Details of Demands for Grants and Appropriations - Vol-IV (Development), part 7

FY 2024-25Details of demandsPages 601 to 627 of 627

The Details of Demands for Grants and Appropriations - Vol-IV (Development) is part of the federal budget for FY 2024-25. This page reproduces the text of its 627 PDF pages, extracted automatically from the official PDF published by the Finance Division, Government of Pakistan.

Go to a page or part

This text was extracted automatically from the PDF's text layer. Tables may lose their column alignment, and a page with no text layer is marked rather than guessed. Check the official PDF before relying on any figure.

Page 601

                                    SECTION VI
                     CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION
                                                             **********

                                                                                   2024-2025
                                                                              Budget
                                                                                     Estimate

                                                                       (Rupees in Thousand)

 Demand presented on behalf of the
Capital Outlay on Maritime Affairs Division

 Development Expenditure on Capital Account.
              132.  Capital Outlay on Maritime Affairs Division                                 5,300,000

                                                                           Total :              5,300,000

Page 602

No text layer on this page, see the official PDF.

Page 603

NO. 132.- CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION                   DEMANDS FOR GRANTS
                                DEMAND NO. 132
                                                                            ( FC12C51 )
                         CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2025 to defray the Salaries and Other
Expenses of the CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION.

                                Voted           Rs. 5,300,000,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF MARITIME AFFAIRS  .

                                                           2023-2024         2023-2024         2024-2025
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
045    Construction and Transport                                  241,616,000          197,696,000         5,300,000,000
046    Communications                                            2,058,384,000         2,087,304,000
063    Water Supply                                               272,262,000          272,262,000
               Total                                               2,572,262,000         2,557,262,000         5,300,000,000
     OBJECT CLASSIFICATION
A01   Employees Related Expenses                           79,624,000         79,624,000
A011  Pay                                                          46,528,000            46,528,000
A011-1 Pay of Officers                                                 (33,600,000)           (33,600,000)
A011-2 Pay of Other Staff                                              (12,928,000)           (12,928,000)
A012  Allowances                                                   33,096,000            33,096,000
A012-1 Regular Allowances                                            (33,096,000)           (33,096,000)
A02    Project Pre-Investment Analysis                                                               93,794,000
A03   Operating Expenses                                     7,500,000           7,500,000         50,000,000
A09   Physical Assets                                      205,500,000        205,500,000
A12    Civil works                                          2,261,638,000       2,246,638,000       5,156,206,000
A13   Repairs and Maintenance                               18,000,000         18,000,000
               Total                                         2,572,262,000       2,557,262,000       5,300,000,000
                  (In Foreign Exchange)                                 (15,000,000)
            (Own Resources)
               (Foreign Aid)                                           (15,000,000)
                  (In Local Currency)                                  (2,557,262,000)        (2,557,262,000)        (5,300,000,000)
                                                  __________________________________________________

Page 604

NO. 132.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION             DEMANDS FOR GRANTS
III.I.  - DETAILS are as follows :-
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

04     Economic Affairs:
045    Construction and Transport:
0453   Water Transport:
045301 PORT AND SHIPPPING  :
KA1385 ESTABLISHMENT OF EXPORT ORIENTED FISHERIES & INFRASTRUCTURE AT KORANGI FISHERIES
HARBOUR AUTORITY
045301- A12     Civil works                                                                                   734,206,000
045301- A124    Building and Structures                                                                       734,206,000
        Total- ESTABLISHMENT OF EXPORT                                                        734,206,000
           ORIENTED FISHERIES &
           INFRASTRUCTURE AT KORANGI
            FISHERIES HARBOUR AUTORITY
KA1389 ANCILIARY FACILIES AT GPA HOUSING COMPLEX GAWADAR
045301- A03    Operating Expenses                                                                           50,000,000
045301- A039   General                                                                                        50,000,000
        Total- ANCILIARY FACILIES AT GPA HOUSING                                                50,000,000
          COMPLEX GAWADAR
KA7083 MODIFICATION OF AUCTION HALL KORANGI FISHERIES HARBOUR KARACHI
045301- A12     Civil works                                           5,000,000
045301- A124    Building and Structures                               5,000,000
        Total- MODIFICATION OF AUCTION HALL                5,000,000
           KORANGI FISHERIES HARBOUR
           KARACHI
                  (In Foreign Exchange)                               (5,000,000)
               (Foreign Aid)                                        (5,000,000)
                                                  __________________________________________________
KA7084 ESTABLISHMENT OF COLD STORAGE AND FREEZING TUNNELS AT KORANGI FISHERIES HARBOUR
KARACHI
045301- A12     Civil works                                           5,000,000
045301- A124    Building and Structures                               5,000,000
        Total- ESTABLISHMENT OF COLD STORAGE            5,000,000
          AND FREEZING TUNNELS AT KORANGI
            FISHERIES HARBOUR KARACHI
                  (In Foreign Exchange)                               (5,000,000)
               (Foreign Aid)                                        (5,000,000)
                                                  __________________________________________________

Page 605

NO. 132.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION             DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

