Skip to content
Qanoon Digest

Details of Demands for Grants & Appropriations (Development Budget Demands, Volume-V), part 6

FY 2020-21Details of demandsPages 501 to 550 of 550

The Details of Demands for Grants & Appropriations (Development Budget Demands, Volume-V) is part of the federal budget for FY 2020-21. This page reproduces the text of its 550 PDF pages, extracted automatically from the official PDF published by the Finance Division, Government of Pakistan.

Go to a page or part

This text was extracted automatically from the PDF's text layer. Tables may lose their column alignment, and a page with no text layer is marked rather than guessed. Check the official PDF before relying on any figure.

Page 501

  Table of Content                                    Previous     Next                                      4420

NO. 188.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

          FROM CHACHAR SHARIF TO KOT
          PEHLWAN AND CONSTRUCTION OF
          METTALED ROAD FROM
IB2256 CONSTRUCTION OF METALLED ROAD FROM BHAKHAR BAR CHACHAR SHARIF ROAD DERA ZIADA TO
DERA HAKEEM FAZAL
045702- A12     Civil works                                                                                     10,396,000
045702- A124    Building and Structures                                                                         10,396,000
        Total- CONSTRUCTION OF METALLED ROAD                                                  10,396,000
          FROM BHAKHAR BAR CHACHAR
           SHARIF ROAD DERA ZIADA TO DERA
          HAKEEM FAZAL
IB2257 CONSTRUCTION OF OFFICER'S MESS AT NAB (L) |COMPLEX LAHORE
045702- A12     Civil works                                                                                       4,695,000
045702- A124    Building and Structures                                                                           4,695,000
        Total- CONSTRUCTION OF OFFICER'S MESS                                                    4,695,000
           AT NAB (L) |COMPLEX LAHORE
IB2258 CONSTRUCTION OF M/ROAD / RCC ROAD / PCC / TUFF TILES / CULVERTS / NALLAH AND DRAIN IN
DIFFERENT UCS OF
045702- A12     Civil works                                                                                   500,000,000
045702- A124    Building and Structures                                                                       500,000,000
        Total- CONSTRUCTION OF M/ROAD / RCC                                                   500,000,000
          ROAD / PCC / TUFF TILES / CULVERTS /
          NALLAH AND DRAIN IN DIFFERENT
          UCS OF
IB2259 CONSTRUCTION OF INDUSTRIAL AREA ROAD FROM GT ROAD TO GHAZI CHAK INCLUDING BRIDGES ON
BHIMER NALLAH
045702- A12     Civil works                                                                                   938,967,000
045702- A124    Building and Structures                                                                       938,967,000
        Total- CONSTRUCTION OF INDUSTRIAL AREA                                               938,967,000
          ROAD FROM GT ROAD TO GHAZI CHAK
           INCLUDING BRIDGES ON BHIMER
          NALLAH
IB2260 DUALIZATION OF GUJRAT JALALPUR JATTAN ROAD (SUB-HEAD) : DUALIZATION OF ROAD FROM
ZAHORR ELAHI PARK TO
045702- A12     Civil works                                                                                   469,484,000

Page 502

  Table of Content                                    Previous     Next                                      4421

NO. 188.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A124    Building and Structures                                                                       469,484,000
        Total- DUALIZATION OF GUJRAT JALALPUR                                                469,484,000
           JATTAN ROAD (SUB-HEAD) :
           DUALIZATION OF ROAD FROM ZAHORR
            ELAHI PARK TO
IB2261 CONSTRUCTION OF METALLED ROAD AND BRIDGE IN DIFFERENT AREA OF TEHSIL YAZMAN DISTRICT
BAHAWALPUR (32 NOS
045702- A12     Civil works                                                                                   485,446,000
045702- A124    Building and Structures                                                                       485,446,000
        Total- CONSTRUCTION OF METALLED ROAD                                                485,446,000
          AND BRIDGE IN DIFFERENT AREA OF
            TEHSIL YAZMAN DISTRICT
          BAHAWALPUR (32 NOS
IB2262 CONSTRUCTION OF BRICK PAVEMENTS IN STREETS CONSTRUCTION OF BOUNDARY WALLS OF
GREAVEYARD AND
045702- A12     Civil works                                                                                   230,361,000
045702- A124    Building and Structures                                                                       230,361,000
        Total- CONSTRUCTION OF BRICK                                                           230,361,000
          PAVEMENTS IN STREETS
           CONSTRUCTION OF BOUNDARY
          WALLS OF GREAVEYARD AND
IB2263 PROVIDING AND LAYING OF WATER SUPPLY AND SEWERAGE IN DIFFERENT AREAS OF TEHSIL YAZMAN
DISTRICT BAHAWALPUR
045702- A12     Civil works                                                                                   223,474,000
045702- A124    Building and Structures                                                                       223,474,000
        Total- PROVIDING AND LAYING OF WATER                                                  223,474,000
           SUPPLY AND SEWERAGE IN
           DIFFERENT AREAS OF TEHSIL YAZMAN
            DISTRICT BAHAWALPUR
IB2264 CONSTRUCTION OF SERVICE MORE FLYOVER AND INDUSTRIAL AREA LINK ROAD GUJRAT DISTRICT
GUJRAT-II
045702- A12     Civil works                                                                                   673,395,000
045702- A124    Building and Structures                                                                       673,395,000
        Total- CONSTRUCTION OF SERVICE MORE                                                  673,395,000
          FLYOVER AND INDUSTRIAL AREA LINK
          ROAD GUJRAT DISTRICT GUJRAT-II

Page 503

  Table of Content                                    Previous     Next                                      4422

NO. 188.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

IB2265 REHABLITION OF ROAD FROM LAHORE ROAD (ADA 10 MILE) TO FAISLABAD ROAD (46 ADA) VIA 29
JHALL 36 PULL
045702- A12     Civil works                                                                                   281,690,000
045702- A124    Building and Structures                                                                       281,690,000
        Total- REHABLITION OF ROAD FROM LAHORE                                              281,690,000
          ROAD (ADA 10 MILE) TO FAISLABAD
          ROAD (46 ADA) VIA 29 JHALL 36 PULL
IB2266 DEVELPOMENT SCHEME 21 NOS IN DISTRICT CHAKWAL NA-65 (ROAD SCHEMES)
045702- A12     Civil works                                                                                   328,638,000
045702- A124    Building and Structures                                                                       328,638,000
        Total- DEVELPOMENT SCHEME 21 NOS IN                                                   328,638,000
            DISTRICT CHAKWAL NA-65 (ROAD
           SCHEMES)
IB2267 CONSTRUCTION OF 20 BEDDED HOSPITAL AT VILLAGE LATIFAL DISTRICT CHAKWAL
045702- A12     Civil works                                                                                   469,484,000
045702- A124    Building and Structures                                                                       469,484,000
        Total- CONSTRUCTION OF 20 BEDDED                                                      469,484,000
           HOSPITAL AT VILLAGE LATIFAL
            DISTRICT CHAKWAL
IB2268 WIDENING/REHABILITATION OF ROAD FROM QUAIDABAD TO WARCHHA VIA FATEHPUR DISTRICT
KHUSHAB
045702- A12     Civil works                                                                                   274,742,000
045702- A124    Building and Structures                                                                       274,742,000
        Total- WIDENING/REHABILITATION OF ROAD                                                274,742,000
          FROM QUAIDABAD TO WARCHHA VIA
          FATEHPUR DISTRICT KHUSHAB
IB2269 FEASIBILITY STUDY FOR CONSTRUCTION OF DUAL ROAD FROM ALIPUR CHOWK TO KALASKY AND
GONDLAWALA BYPASS
045702- A12     Civil works                                                                                       7,746,000
045702- A124    Building and Structures                                                                           7,746,000
        Total- FEASIBILITY STUDY FOR                                                                7,746,000
           CONSTRUCTION OF DUAL ROAD FROM
           ALIPUR CHOWK TO KALASKY AND
          GONDLAWALA BYPASS
IB2270 CONSTRUCTION / REHABILITATION / IMPROVEMENT OF ROADS AND SEWERAGE IN DIFFERENT AREAS

Page 504

  Table of Content                                    Previous     Next                                      4423

NO. 188.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

OF DISTRICT
045702- A12     Civil works                                                                                   207,782,000
045702- A124    Building and Structures                                                                       207,782,000
        Total- CONSTRUCTION / REHABILITATION /                                                 207,782,000
          IMPROVEMENT OF ROADS AND
          SEWERAGE IN DIFFERENT AREAS OF
            DISTRICT
IB2271 CONSTRUCTION / REHABILITATION OF FLOOD AFFECTED ROAD DISTRICT MUZAFFARGARH-I
045702- A12     Civil works                                                                                   158,699,000
045702- A124    Building and Structures                                                                       158,699,000
        Total- CONSTRUCTION / REHABILITATION OF                                               158,699,000
          FLOOD AFFECTED ROAD DISTRICT
           MUZAFFARGARH-I
IB2272 CONSTRUCTION OF 1ST FLOOR OF ACADEMIC BLOCK AT CIVIL SERVICES ACADEMY WALTON LAHORE
045702- A12     Civil works                                                               94,503,000            23,474,000
045702- A124    Building and Structures                                                   94,503,000            23,474,000
        Total- CONSTRUCTION OF 1ST FLOOR OF                                 94,503,000          23,474,000
           ACADEMIC BLOCK AT CIVIL SERVICES
          ACADEMY WALTON LAHORE
IB2273 CONSTRUCTION OF 2ND FLOOR OF BOLAN HOSTEL AT CIVIL SERVICES ACADEMY WALTON LAHORE
045702- A12     Civil works                                                                                     32,149,000
045702- A124    Building and Structures                                                                         32,149,000
        Total- CONSTRUCTION OF 2ND FLOOR OF                                                    32,149,000
          BOLAN HOSTEL AT CIVIL SERVICES
          ACADEMY WALTON LAHORE
IB2274 UP-GRADATION OF AHK NCRD HOSTEL BUILDING ISLAMABAD
045702- A12     Civil works                                                                                     23,109,000
045702- A124    Building and Structures                                                                         23,109,000
        Total- UP-GRADATION OF AHK NCRD HOSTEL                                                23,109,000
            BUILDING ISLAMABAD
IB2275 PROVISION OF SECURITY MEASURES AT CIVIL SERVICES ACADEMY (CSA) WALTON LAHORE
045702- A12     Civil works                                                                                     12,325,000
045702- A124    Building and Structures                                                                         12,325,000
        Total- PROVISION OF SECURITY MEASURES                                                  12,325,000

Page 505

  Table of Content                                    Previous     Next                                      4424

NO. 188.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

           AT CIVIL SERVICES ACADEMY (CSA)
          WALTON LAHORE
IB2276 REPLACEMENT OF OLD/OBSOLETS PASSENGER WITH NEW MRL PASSENGER LIFT AT FIA HQ COMPLEX
G-9/4 ISLAMABAD
045702- A12     Civil works                                                                                       7,831,000
045702- A124    Building and Structures                                                                           7,831,000
        Total- REPLACEMENT OF OLD/OBSOLETS                                                      7,831,000
          PASSENGER WITH NEW MRL
          PASSENGER LIFT AT FIA HQ COMPLEX
              G-9/4 ISLAMABAD
IB2277 DEVELOPMENT SCHEMES IN DISTRICT MANSEHRA
045702- A12     Civil works                                                             506,197,000            73,901,000
045702- A124    Building and Structures                                                  506,197,000            73,901,000
        Total- DEVELOPMENT SCHEMES IN DISTRICT                            506,197,000          73,901,000
          MANSEHRA
IB2278 CONSTRUCTION OF POLICE BARRACKS POLICE STATION CIVIL LINES INCLUDING PRISONER CELL AT
NAB KPK HAYATABAD
045702- A12     Civil works                                                                                     46,948,000
045702- A124    Building and Structures                                                                         46,948,000
        Total- CONSTRUCTION OF POLICE                                                           46,948,000
          BARRACKS POLICE STATION CIVIL
            LINES INCLUDING PRISONER CELL AT
          NAB KPK HAYATABAD
IB2279 CONSTRUCTION OF NEW ROAD FROM CHANDORE SHARIF TO HARI PUR VIA LASSAN ADDA PALSALA
JHOKAN DIST MANSEHRA NA-21
045702- A12     Civil works                                                                                     19,788,000
045702- A124    Building and Structures                                                                         19,788,000
        Total- CONSTRUCTION OF NEW ROAD FROM                                                 19,788,000
          CHANDORE SHARIF TO HARI PUR VIA
          LASSAN ADDA PALSALA JHOKAN DIST
          MANSEHRA NA-21
IB2280 CONSTRUCTION OF OPERATION THEATRE AT CENTRAL HOSPITAL AT MINGORA SWAT
045702- A12     Civil works                                                                                     18,779,000
045702- A124    Building and Structures                                                                         18,779,000
        Total- CONSTRUCTION OF OPERATION                                                       18,779,000

Page 506

  Table of Content                                    Previous     Next                                      4425

