Skip to content
Qanoon Digest

Details of Demands for Grants and Appropriations (Volume-IV) Development Expenditure, part 6

FY 2019-20Details of demandsPages 501 to 584 of 584

The Details of Demands for Grants and Appropriations (Volume-IV) Development Expenditure is part of the federal budget for FY 2019-20. This page reproduces the text of its 584 PDF pages, extracted automatically from the official PDF published by the Finance Division, Government of Pakistan.

Go to a page or part

This text was extracted automatically from the PDF's text layer. Tables may lose their column alignment, and a page with no text layer is marked rather than guessed. Check the official PDF before relying on any figure.

Page 501

                                                     3,958

NO. 144.- FC22D84 DEVELOPMENT EXPENDITURE OF WATER RESOURC ES DIVISION   DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

          SECTOR BALOCHISTAN
QA9028 EXTENSION OF PAT FEEDER CANAL FOR USE OF INDUS WATER IN BALOCHISTAN PACKAGE-III
042203- A05    Grants, Subsidies and Write off Loans             50,000,000
042203- A052   Grants Domestic                                    50,000,000
        Total- EXTENSION OF PAT FEEDER CANAL            50,000,000
          FOR USE OF INDUS WATER IN
           BALOCHISTAN PACKAGE-III
QA9030 TOIWAR BATOZAI DAM DISTT KILLA SAIFULLAH
042203- A05    Grants, Subsidies and Write off Loans          1,000,000,000          800,000,000             9,783,000
042203- A052   Grants Domestic                                  1,000,000,000          800,000,000             9,783,000
        Total- TOIWAR BATOZAI DAM DISTT KILLA          1,000,000,000        800,000,000           9,783,000
           SAIFULLAH
QA9043 SHORE PROTECTION OF PASNI TOWNS BALOCHISTAN
042203- A05    Grants, Subsidies and Write off Loans            198,000,000          198,000,000
042203- A052   Grants Domestic                                  198,000,000          198,000,000
        Total- SHORE PROTECTION OF PASNI TOWNS        198,000,000        198,000,000
           BALOCHISTAN
     042203   Total-  Canal irrigation                         1,486,545,000       1,236,545,000        256,648,000
     0422     Total-   Irrigation                               8,012,113,000       3,955,985,000       8,961,127,000
     042      Total-  Agriculture,Food,Irrigation,Forestry       8,012,113,000       3,955,985,000       8,961,127,000
                   and Fishing
     04        Total-  Economic Affairs                       8,012,113,000       3,955,985,000       8,961,127,000
10      Social Protection:
107    Administration:
1071   Administration:
107105 Flood Control  :
QA9042 NORMAL EMERGENT FLOOD PROGRAMME BALOCHISTAN
107105- A05    Grants, Subsidies and Write off Loans             80,000,000            80,000,000            40,000,000
107105- A052   Grants Domestic                                    80,000,000            80,000,000            40,000,000
        Total- NORMAL EMERGENT FLOOD                    80,000,000         80,000,000          40,000,000
         PROGRAMME BALOCHISTAN
     107105   Total-  Flood Control                             80,000,000         80,000,000         40,000,000
     1071     Total-  Administration                            80,000,000         80,000,000         40,000,000
     107      Total-  Administration                            80,000,000         80,000,000         40,000,000

Page 502

                                                     3,959

NO. 144.- FC22D84 DEVELOPMENT EXPENDITURE OF WATER RESOURC ES DIVISION   DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

     10        Total-  Social Protection                          80,000,000         80,000,000         40,000,000
               Total- ACCOUNTANT GENERAL                 8,092,113,000         4,035,985,000         9,001,127,000
                PAKISTAN REVENUES
                  SUB-OFFICE, QUETTA

Page 503

                                                     3,960

NO. 144.- FC22D84 DEVELOPMENT EXPENDITURE OF WATER RESOURC ES DIVISION   DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, GILGIT

04     Economic Affairs:
042     Agriculture,Food,Irrigation,Forestry and Fishing:
0422    Irrigation:
042202 Irrigation dams  :
GL1172 DIAMER BASHA DAM (LAND ACQUISATION AND RESETTLEMENT) CHILAS
042202- A05    Grants, Subsidies and Write off Loans                                                      4,000,000,000
042202- A052   Grants Domestic                                                                              4,000,000,000
        Total- DIAMER BASHA DAM (LAND                                                          4,000,000,000
           ACQUISATION AND RESETTLEMENT)
           CHILAS
GL7090 DIAMER BASHA DAM PROJECT (DAM PART)
042202- A05    Grants, Subsidies and Write off Loans         23,680,350,000         8,680,350,000        16,000,000,000
042202- A052   Grants Domestic                                23,680,350,000         8,680,350,000        16,000,000,000
        Total- DIAMER BASHA DAM PROJECT (DAM        23,680,350,000       8,680,350,000      16,000,000,000
            PART)
     042202   Total-   Irrigation dams                        23,680,350,000       8,680,350,000      20,000,000,000
     0422     Total-   Irrigation                             23,680,350,000       8,680,350,000      20,000,000,000
     042      Total-  Agriculture,Food,Irrigation,Forestry      23,680,350,000       8,680,350,000      20,000,000,000
                   and Fishing
     04        Total-  Economic Affairs                      23,680,350,000       8,680,350,000      20,000,000,000
10      Social Protection:
107    Administration:
1071   Administration:
107105 Flood Control  :
GL7055 NORMAL EMERGENT FLOOD PROGRAMME GILGIT BALTISTAN
107105- A05    Grants, Subsidies and Write off Loans             10,000,000            10,000,000             5,000,000
107105- A052   Grants Domestic                                    10,000,000            10,000,000             5,000,000
        Total- NORMAL EMERGENT FLOOD                    10,000,000         10,000,000           5,000,000
         PROGRAMME GILGIT BALTISTAN
     107105   Total-  Flood Control                             10,000,000         10,000,000           5,000,000
     1071     Total-  Administration                            10,000,000         10,000,000           5,000,000
     107      Total-  Administration                            10,000,000         10,000,000           5,000,000
     10        Total-  Social Protection                          10,000,000         10,000,000           5,000,000

Page 504

                                                     3,961

NO. 144.- FC22D84 DEVELOPMENT EXPENDITURE OF WATER RESOURC ES DIVISION   DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, GILGIT

               Total- ACCOUNTANT GENERAL                23,690,350,000         8,690,350,000        20,005,000,000
                PAKISTAN REVENUES
                  SUB-OFFICE, GILGIT
          TOTAL - DEMAND                           62,026,495,000      20,920,367,000      66,856,579,000
                  (In Foreign Exchange)                             (61,000,000)         (61,000,000)       (701,000,000)
            (Own Resources)
               (Foreign Aid)                                      (61,000,000)         (61,000,000)       (701,000,000)
                  (In Local Currency)                            (61,965,495,000)     (20,859,367,000)     (66,155,579,000)
                                                  __________________________________________________

Page 505

                                                     3,967

NO. 145.- CAPITAL OUTLAY ON DEVELOPMENT OF ATOMIC ENERGY              DEMANDS FOR GRANTS
                                DEMAND NO. 145
                                                                            ( FC12C17 )
                      CAPITAL OUTLAY ON DEVELOPMENT OF ATOMIC ENERGY

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2020 for CAPITAL OUTLAY ON
DEVELOPMENT OF ATOMIC ENERGY.

                                Voted           Rs. 24,758,726,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
CABINET SECRETARIAT  .

                                                           2018-2019         2018-2019         2019-2020
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
017    Research and Development General Public                28,639,890,000        22,975,481,000        24,758,726,000
       Services
               Total                                              28,639,890,000        22,975,481,000        24,758,726,000
     OBJECT CLASSIFICATION
A03   Operating Expenses                                28,639,890,000      22,975,481,000      24,758,726,000
               Total                                        28,639,890,000      22,975,481,000      24,758,726,000
                  (In Foreign Exchange)                              (7,176,500,000)        (7,166,500,000)       (10,036,000,000)
            (Own Resources)                                   (7,176,500,000)        (7,166,500,000)       (10,036,000,000)
               (Foreign Aid)
                  (In Local Currency)                                (21,463,390,000)       (15,808,981,000)       (14,722,726,000)
                                                  __________________________________________________

Page 506

                                                     3,968

NO. 145.- FC12C17 CAPITAL OUTLAY ON DEVELOPMENT OF ATOMIC ENERGY        DEMANDS FOR GRANTS

III.  - DETAILS are as follows :-
                                 No of Posts        2018-2019         2018-2019       2019-2020
                                       2018-19 2019-20       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
01     General Public Service:
017    Research and Development General Public Services:
0171   Research & Dev. General Public Services:
017101 Atomic Energy  :
ID0021 PAKISTAN ATOMIC ENERGY COMMISSION
017101- A03    Operating Expenses                            28,339,890,000        22,711,481,000        24,457,256,000
017101- A039   General                                         28,339,890,000        22,711,481,000        24,457,256,000
        Total- PAKISTAN ATOMIC ENERGY                28,339,890,000      22,711,481,000      24,457,256,000
           COMMISSION
                  (In Foreign Exchange)                          (7,141,500,000)      (7,141,500,000)     (10,000,000,000)
            (Own Resources)                               (7,141,500,000)      (7,141,500,000)     (10,000,000,000)
                  (In Local Currency)                            (21,198,390,000)     (15,569,981,000)     (14,457,256,000)
                                                  __________________________________________________
ID7198 ESTABLISHMENT OF NATIONAL RADIOLOGICAL EMERGENCY COORDINATION CENTER
017101- A03    Operating Expenses                              230,000,000          230,000,000          220,000,000
017101- A039   General                                           230,000,000          230,000,000          220,000,000
        Total- ESTABLISHMENT OF NATIONAL               230,000,000        230,000,000        220,000,000
           RADIOLOGICAL EMERGENCY
           COORDINATION CENTER
                  (In Foreign Exchange)                             (10,000,000)                               (5,000,000)
            (Own Resources)                                 (10,000,000)                               (5,000,000)
                  (In Local Currency)                              (220,000,000)       (230,000,000)       (215,000,000)
                                                  __________________________________________________
ID8127 CAPACITY BUILDING IN DESIGN ASSESSMENT & ANALYSIS TO ENSURE SAFETY OF ADVANCE NUCLEAR
POWERPLANTS
017101- A03    Operating Expenses                               40,000,000            28,000,000            51,470,000
017101- A039   General                                             40,000,000            28,000,000            51,470,000
        Total- CAPACITY BUILDING IN DESIGN                 40,000,000         28,000,000          51,470,000
          ASSESSMENT & ANALYSIS TO ENSURE
           SAFETY OF ADVANCE NUCLEAR
          POWERPLANTS
                  (In Foreign Exchange)                             (20,000,000)         (25,000,000)         (26,000,000)
            (Own Resources)                                 (20,000,000)         (25,000,000)         (26,000,000)
                  (In Local Currency)                                (20,000,000)          (3,000,000)         (25,470,000)
                                                  __________________________________________________

