and Structures                             23,474,000
        Total- CONSTRUCTION OF OFFICE FOR IB AT          25,000,000
            DISTRICT CHAMAN
IB3273 CONSTRUCTION OF NAB COMPLEX LAHORE (2ND REVISED PC-I)
045702- A03    Operating Expenses                                 3,052,000
045702- A039   General                                              3,052,000
045702- A12     Civil works                                         46,948,000
045702- A124    Building and Structures                             46,948,000
        Total- CONSTRUCTION OF NAB COMPLEX             50,000,000
          LAHORE (2ND REVISED PC-I)
IB3274 CONSTRUCTION OF 12 NOS. APARTMENTS IN MINISTER'S ENCLAVE ISLAMABAD
045702- A03    Operating Expenses                                 8,100,000             8,100,000
045702- A039   General                                              8,100,000             8,100,000
045702- A12     Civil works                                        124,622,000          124,622,000          132,722,000
045702- A124    Building and Structures                            124,622,000          124,622,000          132,722,000
        Total- CONSTRUCTION OF 12 NOS.                   132,722,000        132,722,000        132,722,000
          APARTMENTS IN MINISTER'S ENCLAVE
           ISLAMABAD

Page 575

NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB3354 CONSTRUCTION OF OPERATION THEATRE AT CENTRAL HOSPITAL AT MINGORA SWAT (REVISED PC-1)
045702- A03    Operating Expenses                                 8,019,000
045702- A039   General                                              8,019,000
045702- A12     Civil works                                        123,362,000
045702- A124    Building and Structures                            123,362,000
        Total- CONSTRUCTION OF OPERATION               131,381,000
           THEATRE AT CENTRAL HOSPITAL AT
          MINGORA SWAT (REVISED PC-1)
IB3436 CONST. OF ROAD FROM CHAAL TO DHOLAN MORR VIA NONAR MUSALMANIA KILLA AHMEDABAD
(PHASE-I & II)
045702- A03    Operating Expenses                               29,184,000
045702- A039   General                                             29,184,000
045702- A12     Civil works                                        448,984,000
045702- A124    Building and Structures                            448,984,000
        Total- CONST. OF ROAD FROM CHAAL TO            478,168,000
          DHOLAN MORR VIA NONAR
          MUSALMANIA KILLA AHMEDABAD
             (PHASE-I & II)
IB3621 CONSTRUCTION OF ELECTION ACADEMY AND OTHER OFFICES OF ELECTION COMMISSION OF
PAKISTAN
045702- A03    Operating Expenses                               24,413,000            24,413,000
045702- A039   General                                             24,413,000            24,413,000
045702- A12     Civil works                                        375,587,000          375,587,000          100,000,000
045702- A124    Building and Structures                            375,587,000          375,587,000          100,000,000
        Total- CONSTRUCTION OF ELECTION                400,000,000        400,000,000        100,000,000
          ACADEMY AND OTHER OFFICES OF
           ELECTION COMMISSION OF PAKISTAN
IB5179 CONSTRUCTION OF RAILWAYS UNDERPASS JAHNIAN DISTRICT KHANEWAL
045702- A03    Operating Expenses                               15,258,000
045702- A039   General                                             15,258,000
045702- A12     Civil works                                        234,742,000
045702- A124    Building and Structures                            234,742,000
        Total- CONSTRUCTION OF RAILWAYS                250,000,000
          UNDERPASS JAHNIAN DISTRICT
          KHANEWAL

Page 576

NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB9005 CONSTRUCTION OF METALLED ROAD FROM KOT RADHA KISHEN ROAD (PAJIAN BYPASS) TO GOHAR
JAGEER VIA KHUDIAN AND
045702- A03    Operating Expenses                                 1,831,000
045702- A039   General                                              1,831,000
045702- A12     Civil works                                         28,169,000
045702- A124    Building and Structures                             28,169,000
        Total- CONSTRUCTION OF METALLED ROAD          30,000,000
          FROM KOT RADHA KISHEN ROAD
            (PAJIAN BYPASS) TO GOHAR JAGEER
             VIA KHUDIAN AND
IB9007 CONSTRUCTION OF METALLED ROAD FROM GANDA SINGH TO KANGAN PUR ALONG DEPALPUR CANAL
DISTRICT KASUR (54
045702- A03    Operating Expenses                                 1,831,000
045702- A039   General                                              1,831,000
045702- A12     Civil works                                         28,169,000
045702- A124    Building and Structures                             28,169,000
        Total- CONSTRUCTION OF METALLED ROAD          30,000,000
          FROM GANDA SINGH TO KANGAN PUR
          ALONG DEPALPUR CANAL DISTRICT
          KASUR (54
IB9119 REHABILITATION/UPGRADATION SAKRAN DUREJI ROAD DIFFERENT REACHES (PHASE-1 KM 16 TO 50)
DISTRICT
045702- A03    Operating Expenses                                 2,399,000
045702- A039   General                                              2,399,000
045702- A12     Civil works                                         36,912,000
045702- A124    Building and Structures                             36,912,000
        Total- REHABILITATION/UPGRADATION               39,311,000
          SAKRAN DUREJI ROAD DIFFERENT
          REACHES (PHASE-1 KM 16 TO 50)
            DISTRICT
IB9120 CONSTRUCTION OF BLACK TOP ROAD FROM RCD TOWARDS KILLI ABDUL HANAN TEHSIL WADH
DISTRICT KHUZDAR
045702- A03    Operating Expenses                                 5,067,000
045702- A039   General                                              5,067,000
045702- A12     Civil works                                         77,957,000

Page 577

NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A124    Building and Structures                             77,957,000
        Total- CONSTRUCTION OF BLACK TOP ROAD          83,024,000
          FROM RCD TOWARDS KILLI ABDUL
          HANAN TEHSIL WADH DISTRICT
          KHUZDAR
IB9121 CONSTRUCTION OF 25 KM BT ROAD FROM ZEEDI TO GORU DHAL KHUNJ KHUZDAR
045702- A03    Operating Expenses                                 5,249,000
045702- A039   General                                              5,249,000
045702- A12     Civil works                                         80,751,000
045702- A124    Building and Structures                             80,751,000
        Total- CONSTRUCTION OF 25 KM BT ROAD            86,000,000
          FROM ZEEDI TO GORU DHAL KHUNJ
          KHUZDAR
IB9124 CONSTRUCTION OF INTERNAL ROADS IN QUETTA
045702- A03    Operating Expenses                                 5,700,000
045702- A039   General                                              5,700,000
045702- A12     Civil works                                         87,700,000
045702- A124    Building and Structures                             87,700,000
        Total- CONSTRUCTION OF INTERNAL ROADS          93,400,000
              IN QUETTA
IB9125 CONSTRUCTION OF BLACK TOP ROAD AND TUFF TILES IN NA-266 QUETTA
045702- A03    Operating Expenses                                 4,761,000
045702- A039   General                                              4,761,000
045702- A12     Civil works                                         73,239,000
045702- A124    Building and Structures                             73,239,000
        Total- CONSTRUCTION OF BLACK TOP ROAD          78,000,000
          AND TUFF TILES IN NA-266 QUETTA
IB9126 CONSTRUCTION OF SOLAR TUBE WELLS AND STREET LIGHTS IN NA-266 QUETTA
045702- A03    Operating Expenses                                 5,681,000
045702- A039   General                                              5,681,000
045702- A12     Civil works                                         87,395,000
045702- A124    Building and Structures                             87,395,000
        Total- CONSTRUCTION OF SOLAR TUBE               93,076,000
          WELLS AND STREET LIGHTS IN NA-266
          QUETTA