KA7085 ESTABLISHMENT OF BUSINESS PARK AT KORANGI FISHERIES HARBOUR KARACHI
045301- A12     Civil works                                           5,000,000
045301- A124    Building and Structures                               5,000,000
        Total- ESTABLISHMENT OF BUSINESS PARK            5,000,000
           AT KORANGI FISHERIES HARBOUR
           KARACHI
                  (In Foreign Exchange)                               (5,000,000)
               (Foreign Aid)                                        (5,000,000)
                                                  __________________________________________________
     045301   Total- PORT AND SHIPPPING                   15,000,000                            784,206,000
     0453     Total-  Water Transport                          15,000,000                            784,206,000
     045      Total-  Construction and Transport                 15,000,000                            784,206,000
046    Communications:
0461   Communications:
046101 ADMINISTRATION  :
KA7317 IMPROVEMENT OF OFFICIAL CONTROL SYSTEM AND STRENGTHENING TESTING SERVICES OF MFD
046101- A01    Employees Related Expenses                      79,624,000            79,624,000
046101- A011   Pay                                                 46,528,000            46,528,000
046101- A011-1 Pay of Officers                                  (33,600,000)         (33,600,000)
046101- A011-2 Pay of Other Staff                               (12,928,000)         (12,928,000)
046101- A012   Allowances                                         33,096,000            33,096,000
046101- A012-1  Regular Allowances                             (33,096,000)         (33,096,000)
046101- A03    Operating Expenses                                 7,500,000             7,500,000
046101- A032   Communications                                       60,000               60,000
046101- A033     Utilities                                               900,000              900,000
046101- A038    Travel & Transportation                               1,800,000             1,800,000
046101- A039   General                                              4,740,000             4,740,000
046101- A09    Physical Assets                                   105,500,000          105,500,000
046101- A092   Computer Equipment                                 4,000,000             4,000,000
046101- A095   Purchase of Transport                              16,000,000            16,000,000
046101- A096   Purchase of Plant and Machinery                    85,500,000            85,500,000
046101- A13    Repairs and Maintenance                          18,000,000            18,000,000
046101- A130    Transport                                             4,000,000             4,000,000
046101- A131   Machinery and Equipment                                                  2,100,000

Page 606

NO. 132.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION             DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

046101- A132    Furniture and Fixture                                14,000,000            11,900,000
        Total- IMPROVEMENT OF OFFICIAL CONTROL        210,624,000        210,624,000
          SYSTEM AND STRENGTHENING
           TESTING SERVICES OF MFD
     046101   Total-  ADMINISTRATION                      210,624,000        210,624,000
     0461     Total-  Communications                         210,624,000        210,624,000
     046      Total-  Communications                         210,624,000        210,624,000
     04        Total-  Economic Affairs                        225,624,000        210,624,000        784,206,000
               Total- ACCOUNTANT GENERAL                  225,624,000          210,624,000          784,206,000
                PAKISTAN REVENUES
                  SUB-OFFICE, KARACHI
                       (In Foreign Exchange)                             (15,000,000)
               (Own Resources)
                   (Foreign Aid)                                      (15,000,000)
                       (In Local Currency)                               (210,624,000)         (210,624,000)         (784,206,000)

Page 607

NO. 132.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION             DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

04     Economic Affairs:
045    Construction and Transport:
0453   Water Transport:
045301 PORT AND SHIPPPING  :
GR0134 SURVEY AND FEASIBILITY STUDY FOR CONSTRUCTION OF EASTBAY EXPRESSWAYS PHASE-II OF
GAWADAR
045301- A02     Project Pre-Investment Analysis                                                              93,794,000
045301- A021    Feasibility Studies                                                                              93,794,000
        Total- SURVEY AND FEASIBILITY STUDY FOR                                                 93,794,000
           CONSTRUCTION OF EASTBAY
          EXPRESSWAYS PHASE-II OF
         GAWADAR
GR0135 MODERNIZATION AND UPGRADATION OF GADDANI SHIP BREAKING AND RECYCLING INDUSTRY
(MUGSBRI) AND
045301- A12     Civil works                                                                                   4,172,000,000
045301- A125   Other Works                                                                                  4,172,000,000
        Total- MODERNIZATION AND UPGRADATION                                                4,172,000,000
          OF GADDANI SHIP BREAKING AND
           RECYCLING INDUSTRY (MUGSBRI) AND
GR0136 BLUE ECONOMY CENTRE
045301- A12     Civil works                                                                                   250,000,000
045301- A125   Other Works                                                                                 250,000,000
        Total- BLUE ECONOMY CENTRE                                                            250,000,000
GR9018 CONSTRUCTION OF GROYNE WALL/BREAK WATER & ALLIED WORKS AT EAST BAY (DEMI ZER)
GWADAR
045301- A12     Civil works                                        226,616,000          197,696,000
045301- A125   Other Works                                      226,616,000          197,696,000
        Total- CONSTRUCTION OF GROYNE                  226,616,000        197,696,000
           WALL/BREAK WATER & ALLIED
         WORKS AT EAST BAY (DEMI ZER)
         GWADAR
     045301   Total- PORT AND SHIPPPING                  226,616,000        197,696,000       4,515,794,000
     0453     Total-  Water Transport                         226,616,000        197,696,000       4,515,794,000
     045      Total-  Construction and Transport               226,616,000        197,696,000       4,515,794,000

Page 608

NO. 132.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION             DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

046    Communications:
0461   Communications:
046101 ADMINISTRATION  :
GR0210 SEWERAGE TREATMENT PLANT FOR GPA HOUSING COMPLEX GWADAR
046101- A12     Civil works                                        101,990,000          115,990,000
046101- A125   Other Works                                      101,990,000          115,990,000
        Total- SEWERAGE TREATMENT PLANT FOR          101,990,000        115,990,000
          GPA HOUSING COMPLEX GWADAR
GR0211 PERIMETRIC SECURITY SYSTEM FOR GWADAR PORT
046101- A09    Physical Assets                                   100,000,000          100,000,000
046101- A096   Purchase of Plant and Machinery                  100,000,000          100,000,000
        Total- PERIMETRIC SECURITY SYSTEM FOR          100,000,000        100,000,000
         GWADAR PORT
GR0212 MAINTENANCE DREDGING OF GWADAR PORT
046101- A12     Civil works                                       1,645,770,000         1,660,690,000
046101- A123   Embankment and Drainage Works                1,645,770,000         1,660,690,000
        Total- MAINTENANCE DREDGING OF                1,645,770,000       1,660,690,000
         GWADAR PORT
     046101   Total-  ADMINISTRATION                     1,847,760,000       1,876,680,000
     0461     Total-  Communications                        1,847,760,000       1,876,680,000
     046      Total-  Communications                        1,847,760,000       1,876,680,000
     04        Total-  Economic Affairs                       2,074,376,000       2,074,376,000       4,515,794,000
06     Housing And Community Amenities:
063    Water Supply:
0631   Water Supply:
063107 Water supply network (transportation & d  :
GR0088 WATER SUPPLY LINE FOR GWADAR FREE ZONE FROM 1.2 MGD DESALINATION PLANT TO GPA
063107- A12     Civil works                                        140,558,000          140,558,000
063107- A123   Embankment and Drainage Works                 140,558,000          140,558,000
        Total- WATER SUPPLY LINE FOR GWADAR           140,558,000        140,558,000
           FREE ZONE FROM 1.2 MGD
           DESALINATION PLANT TO GPA
GR0089 WATER SUPPLY LINE FOR NORTH FREE ZONE GWADAR FROM AIRPORT WATER WORKS
063107- A12     Civil works                                        131,704,000          131,704,000
063107- A123   Embankment and Drainage Works                 131,704,000          131,704,000
        Total- WATER SUPPLY LINE FOR NORTH             131,704,000        131,704,000
           FREE ZONE GWADAR FROM AIRPORT
          WATER WORKS