Page 507

                                                     3,969

NO. 145.- FC12C17 CAPITAL OUTLAY ON DEVELOPMENT OF ATOMIC ENERGY        DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

ID9970 RE-INFORCEMENT OF PNRA'S CAPACITY & REGULATORY OVERSIGHT AGAINST VULNERABILITIES OF
DIGITIZED
017101- A03    Operating Expenses                               30,000,000             6,000,000            30,000,000
017101- A039   General                                             30,000,000             6,000,000            30,000,000
        Total- RE-INFORCEMENT OF PNRA'S                  30,000,000           6,000,000          30,000,000
           CAPACITY & REGULATORY
           OVERSIGHT AGAINST
            VULNERABILITIES OF DIGITIZED
                  (In Foreign Exchange)                               (5,000,000)                               (5,000,000)
            (Own Resources)                                   (5,000,000)                               (5,000,000)
                  (In Local Currency)                                (25,000,000)          (6,000,000)         (25,000,000)
                                                  __________________________________________________
     017101   Total-  Atomic Energy                        28,639,890,000      22,975,481,000      24,758,726,000
     0171     Total-  Research & Dev. General Public        28,639,890,000      22,975,481,000      24,758,726,000
                      Services
     017      Total-  Research and Development            28,639,890,000      22,975,481,000      24,758,726,000
                     General Public Services
     01        Total-  General Public Service                 28,639,890,000      22,975,481,000      24,758,726,000
               Total- ACCOUNTANT GENERAL                28,639,890,000        22,975,481,000        24,758,726,000
                PAKISTAN REVENUES
                       (In Foreign Exchange)                          (7,176,500,000)        (7,166,500,000)       (10,036,000,000)
               (Own Resources)                               (7,176,500,000)        (7,166,500,000)       (10,036,000,000)
                   (Foreign Aid)
                       (In Local Currency)                            (21,463,390,000)       (15,808,981,000)       (14,722,726,000)
          TOTAL - DEMAND                           28,639,890,000      22,975,481,000      24,758,726,000
                  (In Foreign Exchange)                          (7,176,500,000)      (7,166,500,000)     (10,036,000,000)
            (Own Resources)                               (7,176,500,000)      (7,166,500,000)     (10,036,000,000)
               (Foreign Aid)
                  (In Local Currency)                            (21,463,390,000)     (15,808,981,000)     (14,722,726,000)
                                                  __________________________________________________

Page 508

                                                     3,973

NO. 146.- CAPITAL OUTLAY ON PETROLEUM DIVISION                        DEMANDS FOR GRANTS
                                DEMAND NO. 146
                                                                            ( FC12C50 )
                           CAPITAL OUTLAY ON PETROLEUM DIVISION

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2020 to defray the Salaries and Other
Expenses of the CAPITAL OUTLAY ON PETROLEUM DIVISION.

                                Voted           Rs. 581,812,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF ENERGY  .

                                                           2018-2019         2018-2019         2019-2020
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
041    General Economic,Commercial & Labour Affairs              573,175,000          463,175,000          433,852,000
043    Fuel and Energy                                            370,000,000                                147,960,000
               Total                                                943,175,000          463,175,000          581,812,000
     OBJECT CLASSIFICATION
A01   Employees Related Expenses                           16,226,000           7,828,000           1,728,000
A011  Pay                                                            2,118,000
A011-1 Pay of Officers                                                   (2,118,000)
A012  Allowances                                                   14,108,000             7,828,000             1,728,000
A012-1 Regular Allowances                                             (8,830,000)            (4,500,000)             (500,000)
A012-2 Other Allowances (Excluding TA)                                (5,278,000)            (3,328,000)            (1,228,000)
A03   Operating Expenses                                  416,538,000         36,586,000        162,313,000
A06   Transfers                                               150,000            100,000
A09   Physical Assets                                      485,111,000        415,761,000        414,107,000
A12    Civil works                                            21,000,000
A13   Repairs and Maintenance                                4,150,000           2,900,000           3,664,000
               Total                                          943,175,000        463,175,000        581,812,000

Page 509

                                                     3,974

NO. 146.- FC12C50 CAPITAL OUTLAY ON PETROLEUM DIVISION                  DEMANDS FOR GRANTS

III.  - DETAILS are as follows :-
                                 No of Posts        2018-2019         2018-2019       2019-2020
                                       2018-19 2019-20       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
04     Economic Affairs:
043    Fuel and Energy:
0432   Petroleum and Natural Gas:
043202 PETROLEUM AND NATURAL GAS  :
ID9437 UP- GRADATION OF HDIP POL TESTING FACILITIES AT ISB LHR MTLN PSH QTTA AND ISO CERTIFICATION
OF
043202- A03    Operating Expenses                               50,000,000
043202- A039   General                                             50,000,000
        Total- UP- GRADATION OF HDIP POL TESTING         50,000,000
             FACILITIES AT ISB LHR MTLN PSH
          QTTA AND ISO CERTIFICATION OF
ID9438 STRENTHENING & UPGRADATION OF KARACHI LABORITRIES COMPLEX(KLC) AT HDIP OPERATION
OFFICE KARACHI
043202- A03    Operating Expenses                              220,000,000
043202- A039   General                                           220,000,000
        Total- STRENTHENING & UPGRADATION OF          220,000,000
           KARACHI LABORITRIES
           COMPLEX(KLC) AT HDIP OPERATION
            OFFICE KARACHI
ID9439 EXPASION AND UPGRADATION OF PAKISTAN PETROLEUM CREHOUSE(PETCORE) FOR ITS SUSTAIBALE
OPERATOIN TO
043202- A03    Operating Expenses                              100,000,000
043202- A039   General                                           100,000,000
        Total- EXPASION AND UPGRADATION OF             100,000,000
           PAKISTAN PETROLEUM
           CREHOUSE(PETCORE) FOR ITS
           SUSTAIBALE OPERATOIN TO
ID9681 EXPAN. & UPGRADATION OF PAKISTAN PETROLEUM COREHONE(PETCORE) FOR ITS SUSTAINABLE
OPERATIONS TO
043202- A03    Operating Expenses                                                                           70,000,000
043202- A039   General                                                                                        70,000,000
        Total- EXPAN. & UPGRADATION OF PAKISTAN                                                70,000,000
          PETROLEUM COREHONE(PETCORE)
          FOR ITS SUSTAINABLE OPERATIONS

Page 510

                                                     3,975

NO. 146.- FC12C50 CAPITAL OUTLAY ON PETROLEUM DIVISION                  DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

          TO
ID9682 UPGRADATION OF HDIPS POL TESTING FACILITEIS AT ISB.LHR. MNP.PSH.QTA AN ISO CERTIFICATION OF
PETROLEUM
043202- A03    Operating Expenses                                                                           77,960,000
043202- A039   General                                                                                        77,960,000
        Total- UPGRADATION OF HDIPS POL TESTING                                                77,960,000
             FACILITEIS AT ISB.LHR. MNP.PSH.QTA
          AN ISO CERTIFICATION OF
          PETROLEUM
     043202   Total-  PETROLEUM AND NATURAL            370,000,000                            147,960,000
               GAS
     0432     Total-  Petroleum and Natural Gas               370,000,000                            147,960,000
     043      Total-  Fuel and Energy                         370,000,000                            147,960,000
     04        Total-  Economic Affairs                        370,000,000                            147,960,000
               Total- ACCOUNTANT GENERAL                  370,000,000                                147,960,000
                PAKISTAN REVENUES

Page 511

                                                     3,976

NO. 146.- FC12C50 CAPITAL OUTLAY ON PETROLEUM DIVISION                  DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

04     Economic Affairs:
041    General Economic,Commercial & Labour Affairs:
0411   General Economic Affairs:
041103 Geological Survey  :
QA3981 UGRADATION OF CHEM.& PET MIN LAB AT GSP SZ KARACHI
041103- A01    Employees Related Expenses                       7,148,000
041103- A011   Pay                      14                    2,118,000
041103- A011-1 Pay of Officers               (14)                  (2,118,000)
041103- A012   Allowances                                           5,030,000
041103- A012-1  Regular Allowances                               (3,530,000)
041103- A012-2  Other Allowances (Excluding TA)                  (1,500,000)
041103- A03    Operating Expenses                                 2,352,000
041103- A032   Communications                                       73,000
041103- A034   Occupancy Costs                                      25,000
041103- A038    Travel & Transportation                               1,054,000
041103- A039   General                                              1,200,000
041103- A09    Physical Assets                                    68,700,000
041103- A092   Computer Equipment                                 4,700,000
041103- A095   Purchase of Transport                              10,000,000
041103- A096   Purchase of Plant and Machinery                    54,000,000
041103- A12     Civil works                                         21,000,000
041103- A124    Building and Structures                             21,000,000
041103- A13    Repairs and Maintenance                            800,000
041103- A130    Transport                                            500,000
041103- A131   Machinery and Equipment                             300,000
        Total- UGRADATION OF CHEM.& PET MIN LAB        100,000,000
           AT GSP SZ KARACHI
QA3982 GEOLOGICAL MAPING OF 50 TOPOSHEETS OF UN MAPPED AREA BALOCHISTAN
041103- A01    Employees Related Expenses                       1,250,000
041103- A012   Allowances                                           1,250,000
041103- A012-1  Regular Allowances                                (800,000)
041103- A012-2  Other Allowances (Excluding TA)                    (450,000)

Page 512

                                                     3,977

NO. 146.- FC12C50 CAPITAL OUTLAY ON PETROLEUM DIVISION                  DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

041103- A03    Operating Expenses                                 7,600,000
041103- A032   Communications                                       35,000
041103- A033     Utilities                                                50,000
041103- A036   Motor Vehicles                                         10,000
041103- A038    Travel & Transportation                               6,505,000
041103- A039   General                                              1,000,000
041103- A06    Transfers                                              50,000
041103- A063    Entertainment & Gifts                                   50,000
041103- A09    Physical Assets                                      650,000
041103- A092   Computer Equipment                                 450,000
041103- A096   Purchase of Plant and Machinery                      200,000
041103- A13    Repairs and Maintenance                            450,000
041103- A130    Transport                                            250,000
041103- A131   Machinery and Equipment                              50,000
041103- A132    Furniture and Fixture                                   50,000
041103- A137   Computer Equipment                                 100,000
        Total- GEOLOGICAL MAPING OF 50                    10,000,000
          TOPOSHEETS OF UN MAPPED AREA
           BALOCHISTAN
QA9063 EXPLORATION & EVALUATION OF METLIC MINERALS IN BELA & UTHAL AREAS DIST. LASBELA
BALOCHISTAN
041103- A01    Employees Related Expenses                       1,800,000             1,800,000              200,000
041103- A012   Allowances                                           1,800,000             1,800,000              200,000
041103- A012-1  Regular Allowances                               (1,000,000)          (1,000,000)
041103- A012-2  Other Allowances (Excluding TA)                    (800,000)            (800,000)            (200,000)
041103- A03    Operating Expenses                                 9,857,000             9,857,000             2,450,000
041103- A033     Utilities                                                57,000               57,000
041103- A038    Travel & Transportation                               5,500,000             5,500,000             1,900,000
041103- A039   General                                              4,300,000             4,300,000              550,000
041103- A06    Transfers                                              50,000               50,000
041103- A063    Entertainment & Gifts                                   50,000               50,000
041103- A09    Physical Assets                                      1,802,000             1,802,000