Page 578

NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB9127 CONSTRUCTION OF GIRLS MIDDLE SCHOOL AT KHALAQ HAJI ABDUL BASIT QUETTA
045702- A03    Operating Expenses                                 2,869,000
045702- A039   General                                              2,869,000
045702- A12     Civil works                                         44,131,000
045702- A124    Building and Structures                             44,131,000
        Total- CONSTRUCTION OF GIRLS MIDDLE             47,000,000
          SCHOOL AT KHALAQ HAJI ABDUL
            BASIT QUETTA
IB9128 CHAGHI DEVELOPMENT PACKAGE(HOME SOLAR PUMPING STATION WATER ELECTRICITY ROADS
IRRIGATION TUFF TILES STREET
045702- A03    Operating Expenses                                 3,052,000
045702- A039   General                                              3,052,000
045702- A12     Civil works                                         46,948,000
045702- A124    Building and Structures                             46,948,000
        Total- CHAGHI DEVELOPMENT                        50,000,000
          PACKAGE(HOME SOLAR PUMPING
           STATION WATER ELECTRICITY ROADS
            IRRIGATION TUFF TILES STREET
IB9129 NUSHKI DEVELOPMENT PACHAGE (ROADS ELECTRICITY) NA-268
045702- A03    Operating Expenses                                 3,052,000
045702- A039   General                                              3,052,000
045702- A12     Civil works                                         46,948,000
045702- A124    Building and Structures                             46,948,000
        Total- NUSHKI DEVELOPMENT PACHAGE              50,000,000
           (ROADS ELECTRICITY) NA-268
IB9130 CONSTRUCTION ON 19 KM BLACK TOP ROAD CHINGEE TO KANKOO KAKR KHURASAAN DISTRICT ZOHB
045702- A03    Operating Expenses                               12,207,000
045702- A039   General                                             12,207,000
045702- A12     Civil works                                        187,793,000
045702- A124    Building and Structures                            187,793,000
        Total- CONSTRUCTION ON 19 KM BLACK TOP        200,000,000
          ROAD CHINGEE TO KANKOO KAKR
          KHURASAAN DISTRICT ZOHB

Page 579

NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB9131 CONSTRUCTION OF 18 KM BLACK TOP ROAD N-50 MURGHA FAQIRZAI DISTRICT KILLI SAIFULLAH
(PACKAGE-I)
045702- A03    Operating Expenses                               12,207,000
045702- A039   General                                             12,207,000
045702- A12     Civil works                                        187,793,000
045702- A124    Building and Structures                            187,793,000
        Total- CONSTRUCTION OF 18 KM BLACK TOP        200,000,000
          ROAD N-50 MURGHA FAQIRZAI
            DISTRICT KILLI SAIFULLAH
            (PACKAGE-I)
IB9132 CONSTRUCTION OF 15 KM BLACK TOP ROAD N-50 MURGHA FAQIRZAI DISTRICT KILLI SAIFULLAH
(PACKAGE-II)
045702- A03    Operating Expenses                               12,207,000
045702- A039   General                                             12,207,000
045702- A12     Civil works                                        187,793,000
045702- A124    Building and Structures                            187,793,000
        Total- CONSTRUCTION OF 15 KM BLACK TOP        200,000,000
          ROAD N-50 MURGHA FAQIRZAI
            DISTRICT KILLI SAIFULLAH
             (PACKAGE-II)
IB9134 CONSTRUCTION OF BLACK TOP ROAD SANGET ABAD VIA ZANGI ABAD TO BHATOO LANDHI DISTRICT
NOSHKI
045702- A03    Operating Expenses                                 4,419,000
045702- A039   General                                              4,419,000
045702- A12     Civil works                                         67,983,000
045702- A124    Building and Structures                             67,983,000
        Total- CONSTRUCTION OF BLACK TOP ROAD          72,402,000
          SANGET ABAD VIA ZANGI ABAD TO
          BHATOO LANDHI DISTRICT NOSHKI
IB9136 DEVELOPMENT SCHEME FOR COMMUNITY HOME SOLAR ENERGY SYSTEM IN VARIOUS UCS OF TEHSIL
MASHKHEL AND BASIMA
045702- A03    Operating Expenses                                 9,155,000
045702- A039   General                                              9,155,000
045702- A12     Civil works                                        140,845,000
045702- A124    Building and Structures                            140,845,000
        Total- DEVELOPMENT SCHEME FOR                 150,000,000
          COMMUNITY HOME SOLAR ENERGY
          SYSTEM IN VARIOUS UCS OF TEHSIL
          MASHKHEL AND BASIMA

Page 580

NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB9137 DEVELOPMENT SCHEME FOR COMMUNITY HOME SOLAR ENERGY SYSTEM IN VARIOUS UCS OF TEHSIL
WASHUK DISTRICT WASHUK
045702- A03    Operating Expenses                                 8,239,000
045702- A039   General                                              8,239,000
045702- A12     Civil works                                        126,761,000
045702- A124    Building and Structures                            126,761,000
        Total- DEVELOPMENT SCHEME FOR                 135,000,000
          COMMUNITY HOME SOLAR ENERGY
          SYSTEM IN VARIOUS UCS OF TEHSIL
         WASHUK DISTRICT WASHUK
IB9143 CONSTRUCTION OF BLACK TOP ROAD KAMANROD TO MOKCHAH WASHUK MASHKHEL ROAD DISTRICT
WASHUK
045702- A03    Operating Expenses                               10,008,000
045702- A039   General                                             10,008,000
045702- A12     Civil works                                        153,975,000
045702- A124    Building and Structures                            153,975,000
        Total- CONSTRUCTION OF BLACK TOP ROAD        163,983,000
          KAMANROD TO MOKCHAH WASHUK
          MASHKHEL ROAD DISTRICT WASHUK
IB9149 REHABILITATION UPGRADATION SAKRAN DUREJI ROAD DIFFERENT REACHES (PHASE-I KM 50 TO 75)
DISTRICT
045702- A03    Operating Expenses                                 2,125,000
045702- A039   General                                              2,125,000
045702- A12     Civil works                                         32,697,000
045702- A124    Building and Structures                             32,697,000
        Total- REHABILITATION UPGRADATION               34,822,000
          SAKRAN DUREJI ROAD DIFFERENT
          REACHES (PHASE-I KM 50 TO 75)
            DISTRICT
IB9150 CONSTRUCTION OF BLACK TOP ROAD FROM RCD TO HINAMI BENT TEHSIL WAD DISTRICT KHUZDAR
045702- A03    Operating Expenses                               12,207,000