Page 609

NO. 132.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION             DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

     063107   Total-  Water supply network                    272,262,000        272,262,000
                         (transportation & d
     0631     Total-  Water Supply                           272,262,000        272,262,000
     063      Total-  Water Supply                           272,262,000        272,262,000
     06        Total-  Housing And Community Amenities        272,262,000        272,262,000
               Total- ACCOUNTANT GENERAL                 2,346,638,000         2,346,638,000         4,515,794,000
                PAKISTAN REVENUES
                  SUB-OFFICE, QUETTA
          TOTAL - DEMAND                             2,572,262,000       2,557,262,000       5,300,000,000
                  (In Foreign Exchange)                             (15,000,000)
            (Own Resources)
               (Foreign Aid)                                      (15,000,000)
                  (In Local Currency)                             (2,557,262,000)      (2,557,262,000)      (5,300,000,000)
                                                  __________________________________________________

Page 610

No text layer on this page, see the official PDF.

Page 611

                                   SECTION VII
                                MINISTRY OF RAILWAYS
                                                            **********

                                                                                  2024-2025
                                                                             Budget
                                                                                     Estimate

                                                                      (Rupees in Thousand)

Demand presented on behalf of the
Ministry of Railways

Development Expenditure on Capital Account.

             133.  Capital Outlay on Railways Division                                     45,000,000

                                                                           Total :             45,000,000

Page 612

No text layer on this page, see the official PDF.

Page 613

NO. 133.- CAPITAL OUTLAY ON RAILWAYS DIVISION                         DEMANDS FOR GRANTS
                                DEMAND NO. 133
                                                                            ( FC12C33 )
                            CAPITAL OUTLAY ON RAILWAYS DIVISION

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2025 for CAPITAL OUTLAY ON
RAILWAYS DIVISION.

                                Voted           Rs. 45,000,000,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF RAILWAYS  .

                                                           2023-2024         2023-2024         2024-2025
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
014    Transfers                                                 31,727,000,000        32,193,348,000        44,649,000,000
045    Construction and Transport                                 1,273,000,000          629,159,000          351,000,000
               Total                                              33,000,000,000        32,822,507,000        45,000,000,000
     OBJECT CLASSIFICATION
A03   Operating Expenses                                  430,000,000        152,507,000        101,000,000
A11   Investments                                        32,570,000,000      32,670,000,000      44,899,000,000
               Total                                        33,000,000,000      32,822,507,000      45,000,000,000
                  (In Foreign Exchange)                             (24,826,132,000)                             (25,877,000,000)
            (Own Resources)                                  (24,496,132,000)                             (25,676,000,000)
               (Foreign Aid)                                         (330,000,000)                                (201,000,000)
                  (In Local Currency)                                  (8,173,868,000)       (32,822,507,000)       (19,123,000,000)
                                                  __________________________________________________

Page 614

NO. 133.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION                   DEMANDS FOR GRANTS

III.  - DETAILS are as follows :-
                                 No of Posts        2023-2024         2023-2024       2024-2025
                                       2023-24 2024-25       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
04     Economic Affairs:
045    Construction and Transport:
0454   Railway Trasport:
045401 Railway Trasport  :
IB3652 RENOVATION AND CONSTRUCTION OF OFFICES WOMENS BARRACKS AND MULTI PURPOSE TRAINING
ROOMS AT OFFICE OF THE
045401- A03    Operating Expenses                              230,000,000          152,507,000          101,000,000
045401- A039   General                                           230,000,000          152,507,000          101,000,000
        Total- RENOVATION AND CONSTRUCTION OF        230,000,000        152,507,000        101,000,000
           OFFICES WOMENS BARRACKS AND
            MULTI PURPOSE TRAINING ROOMS AT
            OFFICE OF THE
                  (In Foreign Exchange)                           (230,000,000)                            (101,000,000)
               (Foreign Aid)                                    (230,000,000)                            (101,000,000)
                  (In Local Currency)                                                   (152,507,000)
                                                  __________________________________________________
     045401   Total-  Railway Trasport                        230,000,000        152,507,000        101,000,000
     0454     Total-  Railway Trasport                        230,000,000        152,507,000        101,000,000
     045      Total-  Construction and Transport               230,000,000        152,507,000        101,000,000
     04        Total-  Economic Affairs                        230,000,000        152,507,000        101,000,000
               Total- ACCOUNTANT GENERAL                  230,000,000          152,507,000          101,000,000
                PAKISTAN REVENUES
                       (In Foreign Exchange)                           (230,000,000)                                (101,000,000)
               (Own Resources)
                   (Foreign Aid)                                     (230,000,000)                                (101,000,000)
                       (In Local Currency)                                                     (152,507,000)

Page 615

NO. 133.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION                   DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