Page 513

                                                     3,978

NO. 146.- FC12C50 CAPITAL OUTLAY ON PETROLEUM DIVISION                  DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

041103- A092   Computer Equipment                                 500,000              500,000
041103- A095   Purchase of Transport                                   2,000                 2,000
041103- A096   Purchase of Plant and Machinery                     1,150,000             1,150,000
041103- A097   Purchase of Furniture and Fixture                     150,000              150,000
041103- A13    Repairs and Maintenance                            1,100,000             1,100,000              459,000
041103- A130    Transport                                            500,000              500,000              359,000
041103- A131   Machinery and Equipment                             300,000              300,000
041103- A132    Furniture and Fixture                                  100,000              100,000              100,000
041103- A137   Computer Equipment                                 200,000              200,000
        Total- EXPLORATION & EVALUATION OF              14,609,000         14,609,000           3,109,000
           METLIC MINERALS IN BELA & UTHAL
          AREAS DIST. LASBELA BALOCHISTAN
QA9064 APPRASIAL OF NEWLY DISCOVERED COAL RESOURCES OF BADIN COAL FIELD & ITS ADJOING AREAS
OF SOUTHERN
041103- A01    Employees Related Expenses                       3,200,000             3,200,000              800,000
041103- A012   Allowances                                           3,200,000             3,200,000              800,000
041103- A012-1  Regular Allowances                               (2,000,000)          (2,000,000)            (500,000)
041103- A012-2  Other Allowances (Excluding TA)                  (1,200,000)          (1,200,000)            (300,000)
041103- A03    Operating Expenses                               10,336,000            10,336,000              600,000
041103- A034   Occupancy Costs                                     1,300,000             1,300,000
041103- A038    Travel & Transportation                               7,872,000             7,872,000              600,000
041103- A039   General                                              1,164,000             1,164,000
041103- A13    Repairs and Maintenance                            200,000              200,000             2,255,000
041103- A130    Transport                                            200,000              200,000              500,000
041103- A131   Machinery and Equipment                                                                        1,755,000
        Total- APPRASIAL OF NEWLY DISCOVERED           13,736,000         13,736,000           3,655,000
          COAL RESOURCES OF BADIN COAL
            FIELD & ITS ADJOING AREAS OF
          SOUTHERN
QA9065 ACQUISTION OF FOUR DRILLING RIGNS WITH ACCESSORIES FOR THE GEOLOGICAL SURVEY OF
PAKISTAN
041103- A01    Employees Related Expenses                        728,000              728,000              728,000
041103- A012   Allowances                                           728,000              728,000              728,000

Page 514

                                                     3,979

NO. 146.- FC12C50 CAPITAL OUTLAY ON PETROLEUM DIVISION                  DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

041103- A012-2  Other Allowances (Excluding TA)                    (728,000)            (728,000)            (728,000)
041103- A03    Operating Expenses                                 2,700,000             2,700,000             2,700,000
041103- A036   Motor Vehicles                                       250,000              250,000              250,000
041103- A038    Travel & Transportation                               2,150,000             2,150,000             2,150,000
041103- A039   General                                              300,000              300,000              300,000
041103- A09    Physical Assets                                   413,107,000          413,107,000          413,107,000
041103- A095   Purchase of Transport                                1,705,000             1,705,000             1,705,000
041103- A096   Purchase of Plant and Machinery                  411,402,000          411,402,000          411,402,000
        Total- ACQUISTION OF FOUR DRILLING RIGNS        416,535,000        416,535,000        416,535,000
           WITH ACCESSORIES FOR THE
           GEOLOGICAL SURVEY OF PAKISTAN
QA9067 EXPLORATION & EVALUATION OF COAL IN NOSHAM AND BAHLOL AREAS OF BALOCHISTAN
041103- A01    Employees Related Expenses                       2,100,000             2,100,000
041103- A012   Allowances                                           2,100,000             2,100,000
041103- A012-1  Regular Allowances                               (1,500,000)          (1,500,000)
041103- A012-2  Other Allowances (Excluding TA)                    (600,000)            (600,000)
041103- A03    Operating Expenses                               13,693,000            13,693,000             8,603,000
041103- A032   Communications                                     115,000              115,000               50,000
041103- A033     Utilities                                               868,000              868,000             1,000,000
041103- A036   Motor Vehicles                                         10,000               10,000
041103- A038    Travel & Transportation                               9,400,000             9,400,000             7,253,000
041103- A039   General                                              3,300,000             3,300,000              300,000
041103- A06    Transfers                                              50,000               50,000
041103- A063    Entertainment & Gifts                                   50,000               50,000
041103- A09    Physical Assets                                      852,000              852,000             1,000,000
041103- A092   Computer Equipment                                 350,000              350,000
041103- A095   Purchase of Transport                                   2,000                 2,000
041103- A096   Purchase of Plant and Machinery                      300,000              300,000             1,000,000
041103- A097   Purchase of Furniture and Fixture                     200,000              200,000
041103- A13    Repairs and Maintenance                            1,600,000             1,600,000              950,000
041103- A130    Transport                                            700,000              700,000              150,000
041103- A131   Machinery and Equipment                             500,000              500,000              800,000

Page 515

                                                     3,980

NO. 146.- FC12C50 CAPITAL OUTLAY ON PETROLEUM DIVISION                  DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

041103- A132    Furniture and Fixture                                  200,000              200,000
041103- A137   Computer Equipment                                 200,000              200,000
        Total- EXPLORATION & EVALUATION OF              18,295,000         18,295,000          10,553,000
          COAL IN NOSHAM AND BAHLOL AREAS
          OF BALOCHISTAN
     041103   Total-  Geological Survey                       573,175,000        463,175,000        433,852,000
     0411     Total-  General Economic Affairs                 573,175,000        463,175,000        433,852,000
     041      Total-  General Economic,Commercial &          573,175,000        463,175,000        433,852,000
                     Labour Affairs
     04        Total-  Economic Affairs                        573,175,000        463,175,000        433,852,000
               Total- ACCOUNTANT GENERAL                  573,175,000          463,175,000          433,852,000
                PAKISTAN REVENUES
                  SUB-OFFICE, QUETTA
          TOTAL - DEMAND                              943,175,000        463,175,000        581,812,000

Page 516

                                                     3,983

NO. 147.- CAPITAL OUTLAY ON FEDERAL INVESTMENTS                      DEMANDS FOR GRANTS
                                DEMAND NO. 147
                                                                            ( FC12C39 )
                          CAPITAL OUTLAY ON FEDERAL INVESTMENTS

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2020 for CAPITAL OUTLAY ON FEDERAL
INVESTMENTS.

                                Voted           Rs. 684,480,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF FINANCE, REVENUE AND ECONOMIC AFFAIRS .

                                                           2018-2019         2018-2019         2019-2020
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
014    Transfers                                                   1,560,938,000            96,500,000          684,480,000
               Total                                               1,560,938,000            96,500,000          684,480,000
     OBJECT CLASSIFICATION
A11   Investments                                         1,560,938,000         96,500,000        684,480,000
               Total                                         1,560,938,000         96,500,000        684,480,000
                  (In Foreign Exchange)                               (460,680,000)           (91,500,000)         (250,000,000)
            (Own Resources)                                    (460,680,000)           (91,500,000)         (200,000,000)
               (Foreign Aid)                                                                                        (50,000,000)
                  (In Local Currency)                                  (1,100,258,000)            (5,000,000)         (434,480,000)
                                                  __________________________________________________

Page 517

                                                     3,984

NO. 147.- FC12C39 CAPITAL OUTLAY ON FEDERAL INVESTMENTS                DEMANDS FOR GRANTS

III.  - DETAILS are as follows :-
                                 No of Posts        2018-2019         2018-2019       2019-2020
                                       2018-19 2019-20       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
01     General Public Service:
014    Transfers:
0143   Investments:
014302 Non-Financial Institutions  :
ID2055 RBS SHAKARGARH
014302- A11    Investments                                        19,000,000
014302- A111   Investment Local                                    19,000,000
        Total- RBS SHAKARGARH                             19,000,000
ID3219 REBROADCAST STATION, KHARAN
014302- A11    Investments                                        14,430,000
014302- A111   Investment Local                                    14,430,000
        Total- REBROADCAST STATION, KHARAN             14,430,000
                  (In Foreign Exchange)                               (4,540,000)
            (Own Resources)                                   (4,540,000)
                  (In Local Currency)                                  (9,890,000)
                                                  __________________________________________________
ID3220 REBROADCAST STATION, BAR KHAN
014302- A11    Investments                                        17,080,000
014302- A111   Investment Local                                    17,080,000
        Total- REBROADCAST STATION, BAR KHAN           17,080,000
                  (In Foreign Exchange)                               (5,140,000)
            (Own Resources)                                   (5,140,000)
                  (In Local Currency)                                (11,940,000)
                                                  __________________________________________________
ID3222 REBROADCAST STATION, JURA
014302- A11    Investments                                        10,000,000
014302- A111   Investment Local                                    10,000,000
        Total- REBROADCAST STATION, JURA                10,000,000
ID3223 REBROADCAST STATION, ATHMAQAM
014302- A11    Investments                                        10,000,000
014302- A111   Investment Local                                    10,000,000
        Total- REBROADCAST STATION, ATHMAQAM          10,000,000
ID3224 REBROADCAST STATION, KARAN

Page 518

                                                     3,985

NO. 147.- FC12C39 CAPITAL OUTLAY ON FEDERAL INVESTMENTS                DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

014302- A11    Investments                                        10,000,000
014302- A111   Investment Local                                    10,000,000
        Total- REBROADCAST STATION, KARAN               10,000,000
                  (In Foreign Exchange)                               (5,000,000)
            (Own Resources)                                   (5,000,000)
                  (In Local Currency)                                  (5,000,000)
                                                  __________________________________________________
ID3225 REBROADCAST STATION, DHUDHNIAL
014302- A11    Investments                                        10,000,000
014302- A111   Investment Local                                    10,000,000
        Total- REBROADCAST STATION, DHUDHNIAL          10,000,000
                  (In Foreign Exchange)                               (5,000,000)
            (Own Resources)                                   (5,000,000)
                  (In Local Currency)                                  (5,000,000)
                                                  __________________________________________________
ID3226 REBROADCAST STATION, SHARDA
014302- A11    Investments                                        10,000,000
014302- A111   Investment Local                                    10,000,000
        Total- REBROADCAST STATION, SHARDA             10,000,000
                  (In Foreign Exchange)                               (5,000,000)
            (Own Resources)                                   (5,000,000)
                  (In Local Currency)                                  (5,000,000)
                                                  __________________________________________________
ID3227 REBROADCAST STATION, KEL
014302- A11    Investments                                        10,000,000
014302- A111   Investment Local                                    10,000,000
        Total- REBROADCAST STATION, KEL                  10,000,000
                  (In Foreign Exchange)                               (5,000,000)
            (Own Resources)                                   (5,000,000)
                  (In Local Currency)                                  (5,000,000)
                                                  __________________________________________________
ID4130 REBROADCAST STATION, SHANGLA (SWAT).
014302- A11    Investments                                        26,000,000
014302- A111   Investment Local                                    26,000,000
        Total- REBROADCAST STATION, SHANGLA            26,000,000