Page 581

NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A039   General                                             12,207,000
045702- A12     Civil works                                        187,793,000
045702- A124    Building and Structures                            187,793,000
        Total- CONSTRUCTION OF BLACK TOP ROAD        200,000,000
          FROM RCD TO HINAMI BENT TEHSIL
         WAD DISTRICT KHUZDAR
IB9151 CONSTRUCTION OF BLACK TOP ROAD MARVI TOWARDS MADRESSA TOOK TEHSIL WAD DISTRICT
KHUZDAR
045702- A03    Operating Expenses                               11,937,000
045702- A039   General                                             11,937,000
045702- A12     Civil works                                        183,649,000
045702- A124    Building and Structures                            183,649,000
        Total- CONSTRUCTION OF BLACK TOP ROAD        195,586,000
           MARVI TOWARDS MADRESSA TOOK
            TEHSIL WAD DISTRICT KHUZDAR
IB9152 KHARAN DEVELOPMENT PACKAGE (SOLAR PUMPING-HOME SOLAR KITS-ROADS-ELECTRICITY-WATER
045702- A03    Operating Expenses                                 2,548,000
045702- A039   General                                              2,548,000
045702- A12     Civil works                                         39,199,000
045702- A124    Building and Structures                             39,199,000
        Total- KHARAN DEVELOPMENT PACKAGE             41,747,000
           (SOLAR PUMPING-HOME SOLAR
            KITS-ROADS-ELECTRICITY-WATER
IB9155 CONSTRUCTION OF PCC ROAD/STREET-BLACK TOP ROAD-RETAINING WALL/BREAST WALL AT VARIOUS
PLACES TEHSIL
045702- A03    Operating Expenses                                 6,103,000
045702- A039   General                                              6,103,000
045702- A12     Civil works                                         93,897,000
045702- A124    Building and Structures                             93,897,000
        Total- CONSTRUCTION OF PCC                      100,000,000
           ROAD/STREET-BLACK TOP
           ROAD-RETAINING WALL/BREAST WALL
           AT VARIOUS PLACES TEHSIL

Page 582

NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
IB9158 CONSTRUCTION OF 24 KM BLACK TOP ROAD IN NAWAN KILLI KOTWAL AND SURROUNDING AREAS OF
NAWAN KILLI KILLI KOTWAL
045702- A03    Operating Expenses                                 8,062,000
045702- A039   General                                              8,062,000
045702- A12     Civil works                                        124,029,000
045702- A124    Building and Structures                            124,029,000
        Total- CONSTRUCTION OF 24 KM BLACK TOP        132,091,000
          ROAD IN NAWAN KILLI KOTWAL AND
          SURROUNDING AREAS OF NAWAN
              KILLI KILLI KOTWAL
IB9159 VARIOUS DEVELOPMENT WORKS I.E BLACK TOP ROADS FLOOD PROTECTION WALL AND COMMUNITY
CENTER IN SUB DIVISION
045702- A03    Operating Expenses                                 1,831,000
045702- A039   General                                              1,831,000
045702- A12     Civil works                                         28,169,000
045702- A124    Building and Structures                             28,169,000
        Total- VARIOUS DEVELOPMENT WORKS I.E            30,000,000
          BLACK TOP ROADS FLOOD
           PROTECTION WALL AND COMMUNITY
          CENTER IN SUB DIVISION
IB9160 CONSTRUCTION OF BLACK TOP ROAD LALA LEHAD CROSS VIA HUMARI ROSH SHOB (30KM)
045702- A03    Operating Expenses                                 6,103,000
045702- A039   General                                              6,103,000
045702- A12     Civil works                                         93,897,000
045702- A124    Building and Structures                             93,897,000
        Total- CONSTRUCTION OF BLACK TOP ROAD        100,000,000
           LALA LEHAD CROSS VIA HUMARI
          ROSH SHOB (30KM)
IB9475 DEC JAFFARABAD & MASTUNG
045702- A03    Operating Expenses                               20,683,000
045702- A039   General                                             20,683,000
045702- A12     Civil works                                        318,204,000
045702- A124    Building and Structures                            318,204,000
        Total- DEC JAFFARABAD & MASTUNG               338,887,000
IB9476 CONSTRUCTION OF DEC OFFICE SAHIWAL
045702- A03    Operating Expenses                               14,943,000

Page 583

NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A039   General                                             14,943,000
045702- A12     Civil works                                        229,893,000
045702- A124    Building and Structures                            229,893,000
        Total- CONSTRUCTION OF DEC OFFICE              244,836,000
           SAHIWAL
IB9477 CONSTRUCTION OF DEC OFFICE RAJANPUR
045702- A03    Operating Expenses                                 6,140,000
045702- A039   General                                              6,140,000
045702- A12     Civil works                                         94,460,000
045702- A124    Building and Structures                             94,460,000
        Total- CONSTRUCTION OF DEC OFFICE              100,600,000
          RAJANPUR
IB9478 CONSTRUCTION OF REC / DECS OFFICE FAISALABAD
045702- A03    Operating Expenses                               42,701,000
045702- A039   General                                             42,701,000
045702- A12     Civil works                                        656,940,000
045702- A124    Building and Structures                            656,940,000
        Total- CONSTRUCTION OF REC / DECS               699,641,000
            OFFICE FAISALABAD
IB9479 CONSTRUCTION OF ELECTION COMMISSION OFFICE AT NAROWAL
045702- A03    Operating Expenses                                 8,336,000
045702- A039   General                                              8,336,000
045702- A12     Civil works                                        128,238,000
045702- A124    Building and Structures                            128,238,000
        Total- CONSTRUCTION OF ELECTION                136,574,000
           COMMISSION OFFICE AT NAROWAL
IB9480 DEC GAWADAR & LASBELLA
045702- A03    Operating Expenses                               20,328,000
045702- A039   General                                             20,328,000
045702- A12     Civil works                                        312,733,000
045702- A124    Building and Structures                            312,733,000
        Total- DEC GAWADAR & LASBELLA                  333,061,000