NO. 188.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

          THEATRE AT CENTRAL HOSPITAL AT
          MINGORA SWAT
IB2281 CONSTRUCTION OF RCC PRESTRESSED BRIDGE AT KAT GHAR U/C BAHALI TEHSIL AND DISTRICT
MANSEHRA
045702- A12     Civil works                                                                                     14,778,000
045702- A124    Building and Structures                                                                         14,778,000
        Total- CONSTRUCTION OF RCC                                                               14,778,000
          PRESTRESSED BRIDGE AT KAT GHAR
            U/C BAHALI TEHSIL AND DISTRICT
          MANSEHRA
IB2282 CONSTRUCTION OF RCC PRESTRESSED BRIDGE AT DANNA / LUNG SHARIF U/C ANAYATABAD DISTRICT
MANSEHRA
045702- A12     Civil works                                                                                     18,779,000
045702- A124    Building and Structures                                                                         18,779,000
        Total- CONSTRUCTION OF RCC                                                               18,779,000
          PRESTRESSED BRIDGE AT DANNA /
          LUNG SHARIF U/C ANAYATABAD
            DISTRICT MANSEHRA
IB2283 CONSTRUCTION OF JEEPABLE SUSPENSION BRIDGE RATTA CHANGE OVER RIVER KUNHAR AT RAJWAL
U/C KAGHAN
045702- A12     Civil works                                                                                     13,822,000
045702- A124    Building and Structures                                                                         13,822,000
        Total- CONSTRUCTION OF JEEPABLE                                                        13,822,000
           SUSPENSION BRIDGE RATTA CHANGE
          OVER RIVER KUNHAR AT RAJWAL U/C
          KAGHAN
IB2284 FEASIBILITY STUDY FOR CONSTRUCTION OF RCC PRE CAST BRIDGE AT HASSA OVER RIVER KUNHAR
NEAR GOVERNMENT
045702- A12     Civil works                                                                                       2,347,000
045702- A124    Building and Structures                                                                           2,347,000
        Total- FEASIBILITY STUDY FOR                                                                2,347,000
           CONSTRUCTION OF RCC PRE CAST
           BRIDGE AT HASSA OVER RIVER
          KUNHAR NEAR GOVERNMENT
IB2285 CONSTRUCTION OF AUDITORIUM BACHELOR HOSTEL AND OFFICER'S MESS FOR NAB (KP) AT
PESHAWAR

Page 507

  Table of Content                                    Previous     Next                                      4426

NO. 188.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A12     Civil works                                                                                     18,779,000
045702- A124    Building and Structures                                                                         18,779,000
        Total- CONSTRUCTION OF AUDITORIUM                                                      18,779,000
          BACHELOR HOSTEL AND OFFICER'S
          MESS FOR NAB (KP) AT PESHAWAR
IB2286 CONSTRUCTION OF BLACK TOP ROADS AND PCC ROADS IN UNION COUNCILS MAKNORI LUND KHAUR
PARKHO AND MAIN ESA
045702- A12     Civil works                                                                                   426,883,000
045702- A124    Building and Structures                                                                       426,883,000
        Total- CONSTRUCTION OF BLACK TOP                                                      426,883,000
          ROADS AND PCC ROADS IN UNION
           COUNCILS MAKNORI LUND KHAUR
          PARKHO AND MAIN ESA
IB2287 BORING FOR TUBEWELL AND INSTALLATION OF SOLAR ENERGY BASED SUBMERSIBLE PUMPING
MACHINERY IN DIFFERENT
045702- A12     Civil works                                                                                   311,630,000
045702- A124    Building and Structures                                                                       311,630,000
        Total- BORING FOR TUBEWELL AND                                                        311,630,000
            INSTALLATION OF SOLAR ENERGY
          BASED SUBMERSIBLE PUMPING
           MACHINERY IN DIFFERENT
IB2288 CONSTRUCTION OF ROAD OF PARD CAMPUS PESHAWAR
045702- A12     Civil works                                                                                     46,948,000
045702- A124    Building and Structures                                                                         46,948,000
        Total- CONSTRUCTION OF ROAD OF PARD                                                   46,948,000
          CAMPUS PESHAWAR
IB2289 CONSTRUCTION OF CLASSROOM AND OTHER TRAINING FACILITIES AT NIM TRAINING COMPLEX
PESHAWAR
045702- A12     Civil works                                                                                     24,328,000
045702- A124    Building and Structures                                                                         24,328,000
        Total- CONSTRUCTION OF CLASSROOM AND                                                 24,328,000
          OTHER TRAINING FACILITIES AT NIM
            TRAINING COMPLEX PESHAWAR
IB2290 BUILD UP OF NUSERIUES FOR PLANTATIONS (GREEN BALUCHISTAN) IN DISTRICT NUSHKI CHAGAI AND
KHUZDAR

Page 508

  Table of Content                                    Previous     Next                                      4427

NO. 188.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A12     Civil works                                                                                     28,169,000
045702- A124    Building and Structures                                                                         28,169,000
        Total- BUILD UP OF NUSERIUES FOR                                                         28,169,000
           PLANTATIONS (GREEN BALUCHISTAN)
              IN DISTRICT NUSHKI CHAGAI AND
          KHUZDAR
IB2291 CONSTRUCTION OF BLACK TOP ROAD EXTENSION FROM NH-40 KARGOSHKHAN DISTRICT CHAGAI
045702- A12     Civil works                                                                                     18,779,000
045702- A124    Building and Structures                                                                         18,779,000
        Total- CONSTRUCTION OF BLACK TOP ROAD                                                 18,779,000
           EXTENSION FROM NH-40
          KARGOSHKHAN DISTRICT CHAGAI
IB2292 CONSTRUCTION OF BLACK TOP ROAD FROM BRAPCHA -KARIAZ TO FC CHECK POST IN DISTRICT
CHAGAI (10 KM)
045702- A12     Civil works                                                                                     18,779,000
045702- A124    Building and Structures                                                                         18,779,000
        Total- CONSTRUCTION OF BLACK TOP ROAD                                                 18,779,000
          FROM BRAPCHA -KARIAZ TO FC
          CHECK POST IN DISTRICT CHAGAI (10
           KM)
IB2293 CONSTRUCTION OF BLACK TOP ROAD FROM CHAGAI ROAD TO PADI-GHEBAN-KARIAZ DISTRICT CHAGAI
045702- A12     Civil works                                                                                     14,085,000
045702- A124    Building and Structures                                                                         14,085,000
        Total- CONSTRUCTION OF BLACK TOP ROAD                                                 14,085,000
          FROM CHAGAI ROAD TO
           PADI-GHEBAN-KARIAZ DISTRICT
           CHAGAI
IB2294 CONSTRUCTION OF BLACK TOP ROAD FROM NH-40 KHUCHAKI WADH TO KHARAN ROAD (30KM)
045702- A12     Civil works                                                                                     46,946,000
045702- A124    Building and Structures                                                                         46,946,000
        Total- CONSTRUCTION OF BLACK TOP ROAD                                                 46,946,000
          FROM NH-40 KHUCHAKI WADH TO
          KHARAN ROAD (30KM)
IB2295 CONSTRUCTION OF BLACK TOP ROAD FROM NH-40 TO KILLI SHAREEF KHAN KAPOOR & KILLION
SANGERY AND KILLI

Page 509

  Table of Content                                    Previous     Next                                      4428

NO. 188.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A12     Civil works                                                                                     14,085,000
045702- A124    Building and Structures                                                                         14,085,000
        Total- CONSTRUCTION OF BLACK TOP ROAD                                                 14,085,000
          FROM NH-40 TO KILLI SHAREEF KHAN
          KAPOOR & KILLION SANGERY AND
              KILLI
IB2296 CONSTRUCTION OF BUILDING FOR GIRLS COLLEGE AT KACHI BAIG SARYAB ROAD QUETTA
045702- A12     Civil works                                                                                     18,779,000
045702- A124    Building and Structures                                                                         18,779,000
        Total- CONSTRUCTION OF BUILDING FOR                                                    18,779,000
            GIRLS COLLEGE AT KACHI BAIG
          SARYAB ROAD QUETTA
IB2297 CONSTRUCTION OF LIBRARY SARYAB ROAD QUETTA
045702- A12     Civil works                                                                                     18,779,000
045702- A124    Building and Structures                                                                         18,779,000
        Total- CONSTRUCTION OF LIBRARY SARYAB                                                 18,779,000
          ROAD QUETTA
IB2298 CONSTRUCTION OF ROAD FROM 3/T FROM N-65 TO GUANDAIN MASTUNG
045702- A12     Civil works                                                                                       9,390,000
045702- A124    Building and Structures                                                                           9,390,000
        Total- CONSTRUCTION OF ROAD FROM 3/T                                                     9,390,000
          FROM N-65 TO GUANDAIN MASTUNG
IB2299 CONSTRUCTION OF ROAD FROM HAZRAT JAFT TO ESSAH CHAH DISTRICT NUSHKI
045702- A12     Civil works                                                                                       9,390,000
045702- A124    Building and Structures                                                                           9,390,000
        Total- CONSTRUCTION OF ROAD FROM                                                        9,390,000
          HAZRAT JAFT TO ESSAH CHAH
            DISTRICT NUSHKI
IB2300 CONSTRUCTION OF ROAD FROM MAIN RCD ROAD NUSHKI TO ZANGIABAD
045702- A12     Civil works                                                                                       9,390,000
045702- A124    Building and Structures                                                                           9,390,000
        Total- CONSTRUCTION OF ROAD FROM MAIN                                                   9,390,000
          RCD ROAD NUSHKI TO ZANGIABAD
IB2301 CONSTRUCTION OF ROAD FROM UNION COUNCIL DAAK DISTRICT NUSHKI TO CHAGAI

Page 510

  Table of Content                                    Previous     Next                                      4429

NO. 188.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A12     Civil works                                                                                       9,390,000
045702- A124    Building and Structures                                                                           9,390,000
        Total- CONSTRUCTION OF ROAD FROM                                                        9,390,000
           UNION COUNCIL DAAK DISTRICT
           NUSHKI TO CHAGAI
IB2303 MUSA KHAIL TANNSA ROAD (35-KM) STRETCH ROAD TO CONSTRUCTED AND LINKS WITH ZHOB
045702- A12     Civil works                                                                                   329,237,000
045702- A124    Building and Structures                                                                       329,237,000
        Total- MUSA KHAIL TANNSA ROAD (35-KM)                                                 329,237,000
          STRETCH ROAD TO CONSTRUCTED
          AND LINKS WITH ZHOB
IB2304 INSTALLATION OF FIREFIGHTING SYSTEM FOR OFFICE BUILDING AT NAB (B) QUETTA
045702- A12     Civil works                                                                                       9,390,000
045702- A124    Building and Structures                                                                           9,390,000
        Total- INSTALLATION OF FIREFIGHTING                                                        9,390,000
          SYSTEM FOR OFFICE BUILDING AT
          NAB (B) QUETTA
IB2305 INSTALLATION OF 1500 UNITS SOLAR ENERGY HOME SYSTEM IN OFF GRID AREA OF AAMIRI DISTRICT
CHAGHI
045702- A12     Civil works                                                                                     37,559,000
045702- A124    Building and Structures                                                                         37,559,000
        Total- INSTALLATION OF 1500 UNITS SOLAR                                                  37,559,000
          ENERGY HOME SYSTEM IN OFF GRID
          AREA OF AAMIRI DISTRICT CHAGHI
IB2306 INSTALLATION OF 1500 UNITS SOLAR ENERGY HOME SYSTEM IN OFF GRID AREA OF SUBURBS DISTRICT
NOSHKI
045702- A12     Civil works                                                                                     37,559,000
045702- A124    Building and Structures                                                                         37,559,000
        Total- INSTALLATION OF 1500 UNITS SOLAR                                                  37,559,000
          ENERGY HOME SYSTEM IN OFF GRID
          AREA OF SUBURBS DISTRICT NOSHKI
IB2307 INSTALLATION OF 1500 UNITS SOLAR ENERGY HOME SYSTEM IN OFF GRID AREA OF DAAK ESSAH CHAH
DISTRICT NOSHKI
045702- A12     Civil works                                                                                     37,559,000
045702- A124    Building and Structures                                                                         37,559,000

Page 511

  Table of Content                                    Previous     Next                                      4430

NO. 188.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

        Total- INSTALLATION OF 1500 UNITS SOLAR                                                  37,559,000
          ENERGY HOME SYSTEM IN OFF GRID
          AREA OF DAAK ESSAH CHAH DISTRICT
           NOSHKI
IB2308 PROVISION OF 2000 HOMES SOLAR KITS FOR NA-268
045702- A12     Civil works                                                                                     33,100,000
045702- A124    Building and Structures                                                                         33,100,000
        Total- PROVISION OF 2000 HOMES SOLAR                                                    33,100,000
            KITS FOR NA-268
IB2309 FEASIBILITY STUDY FOR IMPROVEMENT / WIDENING OF SARYAB ROAD QUETTA
045702- A12     Civil works                                                                                     17,744,000
045702- A124    Building and Structures                                                                         17,744,000
        Total- FEASIBILITY STUDY FOR                                                               17,744,000
          IMPROVEMENT / WIDENING OF
          SARYAB ROAD QUETTA
IB2310 INSTALLATION OF NEW TUBE WELL IN PREMISES OF SURVEY OF PAKISTAN COLONY AT BREWERY
ROAD QUETTA
045702- A12     Civil works                                                                                       5,269,000
045702- A124    Building and Structures                                                                           5,269,000
        Total- INSTALLATION OF NEW TUBE WELL IN                                                   5,269,000
           PREMISES OF SURVEY OF PAKISTAN
          COLONY AT BREWERY ROAD QUETTA
IB2311 CONSTRUCTION OF BRIDGE OVER RIVER KOTIRA AND 17 KMS ROAD IN UC LOHI DISTRICT LASBELA
BALOCHISTAN
045702- A12     Civil works                                                                                   140,845,000
045702- A124    Building and Structures                                                                       140,845,000
        Total- CONSTRUCTION OF BRIDGE OVER                                                   140,845,000
            RIVER KOTIRA AND 17 KMS ROAD IN
          UC LOHI DISTRICT LASBELA
           BALOCHISTAN
IB2312 CONSTRUCTION OF STAGING / SAFE HOUSE FOR NAB AT GWADAR AND CONSTRUCTION OF OFFICE
ACCOMMODATION FOR NAB AT
045702- A12     Civil works                                                                                       8,421,000
045702- A124    Building and Structures                                                                           8,421,000
        Total- CONSTRUCTION OF STAGING / SAFE                                                     8,421,000