Page 519

                                                     3,986

NO. 147.- FC12C39 CAPITAL OUTLAY ON FEDERAL INVESTMENTS                DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

             (SWAT).
ID7197 DUBBING OF PAKISTANI DRAMAS IN FOREIGN LANGUAGES
014302- A11    Investments                                        14,373,000             5,000,000
014302- A111   Investment Local                                    14,373,000             5,000,000
        Total- DUBBING OF PAKISTANI DRAMAS IN            14,373,000           5,000,000
           FOREIGN LANGUAGES
ID9147 REPLACEMNET OF EQUIPMENT OF STUDIO & CONTROL ROOM OF PTV ACADEMY
014302- A11    Investments                                        30,000,000
014302- A111   Investment Local                                    30,000,000
        Total- REPLACEMNET OF EQUIPMENT OF             30,000,000
           STUDIO & CONTROL ROOM OF PTV
          ACADEMY
ID9148 MODERNIZATION OF CAMERA AND PRODUCTION EQUIPMENT OF PTV
014302- A11    Investments                                       200,000,000            91,500,000          200,000,000
014302- A111   Investment Local                                  200,000,000            91,500,000          200,000,000
        Total- MODERNIZATION OF CAMERA AND            200,000,000         91,500,000        200,000,000
           PRODUCTION EQUIPMENT OF PTV
                  (In Foreign Exchange)                           (100,000,000)         (91,500,000)       (200,000,000)
            (Own Resources)                                (100,000,000)         (91,500,000)       (200,000,000)
                  (In Local Currency)                              (100,000,000)
                                                  __________________________________________________
ID9347 PTV TERRESTERIAL DIGITALISATION DTMB DEMONSTRATION PROJECT THROUGH GRANT-IN-AID
014302- A11    Investments                                        34,000,000                                 84,480,000
014302- A111   Investment Local                                    34,000,000                                 84,480,000
        Total- PTV TERRESTERIAL DIGITALISATION           34,000,000                             84,480,000
          DTMB DEMONSTRATION PROJECT
          THROUGH GRANT-IN-AID
                  (In Foreign Exchange)                                                                      (50,000,000)
               (Foreign Aid)                                                                               (50,000,000)
                  (In Local Currency)                                (34,000,000)                             (34,480,000)
                                                  __________________________________________________
ID9348 REBROADCAST STATION MUSA KHEL BALOCHISTAN
014302- A11    Investments                                       107,943,000
014302- A111   Investment Local                                  107,943,000

Page 520

                                                     3,987

NO. 147.- FC12C39 CAPITAL OUTLAY ON FEDERAL INVESTMENTS                DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

        Total- REBROADCAST STATION MUSA KHEL         107,943,000
           BALOCHISTAN
ID9349 REBROADCAST STATION MUSLIM BAGH BALOCHISTAN
014302- A11    Investments                                       112,318,000
014302- A111   Investment Local                                  112,318,000
        Total- REBROADCAST STATION MUSLIM             112,318,000
          BAGH BALOCHISTAN
ID9350 REBROADCAST STATION KHAN MEHTERZAI BALOCHISTAN
014302- A11    Investments                                       111,376,000
014302- A111   Investment Local                                  111,376,000
        Total- REBROADCAST STATION KHAN               111,376,000
           MEHTERZAI BALOCHISTAN
ID9351 REBROADCAST STATION SHERANI BALOCHISTAN
014302- A11    Investments                                       113,418,000
014302- A111   Investment Local                                  113,418,000
        Total- REBROADCAST STATION SHERANI            113,418,000
           BALOCHISTAN
ID9352 PTV PARLIAMENTRY CHANNEL
014302- A11    Investments                                       331,000,000
014302- A111   Investment Local                                  331,000,000
        Total- PTV PARLIAMENTRY CHANNEL                331,000,000
                  (In Foreign Exchange)                           (331,000,000)
            (Own Resources)                                (331,000,000)
                                                  __________________________________________________
ID9571 REBRANDING/ RENOVATI REBRANDING/485 POST OFFICESS ALL OVER THE COUNTRY
014302- A11    Investments                                       200,000,000
014302- A111   Investment Local                                  200,000,000
        Total- REBRANDING/ RENOVATI                     200,000,000
           REBRANDING/485 POST OFFICESS ALL
          OVER THE COUNTRY
ID9572 CONSTRUCTION OF INTERNATIONAL MAIL OFFIC E AT KARACHI
014302- A11    Investments                                        80,000,000
014302- A111   Investment Local                                    80,000,000
        Total- CONSTRUCTION OF INTERNATIONAL           80,000,000

Page 521

                                                     3,988

NO. 147.- FC12C39 CAPITAL OUTLAY ON FEDERAL INVESTMENTS                DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

            MAIL OFFIC E AT KARACHI
ID9573 CONSTRUCTION OF INTERNATIONAL STANDARD MAIL FACILITATION CENTRE AT GOLRA M ORE
RAWALPINDI
014302- A11    Investments                                        50,000,000
014302- A111   Investment Local                                    50,000,000
        Total- CONSTRUCTION OF INTERNATIONAL           50,000,000
          STANDARD MAIL FACILITATION
          CENTRE AT GOLRA M ORE
           RAWALPINDI
ID9574 CONSTRUCTION OF INTERNATIONAL MAIL OFFIC E AT GAWADAR
014302- A11    Investments                                        40,000,000
014302- A111   Investment Local                                    40,000,000
        Total- CONSTRUCTION OF INTERNATIONAL           40,000,000
            MAIL OFFIC E AT GAWADAR
     014302   Total-  Non-Financial Institutions                1,560,938,000         96,500,000        284,480,000
     0143     Total-  Investments                            1,560,938,000         96,500,000        284,480,000
     014      Total-  Transfers                              1,560,938,000         96,500,000        284,480,000
     01        Total-  General Public Service                  1,560,938,000         96,500,000        284,480,000
               Total- ACCOUNTANT GENERAL                 1,560,938,000            96,500,000          284,480,000
                PAKISTAN REVENUES
                       (In Foreign Exchange)                           (460,680,000)           (91,500,000)         (250,000,000)
               (Own Resources)                                (460,680,000)           (91,500,000)         (200,000,000)
                   (Foreign Aid)                                                                                    (50,000,000)
                       (In Local Currency)                             (1,100,258,000)            (5,000,000)           (34,480,000)

Page 522

                                                     3,989

NO. 147.- FC12C39 CAPITAL OUTLAY ON FEDERAL INVESTMENTS                DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

01     General Public Service:
014    Transfers:
0143   Investments:
014302 Non-Financial Institutions  :
LO3122 PAKISTAN EXPO CENTRE QUETTA
014302- A11    Investments                                                                                 100,000,000
014302- A111   Investment Local                                                                             100,000,000
        Total- PAKISTAN EXPO CENTRE QUETTA                                                   100,000,000
LO3123 PAKISTAN EXPO CENTRE PESHAWAR
014302- A11    Investments                                                                                 300,000,000
014302- A111   Investment Local                                                                             300,000,000
        Total- PAKISTAN EXPO CENTRE PESHAWAR                                                300,000,000
     014302   Total-  Non-Financial Institutions                                                        400,000,000
     0143     Total-  Investments                                                                   400,000,000
     014      Total-  Transfers                                                                      400,000,000
     01        Total-  General Public Service                                                          400,000,000
               Total- ACCOUNTANT GENERAL                                                             400,000,000
                PAKISTAN REVENUES
                  SUB-OFFICE, LAHORE
          TOTAL - DEMAND                             1,560,938,000         96,500,000        684,480,000
                  (In Foreign Exchange)                           (460,680,000)         (91,500,000)       (250,000,000)
            (Own Resources)                                (460,680,000)         (91,500,000)       (200,000,000)
               (Foreign Aid)                                                                               (50,000,000)
                  (In Local Currency)                             (1,100,258,000)          (5,000,000)       (434,480,000)
                                                  __________________________________________________

Page 523

                                                     3,990

NO. 148.- DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT    DEMANDS FOR GRANTS
                                DEMAND NO. 148
                                                                            ( FC12D36 )
              DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL GOVERNMENT

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2020 for DEVELOPMENT LOANS AND
ADVANCES BY THE FEDERAL GOVERNMENT.

                                Voted           Rs. 136,113,059,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF FINANCE, REVENUE AND ECONOMIC AFFAIRS .

                                                           2018-2019         2018-2019         2019-2020
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
014    Transfers                                                156,314,643,000       100,156,052,000       136,113,059,000
               Total                                            156,314,643,000       100,156,052,000       136,113,059,000
     OBJECT CLASSIFICATION
A08   Loans and Advances                              156,314,643,000    100,156,052,000    136,113,059,000
               Total                                      156,314,643,000    100,156,052,000    136,113,059,000
                  (In Foreign Exchange)                                 (37,656,000)
            (Own Resources)
               (Foreign Aid)                                           (37,656,000)
                  (In Local Currency)                               (156,276,987,000)     (100,156,052,000)     (136,113,059,000)
                                                  __________________________________________________