Page 584

NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
IB9481 PUBLIC SECTOR DEVELOPMENT PROGRAM FOR AGRICULTURE CUM WATER SUPPLY IN VARIOUS KILLIS
OF TEHSIL BESIMA
045702- A03    Operating Expenses                                 1,221,000
045702- A039   General                                              1,221,000
045702- A12     Civil works                                         18,779,000
045702- A124    Building and Structures                             18,779,000
        Total- PUBLIC SECTOR DEVELOPMENT                20,000,000
          PROGRAM FOR AGRICULTURE CUM
          WATER SUPPLY IN VARIOUS KILLIS OF
            TEHSIL BESIMA
IB9482 DEVELOPMENT SCHEMES IN PLANTAK BASIMA ASFANDABAD DISTRICT WASHUK (4 SCHEMES) (AT
REDUCED COST OF RS
045702- A03    Operating Expenses                                 6,301,000
045702- A039   General                                              6,301,000
045702- A12     Civil works                                         96,941,000
045702- A124    Building and Structures                             96,941,000
        Total- DEVELOPMENT SCHEMES IN PLANTAK        103,242,000
           BASIMA ASFANDABAD DISTRICT
          WASHUK (4 SCHEMES) (AT REDUCED
          COST OF RS
IB9483 PUBLIC SECTOR DEVELOPMENT PROGRAM FOR AGRICULTURE CUM WATER SUPPLY AND COMMUNITY
HOME SOLAR ENERGY SYSTEM
045702- A03    Operating Expenses                                 1,221,000
045702- A039   General                                              1,221,000
045702- A12     Civil works                                         18,779,000
045702- A124    Building and Structures                             18,779,000
        Total- PUBLIC SECTOR DEVELOPMENT                20,000,000
          PROGRAM FOR AGRICULTURE CUM
          WATER SUPPLY AND COMMUNITY
          HOME SOLAR ENERGY SYSTEM
IB9484 PUBLIC SECTOR DEVELOPMENT PROGRAM FOR AGRICULTURE CUM WATER SUPPLY AND COMMUNITY
HOME SOLAR ENERGY SYSTEM
045702- A03    Operating Expenses                                 5,493,000
045702- A039   General                                              5,493,000
045702- A12     Civil works                                         84,507,000
045702- A124    Building and Structures                             84,507,000
        Total- PUBLIC SECTOR DEVELOPMENT                90,000,000
          PROGRAM FOR AGRICULTURE CUM
          WATER SUPPLY AND COMMUNITY
          HOME SOLAR ENERGY SYSTEM

Page 585

NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB9486 DEVELOPMENT SCHEMES IN PIRHYAN ARI PEER BARAK BEHLOOR DISTRICT HUB (04 SCHEMES)
045702- A03    Operating Expenses                                 6,295,000
045702- A039   General                                              6,295,000
045702- A12     Civil works                                         96,842,000
045702- A124    Building and Structures                             96,842,000
        Total- DEVELOPMENT SCHEMES IN PIRHYAN         103,137,000
            ARI PEER BARAK BEHLOOR DISTRICT
          HUB (04 SCHEMES)
IB9487 DEVELOPMENT SCHEMES IN KALAT SURAB & MASTUNG DISTRICTS
045702- A03    Operating Expenses                                 3,052,000
045702- A039   General                                              3,052,000
045702- A12     Civil works                                         46,948,000
045702- A124    Building and Structures                             46,948,000
        Total- DEVELOPMENT SCHEMES IN KALAT            50,000,000
          SURAB & MASTUNG DISTRICTS
IB9488 COMMUNITY BASED DEVELOPMENT SCHEMES FOR INSTALLATION OF COMMUNITY HOME SOLAR
SYSTEM IN VARIOUS KILLIS OF
045702- A03    Operating Expenses                                 2,417,000
045702- A039   General                                              2,417,000
045702- A12     Civil works                                         37,183,000
045702- A124    Building and Structures                             37,183,000
        Total- COMMUNITY BASED DEVELOPMENT            39,600,000
          SCHEMES FOR INSTALLATION OF
          COMMUNITY HOME SOLAR SYSTEM IN
           VARIOUS KILLIS OF
IB9491 CONSTRUCTION OF INTERNAL BLACK TOP ROADS AT TEHSIL & DISTRICT CHAMAN
045702- A03    Operating Expenses                                 4,883,000
045702- A039   General                                              4,883,000
045702- A12     Civil works                                         75,117,000
045702- A124    Building and Structures                             75,117,000
        Total- CONSTRUCTION OF INTERNAL BLACK          80,000,000
           TOP ROADS AT TEHSIL & DISTRICT
          CHAMAN

Page 586

NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB9492 PUBLIC SECTOR DEVELOPMENT PROGRAM FOR BORING OF TUBE WELL AND INSTALLATION OF SOLAR
ENERGY
045702- A03    Operating Expenses                                 5,932,000
045702- A039   General                                              5,932,000
045702- A12     Civil works                                         91,268,000
045702- A124    Building and Structures                             91,268,000
        Total- PUBLIC SECTOR DEVELOPMENT                97,200,000
         PROGRAM FOR BORING OF TUBE
          WELL AND INSTALLATION OF SOLAR
          ENERGY
IB9494 CONSTRUCTION OF INTERNAL ROADS IN KUCHLAAK AND SURROUNDING AREAS DISTRICT QUETTA.
045702- A03    Operating Expenses                                 3,748,000
045702- A039   General                                              3,748,000
045702- A12     Civil works                                         57,664,000
045702- A124    Building and Structures                             57,664,000
        Total- CONSTRUCTION OF INTERNAL ROADS          61,412,000
              IN KUCHLAAK AND SURROUNDING
          AREAS DISTRICT QUETTA.
IB9495 CONSTRUCTION OF INTERNAL ROADS AT PANJPAI AGHBARG CHASHMA & SURROUNDING AREAS OF
DISTRICT
045702- A03    Operating Expenses                                 4,186,000
045702- A039   General                                              4,186,000
045702- A12     Civil works                                         64,402,000
045702- A124    Building and Structures                             64,402,000
        Total- CONSTRUCTION OF INTERNAL ROADS          68,588,000
           AT PANJPAI AGHBARG CHASHMA &
          SURROUNDING AREAS OF DISTRICT
IB9496 CONSTRUCTION OF PARK AT CAR BAZAR UC-06 DISTRICT CENTRAL KARACHI (AT REDUCED COST OF
RS 265.843 MN ONLY
045702- A03    Operating Expenses                               15,468,000
045702- A039   General                                             15,468,000
045702- A12     Civil works                                        237,965,000

Page 587

NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A124    Building and Structures                            237,965,000
        Total- CONSTRUCTION OF PARK AT CAR             253,433,000
          BAZAR UC-06 DISTRICT CENTRAL
           KARACHI (AT REDUCED COST OF RS
              265.843 MN ONLY
IB9497 CONSTRUCTION OF PARK NEAR AL-KHAIR SCHOOL UC-09 DISTRICT CENTRAL KARACHI
045702- A03    Operating Expenses                                 3,920,000
045702- A039   General                                              3,920,000
045702- A12     Civil works                                         60,313,000
045702- A124    Building and Structures                             60,313,000
        Total- CONSTRUCTION OF PARK NEAR                64,233,000
            AL-KHAIR SCHOOL UC-09 DISTRICT
          CENTRAL KARACHI
IB9498 CONSTRUCTION OF DAUD GROUND BEHIND MAKHDOOMIN MASJID UC-10 DISTRICT CENTRAL KARACHI
045702- A03    Operating Expenses                                 8,164,000
045702- A039   General                                              8,164,000
045702- A12     Civil works                                        125,600,000
045702- A124    Building and Structures                            125,600,000
        Total- CONSTRUCTION OF DAUD GROUND           133,764,000
           BEHIND MAKHDOOMIN MASJID UC-10
            DISTRICT CENTRAL KARACHI
IB9499 CONSTRUCTION OF PARK ASIAN FOOTBALL GROUND UC-07 DISTRICT CENTRAL KARACHI
045702- A03    Operating Expenses                                 6,070,000
045702- A039   General                                              6,070,000
045702- A12     Civil works                                         93,378,000
045702- A124    Building and Structures                             93,378,000
        Total- CONSTRUCTION OF PARK ASIAN               99,448,000
          FOOTBALL GROUND UC-07 DISTRICT
          CENTRAL KARACHI
IB9500 CONSTRUCTION OF COMPUTER INSTITUTE BEHIND UC-06 DISTRICT CENTRAL KARACHI
045702- A03    Operating Expenses                                 2,832,000
045702- A039   General                                              2,832,000
045702- A12     Civil works                                         43,566,000
045702- A124    Building and Structures                             43,566,000
        Total- CONSTRUCTION OF COMPUTER                46,398,000
            INSTITUTE BEHIND UC-06 DISTRICT
          CENTRAL KARACHI