Page 512

  Table of Content                                    Previous     Next                                      4431

NO. 188.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

          HOUSE FOR NAB AT GWADAR AND
           CONSTRUCTION OF OFFICE
          ACCOMMODATION FOR NAB AT
IB2313 FEASIBILITY STUDY FOR CONSTRUCTION OF 4 NOS BLACK TOP ROAD FROM RCD TO HINAMI BENT
FROM LOOP TOWARDS
045702- A12     Civil works                                                                                     13,474,000
045702- A124    Building and Structures                                                                         13,474,000
        Total- FEASIBILITY STUDY FOR                                                               13,474,000
           CONSTRUCTION OF 4 NOS BLACK TOP
          ROAD FROM RCD TO HINAMI BENT
          FROM LOOP TOWARDS
IB2314 CONSTRUCTION OF FACILITATION CENTER AND RESIDENTIAL ACCOMMODATION FOR FIA AT TAFTAN
045702- A12     Civil works                                                                                     27,026,000
045702- A124    Building and Structures                                                                         27,026,000
        Total- CONSTRUCTION OF FACILITATION                                                     27,026,000
          CENTER AND RESIDENTIAL
          ACCOMMODATION FOR FIA AT TAFTAN
ID8076 ESTABLISHMENT CHARGES CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD SINDH)
045702- A03    Operating Expenses                                 4,878,000             4,878,000             4,250,000
045702- A039   General                                              4,878,000             4,878,000             4,250,000
        Total- ESTABLISHMENT CHARGES CREDITED           4,878,000           4,878,000           4,250,000
          TO OTHER GOVERNMENT
          DEPARTMENTS (PAK. PWD SINDH)
ID8077 TOOLS AND PLANTS CHARGES CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD SINDH)
045702- A03    Operating Expenses                                 1,463,000             1,463,000             1,275,000
045702- A039   General                                              1,463,000             1,463,000             1,275,000
        Total- TOOLS AND PLANTS CHARGES                  1,463,000           1,463,000           1,275,000
           CREDITED TO OTHER GOVERNMENT
          DEPARTMENTS (PAK. PWD SINDH)
ID8079 CIVIL WORKS (PAK. PWD PUNJAB)
045702- A12     Civil works                                       1,915,502,000         1,915,502,000
045702- A124    Building and Structures                           1,915,502,000         1,915,502,000
        Total-  CIVIL WORKS (PAK. PWD PUNJAB)           1,915,502,000       1,915,502,000
ID8081 ESTABLISHMENT DIVISION (PAK. PWD PUNJAB)
045702- A12     Civil works                                         94,503,000

Page 513

  Table of Content                                    Previous     Next                                      4432

NO. 188.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A124    Building and Structures                             94,503,000
        Total- ESTABLISHMENT DIVISION (PAK. PWD          94,503,000
           PUNJAB)
ID8082 ESTABLISHMENT CHARGES CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD PUNJAB)
045702- A03    Operating Expenses                               60,500,000            60,500,000          304,716,000
045702- A039   General                                             60,500,000            60,500,000          304,716,000
        Total- ESTABLISHMENT CHARGES CREDITED         60,500,000         60,500,000        304,716,000
          TO OTHER GOVERNMENT
          DEPARTMENTS (PAK. PWD PUNJAB)
ID8083 TOOLS AND PLANTS CHARGES CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD PUNJAB)
045702- A03    Operating Expenses                               18,274,000            18,151,000            91,415,000
045702- A039   General                                             18,274,000            18,151,000            91,415,000
        Total- TOOLS AND PLANTS CHARGES                 18,274,000         18,151,000          91,415,000
           CREDITED TO OTHER GOVERNMENT
          DEPARTMENTS (PAK. PWD PUNJAB)
ID8085 ESTABLISHMENT CHARGES CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD KHYBER
PAKHTUNKHWA).
045702- A03    Operating Expenses                               19,189,000                                 48,191,000
045702- A039   General                                             19,189,000                                 48,191,000
045702- A12     Civil works                                                                                     47,050,000
045702- A124    Building and Structures                                                                         47,050,000
        Total- ESTABLISHMENT CHARGES CREDITED         19,189,000                             95,241,000
          TO OTHER GOVERNMENT
          DEPARTMENTS (PAK. PWD KHYBER
           PAKHTUNKHWA).
ID8086 TOOLS AND PLANTS CHARGES CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. P.W.D.,
KHYBER PAKHTUNKHWA).
045702- A03    Operating Expenses                                 5,757,000                                 14,457,000
045702- A039   General                                              5,757,000                                 14,457,000
        Total- TOOLS AND PLANTS CHARGES                  5,757,000                             14,457,000
           CREDITED TO OTHER GOVERNMENT
          DEPARTMENTS (PAK. P.W.D., KHYBER
           PAKHTUNKHWA).
ID8087 INTERIOR (PAK. PWD BALOCHISTAN)
045702- A12     Civil works                                         36,416,000            36,416,000

Page 514

  Table of Content                                    Previous     Next                                      4433

NO. 188.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A124    Building and Structures                             36,416,000            36,416,000
        Total- INTERIOR (PAK. PWD BALOCHISTAN)           36,416,000         36,416,000
ID8088 ESTABLISHMENT CHARGES CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD
BALOCHISTAN)
045702- A03    Operating Expenses                                 3,323,000             1,502,000            27,843,000
045702- A039   General                                              3,323,000             1,502,000            27,843,000
045702- A12     Civil works                                                                 1,821,000             8,252,000
045702- A124    Building and Structures                                                     1,821,000             8,252,000
        Total- ESTABLISHMENT CHARGES CREDITED           3,323,000           3,323,000          36,095,000
          TO OTHER GOVERNMENT
          DEPARTMENTS (PAK. PWD
           BALOCHISTAN)
ID8089 TOOLS AND PLANTS CHARGES CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD
BALOCHISTAN)
045702- A03    Operating Expenses                                 873,000              450,000             8,353,000
045702- A039   General                                              873,000              450,000             8,353,000
045702- A12     Civil works                                                                546,000              405,000
045702- A124    Building and Structures                                                    546,000              405,000
        Total- TOOLS AND PLANTS CHARGES                   873,000            996,000           8,758,000
           CREDITED TO OTHER GOVERNMENT
          DEPARTMENTS (PAK. PWD
           BALOCHISTAN)
ID8092 CIVIL WORKS (PAK.PWD KHYBER PAKHTUNKHWA)
045702- A12     Civil works                                        481,251,000
045702- A124    Building and Structures                            481,251,000
        Total-  CIVIL WORKS (PAK.PWD KHYBER              481,251,000
          PAKHTUNKHWA)
ID8095 CIVIL WORKS (PAK.PWD BALOCHISTAN)
045702- A12     Civil works                                        330,031,000          330,031,000
045702- A124    Building and Structures                            330,031,000          330,031,000
        Total-  CIVIL WORKS (PAK.PWD                      330,031,000        330,031,000
           BALOCHISTAN)
ID8106 CIVIL WORKS
045702- A12     Civil works                                         97,546,000            97,546,000

Page 515

  Table of Content                                    Previous     Next                                      4434

NO. 188.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

045702- A124    Building and Structures                             97,546,000            97,546,000
        Total-  CIVIL WORKS                                   97,546,000         97,546,000
     045702   Total-  Buildings and Structures                 3,069,506,000       3,069,506,000       9,036,390,000
     0457     Total-  Construction (Works)                    3,069,506,000       3,069,506,000       9,036,390,000
     045      Total-  Construction and Transport              3,069,506,000       3,069,506,000       9,036,390,000
     04        Total-  Economic Affairs                       3,069,506,000       3,069,506,000       9,036,390,000
               Total- ACCOUNTANT GENERAL                 3,069,506,000         3,069,506,000         9,036,390,000
                PAKISTAN REVENUES
          TOTAL - DEMAND                             3,069,506,000       3,069,506,000       9,036,390,000

Page 516

  Table of Content                                    Previous     Next                                      4435

NO.  ---.-  OTHER EXPENDITURE OF HOUSING & WORKS DIV                    DEMANDS FOR GRANTS
                                 DEMAND NO. ---
                                                                            ( FC12Y03 )
                      OTHER EXPENDITURE OF HOUSING & WORKS DIV

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2021 for OTHER EXPENDITURE OF
HOUSING & WORKS DIV.

                                Voted           Rs.

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF HOUSING AND WORKS  .

                                                           2019-2020         2019-2020         2020-2021
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
045    Construction and Transport                                 5,000,000,000
               Total                                               5,000,000,000
     OBJECT CLASSIFICATION
A08   Loans and Advances                                 5,000,000,000
               Total                                         5,000,000,000

Page 517

  Table of Content                                    Previous     Next                                      4436

NO.  ---.- FC12Y03 OTHER EXPENDITURE OF HOUSING & WORKS DIV              DEMANDS FOR GRANTS

III.  - DETAILS are as follows :-
                                 No of Posts        2019-2020         2019-2020       2020-2021
                                       2019-20 2020-21       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
04     Economic Affairs:
045    Construction and Transport:
0457   Construction (Works):
045702 Buildings and Structures  :
IB0748 LOW COST SCHEMES
045702- A08    Loans and Advances                            5,000,000,000
045702- A085   Loans to Non Financial Institutions                5,000,000,000
        Total- LOW COST SCHEMES                        5,000,000,000
     045702   Total-  Buildings and Structures                 5,000,000,000
     0457     Total-  Construction (Works)                    5,000,000,000
     045      Total-  Construction and Transport              5,000,000,000
     04        Total-  Economic Affairs                       5,000,000,000
               Total- ACCOUNTANT GENERAL                 5,000,000,000
                PAKISTAN REVENUES
          TOTAL - DEMAND                             5,000,000,000

Page 518

Table of Content                                    Previous     Next                                  4437

                                   SECTION VI

                       MINISTRY OF INDUSTRIES AND PRODUCTION

                                                            **********

                                                                                       2020-2021
                                                                                  Budget
                                                                                          Estimate

                                                                           (Rupees in Thousand)

    Demands presented on behalf of the Ministry of
     Industries and Production

    Development Expendiutre on Capital Account.

                  189.  Capital Outlay on Industrial Development                                  800,000

                                                                                Total :               800,000

Page 519

  Table of Content                                    Previous     Next                                      4438

NO. 189.- CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT                    DEMANDS FOR GRANTS
                                DEMAND NO. 189
                                                                            ( FC12C32 )
                         CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2021 to defray the Salaries and Other
Expenses of the CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT.

                                Voted           Rs. 800,000,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF INDUSTRIES AND PRODUCTION  .

                                                           2019-2020         2019-2020         2020-2021
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
044    Mining and Manufacturing                                   2,343,293,000          726,206,000          800,000,000
               Total                                               2,343,293,000          726,206,000          800,000,000
     OBJECT CLASSIFICATION
A01   Employees Related Expenses                         305,405,000         77,882,000        113,773,000
A011  Pay                                                        304,325,000            77,882,000          113,773,000
A011-1 Pay of Officers                                               (283,075,000)           (57,882,000)           (81,267,000)
A011-2 Pay of Other Staff                                              (21,250,000)           (20,000,000)           (32,506,000)
A012  Allowances                                                    1,080,000
A012-1 Regular Allowances                                             (1,080,000)
A03   Operating Expenses                                  282,470,000         70,740,000        112,975,000
A05   Grants, Subsidies and Write off Loans                  306,335,000        180,448,000        213,675,000
A09   Physical Assets                                      894,753,000        121,242,000        214,980,000
A12    Civil works                                           538,430,000        275,894,000        138,397,000
A13   Repairs and Maintenance                               15,900,000                              6,200,000
               Total                                         2,343,293,000        726,206,000        800,000,000

Page 520

  Table of Content                                    Previous     Next                                      4439