Page 524

                                                     3,991

NO. 148.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
III.  - DETAILS are as follows :-
                                 No of Posts        2018-2019         2018-2019       2019-2020
                                       2018-19 2019-20       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
01     General Public Service:
014    Transfers:
0141   Transfers (Inter-Governmental):
014102 To district governments  :
ID0983 NATIONAL HIGHWAY AUTHORITY
014102- A08    Loans and Advances                          125,783,000,000        77,997,800,000        98,554,919,000
014102- A083    District Government / TMAs                    125,783,000,000        77,997,800,000        98,554,919,000
        Total- NATIONAL HIGHWAY AUTHORITY          125,783,000,000      77,997,800,000      98,554,919,000
ID4138 100KW MW TRANSMITTER GWADAR
014102- A08    Loans and Advances                               15,000,000                                 40,146,000
014102- A083    District Government / TMAs                         15,000,000                                 40,146,000
        Total- 100KW MW TRANSMITTER GWADAR            15,000,000                             40,146,000
ID9149 ESTABLISHMENT OF SAUTUL QURAN FM NETWORK PHASE-II
014102- A08    Loans and Advances                               40,000,000             7,300,000
014102- A083    District Government / TMAs                         40,000,000             7,300,000
        Total- ESTABLISHMENT OF SAUTUL QURAN           40,000,000           7,300,000
          FM NETWORK PHASE-II
ID9150 UP-GRADTION OF RADIO STATION MULTAN UNDER ODA PROGRAMME KOREA
014102- A08    Loans and Advances                               52,656,000            36,087,000            14,384,000
014102- A083    District Government / TMAs                         52,656,000            36,087,000            14,384,000
        Total- UP-GRADTION OF RADIO STATION              52,656,000         36,087,000          14,384,000
          MULTAN UNDER ODA PROGRAMME
          KOREA
                  (In Foreign Exchange)                             (37,656,000)
               (Foreign Aid)                                      (37,656,000)
                  (In Local Currency)                                (15,000,000)         (36,087,000)         (14,384,000)
                                                  __________________________________________________
ID9157 RAHABILTATION OF MEDIUM WAVE SERVICE FROM MUZAFARABAD(AJK) & REBUILT OF BH
014102- A08    Loans and Advances                               40,000,000            25,519,000            41,500,000
014102- A083    District Government / TMAs                         40,000,000            25,519,000            41,500,000
        Total- RAHABILTATION OF MEDIUM WAVE             40,000,000         25,519,000          41,500,000
           SERVICE FROM MUZAFARABAD(AJK) &
           REBUILT OF BH

Page 525

                                                     3,992

NO. 148.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

ID9158 REPLACEMENT OF MEDIUM WAVE TRANSMITTER AT MIRPUR
014102- A08    Loans and Advances                               50,000,000                                 60,000,000
014102- A083    District Government / TMAs                         50,000,000                                 60,000,000
        Total- REPLACEMENT OF MEDIUM WAVE              50,000,000                             60,000,000
           TRANSMITTER AT MIRPUR
     014102   Total-  To district governments               125,980,656,000      78,066,706,000      98,710,949,000
014110 Others  :
IB5026 REHABILITATION OF AFFECTED POPULATION RESIDING ALONG LOC PHASE-I
014110- A08    Loans and Advances                                                                        300,000,000
014110- A086   Loans to Others                                                                              300,000,000
        Total- REHABILITATION OF AFFECTED                                                      300,000,000
           POPULATION RESIDING ALONG LOC
            PHASE-I
ID0979 AZAD GOVERNMENT OF THE STATE OF JAMMU AND KASHMIR.(NON-SAP)
014110- A08    Loans and Advances                           20,200,000,000        15,200,000,000        22,000,000,000
014110- A086   Loans to Others                                 20,200,000,000        15,200,000,000        22,000,000,000
        Total- AZAD GOVERNMENT OF THE STATE OF     20,200,000,000      15,200,000,000      22,000,000,000
          JAMMU AND KASHMIR.(NON-SAP)
ID3298 PROVISION OF WATER SUPPLY AND SEVERAGE TO MIRPUR CITYAND HAMLETS
014110- A08    Loans and Advances                             300,000,000          300,000,000            50,000,000
014110- A086   Loans to Others                                   300,000,000          300,000,000            50,000,000
        Total- PROVISION OF WATER SUPPLY AND           300,000,000        300,000,000          50,000,000
          SEVERAGE TO MIRPUR CITYAND
          HAMLETS
ID3300 CONSTRUCTION OF RATHUA HARYAM BRIDGE ACCROS RESERVOIR MIRPUR.
014110- A08    Loans and Advances                            1,955,617,000         1,955,617,000          407,260,000
014110- A086   Loans to Others                                  1,955,617,000         1,955,617,000          407,260,000
        Total- CONSTRUCTION OF RATHUA HARYAM       1,955,617,000       1,955,617,000        407,260,000
           BRIDGE ACCROS RESERVOIR MIRPUR.
ID4584 48 MW JAGRAN HYDRO POWER PROJECT
014110- A08    Loans and Advances                               30,000,000            30,000,000          200,000,000
014110- A086   Loans to Others                                     30,000,000            30,000,000          200,000,000

Page 526

                                                     3,993

NO. 148.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

        Total- 48 MW JAGRAN HYDRO POWER                 30,000,000         30,000,000        200,000,000
          PROJECT
ID7377 ATHMUQAM-KERAN BYPASS ROAD
014110- A08    Loans and Advances                             100,000,000          100,000,000          227,815,000
014110- A086   Loans to Others                                   100,000,000          100,000,000          227,815,000
        Total- ATHMUQAM-KERAN BYPASS ROAD            100,000,000        100,000,000        227,815,000
ID7378 MIR WAIZ MUHAMMAD FAROOQ SHAHEED MEDICAL COLLEGE MUZAFFARABAD
014110- A08    Loans and Advances                             500,000,000          500,000,000          350,000,000
014110- A086   Loans to Others                                   500,000,000          500,000,000          350,000,000
        Total- MIR WAIZ MUHAMMAD FAROOQ               500,000,000        500,000,000        350,000,000
          SHAHEED MEDICAL COLLEGE
          MUZAFFARABAD
ID7379 MEDICAL COLLEGE MIRPUR
014110- A08    Loans and Advances                             471,000,000          471,000,000          350,000,000
014110- A086   Loans to Others                                   471,000,000          471,000,000          350,000,000
        Total- MEDICAL COLLEGE MIRPUR                   471,000,000        471,000,000        350,000,000
ID7380 NOSERI-LESWA BYPASS ROAD
014110- A08    Loans and Advances                             100,000,000          100,000,000          179,325,000
014110- A086   Loans to Others                                   100,000,000          100,000,000          179,325,000
        Total- NOSERI-LESWA BYPASS ROAD                100,000,000        100,000,000        179,325,000
ID8212 LEGISTATIVE ASSEMBLY AJ&K
014110- A08    Loans and Advances                             500,000,000          400,000,000          400,000,000
014110- A086   Loans to Others                                   500,000,000          400,000,000          400,000,000
        Total- LEGISTATIVE ASSEMBLY AJ&K                500,000,000        400,000,000        400,000,000
ID9447 ESTAB. OF ENDOWMENT FUND FOR PAKISTAN RED CRESCENT IN AJK
014110- A08    Loans and Advances                             100,000,000
014110- A086   Loans to Others                                   100,000,000
        Total- ESTAB. OF ENDOWMENT FUND FOR           100,000,000
           PAKISTAN RED CRESCENT IN AJK
ID9448 IMPROVEMENT & MODELING OF LINK ROAD KONKAN PANJOOR GALI (13 KM) DISTT. MUZAFFARABAD
014110- A08    Loans and Advances                               50,000,000
014110- A086   Loans to Others                                     50,000,000

Page 527

                                                     3,994

NO. 148.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

        Total- IMPROVEMENT & MODELING OF LINK           50,000,000
          ROAD KONKAN PANJOOR GALI (13 KM)
             DISTT. MUZAFFARABAD
     014110   Total-  Others                               24,306,617,000      19,056,617,000      24,464,400,000
     0141     Total-  Transfers (Inter-Governmental)        150,287,273,000      97,123,323,000    123,175,349,000
0142   Transfers (Others):
014202 Trasfer To Non-Financial Institutions  :
IB0703 SUPPLY OF ELECTRICITY TO SPECIAL Economic zones
014202- A08    Loans and Advances                                                                        1,210,000,000
014202- A085   Loans to Non Financial Institutions                                                            1,210,000,000
        Total- SUPPLY OF ELECTRICITY TO SPECIAL                                               1,210,000,000
            Economic zones
IB0705 OFF-GRID SOLUTIONS (MERGED DISTRICTS & Balochistan) (Feasiblity)
014202- A08    Loans and Advances                                                                          20,000,000
014202- A085   Loans to Non Financial Institutions                                                              20,000,000
        Total- OFF-GRID SOLUTIONS (MERGED                                                       20,000,000
            DISTRICTS & Balochistan) (Feasiblity)
IB0706 DISTRI. GENERATION SCHEMES THROUGH RENEW ABLE ENERGY
014202- A08    Loans and Advances                                                                        100,000,000
014202- A085   Loans to Non Financial Institutions                                                            100,000,000
        Total-  DISTRI. GENERATION SCHEMES                                                      100,000,000
          THROUGH RENEW ABLE ENERGY
ID8219 CASH DEVELOPMENT LOAN TO QESCO
014202- A08    Loans and Advances                            2,684,430,000
014202- A085   Loans to Non Financial Institutions                2,684,430,000
        Total- CASH DEVELOPMENT LOAN TO QESCO      2,684,430,000

ID8446 CASH DEVELOPMENT LOAN TO TESCO
014202- A08    Loans and Advances                             107,940,000
014202- A085   Loans to Non Financial Institutions                 107,940,000
        Total- CASH DEVELOPMENT LOAN TO TESCO        107,940,000

ID9258 CASH DEVELOPMENT LOAN TO PESCO

Page 528

                                                     3,995

NO. 148.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

014202- A08    Loans and Advances                             500,000,000
014202- A085   Loans to Non Financial Institutions                 500,000,000
        Total- CASH DEVELOPMENT LOAN TO PESCO        500,000,000

ID9259 CASH DEVELOPMENT LOAN TO M/O WATER & POWER
014202- A08    Loans and Advances                                5,000,000
014202- A085   Loans to Non Financial Institutions                    5,000,000
        Total- CASH DEVELOPMENT LOAN TO M/O              5,000,000
          WATER & POWER
ID9260 CASH DEVELOPMENT LOAN TO PPIB
014202- A08    Loans and Advances                                5,000,000
014202- A085   Loans to Non Financial Institutions                    5,000,000
        Total- CASH DEVELOPMENT LOAN TO PPIB             5,000,000
ID9557 CASH DEVELOPMENT LOAN TO SEPCO
014202- A08    Loans and Advances                             125,000,000
014202- A085   Loans to Non Financial Institutions                 125,000,000
        Total- CASH DEVELOPMENT LOAN TO SEPCO        125,000,000

     014202   Total-  Trasfer To Non-Financial                3,427,370,000                           1,330,000,000
                           Institutions
     0142     Total-  Transfers (Others)                      3,427,370,000                           1,330,000,000
     014      Total-  Transfers                           153,714,643,000      97,123,323,000    124,505,349,000
     01        Total-  General Public Service               153,714,643,000      97,123,323,000    124,505,349,000
               Total- ACCOUNTANT GENERAL               153,714,643,000        97,123,323,000       124,505,349,000
                PAKISTAN REVENUES
                       (In Foreign Exchange)                             (37,656,000)
               (Own Resources)
                   (Foreign Aid)                                      (37,656,000)
                       (In Local Currency)                           (153,676,987,000)       (97,123,323,000)     (124,505,349,000)