01     General Public Service:
014    Transfers:
0143   Investments:
014302 Non-Financial Institutions  :
KA0853 ESSENTIAL TRACK SAFETY WORKS ON KIAMARI-HYDERABAD SECTION IN KARACHI DIVISION
014302- A11    Investments                                                                                 500,000,000
014302- A111   Investment Local                                                                             500,000,000
        Total- ESSENTIAL TRACK SAFETY WORKS ON                                              500,000,000
           KIAMARI-HYDERABAD SECTION IN
           KARACHI DIVISION
                  (In Foreign Exchange)                                                                    (400,000,000)
            (Own Resources)                                                                         (400,000,000)
                  (In Local Currency)                                                                       (100,000,000)
                                                  __________________________________________________
KA0854 RECONSTRUCTION OF RAILWAY BRIDGE NO.4 (5X23') TO ENHANCE BRIDGE SAFETY AND PUNCTUALITY
OF TRAINS ON
014302- A11    Investments                                                                                 294,000,000
014302- A111   Investment Local                                                                             294,000,000
        Total- RECONSTRUCTION OF RAILWAY                                                     294,000,000
           BRIDGE NO.4 (5X23') TO ENHANCE
           BRIDGE SAFETY AND PUNCTUALITY
          OF TRAINS ON
KA0855 UP-GRADATION OF THE SIGNALLING SYSTEM BY PROVIDING COMPUTER BASED INTER LOCKING AT
SARHAD JUMMA GOTH BADAL
014302- A11    Investments                                                                                 200,000,000
014302- A111   Investment Local                                                                             200,000,000
        Total- UP-GRADATION OF THE SIGNALLING                                                 200,000,000
          SYSTEM BY PROVIDING COMPUTER
          BASED INTER LOCKING AT SARHAD
          JUMMA GOTH BADAL
                  (In Foreign Exchange)                                                                    (190,000,000)
            (Own Resources)                                                                         (190,000,000)
                  (In Local Currency)                                                                         (10,000,000)
                                                  __________________________________________________

Page 616

NO. 133.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION                   DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

KA0856 ESSENTIAL TRACK SAFETY WORKS ON SHAHDARA - SHIEKHUPURA - FAISALABAD - KHANEWAL
SECTION IN
014302- A11    Investments                                                                                 200,000,000
014302- A111   Investment Local                                                                             200,000,000
        Total- ESSENTIAL TRACK SAFETY WORKS ON                                              200,000,000
          SHAHDARA - SHIEKHUPURA -
           FAISALABAD - KHANEWAL SECTION IN
                  (In Foreign Exchange)                                                                    (150,000,000)
            (Own Resources)                                                                         (150,000,000)
                  (In Local Currency)                                                                         (50,000,000)
                                                  __________________________________________________
KA0857 REHABILITATION & STRENGHTENING OF WEAK BRIDGES ON PAKISTAN RAILWAYS SYSTEM
014302- A11    Investments                                                                                 200,000,000
014302- A111   Investment Local                                                                             200,000,000
        Total- REHABILITATION & STRENGHTENING                                                200,000,000
          OF WEAK BRIDGES ON PAKISTAN
           RAILWAYS SYSTEM
KA0858 ESSENTIAL TRACK SAFETY WORKS ON SHERSHAH - KUNDIAN SECTION IN MULTAN DIVISION
014302- A11    Investments                                                                                 200,000,000
014302- A111   Investment Local                                                                             200,000,000
        Total- ESSENTIAL TRACK SAFETY WORKS ON                                              200,000,000
          SHERSHAH - KUNDIAN SECTION IN
          MULTAN DIVISION
                  (In Foreign Exchange)                                                                    (150,000,000)
            (Own Resources)                                                                         (150,000,000)
                  (In Local Currency)                                                                         (50,000,000)
                                                  __________________________________________________
KA0859 ESSENTIAL TRACK SAFETY WORKS ON ROHRI - SIBI SECTION IN SUKKUR DIVISION
014302- A11    Investments                                                                                 200,000,000
014302- A111   Investment Local                                                                             200,000,000
        Total- ESSENTIAL TRACK SAFETY WORKS ON                                              200,000,000
           ROHRI - SIBI SECTION IN SUKKUR
             DIVISION
                  (In Foreign Exchange)                                                                    (150,000,000)
            (Own Resources)                                                                         (150,000,000)
                  (In Local Currency)                                                                         (50,000,000)
                                                  __________________________________________________

Page 617

NO. 133.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION                   DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
KA1263 ACQUISITION OF LAND FOR RAIL CONNECTIVITY FROM GAWADAR TO MASTUNG VIA BESIMA AND
BESIMA
014302- A11    Investments                                                                                  2,210,000,000
014302- A111   Investment Local                                                                              2,210,000,000
        Total- ACQUISITION OF LAND FOR RAIL                                                    2,210,000,000
           CONNECTIVITY FROM GAWADAR TO
          MASTUNG VIA BESIMA AND BESIMA
KA1273 ACQUISITION OF LAND FOR RAIL CONNECTIVITY WITH AFGHANISTAN FROM KOHAT (ZERO POINT) TO
KHARLACHI
014302- A11    Investments                                                                                 200,000,000
014302- A111   Investment Local                                                                             200,000,000
        Total- ACQUISITION OF LAND FOR RAIL                                                     200,000,000
           CONNECTIVITY WITH AFGHANISTAN
          FROM KOHAT (ZERO POINT) TO
           KHARLACHI
KA1326 REPLACEMENT OF ROOF MOUNTED A.C PLANTS IN PASSENGER COACHES FOR BETTER SERVICE
DELIVERY
014302- A11    Investments                                                                                 100,000,000
014302- A111   Investment Local                                                                             100,000,000
        Total- REPLACEMENT OF ROOF MOUNTED                                                  100,000,000
            A.C PLANTS IN PASSENGER COACHES
          FOR BETTER SERVICE DELIVERY
                  (In Foreign Exchange)                                                                      (75,000,000)
            (Own Resources)                                                                           (75,000,000)
                  (In Local Currency)                                                                         (25,000,000)
                                                  __________________________________________________
KA1363 INSTALLATION AND COMMISSIONING OF SOLAR SYSTEM AT 155 NOS RAILWAY STATIONS
014302- A11    Investments                                          1,000,000                                 50,000,000
014302- A111   Investment Local                                     1,000,000                                 50,000,000
        Total- INSTALLATION AND COMMISSIONING            1,000,000                             50,000,000
          OF SOLAR SYSTEM AT 155 NOS
           RAILWAY STATIONS
KA1364 INDIGENOUS DEVELOPMENT OF WIRELESS BASED BLOCK INSTRUMENT INTERLOCKING SYSTEM AND
014302- A11    Investments                                       100,000,000            70,374,000
014302- A111   Investment Local                                  100,000,000            70,374,000
        Total- INDIGENOUS DEVELOPMENT OF               100,000,000         70,374,000
           WIRELESS BASED BLOCK
           INSTRUMENT INTERLOCKING SYSTEM
          AND