NO. 189.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

04     Economic Affairs:
044    Mining and Manufacturing:
0441   Manufacturing:
044101 Support for Industrial Development  :
LO0772 HYDERABAD ENGINEERING SUPPORT CENTRE (HESC) (ADB FUNDED)
044101- A01    Employees Related Expenses                       9,500,000             9,500,000            15,000,000
044101- A011   Pay                      31     31            9,500,000             9,500,000            15,000,000
044101- A011-1 Pay of Officers               (10)      (7)          (4,000,000)          (4,000,000)          (7,000,000)
044101- A011-2 Pay of Other Staff            (21)    (24)          (5,500,000)          (5,500,000)          (8,000,000)
044101- A03    Operating Expenses                                 6,226,000             3,226,000             9,200,000
044101- A039   General                                              6,226,000             3,226,000             9,200,000
044101- A05    Grants, Subsidies and Write off Loans                                                          4,000,000
044101- A052   Grants Domestic                                                                                 4,000,000
044101- A09    Physical Assets                                      4,830,000               30,000             9,600,000
044101- A095   Purchase of Transport                                4,800,000                                   9,600,000
044101- A096   Purchase of Plant and Machinery                       30,000               30,000
044101- A12     Civil works                                                                                       2,200,000
044101- A124    Building and Structures                                                                           2,200,000
        Total- HYDERABAD ENGINEERING SUPPORT          20,556,000         12,756,000          40,000,000
          CENTRE (HESC) (ADB FUNDED)
LO0774 PESHAWAR LIGHT ENGINEERING SUPPORT CENTRE (PESC) (ADB FUNDED) KHYBER PAKHTUNKHWA
044101- A01    Employees Related Expenses                      13,500,000            10,700,000            14,000,000
044101- A011   Pay                      31     31           13,500,000            10,700,000            14,000,000
044101- A011-1 Pay of Officers               (10)    (10)          (6,000,000)          (3,200,000)          (6,000,000)
044101- A011-2 Pay of Other Staff            (21)    (21)          (7,500,000)          (7,500,000)          (8,000,000)
044101- A03    Operating Expenses                               15,238,000             3,138,000             8,200,000
044101- A039   General                                             15,238,000             3,138,000             8,200,000
044101- A05    Grants, Subsidies and Write off Loans                  1,000                 1,000             4,500,000
044101- A052   Grants Domestic                                         1,000                 1,000             4,500,000
044101- A09    Physical Assets                                      4,801,000             5,301,000            18,300,000
044101- A095   Purchase of Transport                                4,800,000                                   3,300,000
044101- A096   Purchase of Plant and Machinery                         1,000             5,301,000            15,000,000
        Total- PESHAWAR LIGHT ENGINEERING               33,540,000         19,140,000          45,000,000

Page 521

  Table of Content                                    Previous     Next                                      4440

NO. 189.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

          SUPPORT CENTRE (PESC) (ADB
           FUNDED) KHYBER PAKHTUNKHWA
LO1076 LIGHT ENGINEERING UPGRADATION CENTER FOR SMES IN BALOCHISTAN (HUB)
044101- A01    Employees Related Expenses                      11,500,000            10,700,000            16,000,000
044101- A011   Pay                      39     39           11,500,000            10,700,000            16,000,000
044101- A011-1 Pay of Officers                  (9)      (9)          (4,500,000)          (3,700,000)          (7,000,000)
044101- A011-2 Pay of Other Staff            (30)    (30)          (7,000,000)          (7,000,000)          (9,000,000)
044101- A03    Operating Expenses                                 8,865,000             2,465,000            10,400,000
044101- A039   General                                              8,865,000             2,465,000            10,400,000
044101- A05    Grants, Subsidies and Write off Loans               303,000              303,000             4,000,000
044101- A052   Grants Domestic                                     303,000              303,000             4,000,000
044101- A09    Physical Assets                                      2,400,000                                   9,600,000
044101- A095   Purchase of Transport                                2,400,000                                   9,600,000
        Total- LIGHT ENGINEERING UPGRADATION            23,068,000         13,468,000          40,000,000
          CENTER FOR SMES IN BALOCHISTAN
            (HUB)
LO1175 NATIONAL BUSSINESS DEVELOPMENT PROGRAMM FOR SME'S
044101- A01    Employees Related Expenses                      44,915,000            34,045,000            40,296,000
044101- A011   Pay                      38     38           44,915,000            34,045,000            40,296,000
044101- A011-1 Pay of Officers               (38)    (31)         (44,915,000)         (34,045,000)         (38,081,000)
044101- A011-2 Pay of Other Staff                       (7)                                                    (2,215,000)
044101- A03    Operating Expenses                               33,740,000             9,006,000             6,265,000
044101- A037   Consultancy and Contractual Work                  24,000,000
044101- A039   General                                              9,740,000             9,006,000             6,265,000
044101- A05    Grants, Subsidies and Write off Loans            145,122,000            80,891,000            80,000,000
044101- A052   Grants Domestic                                  145,122,000            80,891,000            80,000,000
044101- A09    Physical Assets                                    22,223,000             9,500,000            13,430,000
044101- A092   Computer Equipment                                 3,500,000             3,500,000
044101- A095   Purchase of Transport                              12,723,000                                 12,723,000
044101- A097   Purchase of Furniture and Fixture                     1,000,000             1,000,000              707,000
044101- A098   Purchase of Other Assets                             5,000,000             5,000,000
044101- A12     Civil works                                           4,000,000             4,000,000             1,017,000
044101- A124    Building and Structures                               4,000,000             4,000,000             1,017,000

Page 522

  Table of Content                                    Previous     Next                                      4441

NO. 189.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

        Total- NATIONAL BUSSINESS DEVELOPMENT        250,000,000        137,442,000        141,008,000
         PROGRAMM FOR SME'S
LO1176 FRUIT DEHYDRATION UNIT SWAT
044101- A01    Employees Related Expenses                      10,487,000             5,232,000             6,367,000
044101- A011   Pay                      16     16           10,487,000             5,232,000             6,367,000
044101- A011-1 Pay of Officers               (16)      (4)         (10,487,000)          (5,232,000)          (3,756,000)
044101- A011-2 Pay of Other Staff                    (12)                                                    (2,611,000)
044101- A03    Operating Expenses                                 9,601,000             3,026,000             5,450,000
044101- A032   Communications                                     110,000               48,000
044101- A033     Utilities                                               2,975,000              844,000             1,500,000
044101- A037   Consultancy and Contractual Work                    500,000               70,000
044101- A038    Travel & Transportation                               1,750,000              448,000              820,000
044101- A039   General                                              4,266,000             1,616,000             3,130,000
044101- A09    Physical Assets                                      1,856,000             1,694,000              175,000
044101- A096   Purchase of Plant and Machinery                      917,000              917,000
044101- A098   Purchase of Other Assets                             939,000              777,000              175,000
044101- A12     Civil works                                           3,950,000             3,950,000
044101- A124    Building and Structures                               3,950,000             3,950,000
        Total- FRUIT DEHYDRATION UNIT SWAT               25,894,000         13,902,000          11,992,000
LO1180 PRODUCT DEV.CENTRE FOR COMPOSITS BASED SPORTS GOOD SIALKOT
044101- A01    Employees Related Expenses                       1,800,000             1,800,000             2,800,000
044101- A011   Pay                       7     11            1,800,000             1,800,000             2,800,000
044101- A011-1 Pay of Officers                  (7)      (2)          (1,800,000)          (1,800,000)            (900,000)
044101- A011-2 Pay of Other Staff                       (9)                                                    (1,900,000)
044101- A03    Operating Expenses                                 1,300,000             1,300,000             2,800,000
044101- A037   Consultancy and Contractual Work                                                               1,600,000
044101- A039   General                                              1,300,000             1,300,000             1,200,000
044101- A09    Physical Assets                                    96,900,000              579,000            69,400,000
044101- A092   Computer Equipment                                 250,000              250,000              110,000
044101- A095   Purchase of Transport                                2,700,000                                   2,700,000
044101- A096   Purchase of Plant and Machinery                    93,950,000              329,000            66,490,000
044101- A097   Purchase of Furniture and Fixture                                                                 90,000
044101- A098   Purchase of Other Assets                                                                         10,000

Page 523

  Table of Content                                    Previous     Next                                      4442

NO. 189.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

044101- A12     Civil works                                                               70,000,000
044101- A124    Building and Structures                                                   70,000,000
        Total- PRODUCT DEV.CENTRE FOR                  100,000,000         73,679,000          75,000,000
           COMPOSITS BASED SPORTS GOOD
           SIALKOT
LO1182 BUSSINESS SKILL DEV. CENTRE FOR WOMEN AT VARIOUS LOCATION
044101- A01    Employees Related Expenses                        450,000                                   520,000
044101- A011   Pay                      11      3             450,000                                   520,000
044101- A011-1 Pay of Officers               (11)      (1)            (450,000)                                (280,000)
044101- A011-2 Pay of Other Staff                       (2)                                                     (240,000)
044101- A03    Operating Expenses                                 550,000              100,000             2,300,000
044101- A032   Communications                                       10,000
044101- A037   Consultancy and Contractual Work                                                               1,000,000
044101- A038    Travel & Transportation                               260,000                                   1,000,000
044101- A039   General                                              280,000              100,000              300,000
044101- A09    Physical Assets                                    14,000,000                                 14,000,000
044101- A091   Purchase of Building                                14,000,000                                 14,000,000
044101- A12     Civil works                                                                                       3,180,000
044101- A124    Building and Structures                                                                           3,180,000
        Total- BUSSINESS SKILL DEV. CENTRE FOR           15,000,000            100,000          20,000,000
         WOMEN AT VARIOUS LOCATION
LO1280 INDUSTRIAL DESIGN AND AUTOMATION CENRE
044101- A01    Employees Related Expenses                       4,590,000             4,590,000             7,650,000
044101- A011   Pay                       2      4            4,590,000             4,590,000             7,650,000
044101- A011-1 Pay of Officers                  (2)      (4)          (4,590,000)          (4,590,000)          (7,650,000)
044101- A03    Operating Expenses                                 2,479,000             2,479,000             1,500,000
044101- A039   General                                              2,479,000             2,479,000             1,500,000
044101- A05    Grants, Subsidies and Write off Loans             11,256,000            11,256,000            28,075,000
044101- A052   Grants Domestic                                    11,256,000            11,256,000            28,075,000
044101- A09    Physical Assets                                    81,675,000            81,675,000              775,000
044101- A091   Purchase of Building                                81,675,000            81,675,000
044101- A092   Computer Equipment                                                                           625,000
044101- A097   Purchase of Furniture and Fixture                                                               150,000

Page 524

  Table of Content                                    Previous     Next                                      4443

NO. 189.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

044101- A12     Civil works                                                                                     42,000,000
044101- A124    Building and Structures                                                                         42,000,000
        Total- INDUSTRIAL DESIGN AND                     100,000,000        100,000,000          80,000,000
          AUTOMATION CENRE
LO3121 SME BUSSINESS FACILITATION CENTRE (SMEBFC) MULTAN
044101- A01    Employees Related Expenses                       4,919,000              115,000             5,000,000
044101- A011   Pay                       9      8            4,919,000              115,000             5,000,000
044101- A011-1 Pay of Officers                  (9)      (8)          (4,919,000)            (115,000)          (5,000,000)
044101- A03    Operating Expenses                                 7,518,000             1,000,000             4,300,000
044101- A039   General                                              7,518,000             1,000,000             4,300,000
044101- A05    Grants, Subsidies and Write off Loans              7,853,000               97,000              700,000
044101- A052   Grants Domestic                                     7,853,000               97,000              700,000
044101- A09    Physical Assets                                      7,200,000             2,777,000
044101- A092   Computer Equipment                                 1,800,000              858,000
044101- A097   Purchase of Furniture and Fixture                     2,400,000             1,913,000
044101- A098   Purchase of Other Assets                             3,000,000                 6,000
044101- A12     Civil works                                           2,400,000             1,944,000
044101- A125   Other Works                                          2,400,000             1,944,000
        Total- SME BUSSINESS FACILITATION                 29,890,000           5,933,000          10,000,000
          CENTRE (SMEBFC) MULTAN
LO9644 NATIONAL STRATEGIC PROGRAM FPR ACQUISTION OF IND TECH-NSPAIT INCLUDING FEASIBILITY-
KNOWLEDGE
044101- A01    Employees Related Expenses                    169,268,000                                   3,300,000
044101- A011   Pay                      81     81          169,268,000                                   3,300,000
044101- A011-1 Pay of Officers               (76)    (81)       (168,018,000)                               (3,300,000)
044101- A011-2 Pay of Other Staff               (5)                  (1,250,000)
044101- A03    Operating Expenses                               48,669,000                                   900,000
044101- A039   General                                             48,669,000                                   900,000
044101- A05    Grants, Subsidies and Write off Loans            118,746,000            84,970,000            92,000,000
044101- A052   Grants Domestic                                  118,746,000            84,970,000            92,000,000
044101- A09    Physical Assets                                   622,747,000                                 68,600,000
044101- A092   Computer Equipment                               43,208,000                                   2,000,000
044101- A095   Purchase of Transport                              16,200,000                                   2,500,000

Page 525

  Table of Content                                    Previous     Next                                      4444

NO. 189.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

044101- A096   Purchase of Plant and Machinery                  551,758,000                                 62,800,000
044101- A097   Purchase of Furniture and Fixture                     9,781,000                                   1,300,000
044101- A098   Purchase of Other Assets                             1,800,000
044101- A13    Repairs and Maintenance                          11,900,000                                   2,200,000
044101- A133    Buildings and Structure                             11,900,000                                   2,200,000
        Total- NATIONAL STRATEGIC PROGRAM FPR         971,330,000         84,970,000        167,000,000
           ACQUISTION OF IND TECH-NSPAIT
           INCLUDING FEASIBILITY- KNOWLEDGE
LO9645 FOOTWEAR CLUSTER DEV THROUGH CAD CAM AND CNC MACHINING LAHORE
044101- A01    Employees Related Expenses                       1,800,000             1,200,000             2,840,000
044101- A011   Pay                       2      5            1,800,000             1,200,000             2,840,000
044101- A011-1 Pay of Officers                  (2)      (3)          (1,800,000)          (1,200,000)          (2,300,000)
044101- A011-2 Pay of Other Staff                       (2)                                                     (540,000)
044101- A03    Operating Expenses                                 1,584,000             1,000,000             1,660,000
044101- A039   General                                              1,584,000             1,000,000             1,660,000
044101- A05    Grants, Subsidies and Write off Loans              2,930,000             2,930,000              400,000
044101- A052   Grants Domestic                                     2,930,000             2,930,000              400,000
044101- A09    Physical Assets                                    19,686,000            19,686,000            11,100,000
044101- A092   Computer Equipment                               16,843,000            16,843,000
044101- A096   Purchase of Plant and Machinery                     2,843,000             2,843,000            11,100,000
044101- A13    Repairs and Maintenance                            4,000,000                                   4,000,000
044101- A133    Buildings and Structure                               4,000,000                                   4,000,000
        Total- FOOTWEAR CLUSTER DEV THROUGH           30,000,000         24,816,000          20,000,000
          CAD CAM AND CNC MACHINING
          LAHORE
LO9646 HANDICRAFT DEV AND PROMOTION IN LESS DEVELOPED AREAS OF PAKISTAN
044101- A01    Employees Related Expenses                       3,264,000
044101- A011   Pay                      41                    2,184,000
044101- A011-1 Pay of Officers               (41)                  (2,184,000)
044101- A012   Allowances                                           1,080,000
044101- A012-1  Regular Allowances                               (1,080,000)
044101- A03    Operating Expenses                               21,500,000
044101- A033     Utilities                                               1,000,000