Page 529

                                                     3,996

NO. 148.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

              ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR

01     General Public Service:
014    Transfers:
0142   Transfers (Others):
014202 Trasfer To Non-Financial Institutions  :
PR3128 ABC CABLES FOR PESHAWAR KHAYBER & BANNU Circles (PESCO)
014202- A08    Loans and Advances                                                                        350,000,000
014202- A085   Loans to Non Financial Institutions                                                            350,000,000
        Total- ABC CABLES FOR PESHAWAR                                                       350,000,000
          KHAYBER & BANNU Circles (PESCO)
PR3129 ELECTRIFICATION WORKS AT DIFFERENT valleys of District Chitral (PESCO)
014202- A08    Loans and Advances                                                                        150,000,000
014202- A085   Loans to Non Financial Institutions                                                            150,000,000
        Total- ELECTRIFICATION WORKS AT                                                        150,000,000
           DIFFERENT valleys of District Chitral
            (PESCO)
PR3130 ESTAB. OF 132 KV GRID SYS. ALONGWITH UPG RADATION OF EXTG. 33KV GRID SYS. TO 132KV IN DISTT.
CHITRAL (PESCO)
014202- A08    Loans and Advances                                                                        150,000,000
014202- A085   Loans to Non Financial Institutions                                                            150,000,000
        Total- ESTAB. OF 132 KV GRID SYS.                                                         150,000,000
          ALONGWITH UPG RADATION OF EXTG.
           33KV GRID SYS. TO 132KV IN DISTT.
           CHITRAL (PESCO)
PR3131 EVACUATION OF POWER FROM 220-KV/ 132-KV Grid Station Sawabi (PESCO)
014202- A08    Loans and Advances                                                                        300,000,000
014202- A085   Loans to Non Financial Institutions                                                            300,000,000
        Total- EVACUATION OF POWER FROM 220-KV/                                              300,000,000
             132-KV Grid Station Sawabi (PESCO)
     014202   Total-  Trasfer To Non-Financial                                                        950,000,000
                           Institutions
     0142     Total-  Transfers (Others)                                                              950,000,000
     014      Total-  Transfers                                                                      950,000,000

Page 530

                                                     3,997

NO. 148.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

              ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, PESHAWAR

     01        Total-  General Public Service                                                          950,000,000
               Total- ACCOUNTANT GENERAL                                                             950,000,000
                PAKISTAN REVENUES
                  SUB-OFFICE, PESHAWAR

Page 531

                                                     3,998

NO. 148.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

01     General Public Service:
014    Transfers:
0142   Transfers (Others):
014202 Trasfer To Non-Financial Institutions  :
SK0178 LOWRE INDUS RIGHT BANK IRRIGATION & DRAINAGE PROJECT(RBOD-I)
014202- A08    Loans and Advances                            1,000,000,000         1,000,000,000         1,321,780,000
014202- A085   Loans to Non Financial Institutions                1,000,000,000         1,000,000,000         1,321,780,000
        Total- LOWRE INDUS RIGHT BANK                  1,000,000,000       1,000,000,000       1,321,780,000
            IRRIGATION & DRAINAGE
            PROJECT(RBOD-I)
SK0179 BALOCHISTAN EFFLUENT DISPOSAL INT RBOD(RBOD-III)
014202- A08    Loans and Advances                            1,600,000,000         1,600,000,000         1,500,000,000
014202- A085   Loans to Non Financial Institutions                1,600,000,000         1,600,000,000         1,500,000,000
        Total- BALOCHISTAN EFFLUENT DISPOSAL         1,600,000,000       1,600,000,000       1,500,000,000
             INT RBOD(RBOD-III)
     014202   Total-  Trasfer To Non-Financial                2,600,000,000       2,600,000,000       2,821,780,000
                           Institutions
     0142     Total-  Transfers (Others)                      2,600,000,000       2,600,000,000       2,821,780,000
     014      Total-  Transfers                              2,600,000,000       2,600,000,000       2,821,780,000
     01        Total-  General Public Service                  2,600,000,000       2,600,000,000       2,821,780,000
               Total- ACCOUNTANT GENERAL                 2,600,000,000         2,600,000,000         2,821,780,000
                PAKISTAN REVENUES
                  SUB-OFFICE, KARACHI

Page 532

                                                     3,999

NO. 148.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

01     General Public Service:
014    Transfers:
0142   Transfers (Others):
014202 Trasfer To Non-Financial Institutions  :
QA3112 CONSTRUCTION OF 132-KV MASHKAY G/S WITH Allied 132-KV Nai-Mashkay T/Line (QESCO)
014202- A08    Loans and Advances                                                                        600,000,000
014202- A085   Loans to Non Financial Institutions                                                            600,000,000
        Total- CONSTRUCTION OF 132-KV MASHKAY                                                600,000,000
            G/S WITH Allied 132-KV Nai-Mashkay
              T/Line (QESCO)
QA3113 CONSTRUCTION SERVICES FOR FEASIBILITY Study of Solar Water Pumping in Balochistan Area
014202- A08    Loans and Advances                                                                          90,000,000
014202- A085   Loans to Non Financial Institutions                                                              90,000,000
        Total- CONSTRUCTION SERVICES FOR                                                       90,000,000
             FEASIBILITY Study of Solar Water
            Pumping in Balochistan Area
QA3114 CONSTRUCTION OF LT LINES INTO ABC WORKS in Khazzdar City (QESCO)
014202- A08    Loans and Advances                                                                          27,350,000
014202- A085   Loans to Non Financial Institutions                                                              27,350,000
        Total- CONSTRUCTION OF LT LINES INTO                                                     27,350,000
          ABC WORKS in Khazzdar City (QESCO)
QA4100 ELECTRIFICATION OF VILLAGES DERABUGTI(DERABUGTI PACKAGE)
014202- A08    Loans and Advances                                                                        270,000,000
014202- A085   Loans to Non Financial Institutions                                                            270,000,000
        Total- ELECTRIFICATION OF VILLAGES                                                     270,000,000
           DERABUGTI(DERABUGTI PACKAGE)
QA4101 CONSTRUCTION OF 132 KV GRID STATION ATKHAN MEHTERZAI WITH ALLIED T/LINE
014202- A08    Loans and Advances                                                                        149,770,000
014202- A085   Loans to Non Financial Institutions                                                            149,770,000
        Total- CONSTRUCTION OF 132 KV GRID                                                     149,770,000
           STATION ATKHAN MEHTERZAI WITH
            ALLIED T/LINE

Page 533

                                                     4,000

NO. 148.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

QA4102 CONSTRUCTION OF 132 KV GRID STATIONDEEP SEA PORT AND ASSOCIATED 132KV D/C TRANSMISSION
LINE
014202- A08    Loans and Advances                                                   102,729,000          215,000,000
014202- A085   Loans to Non Financial Institutions                                       102,729,000          215,000,000
        Total- CONSTRUCTION OF 132 KV GRID                                  102,729,000        215,000,000
           STATIONDEEP SEA PORT AND
           ASSOCIATED 132KV D/C
           TRANSMISSION LINE
QA4103 CONSTRUCTION OF 132 KV GRID STATION ATDHADAR & 132 KV GRID SDTSIBBI-DHADAR T/LINE
014202- A08    Loans and Advances                                                   200,000,000          183,810,000
014202- A085   Loans to Non Financial Institutions                                       200,000,000          183,810,000
        Total- CONSTRUCTION OF 132 KV GRID                                  200,000,000        183,810,000
           STATION ATDHADAR & 132 KV GRID
           SDTSIBBI-DHADAR T/LINE
QA4104 INTERCONNECTION OF ISOLATED NETWORK ATBASIMA VIA NAG G/STATION FROMPANJGOOR
G/STATION
014202- A08    Loans and Advances                                                    30,000,000         6,000,000,000
014202- A085   Loans to Non Financial Institutions                                        30,000,000         6,000,000,000
        Total- INTERCONNECTION OF ISOLATED                                  30,000,000       6,000,000,000
          NETWORK ATBASIMA VIA NAG
            G/STATION FROMPANJGOOR
            G/STATION
QA4105 CONSTRUCTION OF 132 KV G/S AT ISPLINJIDISTRICT MASTUNG
014202- A08    Loans and Advances                                                   100,000,000          300,000,000
014202- A085   Loans to Non Financial Institutions                                       100,000,000          300,000,000
        Total- CONSTRUCTION OF 132 KV G/S AT                                100,000,000        300,000,000
             ISPLINJIDISTRICT MASTUNG
     014202   Total-  Trasfer To Non-Financial                                     432,729,000       7,835,930,000
                           Institutions
     0142     Total-  Transfers (Others)                                          432,729,000       7,835,930,000
     014      Total-  Transfers                                                  432,729,000       7,835,930,000
     01        Total-  General Public Service                                      432,729,000       7,835,930,000
               Total- ACCOUNTANT GENERAL                                        432,729,000         7,835,930,000

Page 534

                                                     4,001

NO. 148.- FC12D36 DEVELOPMENT LOANS AND ADVANCES BY THE FEDERAL        DEMANDS FOR GRANTS
             GOVERNMENT
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

                PAKISTAN REVENUES
                  SUB-OFFICE, QUETTA
          TOTAL - DEMAND                          156,314,643,000    100,156,052,000    136,113,059,000
                  (In Foreign Exchange)                             (37,656,000)
            (Own Resources)
               (Foreign Aid)                                      (37,656,000)
                  (In Local Currency)                          (156,276,987,000)   (100,156,052,000)   (136,113,059,000)
                                                  __________________________________________________

Page 535

                                                     4,002

NO. 149.- EXTERNAL DEVELOPMENT LONAS AND ADVANCES BY THE FEDERAL      DEMANDS FOR GRANTS
       GOVERNMENT
                                DEMAND NO. 149
                                                                    ( FC12E14 / FC15E14 )
          EXTERNAL DEVELOPMENT LONAS AND ADVANCES BY THE FEDERAL GOVERNMENT

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2020 for EXTERNAL DEVELOPMENT
LONAS AND ADVANCES BY THE FEDERAL GOVERNMENT.

                                        Total                Rs.    270,335,121,000
                                      (Charged)            Rs.    163,103,905,000
                                         (Voted)               Rs.    107,231,216,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF FINANCE, REVENUE AND ECONOMIC AFFAIRS .