Page 618

NO. 133.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION                   DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
KA1366 REHABILITATION OF 300 KVA DG SETS
014302- A11    Investments                                       574,160,000          574,160,000
014302- A111   Investment Local                                  574,160,000          574,160,000
        Total- REHABILITATION OF 300 KVA DG SETS        574,160,000        574,160,000

KA1367 CONSTRUCTION OF NEW TRACK & UP-GRADATION / REHABILITATION OF TRACK FROM CHAMAN YARD
(INCLUDING)
014302- A11    Investments                                       592,000,000          122,403,000          975,000,000
014302- A111   Investment Local                                  592,000,000          122,403,000          975,000,000
        Total- CONSTRUCTION OF NEW TRACK &            592,000,000        122,403,000        975,000,000
           UP-GRADATION / REHABILITATION OF
          TRACK FROM CHAMAN YARD
             (INCLUDING)
                  (In Foreign Exchange)                                                                    (500,000,000)
            (Own Resources)                                                                         (500,000,000)
                  (In Local Currency)                              (592,000,000)       (122,403,000)       (475,000,000)
                                                  __________________________________________________
KA7109 CHINA-PAKISTAN ECONOMIC CORRIDOR SUPPORT PROJECT (CPECSP) AT MINISTRY OF RAILWAYS
014302- A11    Investments                                        60,000,000            42,000,000            50,000,000
014302- A111   Investment Local                                    60,000,000            42,000,000            50,000,000
        Total- CHINA-PAKISTAN ECONOMIC                   60,000,000         42,000,000          50,000,000
          CORRIDOR SUPPORT PROJECT
            (CPECSP) AT MINISTRY OF RAILWAYS
KA7111 PRELIMINARY DESIGN / DRAWINGS FOR UPGRADATION/REHABILITATION OF MAIN LINE (ML-1) AND
ESTABLISHMENT OF
014302- A11    Investments                                       468,634,000         1,651,949,000            20,000,000
014302- A111   Investment Local                                  468,634,000         1,651,949,000            20,000,000
        Total- PRELIMINARY DESIGN / DRAWINGS            468,634,000       1,651,949,000          20,000,000
          FOR UPGRADATION/REHABILITATION
          OF MAIN LINE (ML-1) AND
           ESTABLISHMENT OF
KA7113 PROCUREMENT OF EQUIPMENT FOR IMPROVED SECURITY AND ANTI-TERRORISM MEASURES
014302- A11    Investments                                       139,168,000

Page 619

NO. 133.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION                   DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

014302- A111   Investment Local                                  139,168,000
        Total- PROCUREMENT OF EQUIPMENT FOR          139,168,000
           IMPROVED SECURITY AND
           ANTI-TERRORISM MEASURES
KA7114 PROCUREMENT/MANUFACTURE OF 820 HIGH CAPACITY BOGIE FREIGHT WAGONS AND 230
PASSENGER COACHES
014302- A11    Investments                                    17,639,132,000        16,893,691,000        11,157,000,000
014302- A111   Investment Local                                17,639,132,000        16,893,691,000        11,157,000,000
        Total- PROCUREMENT/MANUFACTURE OF 820     17,639,132,000      16,893,691,000      11,157,000,000
           HIGH CAPACITY BOGIE FREIGHT
         WAGONS AND 230 PASSENGER
          COACHES
                  (In Foreign Exchange)                         (17,439,132,000)                         (10,500,000,000)
            (Own Resources)                             (17,439,132,000)                         (10,500,000,000)
                  (In Local Currency)                              (200,000,000)     (16,893,691,000)       (657,000,000)
                                                  __________________________________________________
KA7115 PROJECT MANAGEMENT UNIT (PMU) IN MINISTRY OF RAILWAYS (2ND REVISED)
014302- A11    Investments                                       410,000,000            85,000,000          300,000,000
014302- A111   Investment Local                                  410,000,000            85,000,000          300,000,000
        Total- PROJECT MANAGEMENT UNIT (PMU) IN        410,000,000         85,000,000        300,000,000
            MINISTRY OF RAILWAYS (2ND
            REVISED)
KA7120 REPLACEMENT OF OLD AND OBSOLETE SIGNAL GEAR FROM LODHRAN -MULTAN-KHANEWAL #NAME?
014302- A11    Investments                                      1,277,670,000          537,007,000          600,000,000
014302- A111   Investment Local                                 1,277,670,000          537,007,000          600,000,000
        Total- REPLACEMENT OF OLD AND                 1,277,670,000        537,007,000        600,000,000
          OBSOLETE SIGNAL GEAR FROM
          LODHRAN -MULTAN-KHANEWAL
          #NAME?
                  (In Foreign Exchange)                          (1,000,000,000)                            (550,000,000)
            (Own Resources)                               (1,000,000,000)                            (550,000,000)
                  (In Local Currency)                              (277,670,000)       (537,007,000)         (50,000,000)
                                                  __________________________________________________
KA7121 STRENGTHENING OF PLANNING DEVELOPMENT MONITORING AND EVALUATION (PD&ME)
DIRECTORATE MINISTRY OF MINISTRY
014302- A11    Investments                                        60,000,000            45,000,000            50,000,000

Page 620

NO. 133.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION                   DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