Page 526

  Table of Content                                    Previous     Next                                      4445

NO. 189.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

044101- A034   Occupancy Costs                                     4,423,000
044101- A038    Travel & Transportation                               1,512,000
044101- A039   General                                             14,565,000
044101- A05    Grants, Subsidies and Write off Loans              5,236,000
044101- A052   Grants Domestic                                     5,236,000
        Total- HANDICRAFT DEV AND PROMOTION IN          30,000,000
           LESS DEVELOPED AREAS OF
           PAKISTAN
LO9647 HANDICRAFT EXPORT DEVELOPMENT PROJECT ALL OVER PAKISTAN
044101- A01    Employees Related Expenses                      29,412,000
044101- A011   Pay                      48                   29,412,000
044101- A011-1 Pay of Officers               (48)                (29,412,000)
044101- A03    Operating Expenses                               24,400,000
044101- A032   Communications                                     540,000
044101- A033     Utilities                                               2,700,000
044101- A034   Occupancy Costs                                     7,500,000
044101- A037   Consultancy and Contractual Work                   1,500,000
044101- A038    Travel & Transportation                               848,000
044101- A039   General                                             11,312,000
044101- A05    Grants, Subsidies and Write off Loans              4,888,000
044101- A052   Grants Domestic                                     4,888,000
044101- A09    Physical Assets                                      1,300,000
044101- A097   Purchase of Furniture and Fixture                     1,300,000
        Total- HANDICRAFT EXPORT DEVELOPMENT          60,000,000
          PROJECT ALL OVER PAKISTAN
     044101   Total-  Support for Industrial Development       1,689,278,000        486,206,000        650,000,000

     0441     Total-  Manufacturing                          1,689,278,000        486,206,000        650,000,000
     044      Total-  Mining and Manufacturing               1,689,278,000        486,206,000        650,000,000
     04        Total-  Economic Affairs                       1,689,278,000        486,206,000        650,000,000
               Total- ACCOUNTANT GENERAL                 1,689,278,000          486,206,000          650,000,000
                PAKISTAN REVENUES
                  SUB-OFFICE, LAHORE

Page 527

  Table of Content                                    Previous     Next                                      4446

NO. 189.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

04     Economic Affairs:
044    Mining and Manufacturing:
0441   Manufacturing:
044101 Support for Industrial Development  :
LS0109 ESTABLISHMENT OF HUB SPECIAL ECONOMIC ZONE LASBELA
044101- A03    Operating Expenses                               10,800,000             4,000,000            10,000,000
044101- A032   Communications                                     100,000                                   100,000
044101- A037   Consultancy and Contractual Work                   8,500,000             2,500,000             7,500,000
044101- A038    Travel & Transportation                               1,000,000              300,000             1,200,000
044101- A039   General                                              1,200,000             1,200,000             1,200,000
044101- A09    Physical Assets                                    15,135,000
044101- A091   Purchase of Building                                10,000,000
044101- A095   Purchase of Transport                                5,135,000
044101- A12     Civil works                                        374,065,000          196,000,000            90,000,000
044101- A121   Roads Highways and Bridges                      100,636,000          100,636,000            60,000,000
044101- A123   Embankment and Drainage Works                 100,000,000            50,000,000            10,000,000
044101- A124    Building and Structures                             11,606,000             5,000,000            20,000,000
044101- A125   Other Works                                      161,823,000            40,364,000
        Total- ESTABLISHMENT OF HUB SPECIAL            400,000,000        200,000,000        100,000,000
          ECONOMIC ZONE LASBELA
QA0419 PROVISION OF INFRASTRUCTURE IN QUETTA INDUSTRIAL & TRADING ESTATE (PHASE-IV)
044101- A12     Civil works                                         18,255,000
044101- A121   Roads Highways and Bridges                         1,687,000
044101- A125   Other Works                                        16,568,000
        Total- PROVISION OF INFRASTRUCTURE IN            18,255,000
          QUETTA INDUSTRIAL & TRADING
           ESTATE (PHASE-IV)
QA0420 ESTABLISHMENT OF INFRASTRUCTURE IN QUETTA INDUSTRIAL & TRADING ESTATE (PHASE-II)
044101- A12     Civil works                                         24,889,000
044101- A121   Roads Highways and Bridges                       12,819,000
044101- A125   Other Works                                        12,070,000
        Total- ESTABLISHMENT OF                           24,889,000
           INFRASTRUCTURE IN QUETTA

Page 528

  Table of Content                                    Previous     Next                                      4447

NO. 189.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

            INDUSTRIAL & TRADING ESTATE
              (PHASE-II)
QA0536 ESTABLISHMENT OF BOSTAN INDUSTRIAL ESTATE PHASE-I
044101- A12     Civil works                                        110,871,000
044101- A125   Other Works                                      110,871,000
        Total- ESTABLISHMENT OF BOSTAN                 110,871,000
            INDUSTRIAL ESTATE PHASE-I
QA9175 FEASIBILITY FOR ESTABLISHMENT OF METAL PARK IN CHAGAI
044101- A03    Operating Expenses                               90,000,000            40,000,000            50,000,000
044101- A037   Consultancy and Contractual Work                  90,000,000            40,000,000            40,000,000
044101- A038    Travel & Transportation                                                                           4,000,000
044101- A039   General                                                                                          6,000,000
044101- A05    Grants, Subsidies and Write off Loans             10,000,000
044101- A052   Grants Domestic                                    10,000,000
        Total- FEASIBILITY FOR ESTABLISHMENT OF         100,000,000         40,000,000          50,000,000
          METAL PARK IN CHAGAI
     044101   Total-  Support for Industrial Development         654,015,000        240,000,000        150,000,000

     0441     Total-  Manufacturing                           654,015,000        240,000,000        150,000,000
     044      Total-  Mining and Manufacturing                 654,015,000        240,000,000        150,000,000
     04        Total-  Economic Affairs                        654,015,000        240,000,000        150,000,000
               Total- ACCOUNTANT GENERAL                  654,015,000          240,000,000          150,000,000
                PAKISTAN REVENUES
                  SUB-OFFICE, QUETTA
          TOTAL - DEMAND                             2,343,293,000        726,206,000        800,000,000

Page 529

Table of Content                                    Previous     Next                                  4448

                                  SECTION VII

                    CAPITAL OUTLAY ON MARITIME AFFAIRS DIVISION

                                                           **********

                                                                                       2020-2021
                                                                                  Budget
                                                                                          Estimate

                                                                           (Rupees in Thousand)

    Demand presented on behalf of the
     Capital Outlay on Maritime Affairs Division

    Development Expenditure on Capital Account.

                  190.  Capital Outlay on Maritime Affairs Division                                2,683,314

                                                                                Total :              2,683,314

Page 530

  Table of Content                                    Previous     Next                                      4449

NO. 190.- CAPITAL OUTLAY ON MARITIME AFFAIRS DIVIS ION                   DEMANDS FOR GRANTS
                                DEMAND NO. 190
                                                                            ( FC12C51 )
                        CAPITAL OUTLAY ON MARITIME AFFAIRS DIVIS ION

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2021 to defray the Salaries and Other
Expenses of the CAPITAL OUTLAY ON MARITIME AFFAIRS DIVIS ION.

                                Voted           Rs. 2,683,314,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF MARITIME AFFAIRS  .

                                                           2019-2020         2019-2020         2020-2021
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
019    General Public Service Not Elsewhere Defined                                                            79,514,000
045    Construction and Transport                                   64,848,000            17,141,000         1,187,990,000
046    Communications                                            3,535,395,000         4,306,459,000         1,415,810,000
               Total                                               3,600,243,000         4,323,600,000         2,683,314,000
     OBJECT CLASSIFICATION
A01   Employees Related Expenses                           12,872,000         12,113,000           4,166,000
A011  Pay                                                          12,872,000            12,113,000             3,566,000
A011-1 Pay of Officers                                                   (5,372,000)            (4,613,000)            (1,870,000)
A011-2 Pay of Other Staff                                                (7,500,000)            (7,500,000)            (1,696,000)
A012  Allowances                                                                                              600,000
A012-1 Regular Allowances                                                                                           (600,000)
A02    Project Pre-Investment Analysis                        27,156,000         27,156,000        233,779,000
A03   Operating Expenses                                    24,857,000           6,300,000           4,301,000
A06   Transfers                                                   1,000              1,000
A09   Physical Assets                                        45,194,000         16,802,000        514,326,000
A12    Civil works                                          3,489,329,000       4,260,393,000       1,746,627,000
A13   Repairs and Maintenance                                 834,000            835,000        180,115,000
               Total                                         3,600,243,000       4,323,600,000       2,683,314,000
                  (In Foreign Exchange)                              (2,550,000,000)        (7,272,040,000)        (1,050,000,000)
            (Own Resources)
               (Foreign Aid)                                        (2,550,000,000)        (7,272,040,000)        (1,050,000,000)
                  (In Local Currency)                                  (1,050,243,000)       (2,948,440,000-)        (1,633,314,000)
                                                  __________________________________________________

Page 531

  Table of Content                                    Previous     Next                                      4450

NO. 190.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVIS ION             DEMANDS FOR GRANTS

III.  - DETAILS are as follows :-
                                 No of Posts        2019-2020         2019-2020       2020-2021
                                       2019-20 2020-21       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
04     Economic Affairs:
045    Construction and Transport:
0453   Water Transport:
045301 PORT AND SHIPPPING  :
IB0715 DEV. OF IT INFR. FOR IMP. OF E OFFICE M/O MARITIME AFFAIRS
045301- A01    Employees Related Expenses                      11,000,000             6,911,000             2,166,000
045301- A011   Pay                       6      4           11,000,000             6,911,000             1,566,000
045301- A011-1 Pay of Officers                  (2)      (3)          (5,000,000)            (911,000)          (1,470,000)
045301- A011-2 Pay of Other Staff               (4)      (1)          (6,000,000)          (6,000,000)             (96,000)
045301- A012   Allowances                                                                                     600,000
045301- A012-1  Regular Allowances                                                                         (600,000)
045301- A03    Operating Expenses                                 500,000              500,000
045301- A039   General                                              500,000              500,000
045301- A09    Physical Assets                                      9,730,000             9,730,000             1,924,000
045301- A092   Computer Equipment                                 9,080,000             9,080,000              924,000
045301- A096   Purchase of Plant and Machinery                      500,000              500,000              500,000
045301- A097   Purchase of Furniture and Fixture                     150,000              150,000              500,000
        Total- DEV. OF IT INFR. FOR IMP. OF E OFFICE         21,230,000         17,141,000           4,090,000
           M/O MARITIME AFFAIRS
     045301   Total- PORT AND SHIPPPING                   21,230,000         17,141,000           4,090,000
     0453     Total-  Water Transport                          21,230,000         17,141,000           4,090,000
     045      Total-  Construction and Transport                 21,230,000         17,141,000           4,090,000
     04        Total-  Economic Affairs                          21,230,000         17,141,000           4,090,000
               Total- ACCOUNTANT GENERAL                    21,230,000            17,141,000             4,090,000
                PAKISTAN REVENUES

Page 532

  Table of Content                                    Previous     Next                                      4451

NO. 190.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVIS ION             DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

01     General Public Service:
019    General Public Service Not Elsewhere Defined:
0191  Gen Public Service Not Elsewhere Defined:
019101 ADMINISTRATIVE TRAINING  :
KA7106 PAKISTAN MARINE ACADEMY KARACHI
019101- A13    Repairs and Maintenance                                                                     79,514,000
019101- A133    Buildings and Structure                                                                         56,698,000
019101- A139   Telecommunication Works                                                                      22,816,000
        Total- PAKISTAN MARINE ACADEMY                                                          79,514,000
           KARACHI
     019101   Total-  ADMINISTRATIVE TRAINING                                                     79,514,000
     0191     Total-  Gen Public Service Not Elsewhere                                                 79,514,000
                      Defined
     019      Total-  General Public Service Not                                                        79,514,000
                    Elsewhere Defined
     01        Total-  General Public Service                                                           79,514,000
04     Economic Affairs:
045    Construction and Transport:
0453   Water Transport:
045301 PORT AND SHIPPPING  :
KA1314 ENHANCEMENT OF SEAFARER REPORTING MODULE & INSTALLATION ON NEW COMPUTER HARD/IC
CARD PRINTER
045301- A03    Operating Expenses                               18,556,000
045301- A039   General                                             18,556,000
        Total- ENHANCEMENT OF SEAFARER                 18,556,000
           REPORTING MODULE & INSTALLATION
         ON NEW COMPUTER HARD/IC CARD
           PRINTER
KA7083 MODIFICATION OF AUCTION HALL KORANGI FISHERIES HARBOUR KARACHI
045301- A12     Civil works                                                                                     94,500,000
045301- A124    Building and Structures                                                                         94,500,000
        Total- MODIFICATION OF AUCTION HALL                                                     94,500,000
           KORANGI FISHERIES HARBOUR
           KARACHI
KA7084 ESTABLISHMENT OF COLD STORAGE AND FREEZING TUNNELS AT KORANGI FISHERIES HARBOUR