                                                           2018-2019         2018-2019         2019-2020
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
014    Transfers                                                305,224,839,000       321,552,965,000       270,335,121,000
               Total                                            305,224,839,000       321,552,965,000       270,335,121,000
              (Charged)                                  171,866,704,000    166,751,290,000    163,103,905,000
               (Voted)                                    133,358,135,000    154,801,675,000    107,231,216,000
                                                  __________________________________________________
     OBJECT CLASSIFICATION
A08   Loans and Advances                              305,224,839,000    321,552,965,000    270,335,121,000
       (Charged)                                         171,866,704,000    166,751,290,000    163,103,905,000
        (Voted)                                           133,358,135,000    154,801,675,000    107,231,216,000
               Total                                      305,224,839,000    321,552,965,000    270,335,121,000
              (Charged)                                       171,866,704,000       166,751,290,000       163,103,905,000
               (Voted)                                          133,358,135,000       154,801,675,000       107,231,216,000
                                                  __________________________________________________
                  (In Foreign Exchange)                           (305,224,839,000)     (321,552,965,000)     (270,335,121,000)
            (Own Resources)
               (Foreign Aid)                                     (305,224,839,000)     (321,552,965,000)     (270,335,121,000)
                                                  __________________________________________________

                                                     4,003

Page 536

                                                     4,004

NO. 149.- FC12E14 EXTERNAL DEVELOPMENT LONAS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
III.  - DETAILS are as follows :-
                                 No of Posts        2018-2019         2018-2019       2019-2020
                                       2018-19 2019-20       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
01     General Public Service:
014    Transfers:
0141   Transfers (Inter-Governmental):
014101 TO PROVINCES  :
IB0682 BALOCHISTAN
014101- A08    Loans and Advances                                                   543,000,000         1,032,000,000
                (Charged)                                                       543,000,000       1,032,000,000
014101- A082   Provinces                                                               543,000,000         1,032,000,000
                (Charged)                                                       543,000,000       1,032,000,000
        Total- BALOCHISTAN                                                   543,000,000       1,032,000,000
                  (In Foreign Exchange)                                                (543,000,000)      (1,032,000,000)
               (Foreign Aid)                                                        (543,000,000)      (1,032,000,000)
                                                  __________________________________________________
ID8871 PUNJAB PROGRAMME LOAN
014101- A08    Loans and Advances                           24,809,329,000        34,503,877,000        35,840,040,000
                (Charged)                                  24,809,329,000      34,503,877,000      35,840,040,000
014101- A082   Provinces                                       24,809,329,000        34,503,877,000        35,840,040,000
                (Charged)                                  24,809,329,000      34,503,877,000      35,840,040,000
        Total- PUNJAB PROGRAMME LOAN                24,809,329,000      34,503,877,000      35,840,040,000
                  (In Foreign Exchange)                         (24,809,329,000)     (34,503,877,000)     (35,840,040,000)
               (Foreign Aid)                                 (24,809,329,000)     (34,503,877,000)     (35,840,040,000)
                                                  __________________________________________________
ID8872 SINDH PROGRAMME LOAN
014101- A08    Loans and Advances                            1,404,000,000         2,232,520,000          825,000,000
                (Charged)                                   1,404,000,000       2,232,520,000        825,000,000
014101- A082   Provinces                                         1,404,000,000         2,232,520,000          825,000,000
                (Charged)                                   1,404,000,000       2,232,520,000        825,000,000
        Total- SINDH PROGRAMME LOAN                   1,404,000,000       2,232,520,000        825,000,000
                  (In Foreign Exchange)                          (1,404,000,000)      (2,232,520,000)       (825,000,000)
               (Foreign Aid)                                   (1,404,000,000)      (2,232,520,000)       (825,000,000)
                                                  __________________________________________________
ID8873 KPK PROGRAMME LOAN
014101- A08    Loans and Advances                            8,218,140,000        15,482,535,000        12,965,500,000
                (Charged)                                   8,218,140,000      15,482,535,000      12,965,500,000

Page 537

                                                     4,005

NO. 149.- FC12E14 EXTERNAL DEVELOPMENT LONAS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

014101- A082   Provinces                                         8,218,140,000        15,482,535,000        12,965,500,000
                (Charged)                                   8,218,140,000      15,482,535,000      12,965,500,000
        Total- KPK PROGRAMME LOAN                     8,218,140,000      15,482,535,000      12,965,500,000
                  (In Foreign Exchange)                          (8,218,140,000)     (15,482,535,000)     (12,965,500,000)
               (Foreign Aid)                                   (8,218,140,000)     (15,482,535,000)     (12,965,500,000)
                                                  __________________________________________________
ID8986 SINDH
014101- A08    Loans and Advances                           39,906,009,000        28,706,770,000        51,133,030,000
                (Charged)                                  39,906,009,000      28,706,770,000      51,133,030,000
014101- A082   Provinces                                       39,906,009,000        28,706,770,000        51,133,030,000
                (Charged)                                  39,906,009,000      28,706,770,000      51,133,030,000
        Total- SINDH                                      39,906,009,000      28,706,770,000      51,133,030,000
                  (In Foreign Exchange)                         (39,906,009,000)     (28,706,770,000)     (51,133,030,000)
               (Foreign Aid)                                 (39,906,009,000)     (28,706,770,000)     (51,133,030,000)
                                                  __________________________________________________
ID8987 PUNJAB
014101- A08    Loans and Advances                           62,993,131,000        52,094,197,000        27,680,002,000
                (Charged)                                  62,993,131,000      52,094,197,000      27,680,002,000
014101- A082   Provinces                                       62,993,131,000        52,094,197,000        27,680,002,000
                (Charged)                                  62,993,131,000      52,094,197,000      27,680,002,000
        Total- PUNJAB                                    62,993,131,000      52,094,197,000      27,680,002,000
                  (In Foreign Exchange)                         (62,993,131,000)     (52,094,197,000)     (27,680,002,000)
               (Foreign Aid)                                 (62,993,131,000)     (52,094,197,000)     (27,680,002,000)
                                                  __________________________________________________
ID8988 KHYBER PAKHTUNKHWA
014101- A08    Loans and Advances                           30,457,095,000        27,477,701,000        26,600,333,000
                (Charged)                                  30,457,095,000      27,477,701,000      26,600,333,000
014101- A082   Provinces                                       30,457,095,000        27,477,701,000        26,600,333,000
                (Charged)                                  30,457,095,000      27,477,701,000      26,600,333,000
        Total- KHYBER PAKHTUNKHWA                   30,457,095,000      27,477,701,000      26,600,333,000
                  (In Foreign Exchange)                         (30,457,095,000)     (27,477,701,000)     (26,600,333,000)
               (Foreign Aid)                                 (30,457,095,000)     (27,477,701,000)     (26,600,333,000)
                                                  __________________________________________________
ID8989 BALOCHISTAN

Page 538

                                                     4,006

NO. 149.- FC12E14 EXTERNAL DEVELOPMENT LONAS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

014101- A08    Loans and Advances                            4,079,000,000         5,710,690,000         7,028,000,000
                (Charged)                                   4,079,000,000       5,710,690,000       7,028,000,000
014101- A082   Provinces                                         4,079,000,000         5,710,690,000         7,028,000,000
                (Charged)                                   4,079,000,000       5,710,690,000       7,028,000,000
        Total- BALOCHISTAN                               4,079,000,000       5,710,690,000       7,028,000,000
                  (In Foreign Exchange)                          (4,079,000,000)      (5,710,690,000)      (7,028,000,000)
               (Foreign Aid)                                   (4,079,000,000)      (5,710,690,000)      (7,028,000,000)
                                                  __________________________________________________
     014101   Total- TO PROVINCES                     171,866,704,000    166,751,290,000    163,103,905,000
014110 OTHERS  :
IB0687 35 MW NAGDAR HPP
014110- A08    Loans and Advances                                                                          40,000,000
014110- A086   Loans to Others                                                                                40,000,000
        Total- 35 MW NAGDAR HPP                                                                   40,000,000
                  (In Foreign Exchange)                                                                      (40,000,000)
               (Foreign Aid)                                                                               (40,000,000)
                                                  __________________________________________________
IB0688 40 MW DOWARIAN
014110- A08    Loans and Advances                                                                          30,000,000
014110- A086   Loans to Others                                                                                30,000,000
        Total- 40 MW DOWARIAN                                                                     30,000,000
                  (In Foreign Exchange)                                                                      (30,000,000)
               (Foreign Aid)                                                                               (30,000,000)
                                                  __________________________________________________
ID8222 48 MW JAGRAN HYDRO POWER PROJECT AJK
014110- A08    Loans and Advances                             270,000,000         1,500,000,000          300,000,000
014110- A086   Loans to Others                                   270,000,000         1,500,000,000          300,000,000
        Total- 48 MW JAGRAN HYDRO POWER               270,000,000       1,500,000,000        300,000,000
          PROJECT AJK
                  (In Foreign Exchange)                           (270,000,000)      (1,500,000,000)       (300,000,000)
               (Foreign Aid)                                    (270,000,000)      (1,500,000,000)       (300,000,000)
                                                  __________________________________________________
ID8994 AJK
014110- A08    Loans and Advances                            1,800,000,000         5,924,738,000         2,430,000,000

Page 539

                                                     4,007

NO. 149.- FC12E14 EXTERNAL DEVELOPMENT LONAS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

014110- A086   Loans to Others                                  1,800,000,000         5,924,738,000         2,430,000,000
        Total- AJK                                          1,800,000,000       5,924,738,000       2,430,000,000
                  (In Foreign Exchange)                          (1,800,000,000)      (5,924,738,000)      (2,430,000,000)
               (Foreign Aid)                                   (1,800,000,000)      (5,924,738,000)      (2,430,000,000)
                                                  __________________________________________________
     014110   Total- OTHERS                              2,070,000,000       7,424,738,000       2,800,000,000
     0141     Total-  Transfers (Inter-Governmental)        173,936,704,000    174,176,028,000    165,903,905,000
0142   Transfers (Others):
014202 TRANSFER TO NON-FINANCIAL INSTITUTIONS  :
IB0689 CHITRAL HYDRO POWER
014202- A08    Loans and Advances                                                   925,790,000          228,000,000
014202- A085   Loans to Non Financial Institutions                                       925,790,000          228,000,000
        Total- CHITRAL HYDRO POWER                                         925,790,000        228,000,000
                  (In Foreign Exchange)                                                (925,790,000)       (228,000,000)
               (Foreign Aid)                                                        (925,790,000)       (228,000,000)
                                                  __________________________________________________
IB0690 DARGI HYDROPOWER PROJECT
014202- A08    Loans and Advances                                                                          50,000,000
014202- A085   Loans to Non Financial Institutions                                                              50,000,000
        Total- DARGI HYDROPOWER PROJECT                                                       50,000,000
                  (In Foreign Exchange)                                                                      (50,000,000)
               (Foreign Aid)                                                                               (50,000,000)
                                                  __________________________________________________
ID7337 DASU HYDRO POWER PROJECT
014202- A08    Loans and Advances                            3,000,000,000         3,000,000,000         4,500,000,000
014202- A085   Loans to Non Financial Institutions                3,000,000,000         3,000,000,000         4,500,000,000
        Total- DASU HYDRO POWER PROJECT              3,000,000,000       3,000,000,000       4,500,000,000
                  (In Foreign Exchange)                          (3,000,000,000)      (3,000,000,000)      (4,500,000,000)
               (Foreign Aid)                                   (3,000,000,000)      (3,000,000,000)      (4,500,000,000)
                                                  __________________________________________________
ID7338 ESTABLISHMENT OF HYDRO POWER TRAINING INSTITUTE
014202- A08    Loans and Advances                               50,000,000          137,100,000
014202- A085   Loans to Non Financial Institutions                  50,000,000          137,100,000
        Total- ESTABLISHMENT OF HYDRO POWER            50,000,000        137,100,000
            TRAINING INSTITUTE

Page 540

                                                     4,008

NO. 149.- FC12E14 EXTERNAL DEVELOPMENT LONAS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