Page 588

NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB9501 CONSTRUCTION OF CRICKET STADIUM AT ST-15 SECTOR 5A-4 DISTRICT CENTRAL KARACHI
045702- A03    Operating Expenses                                 3,524,000
045702- A039   General                                              3,524,000
045702- A12     Civil works                                         54,216,000
045702- A124    Building and Structures                             54,216,000
        Total- CONSTRUCTION OF CRICKET STADIUM         57,740,000
           AT ST-15 SECTOR 5A-4 DISTRICT
          CENTRAL KARACHI
IB9502 CONSTRUCTION OF IT & COMPUTER DIPLOMA CENTER AT ST-22 GULSHAN SAEED DISTRICT CENTRAL
KARACHI
045702- A03    Operating Expenses                                 5,037,000
045702- A039   General                                              5,037,000
045702- A12     Civil works                                         77,488,000
045702- A124    Building and Structures                             77,488,000
        Total- CONSTRUCTION OF IT & COMPUTER            82,525,000
           DIPLOMA CENTER AT ST-22 GULSHAN
          SAEED DISTRICT CENTRAL KARACHI
IB9503 REHABILITATION OF MIAN EXISTING NALA FROM SATTAR SHAH PARK TO ODIAN PLAZA VIA NISHAT
CHOWCK HYDERABAD
045702- A03    Operating Expenses                               16,479,000
045702- A039   General                                             16,479,000
045702- A12     Civil works                                        253,521,000
045702- A124    Building and Structures                            253,521,000
        Total- REHABILITATION OF MIAN EXISTING           270,000,000
          NALA FROM SATTAR SHAH PARK TO
           ODIAN PLAZA VIA NISHAT CHOWCK
          HYDERABAD
IB9504 CONSTRUCTION OF GOVERNMENT GIRLS DEGREE COLLEGE BUILDINGS & LIBRARY WITH FURNITURE#S
AT GOVERNMENT BOYS
045702- A03    Operating Expenses                               30,125,000
045702- A039   General                                             30,125,000
045702- A12     Civil works                                        463,460,000

Page 589

NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A124    Building and Structures                            463,460,000
        Total- CONSTRUCTION OF GOVERNMENT            493,585,000
            GIRLS DEGREE COLLEGE BUILDINGS &
           LIBRARY WITH FURNITURE#S AT
          GOVERNMENT BOYS
IB9505 CONSTRUCTION OF WATER SUPPLY LINE (24# DIA) FROM HUSSAINABAD FILTER PLANT TO KOHSAR
WATER PUMPING STATION
045702- A03    Operating Expenses                               45,775,000
045702- A039   General                                             45,775,000
045702- A12     Civil works                                        704,225,000
045702- A124    Building and Structures                            704,225,000
        Total- CONSTRUCTION OF WATER SUPPLY           750,000,000
            LINE (24# DIA) FROM HUSSAINABAD
            FILTER PLANT TO KOHSAR WATER
           PUMPING STATION
IB9506 PUBLIC SECTOR DEVELOPMENT PROGRAM FOR COMMUNITY HOME SOLAR ENERGY SYSTEM IN
VARIOUS KILLIS OF DISTRICT
045702- A03    Operating Expenses                                 1,831,000
045702- A039   General                                              1,831,000
045702- A12     Civil works                                         28,169,000
045702- A124    Building and Structures                             28,169,000
        Total- PUBLIC SECTOR DEVELOPMENT                30,000,000
         PROGRAM FOR COMMUNITY HOME
          SOLAR ENERGY SYSTEM IN VARIOUS
             KILLIS OF DISTRICT
IB9507 RESTORATION/ REHABILITATION OF FLOOD DAMAGED AGRICULTURE TUBE WELLS IN VARIOUS KILLIS
OF TEHSIL AND
045702- A03    Operating Expenses                                 1,831,000
045702- A039   General                                              1,831,000
045702- A12     Civil works                                         28,169,000
045702- A124    Building and Structures                             28,169,000
        Total- RESTORATION/ REHABILITATION OF            30,000,000
          FLOOD DAMAGED AGRICULTURE TUBE
          WELLS IN VARIOUS KILLIS OF TEHSIL
          AND

Page 590

NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB9508 PUBLIC SECTOR DEVELOPMENT PROGRAM FOR COMMUNITY HOME SOLAR ENERGY SYSTEM IN
VARIOUS KILLIS OF DISTRICT
045702- A03    Operating Expenses                                 3,052,000
045702- A039   General                                              3,052,000
045702- A12     Civil works                                         46,948,000
045702- A124    Building and Structures                             46,948,000
        Total- PUBLIC SECTOR DEVELOPMENT                50,000,000
         PROGRAM FOR COMMUNITY HOME
          SOLAR ENERGY SYSTEM IN VARIOUS
             KILLIS OF DISTRICT
IB9509 PUBLIC SECTOR DEVELOPMENT PROGRAM FOR AGRICULTURE CUM WATER SUPPLY IN VARIOUS KILLIS
OF DISTRICT PISHIN
045702- A03    Operating Expenses                                 3,052,000
045702- A039   General                                              3,052,000
045702- A12     Civil works                                         46,948,000
045702- A124    Building and Structures                             46,948,000
        Total- PUBLIC SECTOR DEVELOPMENT                50,000,000
         PROGRAM FOR AGRICULTURE CUM
          WATER SUPPLY IN VARIOUS KILLIS OF
            DISTRICT PISHIN
IB9510 COMMUNITY HOME SOLAR ENERGY SYSTEM IN TEHSIL AMORI TAFTAN DALBANDIN CHILGHAZAI AND
CHAGHI DISTRICT
045702- A03    Operating Expenses                                 3,052,000
045702- A039   General                                              3,052,000
045702- A12     Civil works                                         46,948,000
045702- A124    Building and Structures                             46,948,000
        Total- COMMUNITY HOME SOLAR ENERGY            50,000,000
          SYSTEM IN TEHSIL AMORI TAFTAN
           DALBANDIN CHILGHAZAI AND CHAGHI
            DISTRICT
IB9511 CONSTRUCTION OF PCC ROADS AND DRAIN AT DISTRICT TANK
045702- A03    Operating Expenses                                 5,279,000
045702- A039   General                                              5,279,000
045702- A12     Civil works                                         81,211,000
045702- A124    Building and Structures                             81,211,000
        Total- CONSTRUCTION OF PCC ROADS AND           86,490,000
           DRAIN AT DISTRICT TANK