Page 533

  Table of Content                                    Previous     Next                                      4452

NO. 190.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVIS ION             DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

KARACHI
045301- A12     Civil works                                                                                     40,000,000
045301- A124    Building and Structures                                                                         40,000,000
        Total- ESTABLISHMENT OF COLD STORAGE                                                  40,000,000
          AND FREEZING TUNNELS AT KORANGI
            FISHERIES HARBOUR KARACHI
KA7085 ESTABLISHMENT OF BUSINESS PARK AT KORANGI FISHERIES HARBOUR KARACHI
045301- A12     Civil works                                                                                   100,000,000
045301- A124    Building and Structures                                                                       100,000,000
        Total- ESTABLISHMENT OF BUSINESS PARK                                                100,000,000
           AT KORANGI FISHERIES HARBOUR
           KARACHI
KA9623 PROVIDING AND INSTALLATION OF SECURITY AND STREET LIGHTS IN PREMISES
045301- A09    Physical Assets                                    25,062,000
045301- A092   Computer Equipment                                 2,207,000
045301- A096   Purchase of Plant and Machinery                     2,101,000
045301- A097   Purchase of Furniture and Fixture                   20,754,000
        Total- PROVIDING AND INSTALLATION OF             25,062,000
           SECURITY AND STREET LIGHTS IN
           PREMISES
     045301   Total- PORT AND SHIPPPING                   43,618,000                            234,500,000
     0453     Total-  Water Transport                          43,618,000                            234,500,000
     045      Total-  Construction and Transport                 43,618,000                            234,500,000
     04        Total-  Economic Affairs                          43,618,000                            234,500,000
               Total- ACCOUNTANT GENERAL                    43,618,000                                314,014,000
                PAKISTAN REVENUES
                  SUB-OFFICE, KARACHI

Page 534

  Table of Content                                    Previous     Next                                      4453

NO. 190.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVIS ION             DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

04     Economic Affairs:
045    Construction and Transport:
0453   Water Transport:
045301 PORT AND SHIPPPING  :
GR9010 FEASIBILITY STUDY OF CAPITAL DREDGING OF BERTHING AREAS & CHANNEL FOR ADDITIONAL
TERMINALS
045301- A02     Project Pre-Investment Analysis                                                             148,000,000
045301- A021    Feasibility Studies                                                                            148,000,000
        Total- FEASIBILITY STUDY OF CAPITAL                                                     148,000,000
           DREDGING OF BERTHING AREAS &
          CHANNEL FOR ADDITIONAL
           TERMINALS
GR9011 EQUIPMENT FOR SAFETY OF NAVIGATION
045301- A09    Physical Assets                                                                               14,000,000
045301- A094   Other Stores and Stocks                                                                        14,000,000
        Total- EQUIPMENT FOR SAFETY OF                                                          14,000,000
           NAVIGATION
GR9012 SUPPLY INSTALLATION & COMMISSIONING OF FLOATING JETTY AT GWADAR PORT
045301- A09    Physical Assets                                                                               56,650,000
045301- A098   Purchase of Other Assets                                                                      56,650,000
        Total- SUPPLY INSTALLATION &                                                              56,650,000
           COMMISSIONING OF FLOATING JETTY
           AT GWADAR PORT
GR9013 ACQUISITION OF MOBILE CRANES & FORK LIFTERS FOR GAWADAR PORT
045301- A09    Physical Assets                                                                             111,450,000
045301- A096   Purchase of Plant and Machinery                                                             111,450,000
        Total- ACQUISITION OF MOBILE CRANES &                                                 111,450,000
          FORK LIFTERS FOR GAWADAR PORT
GR9014 UPGRADATION OF BERTHING FACILITIES FOR BOATS AT GWADAR MINI PORT
045301- A13    Repairs and Maintenance                                                                    100,000,000
045301- A133    Buildings and Structure                                                                       100,000,000
        Total- UPGRADATION OF BERTHING                                                        100,000,000
             FACILITIES FOR BOATS AT GWADAR
             MINI PORT

Page 535

  Table of Content                                    Previous     Next                                      4454

NO. 190.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVIS ION             DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

GR9015 ACQUISITION OF MARINE SERVICES VESSEL FOR GWADAR PORT
045301- A09    Physical Assets                                                                             319,300,000
045301- A096   Purchase of Plant and Machinery                                                             319,300,000
        Total- ACQUISITION OF MARINE SERVICES                                                  319,300,000
           VESSEL FOR GWADAR PORT
GR9018 CONSTRUCTION OF GROYNE WALL/BREAK WATER & ALLIED WORKS AT EAST BAY (DEMI ZER)
GWADAR
045301- A12     Civil works                                                                                   200,000,000
045301- A125   Other Works                                                                                 200,000,000
        Total- CONSTRUCTION OF GROYNE                                                         200,000,000
           WALL/BREAK WATER & ALLIED
         WORKS AT EAST BAY (DEMI ZER)
         GWADAR
     045301   Total- PORT AND SHIPPPING                                                        949,400,000
     0453     Total-  Water Transport                                                                949,400,000
     045      Total-  Construction and Transport                                                      949,400,000
046    Communications:
0461   Communications:
046101 ADMINISTRATION  :
GR2015 CONSTRUCTION OF EAST BAY EXPRESSWAY TO LINK GWADAR PORT WITH NATIONAL ROAD
NETWORK GWADAR.
046101- A12     Civil works                                       2,400,000,000         3,834,540,000         1,000,000,000
046101- A121   Roads Highways and Bridges                     2,400,000,000         3,834,540,000         1,000,000,000
        Total- CONSTRUCTION OF EAST BAY               2,400,000,000       3,834,540,000       1,000,000,000
          EXPRESSWAY TO LINK GWADAR PORT
           WITH NATIONAL ROAD NETWORK
          GWADAR.
                  (In Foreign Exchange)                          (2,200,000,000)      (3,772,040,000)       (800,000,000)
               (Foreign Aid)                                   (2,200,000,000)      (3,772,040,000)       (800,000,000)
                  (In Local Currency)                              (200,000,000)         (62,500,000)       (200,000,000)
                                                  __________________________________________________
GR2016 UP GRADATION OF GPA HOUSING COMPLEX
046101- A12     Civil works                                         91,638,000
046101- A124    Building and Structures                             91,638,000
        Total- UP GRADATION OF GPA HOUSING              91,638,000
          COMPLEX

Page 536

  Table of Content                                    Previous     Next                                      4455

NO. 190.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVIS ION             DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

GR2018 FEASIBILITY STUDY FOR CONSTRUCTION OF BR EAK WATERS
046101- A02     Project Pre-Investment Analysis                   27,156,000            27,156,000            85,779,000
046101- A021    Feasibility Studies                                   27,156,000            27,156,000            85,779,000
        Total- FEASIBILITY STUDY FOR                       27,156,000         27,156,000          85,779,000
           CONSTRUCTION OF BR EAK WATERS
GR2020 PAK-CHINA TECHNICAL & VOCATIONAL INSTITUTE AT GWADAR
046101- A12     Civil works                                        425,583,000          425,853,000          312,127,000
046101- A124    Building and Structures                            425,583,000          425,853,000          312,127,000
        Total- PAK-CHINA TECHNICAL &                     425,583,000        425,853,000        312,127,000
           VOCATIONAL INSTITUTE AT GWADAR
                  (In Foreign Exchange)                           (350,000,000)      (3,500,000,000)       (250,000,000)
               (Foreign Aid)                                    (350,000,000)      (3,500,000,000)       (250,000,000)
                  (In Local Currency)                                (75,583,000)     (3,074,147,000-)         (62,127,000)
                                                  __________________________________________________
GR2021 ESTABLISHMENT OF CPEC SUPPORT UNIT(CSU) FOR PROJECTS AND ACTIVITES IN GPA
046101- A01    Employees Related Expenses                       1,872,000             5,202,000             2,000,000
046101- A011   Pay                       7     10            1,872,000             5,202,000             2,000,000
046101- A011-1 Pay of Officers                           (3)            (372,000)          (3,702,000)            (400,000)
046101- A011-2 Pay of Other Staff               (7)      (7)          (1,500,000)          (1,500,000)          (1,600,000)
046101- A03    Operating Expenses                                 5,801,000             5,800,000             4,301,000
046101- A036   Motor Vehicles                                       2,000,000             2,000,000             1,000,000
046101- A038    Travel & Transportation                               2,001,000             2,000,000             1,300,000
046101- A039   General                                              1,800,000             1,800,000             2,001,000
046101- A06    Transfers                                                1,000                 1,000
046101- A063    Entertainment & Gifts                                    1,000                 1,000
046101- A09    Physical Assets                                    10,402,000             7,072,000            11,002,000
046101- A092   Computer Equipment                                 400,000              400,000                 1,000
046101- A095   Purchase of Transport                              10,000,000             6,670,000            11,000,000
046101- A096   Purchase of Plant and Machinery                         1,000                 1,000
046101- A097   Purchase of Furniture and Fixture                        1,000                 1,000                 1,000
046101- A13    Repairs and Maintenance                            834,000              835,000              601,000
046101- A130    Transport                                            831,000              831,000              600,000
046101- A131   Machinery and Equipment                                2,000                 2,000
046101- A137   Computer Equipment                                    1,000                 2,000                 1,000

Page 537

  Table of Content                                    Previous     Next                                      4456

NO. 190.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVIS ION             DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

        Total- ESTABLISHMENT OF CPEC SUPPORT           18,910,000         18,910,000          17,904,000
            UNIT(CSU) FOR PROJECTS AND
            ACTIVITES IN GPA
GR2024 BUSSINESS COMPLEX R.O PLANT(0.2M/G/D Capicity)
046101- A12     Civil works                                        279,808,000
046101- A124    Building and Structures                            279,808,000
        Total- BUSSINESS COMPLEX R.O                    279,808,000
            PLANT(0.2M/G/D Capicity)
GR2026 DEVELOPMENT & CONSTRUCTION OF PORT ALLIED STRUCTURES IN MULLAH BAND AREA
046101- A12     Civil works                                        292,300,000
046101- A124    Building and Structures                            292,300,000
        Total- DEVELOPMENT & CONSTRUCTION OF         292,300,000
          PORT ALLIED STRUCTURES IN
          MULLAH BAND AREA
     046101   Total-  ADMINISTRATION                     3,535,395,000       4,306,459,000       1,415,810,000
     0461     Total-  Communications                        3,535,395,000       4,306,459,000       1,415,810,000
     046      Total-  Communications                        3,535,395,000       4,306,459,000       1,415,810,000
     04        Total-  Economic Affairs                       3,535,395,000       4,306,459,000       2,365,210,000
               Total- ACCOUNTANT GENERAL                 3,535,395,000         4,306,459,000         2,365,210,000
                PAKISTAN REVENUES
                  SUB-OFFICE, QUETTA
                       (In Foreign Exchange)                          (2,550,000,000)        (7,272,040,000)        (1,050,000,000)
               (Own Resources)
                   (Foreign Aid)                                    (2,550,000,000)        (7,272,040,000)        (1,050,000,000)
                       (In Local Currency)                               (985,395,000)       (2,965,581,000-)        (1,315,210,000)
          TOTAL - DEMAND                             3,600,243,000       4,323,600,000       2,683,314,000
                  (In Foreign Exchange)                          (2,550,000,000)      (7,272,040,000)      (1,050,000,000)
            (Own Resources)
               (Foreign Aid)                                   (2,550,000,000)      (7,272,040,000)      (1,050,000,000)
                  (In Local Currency)                             (1,050,243,000)     (2,948,440,000-)      (1,633,314,000)
                                                  __________________________________________________

Page 538

Table of Content                                    Previous     Next                                  4457

                                  SECTION VIII

                                MINISTRY OF RAILWAYS

                                                            **********

                                                                                       2020-2021
                                                                                  Budget
                                                                                          Estimate

                                                                           (Rupees in Thousand)

    Demand presented on behalf of the
     Ministry of Railways

     Development Expenditure on Capital Account.

                   191.  Capital Outlay on Pakistan Railways                                     24,000,000

                                                                                Total :             24,000,000

Page 539

  Table of Content                                    Previous     Next                                      4458

NO. 191.- CAPITAL OUTLAY ON PAKISTAN RAILWAYS                        DEMANDS FOR GRANTS
                                DEMAND NO. 191
                                                                            ( FC12C33 )
                           CAPITAL OUTLAY ON PAKISTAN RAILWAYS

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2021 for CAPITAL OUTLAY ON
PAKISTAN RAILWAYS.

                                Voted           Rs. 24,000,000,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF RAILWAYS  .