014302- A111   Investment Local                                    60,000,000            45,000,000            50,000,000
        Total- STRENGTHENING OF PLANNING                60,000,000         45,000,000          50,000,000
          DEVELOPMENT MONITORING AND
           EVALUATION (PD&ME) DIRECTORATE
            MINISTRY OF MINISTRY
KA7129 SPECIAL REPAIR OF 100 NOS DE LOCOMOTIVES FOR IMPROVING THE REHABILITEE/AVAILABILITY OF
RUNNING
014302- A11    Investments                                      2,000,000,000         2,000,000,000          600,000,000
014302- A111   Investment Local                                 2,000,000,000         2,000,000,000          600,000,000
        Total- SPECIAL REPAIR OF 100 NOS DE             2,000,000,000       2,000,000,000        600,000,000
           LOCOMOTIVES FOR IMPROVING THE
            REHABILITEE/AVAILABILITY OF
           RUNNING
                  (In Foreign Exchange)                          (1,800,000,000)                            (550,000,000)
            (Own Resources)                               (1,800,000,000)                            (550,000,000)
                  (In Local Currency)                              (200,000,000)      (2,000,000,000)         (50,000,000)
                                                  __________________________________________________
KA7130 SPECIAL REPAIR OF 600 PASSENGER COACHES AND 1200 BOGIE WAGONS
014302- A11    Investments                                       769,000,000         1,099,650,000
014302- A111   Investment Local                                  769,000,000         1,099,650,000
        Total- SPECIAL REPAIR OF 600 PASSENGER         769,000,000       1,099,650,000
          COACHES AND 1200 BOGIE WAGONS
                  (In Foreign Exchange)                           (400,000,000)
            (Own Resources)                                (400,000,000)
                  (In Local Currency)                              (369,000,000)      (1,099,650,000)
                                                  __________________________________________________
KA7132 PC-II FOR COMMERCIAL AND FINANCIAL FEASIBILITY STUDY FOR THE SUB-PROJECT UNDER ML-I
PROJECT
014302- A11    Investments                                        17,847,000             6,844,000
014302- A111   Investment Local                                    17,847,000             6,844,000
        Total-  PC-II FOR COMMERCIAL AND                   17,847,000           6,844,000
            FINANCIAL FEASIBILITY STUDY FOR
           THE SUB-PROJECT UNDER ML-I
          PROJECT

Page 621

NO. 133.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION                   DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI
KA7133 UP-GRADATION OF PAKISTAN RAILWAYS EXISTING MAINLINE-1 (ML-I) AND ESTABLISHMENT OF DRY
PORT NEAR
014302- A03    Operating Expenses                              200,000,000
014302- A039   General                                           200,000,000
014302- A11    Investments                                                                                  1,000,000,000
014302- A111   Investment Local                                                                              1,000,000,000
        Total- UP-GRADATION OF PAKISTAN                 200,000,000                           1,000,000,000
           RAILWAYS EXISTING MAINLINE-1 (ML-I)
          AND ESTABLISHMENT OF DRY PORT
          NEAR
                  (In Foreign Exchange)                           (100,000,000)                            (100,000,000)
               (Foreign Aid)                                    (100,000,000)                            (100,000,000)
                  (In Local Currency)                              (100,000,000)                            (900,000,000)
                                                  __________________________________________________
KA7136 UMBRELLA PCII FOR FEASIBITY STUDIES AND TRANSACTION ADVISORY SERVICES
014302- A11    Investments                                       100,000,000          190,000,000          210,000,000
014302- A111   Investment Local                                  100,000,000          190,000,000          210,000,000
        Total- UMBRELLA PCII FOR FEASIBITY               100,000,000        190,000,000        210,000,000
           STUDIES AND TRANSACTION
           ADVISORY SERVICES
KA7137 ESTABLISHMENT OF BUSINESS DEVELOPMENT AND HR SUPPORT UNIT AT PAKISTAN RAILWAYS
014302- A11    Investments                                        50,000,000             8,200,000            30,000,000
014302- A111   Investment Local                                    50,000,000             8,200,000            30,000,000
        Total- ESTABLISHMENT OF BUSINESS                 50,000,000           8,200,000          30,000,000
          DEVELOPMENT AND HR SUPPORT UNIT
           AT PAKISTAN RAILWAYS
KA7138 COLLABORATION OF PAKISTAN RAILWAYS WITH DIFFERENT ACADEMIC INSTITUTES (TRIPLE HELIX
MODEL)
014302- A11    Investments                                        20,000,000            25,000,000            25,000,000
014302- A111   Investment Local                                    20,000,000            25,000,000            25,000,000
        Total- COLLABORATION OF PAKISTAN                20,000,000         25,000,000          25,000,000
           RAILWAYS WITH DIFFERENT
          ACADEMIC INSTITUTES (TRIPLE HELIX
           MODEL)
KA7139 PROCUREMENT AND INSTALLATION OF MACHINERY AT SIGNAL WORKSHOP
014302- A11    Investments                                       288,460,000          253,475,000
014302- A111   Investment Local                                  288,460,000          253,475,000

Page 622

NO. 133.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION                   DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

        Total- PROCUREMENT AND INSTALLATION           288,460,000        253,475,000
          OF MACHINERY AT SIGNAL
         WORKSHOP
KA7141 REHABILITATION OF KPT AND RAIL CONNECTIVITY (PHASE-1)
014302- A11    Investments                                       693,432,000          570,650,000
014302- A111   Investment Local                                  693,432,000          570,650,000
        Total- REHABILITATION OF KPT AND RAIL            693,432,000        570,650,000
           CONNECTIVITY (PHASE-1)
KA7142 REHABILITATION OF TRACK BETWEEN REHMANI NAGAR - BAKRANI ROAD ON DADU-HABIB KOT
SECTION (SUKKUR DIVISION PH-4)
014302- A11    Investments                                          2,000,000             4,400,000            10,000,000
014302- A111   Investment Local                                     2,000,000             4,400,000            10,000,000
        Total- REHABILITATION OF TRACK BETWEEN           2,000,000           4,400,000          10,000,000
           REHMANI NAGAR - BAKRANI ROAD ON
           DADU-HABIB KOT SECTION (SUKKUR
             DIVISION PH-4)
KA7143 REHABILITATION OF TRACK BETWEEN BARULI-SOHAN BRIDGE ON KUNDIAN - ATTOCK CITY SECTION
(PESHAWAR
014302- A11    Investments                                          2,000,000               50,000            10,000,000
014302- A111   Investment Local                                     2,000,000               50,000            10,000,000
        Total- REHABILITATION OF TRACK BETWEEN           2,000,000             50,000          10,000,000
           BARULI-SOHAN BRIDGE ON KUNDIAN -
          ATTOCK CITY SECTION (PESHAWAR
KA7145 RECOMMISSIONING OF 5 ACCIDENTAL LOCOMOTIVES
014302- A11    Investments                                       500,000,000          369,500,000          150,000,000
014302- A111   Investment Local                                  500,000,000          369,500,000          150,000,000
        Total- RECOMMISSIONING OF 5 ACCIDENTAL         500,000,000        369,500,000        150,000,000
           LOCOMOTIVES
                  (In Foreign Exchange)                           (477,000,000)                            (120,000,000)
            (Own Resources)                                (477,000,000)                            (120,000,000)
                  (In Local Currency)                                (23,000,000)       (369,500,000)         (30,000,000)
                                                  __________________________________________________
KA7148 REHABILITATION OF TRACK BETWEEN SAMA SATTA AND BAHAWALNAGAR ON SAMA SATTA AMRUKA
SECTION
014302- A11    Investments                                        50,000,000            14,105,000          115,000,000