Page 591

NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB9513 CONSTRUCTION OF ROAD FROM ESSA MORR TO SIDDIQUEPURA
045702- A03    Operating Expenses                               29,184,000
045702- A039   General                                             29,184,000
045702- A12     Civil works                                        448,984,000
045702- A124    Building and Structures                            448,984,000
        Total- CONSTRUCTION OF ROAD FROM ESSA        478,168,000
         MORR TO SIDDIQUEPURA
IB9514 CONSTRUCTION OF CARPET ROAD FROM MARI BHINDRAN TO GHUMAN WALA DISTRICT GUJRANWALA
045702- A03    Operating Expenses                               31,703,000
045702- A039   General                                             31,703,000
045702- A12     Civil works                                        487,737,000
045702- A124    Building and Structures                            487,737,000
        Total- CONSTRUCTION OF CARPET ROAD            519,440,000
          FROM MARI BHINDRAN TO GHUMAN
         WALA DISTRICT GUJRANWALA
IB9515 DEVELOPMENT SCHEMES IN DISTRICT KACHHI JHAL MAGSI AND NASEERABAD (10 NO.S SCHEMES)
045702- A03    Operating Expenses                                 7,934,000
045702- A039   General                                              7,934,000
045702- A12     Civil works                                        122,053,000
045702- A124    Building and Structures                            122,053,000
        Total- DEVELOPMENT SCHEMES IN DISTRICT         129,987,000
           KACHHI JHAL MAGSI AND
          NASEERABAD (10 NO.S SCHEMES)
IB9516 CONSTRUCTION OF BLACK TOP ROAD FROM REHABILITATION BAND MAHMOOD TO BARIJA DISTRICT
JHAL MAGSI
045702- A03    Operating Expenses                                 4,883,000
045702- A039   General                                              4,883,000
045702- A12     Civil works                                         75,117,000
045702- A124    Building and Structures                             75,117,000
        Total- CONSTRUCTION OF BLACK TOP ROAD          80,000,000
          FROM REHABILITATION BAND
         MAHMOOD TO BARIJA DISTRICT JHAL
           MAGSI

Page 592

NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB9521 MISSING FACILITIES TOILETS OF VARIOUS SCHOOLS OF MAND
045702- A03    Operating Expenses                                 3,906,000
045702- A039   General                                              3,906,000
045702- A12     Civil works                                         60,094,000
045702- A124    Building and Structures                             60,094,000
        Total- MISSING FACILITIES TOILETS OF                64,000,000
           VARIOUS SCHOOLS OF MAND
IB9522 CONSTRUCTION OF TEACHERS HOSTEL IN MAND
045702- A03    Operating Expenses                                 1,221,000
045702- A039   General                                              1,221,000
045702- A12     Civil works                                         18,779,000
045702- A124    Building and Structures                             18,779,000
        Total- CONSTRUCTION OF TEACHERS                 20,000,000
          HOSTEL IN MAND
IB9524 REHABILITATION / IMPROVEMENT OF ROAD FROM GULBAHAR TO MARAKIWAL VIA DAIT AND KAROL
SIALKOT
045702- A03    Operating Expenses                               21,129,000
045702- A039   General                                             21,129,000
045702- A12     Civil works                                        325,061,000
045702- A124    Building and Structures                            325,061,000
        Total- REHABILITATION / IMPROVEMENT OF          346,190,000
          ROAD FROM GULBAHAR TO
          MARAKIWAL VIA DAIT AND KAROL
           SIALKOT
IB9525 SOLARIZATTION OF HOMES AT VARIOUS VILLAGES OF TRIBAL DISTRICT NORTH WAZIRISRAN
PACKAGE-III III IV V
045702- A03    Operating Expenses                                 2,441,000
045702- A039   General                                              2,441,000
045702- A12     Civil works                                         37,559,000
045702- A124    Building and Structures                             37,559,000
        Total- SOLARIZATTION OF HOMES AT                 40,000,000
           VARIOUS VILLAGES OF TRIBAL
            DISTRICT NORTH WAZIRISRAN
             PACKAGE-III III IV V

Page 593

NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB9526 100 NOS WATER BORE FOR TUEB WELL AT DISTRICT SOUTH WAZIRSITAN
045702- A03    Operating Expenses                                 6,020,000
045702- A039   General                                              6,020,000
045702- A12     Civil works                                         92,620,000
045702- A124    Building and Structures                             92,620,000
        Total- 100 NOS WATER BORE FOR TUEB               98,640,000
          WELL AT DISTRICT SOUTH
           WAZIRSITAN
IB9527 SOLARIZATION OF HOMES AT DISTRICT SOUTH WAZIRISRAN (AT REDUCED COST OF RS 340.915 MN
AGAINST APPROVED COST
045702- A03    Operating Expenses                                 2,988,000
045702- A039   General                                              2,988,000
045702- A12     Civil works                                         45,972,000
045702- A124    Building and Structures                             45,972,000
        Total- SOLARIZATION OF HOMES AT                  48,960,000
            DISTRICT SOUTH WAZIRISRAN (AT
          REDUCED COST OF RS 340.915 MN
           AGAINST APPROVED COST
IB9528 CONSTRUCTION OF BLACK TOP ROAD PCC STREET AND JEEPABLE TRACKS AT TRIBAL DISTRICT
UPPER SOUTH
045702- A03    Operating Expenses                                 3,052,000
045702- A039   General                                              3,052,000
045702- A12     Civil works                                         46,948,000
045702- A124    Building and Structures                             46,948,000
        Total- CONSTRUCTION OF BLACK TOP ROAD          50,000,000
          PCC STREET AND JEEPABLE TRACKS
           AT TRIBAL DISTRICT UPPER SOUTH
IB9532 CONSTRUCTION OF BRIDGES/CULVERT AT VARIOUS PLACES DISTRICT UPPER AND LOWER KURRUM
045702- A03    Operating Expenses                                 6,103,000
045702- A039   General                                              6,103,000
045702- A12     Civil works                                         93,897,000
045702- A124    Building and Structures                             93,897,000
        Total- CONSTRUCTION OF BRIDGES/                 100,000,000
           CULVERT AT VARIOUS PLACES
             DISTRICT UPPER AND LOWER
          KURRUM