                                                           2019-2020         2019-2020         2020-2021
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
014    Transfers                                                 13,500,000,000         9,016,128,000        23,500,000,000
045    Construction and Transport                                 2,500,000,000                                500,000,000
               Total                                              16,000,000,000         9,016,128,000        24,000,000,000
     OBJECT CLASSIFICATION
A03   Operating Expenses                                 2,500,000,000                            500,000,000
A11   Investments                                        13,500,000,000       9,016,128,000      23,500,000,000
               Total                                        16,000,000,000       9,016,128,000      24,000,000,000
                  (In Foreign Exchange)                              (7,850,000,000)        (1,862,709,000)        (7,825,000,000)
            (Own Resources)                                   (5,350,000,000)        (1,862,709,000)        (7,325,000,000)
               (Foreign Aid)                                        (2,500,000,000)                                (500,000,000)
                  (In Local Currency)                                  (8,150,000,000)        (7,153,419,000)       (16,175,000,000)
                                                  __________________________________________________
____________________________________________________________________________________________________
      The above estimates do not include recoveries shown below which are adjusted in the accounts in reduction of
Expenditure:
045    Construction and Transport                             -2,500,000,000
                                                  __________________________________________________
               Total - Recoveries                             -2,500,000,000
                                                  __________________________________________________

Page 540

  Table of Content                                    Previous     Next                                      4459

NO. 191.- FC12C33 CAPITAL OUTLAY ON PAKISTAN RAILWAYS                  DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

01     General Public Service:
014    Transfers:
0143   Investments:
014302 Non-Financial Institutions  :
KA2216 PAKISTAN RAILWAYS, (LOCAL CURRENCY)
014302- A11    Investments                                    13,500,000,000         9,016,128,000
014302- A111   Investment Local                                13,500,000,000         9,016,128,000
        Total- PAKISTAN RAILWAYS, (LOCAL              13,500,000,000       9,016,128,000
           CURRENCY)
                  (In Foreign Exchange)                          (5,350,000,000)      (1,862,709,000)
            (Own Resources)                               (5,350,000,000)      (1,862,709,000)
                  (In Local Currency)                             (8,150,000,000)      (7,153,419,000)
                                                  __________________________________________________
KA7108 ACQUISITION OF LAND FOR RAILWAY CORRIDOR FROM SEA PORT KM:525 TO KM:9:00 AND RAILWAY
OPERATIONAL
014302- A11    Investments                                                                                  2,500,000,000
014302- A111   Investment Local                                                                              2,500,000,000
        Total- ACQUISITION OF LAND FOR RAILWAY                                                2,500,000,000
          CORRIDOR FROM SEA PORT KM:525 TO
             KM:9:00 AND RAILWAY OPERATIONAL
KA7109 CHINA-PAKISTAN ECONOMIC CORRIDOR SUPPORT PROJECT (CPECSP) AT MINISTRY OF RAILWAYS
014302- A11    Investments                                                                                   50,000,000
014302- A111   Investment Local                                                                               50,000,000
        Total- CHINA-PAKISTAN ECONOMIC                                                          50,000,000
          CORRIDOR SUPPORT PROJECT
            (CPECSP) AT MINISTRY OF RAILWAYS
KA7110 CONSTRUCTION OF STAFF QUARTERS (REVISED)
014302- A11    Investments                                                                                      5,000,000
014302- A111   Investment Local                                                                                 5,000,000
        Total- CONSTRUCTION OF STAFF QUARTERS                                                  5,000,000
             (REVISED)
KA7111 PRELIMINARY DESIGN / DRAWINGS FOR UPGRADATION/REHABILITATION OF MAIN LINE (ML-1) AND
ESTABLISHMENT OF
014302- A11    Investments                                                                                  1,500,000,000
014302- A111   Investment Local                                                                              1,500,000,000

Page 541

  Table of Content                                    Previous     Next                                      4460

NO. 191.- FC12C33 CAPITAL OUTLAY ON PAKISTAN RAILWAYS                  DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

        Total- PRELIMINARY DESIGN / DRAWINGS                                                  1,500,000,000
          FOR UPGRADATION/REHABILITATION
          OF MAIN LINE (ML-1) AND
           ESTABLISHMENT OF
KA7112 PROCUREMENT OF 75 NOS(55 NOS 4000-4500HP & 20 NOS 2000-2500 HP) DIESEL ELECTRIC
LOCOMOTIVES (DELS)
014302- A11    Investments                                                                                 700,000,000
014302- A111   Investment Local                                                                             700,000,000
        Total- PROCUREMENT OF 75 NOS(55 NOS                                                   700,000,000
             4000-4500HP & 20 NOS 2000-2500 HP)
            DIESEL ELECTRIC LOCOMOTIVES
             (DELS)
KA7113 PROCUREMENT OF EQUIPMENT FOR IMPROVED SECURITY AND ANTI-TERRORSIM MEASURES
014302- A11    Investments                                                                                 100,000,000
014302- A111   Investment Local                                                                             100,000,000
        Total- PROCUREMENT OF EQUIPMENT FOR                                                 100,000,000
           IMPROVED SECURITY AND
           ANTI-TERRORSIM MEASURES
KA7114 PROCURMENT/MANUFACTURE OF 820 HIGH CAPACITY BOGIE FREIGHT WAGONS AND 230 PASSENGER
COACHES
014302- A11    Investments                                                                                  3,250,000,000
014302- A111   Investment Local                                                                              3,250,000,000
        Total- PROCURMENT/MANUFACTURE OF 820                                               3,250,000,000
           HIGH CAPACITY BOGIE FREIGHT
         WAGONS AND 230 PASSENGER
          COACHES
                  (In Foreign Exchange)                                                                    (2,275,000,000)
            (Own Resources)                                                                        (2,275,000,000)
                  (In Local Currency)                                                                       (975,000,000)
                                                  __________________________________________________
KA7115 PROJECT MANAGEMENT UNIT (PMU) IN MINISTRY OF RAILWAYS (2ND REVISED)
014302- A11    Investments                                                                                 100,000,000
014302- A111   Investment Local                                                                             100,000,000
        Total- PROJECT MANAGEMENT UNIT (PMU) IN                                               100,000,000
            MINISTRY OF RAILWAYS (2ND
            REVISED)

Page 542

  Table of Content                                    Previous     Next                                      4461

NO. 191.- FC12C33 CAPITAL OUTLAY ON PAKISTAN RAILWAYS                  DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

KA7116 RECONSTRUCION AND EXTENSION OF CONCRETE SLEEPER FACTORIES (CSF)AT KHANEWAL AND
SUKKUR
014302- A11    Investments                                                                                   10,000,000
014302- A111   Investment Local                                                                               10,000,000
        Total- RECONSTRUCION AND EXTENSION OF                                                 10,000,000
          CONCRETE SLEEPER FACTORIES
            (CSF)AT KHANEWAL AND SUKKUR
KA7117 RECONSTRUCTION/REHABILITATION OF ASSETS DAMAGED DURING THE FLOOD 2010 (REVISED)
014302- A11    Investments                                                                                 100,000,000
014302- A111   Investment Local                                                                             100,000,000
        Total- RECONSTRUCTION/REHABILITATION                                                 100,000,000
          OF ASSETS DAMAGED DURING THE
          FLOOD 2010 (REVISED)
KA7118 REHABILITATION OF RAILWAY ASSETS DAMAGED AT SINDH DURING RIOTS OF 27-28 DECEMBER 2007
FOLLOWED BY
014302- A11    Investments                                                                                   70,000,000
014302- A111   Investment Local                                                                               70,000,000
        Total- REHABILITATION OF RAILWAY ASSETS                                                70,000,000
          DAMAGED AT SINDH DURING RIOTS OF
              27-28 DECEMBER 2007 FOLLOWED BY
KA7119 REHABILITATION/PROCUREMENT OF RE-MANUFACTURED OF 300 TRACTION MOTORS (REVISED)
014302- A11    Investments                                                                                   20,000,000
014302- A111   Investment Local                                                                               20,000,000
        Total- REHABILITATION/PROCUREMENT OF                                                  20,000,000
          RE-MANUFACTURED OF 300 TRACTION
          MOTORS (REVISED)
KA7120 REPLACEMENT OF OLD AND OBSOLETE SIGNAL GEAR FROM LODHRAN -MULTAN-KHANEWAL
-SHAHDARA BAGH MAINLINE SECTION OF
014302- A11    Investments                                                                                 100,000,000
014302- A111   Investment Local                                                                             100,000,000
        Total- REPLACEMENT OF OLD AND                                                         100,000,000
          OBSOLETE SIGNAL GEAR FROM
          LODHRAN -MULTAN-KHANEWAL
           -SHAHDARA BAGH MAINLINE SECTION
          OF

Page 543

  Table of Content                                    Previous     Next                                      4462

NO. 191.- FC12C33 CAPITAL OUTLAY ON PAKISTAN RAILWAYS                  DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

KA7121 STRENGTHENING OF PLANNING DEVELOPMENT MONITORING AND EVALUATION (PD&ME)
DIRECTORATE MINISTRY OF MINISTRY
014302- A11    Investments                                                                                   50,000,000
014302- A111   Investment Local                                                                               50,000,000
        Total- STRENGTHENING OF PLANNING                                                       50,000,000
          DEVELOPMENT MONITORING AND
           EVALUATION (PD&ME) DIRECTORATE
            MINISTRY OF MINISTRY
KA7122 TRACK REHABILITATION ON KHANPUR-LODHRAN SECTION
014302- A11    Investments                                                                                 330,616,000
014302- A111   Investment Local                                                                             330,616,000
        Total- TRACK REHABILITATION ON                                                         330,616,000
          KHANPUR-LODHRAN SECTION
KA7123 UP-GRADATION OF RAILWAY STATIONS TO ATTRACT SIKH TOURISM AT HASSANABADAL NANKANA
SAHIB AND
014302- A11    Investments                                                                                   50,000,000
014302- A111   Investment Local                                                                               50,000,000
        Total- UP-GRADATION OF RAILWAY                                                          50,000,000
           STATIONS TO ATTRACT SIKH TOURISM
           AT HASSANABADAL NANKANA SAHIB
          AND
KA7124 UP-GRADATION OF TERMINAL FACILITIES AND DRYPORTS (REVISED)
014302- A11    Investments                                                                                 105,359,000
014302- A111   Investment Local                                                                             105,359,000
        Total- UP-GRADATION OF TERMINAL                                                       105,359,000
             FACILITIES AND DRYPORTS (REVISED)
KA7125 UP-GRADATION/RENOVATION OF RAILWAY STATIONS
014302- A11    Investments                                                                                   50,000,000
014302- A111   Investment Local                                                                               50,000,000
        Total- UP-GRADATION/RENOVATION OF                                                      50,000,000
           RAILWAY STATIONS
KA7126 FEASIBILITY STUDY FOR RESTORATION/UP-GRADATION OF JACOBABAD-SILRA SHAHDAD
014302- A11    Investments                                                                                   15,500,000
014302- A111   Investment Local                                                                               15,500,000

Page 544

  Table of Content                                    Previous     Next                                      4463

NO. 191.- FC12C33 CAPITAL OUTLAY ON PAKISTAN RAILWAYS                  DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

        Total- FEASIBILITY STUDY FOR                                                               15,500,000
           RESTORATION/UP-GRADATION OF
           JACOBABAD-SILRA SHAHDAD
KA7127 FEASIBILITY STUDY FOR UP-GRADATION/REHABILITATION OF KHANEWAL-SHORKOT-CHAK
014302- A11    Investments                                                                                   14,000,000
014302- A111   Investment Local                                                                               14,000,000
        Total- FEASIBILITY STUDY FOR                                                               14,000,000
            UP-GRADATION/REHABILITATION OF
          KHANEWAL-SHORKOT-CHAK
KA7128 FEASIBILITY STUDY FOR UP-GRADATION/REHABILITATION OF SHAHDARA-SANGLA HILL-CHAK
014302- A11    Investments                                                                                   18,000,000
014302- A111   Investment Local                                                                               18,000,000
        Total- FEASIBILITY STUDY FOR                                                               18,000,000
            UP-GRADATION/REHABILITATION OF
          SHAHDARA-SANGLA HILL-CHAK
KA7129 SPECIAL REPAIR OF 100 NOS DE LOCOMOTIVES FOR IMPROVING THE REABILITY/AVAILABILITY OF
RUNNING
014302- A11    Investments                                                                                  2,700,000,000
014302- A111   Investment Local                                                                              2,700,000,000
        Total- SPECIAL REPAIR OF 100 NOS DE                                                     2,700,000,000
           LOCOMOTIVES FOR IMPROVING THE
             REABILITY/AVAILABILITY OF RUNNING
                  (In Foreign Exchange)                                                                    (1,890,000,000)
            (Own Resources)                                                                        (1,890,000,000)
                  (In Local Currency)                                                                       (810,000,000)
                                                  __________________________________________________
KA7130 SPECIAL REPAIR OF 600 PASSENGER COACHES AND 1200 BOGIE WAGONS
014302- A11    Investments                                                                                  1,000,000,000
014302- A111   Investment Local                                                                              1,000,000,000
        Total- SPECIAL REPAIR OF 600 PASSENGER                                                1,000,000,000
          COACHES AND 1200 BOGIE WAGONS
                  (In Foreign Exchange)                                                                    (600,000,000)
            (Own Resources)                                                                         (600,000,000)
                  (In Local Currency)                                                                       (400,000,000)
                                                  __________________________________________________
KA7131 CONSULTANCY SERVICE REGARDING REVISION OF BRIDGE RULES AND CODES OF PRACTICE

Page 545

  Table of Content                                    Previous     Next                                      4464

NO. 191.- FC12C33 CAPITAL OUTLAY ON PAKISTAN RAILWAYS                  DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