Page 623

NO. 133.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION                   DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

014302- A111   Investment Local                                    50,000,000            14,105,000          115,000,000
        Total- REHABILITATION OF TRACK BETWEEN         50,000,000         14,105,000        115,000,000
          SAMA SATTA AND BAHAWALNAGAR
         ON SAMA SATTA AMRUKA SECTION
                  (In Foreign Exchange)                             (40,000,000)                            (100,000,000)
            (Own Resources)                                 (40,000,000)                            (100,000,000)
                  (In Local Currency)                                (10,000,000)         (14,105,000)         (15,000,000)
                                                  __________________________________________________
KA7309 ESTABILISHMENT PF QASIM RAIL FREIGHT TERMINAL AT LOADOUT STATION KARACHI
014302- A11    Investments                                       300,000,000
014302- A111   Investment Local                                  300,000,000
        Total- ESTABILISHMENT PF QASIM RAIL              300,000,000
           FREIGHT TERMINAL AT LOADOUT
           STATION KARACHI
                  (In Foreign Exchange)                           (150,000,000)
            (Own Resources)                                (150,000,000)
                  (In Local Currency)                              (150,000,000)
                                                  __________________________________________________
KA7310 REHABILITATION AND OVERHAULING OF TRACK MAINTENANCE MACHINES / CRANES
014302- A11    Investments                                       500,000,000              875,000         1,500,000,000
014302- A111   Investment Local                                  500,000,000              875,000         1,500,000,000
        Total- REHABILITATION AND OVERHAULING         500,000,000            875,000       1,500,000,000
          OF TRACK MAINTENANCE MACHINES /
          CRANES
                  (In Foreign Exchange)                           (480,000,000)                          (1,400,000,000)
            (Own Resources)                                (480,000,000)                          (1,400,000,000)
                  (In Local Currency)                                (20,000,000)            (875,000)       (100,000,000)
                                                  __________________________________________________
KA7311 IMPROVE SAFETY THROUGH BETTER COMMUNICATION SYSTEM
014302- A11    Investments                                       200,000,000            10,280,000          839,000,000
014302- A111   Investment Local                                  200,000,000            10,280,000          839,000,000
        Total- IMPROVE SAFETY THROUGH BETTER          200,000,000         10,280,000        839,000,000
           COMMUNICATION SYSTEM
KA7312 CONSTRUCTION OF LEFT GUIDE BUND OF SHERSHAH RAILWAY BRIDGE NO.1 ON SHERSHAH-KUNDIAN
(MULTAN DIVISION)
014302- A11    Investments                                       150,000,000          295,000,000          197,000,000

Page 624

NO. 133.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION                   DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

014302- A111   Investment Local                                  150,000,000          295,000,000          197,000,000
        Total- CONSTRUCTION OF LEFT GUIDE BUND        150,000,000        295,000,000        197,000,000
          OF SHERSHAH RAILWAY BRIDGE NO.1
         ON SHERSHAH-KUNDIAN (MULTAN
              DIVISION)
KA7313 IMMEDIATE TRACK SAFETY WORKS ON TANDO ADAM-ROHRI SECTION IN SUKKUR DIVISION
014302- A11    Investments                                      1,000,000,000          584,000,000         2,660,000,000
014302- A111   Investment Local                                 1,000,000,000          584,000,000         2,660,000,000
        Total- IMMEDIATE TRACK SAFETY WORKS ON      1,000,000,000        584,000,000       2,660,000,000
          TANDO ADAM-ROHRI SECTION IN
          SUKKUR DIVISION
                  (In Foreign Exchange)                           (800,000,000)                            (660,000,000)
            (Own Resources)                                (800,000,000)                            (660,000,000)
                  (In Local Currency)                              (200,000,000)       (584,000,000)      (2,000,000,000)
                                                  __________________________________________________
KA7314 IMMEDIATE TRACK SAFETY WORKS ON ROHRI-KHANPUR SECTION IN SUKKUR DIVISION
014302- A11    Investments                                      1,000,000,000          345,000,000         3,000,000,000
014302- A111   Investment Local                                 1,000,000,000          345,000,000         3,000,000,000
        Total- IMMEDIATE TRACK SAFETY WORKS ON      1,000,000,000        345,000,000       3,000,000,000
           ROHRI-KHANPUR SECTION IN SUKKUR
             DIVISION
                  (In Foreign Exchange)                           (800,000,000)                          (2,000,000,000)
            (Own Resources)                                (800,000,000)                          (2,000,000,000)
                  (In Local Currency)                              (200,000,000)       (345,000,000)      (1,000,000,000)
                                                  __________________________________________________
KA9603 CONSTRUCTION OF LINK ROAD FROM NAROWAL RAILWAY STATION TO SIALKOT PHATTAK
014302- A11    Investments                                                                                 200,000,000
014302- A111   Investment Local                                                                             200,000,000
        Total- CONSTRUCTION OF LINK ROAD FROM                                                200,000,000
         NAROWAL RAILWAY STATION TO
           SIALKOT PHATTAK
KA9608 REHABILITATION AND IMPROVEMENT OF KOTRI JAMSHORO RAIL LINK / PC-I OF REHABILITATION OF
TRACK BETWEEN
014302- A11    Investments                                       893,606,000          533,106,000          846,000,000
014302- A111   Investment Local                                  893,606,000          533,106,000          846,000,000
        Total- REHABILITATION AND IMPROVEMENT         893,606,000        533,106,000        846,000,000
          OF KOTRI JAMSHORO RAIL LINK / PC-I
          OF REHABILITATION OF TRACK
          BETWEEN