Page 594

NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB9535 CONSTRUCTION OF BLACK TOP ROAD AT VARIOUS PLACES OF DISTRICT UPPER AND LOWER KURRUM
045702- A03    Operating Expenses                                 2,930,000
045702- A039   General                                              2,930,000
045702- A12     Civil works                                         45,070,000
045702- A124    Building and Structures                             45,070,000
        Total- CONSTRUCTION OF BLACK TOP ROAD          48,000,000
           AT VARIOUS PLACES OF DISTRICT
          UPPER AND LOWER KURRUM
IB9537 ESTABLISHMENT COMMUNITY HALL AT LOUD KAREZ
045702- A03    Operating Expenses                                 3,784,000
045702- A039   General                                              3,784,000
045702- A12     Civil works                                         58,216,000
045702- A124    Building and Structures                             58,216,000
        Total- ESTABLISHMENT COMMUNITY HALL AT         62,000,000
          LOUD KAREZ
IB9538 IMPROVEMENT OF SEWAGE SYSTEM TUFF TILES AND BLACK TOP IN DIFFERENT AREA QUETTA-3
045702- A03    Operating Expenses                                 3,296,000
045702- A039   General                                              3,296,000
045702- A12     Civil works                                         50,704,000
045702- A124    Building and Structures                             50,704,000
        Total- IMPROVEMENT OF SEWAGE SYSTEM           54,000,000
           TUFF TILES AND BLACK TOP IN
           DIFFERENT AREA QUETTA-3
IB9539 INSTALLATION OF SOLAR KITS FOR ELECTRIFICATION DIGARI MERGED ZEDCO SIMDIGI ZARGHOON
DASHT MIAN
045702- A03    Operating Expenses                                 4,394,000
045702- A039   General                                              4,394,000
045702- A12     Civil works                                         67,606,000
045702- A124    Building and Structures                             67,606,000
        Total- INSTALLATION OF SOLAR KITS FOR            72,000,000
            ELECTRIFICATION DIGARI MERGED
          ZEDCO SIMDIGI ZARGHOON DASHT
           MIAN

Page 595

NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB9541 CONSTRUCTION OF ADDITIONAL CLASS ROOMS & EXAMINATION CENTRE/MULTIPURPOSE HALL AT
DIFFERENT SCHOOLS DISTRCIT
045702- A03    Operating Expenses                                 3,967,000
045702- A039   General                                              3,967,000
045702- A12     Civil works                                         61,033,000
045702- A124    Building and Structures                             61,033,000
        Total- CONSTRUCTION OF ADDITIONAL               65,000,000
          CLASS ROOMS & EXAMINATION
           CENTRE/MULTIPURPOSE HALL AT
           DIFFERENT SCHOOLS DISTRCIT
IB9542 BLACKTOP ROAD AT VARIOUS PLACES IN KHUZDAR CITY
045702- A03    Operating Expenses                                 5,220,000
045702- A039   General                                              5,220,000
045702- A12     Civil works                                         80,301,000
045702- A124    Building and Structures                             80,301,000
        Total- BLACKTOP ROAD AT VARIOUS                 85,521,000
          PLACES IN KHUZDAR CITY
IB9543 CUTTING AND IMPROVEMENT IF KACHA ROAD HIGHWAY TO ARANJI VIA AWAK INCLUDING STRUCTURE
WORKS DISTRCIT
045702- A03    Operating Expenses                                 3,052,000
045702- A039   General                                              3,052,000
045702- A12     Civil works                                         46,948,000
045702- A124    Building and Structures                             46,948,000
        Total- CUTTING AND IMPROVEMENT IF                50,000,000
          KACHA ROAD HIGHWAY TO ARANJI
             VIA AWAK INCLUDING STRUCTURE
         WORKS DISTRCIT
IB9544 CONSTRUCTION/REHABILITATION OF BLACK TOP ROAD IN 07 KILLIS OF DISTRICT NUSHKI
045702- A03    Operating Expenses                                 2,197,000
045702- A039   General                                              2,197,000
045702- A12     Civil works                                         33,803,000
045702- A124    Building and Structures                             33,803,000
        Total- CONSTRUCTION/REHABILITATION OF           36,000,000
          BLACK TOP ROAD IN 07 KILLIS OF
            DISTRICT NUSHKI

Page 596

NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB9548 SOLARIZATION OF EXISTING TUBEWELLS/BORES FOR AGRICULTURE PURPOSE IN VARIOUS KILLIS OF
045702- A03    Operating Expenses                                 2,197,000
045702- A039   General                                              2,197,000
045702- A12     Civil works                                         33,803,000
045702- A124    Building and Structures                             33,803,000
        Total- SOLARIZATION OF EXISTING                    36,000,000
           TUBEWELLS/BORES FOR
           AGRICULTURE PURPOSE IN VARIOUS
             KILLIS OF
IB9551 COMMUNITY HOME SOLAR ENERGY SYSTEM & AGRICULTURE CUM WATER SUPPLY SCHEMES IN
VARIOUS KILLIS OF
045702- A03    Operating Expenses                                 3,296,000
045702- A039   General                                              3,296,000
045702- A12     Civil works                                         50,704,000
045702- A124    Building and Structures                             50,704,000
        Total- COMMUNITY HOME SOLAR ENERGY            54,000,000
          SYSTEM & AGRICULTURE CUM WATER
           SUPPLY SCHEMES IN VARIOUS KILLIS
          OF
IB9553 PUBLIC SECTOR DEVELOPMENT PROGRAM FOR COMMUNITY HOME SOLAR ENERGY SYSTEM IN
VARIOUS KILLIS TEHSIL DUKI
045702- A03    Operating Expenses                                 5,732,000
045702- A039   General                                              5,732,000
045702- A12     Civil works                                         88,190,000
045702- A124    Building and Structures                             88,190,000
        Total- PUBLIC SECTOR DEVELOPMENT                93,922,000
         PROGRAM FOR COMMUNITY HOME
          SOLAR ENERGY SYSTEM IN VARIOUS
             KILLIS TEHSIL DUKI
IB9554 CONSTRUCTION OF ROAD AND PCC STREET AT DISTRCIT LAKKI MARWAT
045702- A03    Operating Expenses                               17,883,000
045702- A039   General                                             17,883,000

Page 597

NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A12     Civil works                                        275,117,000
045702- A124    Building and Structures                            275,117,000
        Total- CONSTRUCTION OF ROAD AND PCC           293,000,000
           STREET AT DISTRCIT LAKKI MARWAT
IB9557 REHABILITATION OF INFRASTRUCTURE WORKS (CONSTRUCTIN OF ROAD WATERLINE SEWERAGE
SYSTEM PARKS &
045702- A03    Operating Expenses                               45,775,000
045702- A039   General                                             45,775,000
045702- A12     Civil works                                        704,225,000
045702- A124    Building and Structures                            704,225,000
        Total- REHABILITATION OF                          750,000,000
           INFRASTRUCTURE WORKS
           (CONSTRUCTIN OF ROAD WATERLINE
          SEWERAGE SYSTEM PARKS &
IB9558 REHABILITATION OF INFRASTRUCTURE WORKS (CONSTRUCTIN OF ROADS FOORPATH WATER SUPPY
SEWERAGE PUBLIC PARKS
045702- A03    Operating Expenses                               45,775,000
045702- A039   General                                             45,775,000
045702- A12     Civil works                                        704,225,000
045702- A124    Building and Structures                            704,225,000
        Total- REHABILITATION OF                          750,000,000
           INFRASTRUCTURE WORKS
           (CONSTRUCTIN OF ROADS FOORPATH
          WATER SUPPY SEWERAGE PUBLIC
          PARKS
IB9559 IMPROVEMENT / REHABILITATION OF DIFFERENT ROADS WATER SUPPLY SEWERAGE PARKS AND
PLAYGROUND IN
045702- A03    Operating Expenses                               45,775,000
045702- A039   General                                             45,775,000
045702- A12     Civil works                                        704,225,000
045702- A124    Building and Structures                            704,225,000
        Total- IMPROVEMENT / REHABILITATION OF          750,000,000
           DIFFERENT ROADS WATER SUPPLY
          SEWERAGE PARKS AND PLAYGROUND
              IN