PRESCRIBED FOR DESIGN OF
014302- A11    Investments                                                                                   26,585,000
014302- A111   Investment Local                                                                               26,585,000
        Total- CONSULTANCY SERVICE REGARDING                                                 26,585,000
            REVISION OF BRIDGE RULES AND
          CODES OF PRACTICE PRESCRIBED
          FOR DESIGN OF
KA7132 PC-II FOR COMMERCIAL AND FINANCIAL FEASIBILITY STUDY FOR THE SUB-PROJECT UNDER ML-I
PROJECT
014302- A11    Investments                                                                                   70,000,000
014302- A111   Investment Local                                                                               70,000,000
        Total-  PC-II FOR COMMERCIAL AND                                                          70,000,000
            FINANCIAL FEASIBILITY STUDY FOR
           THE SUB-PROJECT UNDER ML-I
          PROJECT
KA7133 UP-GRADATION OF PAKISTAN RAILWAYS EXISTING MAINLINE-1 (ML-I) AND ESTABLISHMENT OF
DRYPORT NEAR
014302- A11    Investments                                                                                  5,500,000,000
014302- A111   Investment Local                                                                              5,500,000,000
        Total- UP-GRADATION OF PAKISTAN                                                       5,500,000,000
           RAILWAYS EXISTING MAINLINE-1 (ML-I)
          AND ESTABLISHMENT OF DRYPORT
          NEAR
                  (In Foreign Exchange)                                                                    (500,000,000)
            (Own Resources)                                                                         (500,000,000)
                  (In Local Currency)                                                                       (5,000,000,000)
                                                  __________________________________________________
KA7134 OPERATIONALIZATION OF TRAIN ON EXISTING KCR ALLIGNMENT
014302- A11    Investments                                                                                  1,500,000,000
014302- A111   Investment Local                                                                              1,500,000,000
        Total- OPERATIONALIZATION OF TRAIN ON                                                 1,500,000,000
            EXISTING KCR ALLIGNMENT
                  (In Foreign Exchange)                                                                    (250,000,000)
            (Own Resources)                                                                         (250,000,000)
                  (In Local Currency)                                                                       (1,250,000,000)
                                                  __________________________________________________

Page 546

  Table of Content                                    Previous     Next                                      4465

NO. 191.- FC12C33 CAPITAL OUTLAY ON PAKISTAN RAILWAYS                  DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

KA7135 PROVISION OF TRAIN APPROACHING WARNING SYSTEM FOR LEVEL CROSSING AND INHOUSE
DEVELOPMENT OF LED BASED
014302- A11    Investments                                                                                   30,000,000
014302- A111   Investment Local                                                                               30,000,000
        Total- PROVISION OF TRAIN APPROACHING                                                  30,000,000
          WARNING SYSTEM FOR LEVEL
           CROSSING AND INHOUSE
          DEVELOPMENT OF LED BASED
KA7136 UMBRELLA PCII FOR FEASIBITY STUDIES AND TRANSACTION ADVISORY SERVICES
014302- A11    Investments                                                                                 300,000,000
014302- A111   Investment Local                                                                             300,000,000
        Total- UMBRELLA PCII FOR FEASIBITY                                                      300,000,000
           STUDIES AND TRANSACTION
           ADVISORY SERVICES
KA7137 ESTABLISHMENT OF BUSINESS DEVELOPMENT AND HR SUPPORT UNIT AT PAKISTAN RAILWAYS
014302- A11    Investments                                                                                   50,000,000
014302- A111   Investment Local                                                                               50,000,000
        Total- ESTABLISHMENT OF BUSINESS                                                        50,000,000
          DEVELOPMENT AND HR SUPPORT UNIT
           AT PAKISTAN RAILWAYS
KA7138 COLLABORATION OF PAKISTAN RAILWAYS WITH DIFFERENT ACADEMIC INSTITUTES (TRIPLE HELIX
MODEL)
014302- A11    Investments                                                                                 100,000,000
014302- A111   Investment Local                                                                             100,000,000
        Total- COLLABORATION OF PAKISTAN                                                      100,000,000
           RAILWAYS WITH DIFFERENT
           ACADEMIC INSTITUTES (TRIPLE HELIX
           MODEL)
KA7139 PROCUREMENT AND INSTALLATION OF MACHINERY AT SIGNAL WORKSHOP
014302- A11    Investments                                                                                   84,940,000
014302- A111   Investment Local                                                                               84,940,000
        Total- PROCUREMENT AND INSTALLATION                                                   84,940,000
          OF MACHINERY AT SIGNAL
         WORKSHOP
KA7140 REHABILITATION OF CHINA CREEK BRIDGE NO 4 ON KEMARI - KARACHI SECTION

Page 547

  Table of Content                                    Previous     Next                                      4466

NO. 191.- FC12C33 CAPITAL OUTLAY ON PAKISTAN RAILWAYS                  DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

014302- A11    Investments                                                                                 350,000,000
014302- A111   Investment Local                                                                             350,000,000
        Total- REHABILITATION OF CHINA CREEK                                                   350,000,000
           BRIDGE NO 4 ON KEMARI - KARACHI
           SECTION
                  (In Foreign Exchange)                                                                    (245,000,000)
            (Own Resources)                                                                         (245,000,000)
                  (In Local Currency)                                                                       (105,000,000)
                                                  __________________________________________________
KA7141 REHABILITATION OF KPT AND RAIL CONNECTIVITY (PHASE-1)
014302- A11    Investments                                                                                 400,000,000
014302- A111   Investment Local                                                                             400,000,000
        Total- REHABILITATION OF KPT AND RAIL                                                  400,000,000
           CONNECTIVITY (PHASE-1)
                  (In Foreign Exchange)                                                                    (280,000,000)
            (Own Resources)                                                                         (280,000,000)
                  (In Local Currency)                                                                       (120,000,000)
                                                  __________________________________________________
KA7142 REHABILITATION OF TRACK BETWEEN REHMANI NAGAR - BAKRANI ROAD ON DADU-HABIB KOT
SECTION (SUKKUR DIVISION PH-4)
014302- A11    Investments                                                                                 400,000,000
014302- A111   Investment Local                                                                             400,000,000
        Total- REHABILITATION OF TRACK BETWEEN                                               400,000,000
           REHMANI NAGAR - BAKRANI ROAD ON
           DADU-HABIB KOT SECTION (SUKKUR
             DIVISION PH-4)
                  (In Foreign Exchange)                                                                    (350,000,000)
            (Own Resources)                                                                         (350,000,000)
                  (In Local Currency)                                                                         (50,000,000)
                                                  __________________________________________________
KA7143 REHABILITATION OF TRACK BETWEEN BARULI-SOHAN BRIDGE ON KUNDIAN - ATTOCK CITY SECTION
(PESHAWAR
014302- A11    Investments                                                                                 300,000,000
014302- A111   Investment Local                                                                             300,000,000
        Total- REHABILITATION OF TRACK BETWEEN                                               300,000,000
           BARULI-SOHAN BRIDGE ON KUNDIAN -
          ATTOCK CITY SECTION (PESHAWAR

Page 548

  Table of Content                                    Previous     Next                                      4467

NO. 191.- FC12C33 CAPITAL OUTLAY ON PAKISTAN RAILWAYS                  DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

                  (In Foreign Exchange)                                                                    (210,000,000)
            (Own Resources)                                                                         (210,000,000)
                  (In Local Currency)                                                                         (90,000,000)
                                                  __________________________________________________
KA7144 REVIVAL OF KARACHI CIRCULAR RAILWAYS (KCR) - PHASE2
014302- A11    Investments                                                                                 300,000,000
014302- A111   Investment Local                                                                             300,000,000
        Total- REVIVAL OF KARACHI CIRCULAR                                                    300,000,000
           RAILWAYS (KCR) - PHASE2
KA7145 RECOMMISSIONING OF 5 ACCIDENTAL LOCOMOTIVES
014302- A11    Investments                                                                                 400,000,000
014302- A111   Investment Local                                                                             400,000,000
        Total- RECOMMISSIONING OF 5 ACCIDENTAL                                               400,000,000
           LOCOMOTIVES
                  (In Foreign Exchange)                                                                    (350,000,000)
            (Own Resources)                                                                         (350,000,000)
                  (In Local Currency)                                                                         (50,000,000)
                                                  __________________________________________________
KA7146 IMPROVEMENT OF TERMINAL FACILITIES (MUGHALPURA AND QILA SATTAR SHAH) ON PAKISTAN
RAILWAYS
014302- A11    Investments                                                                                 200,000,000
014302- A111   Investment Local                                                                             200,000,000
        Total- IMPROVEMENT OF TERMINAL                                                        200,000,000
             FACILITIES (MUGHALPURA AND QILA
          SATTAR SHAH) ON PAKISTAN
           RAILWAYS
KA7147 IMPROVEMENT OF ISLAMABAD DRYPORTS ON PAKISTAN RAILWAYS
014302- A11    Investments                                                                                 200,000,000
014302- A111   Investment Local                                                                             200,000,000
        Total- IMPROVEMENT OF ISLAMABAD                                                      200,000,000
          DRYPORTS ON PAKISTAN RAILWAYS
KA7148 REHABILITATION OF TRACK BETWEEN SAMA SATTA AND BAHAWALNAGAR ON SAMA SATTA AMRUKA
SECTION
014302- A11    Investments                                                                                 450,000,000
014302- A111   Investment Local                                                                             450,000,000

Page 549

  Table of Content                                    Previous     Next                                      4468

NO. 191.- FC12C33 CAPITAL OUTLAY ON PAKISTAN RAILWAYS                  DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

        Total- REHABILITATION OF TRACK BETWEEN                                               450,000,000
          SAMA SATTA AND BAHAWALNAGAR
         ON SAMA SATTA AMRUKA SECTION
                  (In Foreign Exchange)                                                                    (375,000,000)
            (Own Resources)                                                                         (375,000,000)
                  (In Local Currency)                                                                         (75,000,000)
                                                  __________________________________________________
     014302   Total-  Non-Financial Institutions               13,500,000,000       9,016,128,000      23,500,000,000
     0143     Total-  Investments                          13,500,000,000       9,016,128,000      23,500,000,000
     014      Total-  Transfers                             13,500,000,000       9,016,128,000      23,500,000,000
     01        Total-  General Public Service                 13,500,000,000       9,016,128,000      23,500,000,000
               Total- ACCOUNTANT GENERAL                13,500,000,000         9,016,128,000        23,500,000,000
                PAKISTAN REVENUES
                  SUB-OFFICE, KARACHI
                       (In Foreign Exchange)                          (5,350,000,000)        (1,862,709,000)        (7,325,000,000)
               (Own Resources)                               (5,350,000,000)        (1,862,709,000)        (7,325,000,000)
                   (Foreign Aid)
                       (In Local Currency)                             (8,150,000,000)        (7,153,419,000)       (16,175,000,000)
                              COMMERCIAL DEPARTMENTS

Page 550

  Table of Content                                    Previous     Next                                      4469

NO. 191.- FC12C33 CAPITAL OUTLAY ON PAKISTAN RAILWAYS                  DEMANDS FOR GRANTS
                                 No of Posts        2019-2020         2019-2020        2020-2021
                                       2019-20 2020-21       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                              COMMERCIAL DEPARTMENTS

04     Economic Affairs:
045    Construction and Transport:
0454   Railway Trasport:
045401 Railway Trasport  :
HQ1763 PAKISTAN RAILWAYS -(FOREIGN AID PORTION)
045401- A03    Operating Expenses                             2,500,000,000                                500,000,000
045401- A039   General                                          2,500,000,000                                500,000,000
        Total- PAKISTAN RAILWAYS -(FOREIGN AID         2,500,000,000                            500,000,000
            PORTION)
                  (In Foreign Exchange)                          (2,500,000,000)                            (500,000,000)
               (Foreign Aid)                                   (2,500,000,000)                            (500,000,000)
                                                  __________________________________________________
     045401   Total-  Railway Trasport                       2,500,000,000                            500,000,000
     0454     Total-  Railway Trasport                       2,500,000,000                            500,000,000
     045      Total-  Construction and Transport              2,500,000,000                            500,000,000
     04        Total-  Economic Affairs                       2,500,000,000                            500,000,000
               Total- COMMERCIAL DEPARTMENTS           2,500,000,000                                500,000,000
                       (In Foreign Exchange)                          (2,500,000,000)                                (500,000,000)
               (Own Resources)
                   (Foreign Aid)                                    (2,500,000,000)                                (500,000,000)
          TOTAL - DEMAND                           16,000,000,000       9,016,128,000      24,000,000,000
                  (In Foreign Exchange)                          (7,850,000,000)      (1,862,709,000)      (7,825,000,000)
            (Own Resources)                               (5,350,000,000)      (1,862,709,000)      (7,325,000,000)
               (Foreign Aid)                                   (2,500,000,000)                            (500,000,000)
                  (In Local Currency)                             (8,150,000,000)      (7,153,419,000)     (16,175,000,000)
                                                  __________________________________________________
  ______________________________________________________________________________________________________________
                           Detail of recoveries adjusted in the accounts in Reduction of Expenditure:-

                              COMMERCIAL DEPARTMENTS

04     Economic Affairs
045    Construction and Transport
0454   Railway Trasport
045401 Railway Trasport
      90001    AMOUNT MET FROM RAILWAYS           -2,500,000,000
              FOREIGN AID DEPOSIT ACCOUNTS                                                  __________________________________________________
     045401      Railway Trasport                           -2,500,000,000
                                                  __________________________________________________
     Total  -     COMMERCIAL DEPARTMENTS            -2,500,000,000
                                                  __________________________________________________