Page 625

NO. 133.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION                   DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

                  (In Foreign Exchange)                           (350,000,000)                            (561,000,000)
            (Own Resources)                                (350,000,000)                            (561,000,000)
                  (In Local Currency)                              (543,606,000)       (533,106,000)       (285,000,000)
                                                  __________________________________________________
KA9609 CONVERSION OF BREAKING SYSTEM OF 328 NOS OF MBFRS FROM VACCUM BRAKE TO AIR BRAKE
014302- A11    Investments                                       400,000,000            43,262,000          641,000,000
014302- A111   Investment Local                                  400,000,000            43,262,000          641,000,000
        Total- CONVERSION OF BREAKING SYSTEM          400,000,000         43,262,000        641,000,000
          OF 328 NOS OF MBFRS FROM VACCUM
          BRAKE TO AIR BRAKE
                  (In Foreign Exchange)                           (380,000,000)                            (510,000,000)
            (Own Resources)                                (380,000,000)                            (510,000,000)
                  (In Local Currency)                                (20,000,000)         (43,262,000)       (131,000,000)
                                                  __________________________________________________
KA9697 IMMEDIATE TRACK SAFETY WORK IN KARACHI AND SUKKUR
014302- A11    Investments                                       868,891,000         1,122,891,000
014302- A111   Investment Local                                  868,891,000         1,122,891,000
        Total- IMMEDIATE TRACK SAFETY WORK IN          868,891,000       1,122,891,000
           KARACHI AND SUKKUR
KA9906 REPLACEMENT OF TRACK MACHINE
014302- A11    Investments                                       400,000,000
014302- A111   Investment Local                                  400,000,000
        Total- REPLACEMENT OF TRACK MACHINE           400,000,000
                  (In Foreign Exchange)                           (380,000,000)
            (Own Resources)                                (380,000,000)
                  (In Local Currency)                                (20,000,000)
                                                  __________________________________________________
KA9997 THAR COAL RAIL CONNECTIVITY WITH EXISTING RAILWAY NETWORK INCLUDING LAST MILE
CONNECTIVITY WITH PORT
014302- A11    Investments                                                            4,695,476,000        15,110,000,000
014302- A111   Investment Local                                                       4,695,476,000        15,110,000,000
        Total- THAR COAL RAIL CONNECTIVITY WITH                           4,695,476,000      15,110,000,000
             EXISTING RAILWAY NETWORK
            INCLUDING LAST MILE CONNECTIVITY
            WITH PORT

Page 626

NO. 133.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION                   DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

                  (In Foreign Exchange)                                                                    (7,110,000,000)
            (Own Resources)                                                                        (7,110,000,000)
                  (In Local Currency)                                                  (4,695,476,000)      (8,000,000,000)
                                                  __________________________________________________
     014302   Total-  Non-Financial Institutions               31,727,000,000      32,193,348,000      44,649,000,000
     0143     Total-  Investments                          31,727,000,000      32,193,348,000      44,649,000,000
     014      Total-  Transfers                             31,727,000,000      32,193,348,000      44,649,000,000
     01        Total-  General Public Service                 31,727,000,000      32,193,348,000      44,649,000,000
04     Economic Affairs:
045    Construction and Transport:
0454   Railway Trasport:
045401 Railway Trasport  :
KA1376 RECONSTRUCTION/REHABILITATION OF ASSETS DAMAGED DURING THE FLOOD 2010
045401- A11    Investments                                       100,000,000          130,170,000
045401- A111   Investment Local                                  100,000,000          130,170,000
        Total- RECONSTRUCTION/REHABILITATION          100,000,000        130,170,000
          OF ASSETS DAMAGED DURING THE
          FLOOD 2010
KA1377 IMPROVEMENT OF TERMINAL FACILITIES AND ENHANCING SECURITY ARRANGEMENT IN MARSHILING
YAD PIPRI KARACHI
045401- A11    Investments                                       943,000,000          346,482,000          250,000,000
045401- A111   Investment Local                                  943,000,000          346,482,000          250,000,000
        Total- IMPROVEMENT OF TERMINAL                 943,000,000        346,482,000        250,000,000
             FACILITIES AND ENHANCING
           SECURITY ARRANGEMENT IN
           MARSHILING YAD PIPRI KARACHI
     045401   Total-  Railway Trasport                       1,043,000,000        476,652,000        250,000,000
     0454     Total-  Railway Trasport                       1,043,000,000        476,652,000        250,000,000
     045      Total-  Construction and Transport              1,043,000,000        476,652,000        250,000,000
     04        Total-  Economic Affairs                       1,043,000,000        476,652,000        250,000,000
               Total- ACCOUNTANT GENERAL                32,770,000,000        32,670,000,000        44,899,000,000
                PAKISTAN REVENUES
                  SUB-OFFICE, KARACHI
                       (In Foreign Exchange)                         (24,596,132,000)                             (25,776,000,000)

Page 627

NO. 133.- FC12C33 CAPITAL OUTLAY ON RAILWAYS DIVISION                   DEMANDS FOR GRANTS
                                 No of Posts        2023-2024         2023-2024        2024-2025
                                       2023-24 2024-25       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

               (Own Resources)                              (24,496,132,000)                             (25,676,000,000)
                   (Foreign Aid)                                     (100,000,000)                                (100,000,000)
                       (In Local Currency)                             (8,173,868,000)       (32,670,000,000)       (19,123,000,000)
          TOTAL - DEMAND                           33,000,000,000      32,822,507,000      45,000,000,000
                  (In Foreign Exchange)                         (24,826,132,000)                         (25,877,000,000)
            (Own Resources)                             (24,496,132,000)                         (25,676,000,000)
               (Foreign Aid)                                    (330,000,000)                            (201,000,000)
                  (In Local Currency)                             (8,173,868,000)     (32,822,507,000)     (19,123,000,000)
                                                  __________________________________________________