Page 598

NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB9560 INFRASTRUCTURE DEVELOPMENT IN TEHSIL YAZMAN DISTRICT BAHAWALPUR
045702- A03    Operating Expenses                               16,479,000
045702- A039   General                                             16,479,000
045702- A12     Civil works                                        253,521,000
045702- A124    Building and Structures                            253,521,000
        Total- INFRASTRUCTURE DEVELOPMENT IN          270,000,000
            TEHSIL YAZMAN DISTRICT
          BAHAWALPUR
IB9561 INFRASTRUCTURE DEVELOPMENT IN DISTRICT GUJRAT
045702- A03    Operating Expenses                               41,060,000
045702- A039   General                                             41,060,000
045702- A12     Civil works                                        631,690,000
045702- A124    Building and Structures                            631,690,000
        Total- INFRASTRUCTURE DEVELOPMENT IN          672,750,000
            DISTRICT GUJRAT
IB9563 CONSTRUCTION OF CAT-D HOSPITAL AT AZAM WARSAK TEHSIL BIRMAL SWTD WANA
045702- A03    Operating Expenses                               24,413,000
045702- A039   General                                             24,413,000
045702- A12     Civil works                                        375,587,000
045702- A124    Building and Structures                            375,587,000
        Total- CONSTRUCTION OF CAT-D HOSPITAL          400,000,000
           AT AZAM WARSAK TEHSIL BIRMAL
          SWTD WANA
IB9567 CONSTRUCTION OF 50 NOS. SOLAR WATER SUPPLY SCHEMES IN DISTRICT KHUZDAR
045702- A03    Operating Expenses                               23,680,000
045702- A039   General                                             23,680,000
045702- A12     Civil works                                        364,307,000
045702- A124    Building and Structures                            364,307,000
        Total- CONSTRUCTION OF 50 NOS. SOLAR           387,987,000
          WATER SUPPLY SCHEMES IN DISTRICT
          KHUZDAR
IB9568 CONSTRUCTION OF B/T ROAD IN MUNICIPLE CORPORATION KHUZDAR
045702- A03    Operating Expenses                                 4,512,000
045702- A039   General                                              4,512,000

Page 599

NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A12     Civil works                                         69,413,000
045702- A124    Building and Structures                             69,413,000
        Total- CONSTRUCTION OF B/T ROAD IN                73,925,000
            MUNICIPLE CORPORATION KHUZDAR
IB9569 REHABILITATION / IMPROVEMENT OF ROAD FROM DUGRI TO SATRA SINDHWAN TEHSIL DASKA
DISTRICT SIALKOT
045702- A03    Operating Expenses                                 4,725,000
045702- A039   General                                              4,725,000
045702- A12     Civil works                                         72,695,000
045702- A124    Building and Structures                             72,695,000
        Total- REHABILITATION / IMPROVEMENT OF           77,420,000
          ROAD FROM DUGRI TO SATRA
          SINDHWAN TEHSIL DASKA DISTRICT
           SIALKOT
IB9571 CONSTRUCTION OF CARPET ROAD FROM MARI BHINDRAN TO GHUMMAN WALA DISTRICT GUJRANWALA
045702- A03    Operating Expenses                               29,298,000
045702- A039   General                                             29,298,000
045702- A12     Civil works                                        450,732,000
045702- A124    Building and Structures                            450,732,000
        Total- CONSTRUCTION OF CARPET ROAD            480,030,000
          FROM MARI BHINDRAN TO GHUMMAN
         WALA DISTRICT GUJRANWALA
IB9573 REPAIRING OF ROADS IN TANDLIANWALA FAISALABAD
045702- A03    Operating Expenses                                 9,155,000
045702- A039   General                                              9,155,000
045702- A12     Civil works                                        140,845,000
045702- A124    Building and Structures                            140,845,000
        Total- REPAIRING OF ROADS IN                      150,000,000
          TANDLIANWALA FAISALABAD
IB9574 URBAN SEWERAGE / DRAINAGE PCC AND TUFF TILE STREET FOR ZONE-D GOJRA CITY TEHSIL GOJRA
DISTRICT TOBA TEK
045702- A03    Operating Expenses                               18,578,000
045702- A039   General                                             18,578,000
045702- A12     Civil works                                        285,811,000

Page 600

NO. 132.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2024-2025         2024-2025        2025-2026
                                       2024-25 2025-26       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A124    Building and Structures                            285,811,000
        Total- URBAN SEWERAGE / DRAINAGE PCC          304,389,000
          AND TUFF TILE STREET FOR ZONE-D
          GOJRA CITY TEHSIL GOJRA DISTRICT
          TOBA TEK
IB9577 CONSTRUCTION OF CARPET ROAD IN DIFFERENT UCS AND CONTONMENT BOARD AREAS DISTRICT
MULTAN
045702- A03    Operating Expenses                               12,023,000
045702- A039   General                                             12,023,000
045702- A12     Civil works                                        184,977,000
045702- A124    Building and Structures                            184,977,000
        Total- CONSTRUCTION OF CARPET ROAD IN         197,000,000
           DIFFERENT UCS AND CONTONMENT
          BOARD AREAS DISTRICT MULTAN
IB9579 CONSTRUCTION OF ROAD FROM BHAGWAL AWAN TO DABOLA VIA KOTLI BHUTTA RORAS ROAD WITH
LINK INFRASTRUCTURE
045702- A03    Operating Expenses                               16,446,000
045702- A039   General                                             16,446,000
045702- A12     Civil works                                        253,014,000
045702- A124    Building and Structures                            253,014,000
        Total- CONSTRUCTION OF ROAD FROM              269,460,000
         BHAGWAL AWAN TO DABOLA VIA
            KOTLI BHUTTA RORAS ROAD WITH
            LINK INFRASTRUCTURE
IB9580 CONSTRUCTION OF ROAD FROM JURIYAN KALAN TO MALKE KALAN VIA OLAKH AWAN & MALO CHAK
WITH LINK INFRASTRUCTURE
045702- A03    Operating Expenses                               21,168,000
045702- A039   General                                             21,168,000
045702- A12     Civil works                                        325,655,000
045702- A124    Building and Structures                            325,655,000
        Total- CONSTRUCTION OF ROAD FROM              346,823,000
           JURIYAN KALAN TO MALKE KALAN VIA
          OLAKH AWAN & MALO CHAK WITH
            LINK INFRASTRUCTURE