                  (In Foreign Exchange)                             (50,000,000)       (137,100,000)
               (Foreign Aid)                                      (50,000,000)       (137,100,000)
                                                  __________________________________________________
ID7339 GOLAN GOL HYDRO POWER PROJECT
014202- A08    Loans and Advances                             600,000,000         1,153,875,000          500,000,000
014202- A085   Loans to Non Financial Institutions                 600,000,000         1,153,875,000          500,000,000
        Total- GOLAN GOL HYDRO POWER PROJECT         600,000,000       1,153,875,000        500,000,000
                  (In Foreign Exchange)                           (600,000,000)      (1,153,875,000)       (500,000,000)
               (Foreign Aid)                                    (600,000,000)      (1,153,875,000)       (500,000,000)
                                                  __________________________________________________
ID7341 HEYAL KHAWAR HYDRO POWER PROJECT
014202- A08    Loans and Advances                             171,000,000            32,660,000            65,000,000
014202- A085   Loans to Non Financial Institutions                 171,000,000            32,660,000            65,000,000
        Total- HEYAL KHAWAR HYDRO POWER              171,000,000         32,660,000          65,000,000
          PROJECT
                  (In Foreign Exchange)                           (171,000,000)         (32,660,000)         (65,000,000)
               (Foreign Aid)                                    (171,000,000)         (32,660,000)         (65,000,000)
                                                  __________________________________________________
ID7342 NEELUM JHELUM POWER PROJECT
014202- A08    Loans and Advances                            5,000,000,000         5,308,602,000         2,000,000,000
014202- A085   Loans to Non Financial Institutions                5,000,000,000         5,308,602,000         2,000,000,000
        Total- NEELUM JHELUM POWER PROJECT          5,000,000,000       5,308,602,000       2,000,000,000
                  (In Foreign Exchange)                          (5,000,000,000)      (5,308,602,000)      (2,000,000,000)
               (Foreign Aid)                                   (5,000,000,000)      (5,308,602,000)      (2,000,000,000)
                                                  __________________________________________________
ID7343 REFURBISHMENT & UP GRADATION OF GENERATION UNIT
014202- A08    Loans and Advances                             840,000,000          150,500,000         1,500,000,000
014202- A085   Loans to Non Financial Institutions                 840,000,000          150,500,000         1,500,000,000
        Total- REFURBISHMENT & UP GRADATION OF        840,000,000        150,500,000       1,500,000,000
           GENERATION UNIT
                  (In Foreign Exchange)                           (840,000,000)       (150,500,000)      (1,500,000,000)
               (Foreign Aid)                                    (840,000,000)       (150,500,000)      (1,500,000,000)
                                                  __________________________________________________
ID7344 TARBELA FOURTH & FIFTH EXTENTION HYDRO POWER PROJECT
014202- A08    Loans and Advances                            3,363,505,000         3,055,975,000         3,000,000,000

Page 541

                                                     4,009

NO. 149.- FC12E14 EXTERNAL DEVELOPMENT LONAS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

014202- A085   Loans to Non Financial Institutions                3,363,505,000         3,055,975,000         3,000,000,000
        Total- TARBELA FOURTH & FIFTH EXTENTION      3,363,505,000       3,055,975,000       3,000,000,000
          HYDRO POWER PROJECT
                  (In Foreign Exchange)                          (3,363,505,000)      (3,055,975,000)      (3,000,000,000)
               (Foreign Aid)                                   (3,363,505,000)      (3,055,975,000)      (3,000,000,000)
                                                  __________________________________________________
ID7345 WARSAK HYDROELECTRIC POWER STATION 2ND REHABALITATION
014202- A08    Loans and Advances                               70,000,000          112,925,000         1,800,000,000
014202- A085   Loans to Non Financial Institutions                  70,000,000          112,925,000         1,800,000,000
        Total- WARSAK HYDROELECTRIC POWER             70,000,000        112,925,000       1,800,000,000
           STATION 2ND REHABALITATION
                  (In Foreign Exchange)                             (70,000,000)       (112,925,000)      (1,800,000,000)
               (Foreign Aid)                                      (70,000,000)       (112,925,000)      (1,800,000,000)
                                                  __________________________________________________
ID8440 CHITRAL HYDAL POWER STATION CAPACITY ENHANCEMENT
014202- A08    Loans and Advances                                5,000,000
014202- A085   Loans to Non Financial Institutions                    5,000,000
        Total- CHITRAL HYDAL POWER STATION               5,000,000
           CAPACITY ENHANCEMENT
                  (In Foreign Exchange)                               (5,000,000)
               (Foreign Aid)                                        (5,000,000)
                                                  __________________________________________________
ID8992 NHA
014202- A08    Loans and Advances                           84,217,000,000       112,152,546,000        57,411,916,000
014202- A085   Loans to Non Financial Institutions               84,217,000,000       112,152,546,000        57,411,916,000
        Total- NHA                                        84,217,000,000    112,152,546,000      57,411,916,000
                  (In Foreign Exchange)                         (84,217,000,000)   (112,152,546,000)     (57,411,916,000)
               (Foreign Aid)                                 (84,217,000,000)   (112,152,546,000)     (57,411,916,000)
                                                  __________________________________________________
ID8993 PEPCO
014202- A08    Loans and Advances                           32,697,630,000        20,850,164,000        31,676,300,000
014202- A085   Loans to Non Financial Institutions               32,697,630,000        20,850,164,000        31,676,300,000
        Total- PEPCO                                     32,697,630,000      20,850,164,000      31,676,300,000
                  (In Foreign Exchange)                         (32,697,630,000)     (20,850,164,000)     (31,676,300,000)
               (Foreign Aid)                                 (32,697,630,000)     (20,850,164,000)     (31,676,300,000)

Page 542

                                                     4,010

NO. 149.- FC12E14 EXTERNAL DEVELOPMENT LONAS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
                                                  __________________________________________________
ID9410 TARBELA 5TH EXTENTION HYDRO POWER PROJECT
014202- A08    Loans and Advances                            1,224,000,000          496,800,000         1,500,000,000
014202- A085   Loans to Non Financial Institutions                1,224,000,000          496,800,000         1,500,000,000
        Total- TARBELA 5TH EXTENTION HYDRO            1,224,000,000        496,800,000       1,500,000,000
         POWER PROJECT
                  (In Foreign Exchange)                          (1,224,000,000)       (496,800,000)      (1,500,000,000)
               (Foreign Aid)                                   (1,224,000,000)       (496,800,000)      (1,500,000,000)
                                                  __________________________________________________
ID9961 ESTABLISHMENT OF PAKISTAN GLACIER MONITORING NETWORK UPPER INDUS BASIN AREA FALLING
WITHIN KPK
014202- A08    Loans and Advances                               50,000,000                                200,000,000
014202- A085   Loans to Non Financial Institutions                  50,000,000                                200,000,000
        Total- ESTABLISHMENT OF PAKISTAN                 50,000,000                            200,000,000
           GLACIER MONITORING NETWORK
          UPPER INDUS BASIN AREA FALLING
            WITHIN KPK
                  (In Foreign Exchange)                             (50,000,000)                            (200,000,000)
               (Foreign Aid)                                      (50,000,000)                            (200,000,000)
                                                  __________________________________________________
     014202   Total- TRANSFER TO NON-FINANCIAL      131,288,135,000    147,376,937,000    104,431,216,000
                  INSTITUTIONS
     0142     Total-  Transfers (Others)                    131,288,135,000    147,376,937,000    104,431,216,000
     014      Total-  Transfers                           305,224,839,000    321,552,965,000    270,335,121,000
     01        Total-  General Public Service               305,224,839,000    321,552,965,000    270,335,121,000
               Total- ACCOUNTANT GENERAL               305,224,839,000       321,552,965,000       270,335,121,000
                PAKISTAN REVENUES
              (Charged)                                        171,866,704,000       166,751,290,000       163,103,905,000
               (Voted)                                           133,358,135,000       154,801,675,000       107,231,216,000
                       (In Foreign Exchange)                       (305,224,839,000)     (321,552,965,000)     (270,335,121,000)
               (Own Resources)
                   (Foreign Aid)                                 (305,224,839,000)     (321,552,965,000)     (270,335,121,000)
          TOTAL - DEMAND                          305,224,839,000    321,552,965,000    270,335,121,000
              (Charged)                                  171,866,704,000    166,751,290,000    163,103,905,000

Page 543

                                                     4,011

NO. 149.- FC12E14 EXTERNAL DEVELOPMENT LONAS AND ADVANCES BY THE       DEMANDS FOR GRANTS
              FEDERAL GOVERNMENT
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

               (Voted)                                     133,358,135,000    154,801,675,000    107,231,216,000
                                                  __________________________________________________
                  (In Foreign Exchange)                       (305,224,839,000)   (321,552,965,000)   (270,335,121,000)
            (Own Resources)
               (Foreign Aid)                                (305,224,839,000)   (321,552,965,000)   (270,335,121,000)
                                                  __________________________________________________

Page 544

                                                     4,115

NO. 150.- CAPITAL OUTLAY ON WORKS OF FOREIGN AFFAIRS DIVISION            DEMANDS FOR GRANTS
                                DEMAND NO. 150
                                                                            ( FC12C15 )
                    CAPITAL OUTLAY ON WORKS OF FOREIGN AFFAIRS DIVISION

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2020 to defray the Salaries and Other
Expenses of the CAPITAL OUTLAY ON WORKS OF FOREIGN AFFAIRS DIVISION.

                                Voted           Rs. 29,774,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF FOREIGN AFFAIRS  .

                                                           2018-2019         2018-2019         2019-2020
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
011    Executive & Legislative Organs,Financial and Fiscal          199,774,000                                 29,774,000
         Affairs, External Affairs
               Total                                                199,774,000                                 29,774,000
     OBJECT CLASSIFICATION
A01   Employees Related Expenses                            4,360,000
A011  Pay                                                            3,608,000
A011-1 Pay of Officers                                                   (3,048,000)
A011-2 Pay of Other Staff                                                (560,000)
A012  Allowances                                                    752,000
A012-1 Regular Allowances                                              (201,000)
A012-2 Other Allowances (Excluding TA)                                 (551,000)
A03   Operating Expenses                                    92,942,000                              1,728,000
A09   Physical Assets                                        12,560,000                             12,555,000
A12    Civil works                                            89,709,000                             15,491,000
A13   Repairs and Maintenance                                 203,000
               Total                                          199,774,000                             29,774,000

Page 545

                                                     4,116

NO. 150.- FC12C15 CAPITAL OUTLAY ON WORKS OF FOREIGN AFFAIRS DIVISION      DEMANDS FOR GRANTS

III.  - DETAILS are as follows :-
                                 No of Posts        2018-2019         2018-2019       2019-2020
                                       2018-19 2019-20       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
01     General Public Service:
011    Executive & Legislative Organs,Financial and Fiscal Affairs, External Affairs:
0113   External Affairs:
011301 Administration  :
HQ3698 CONSULTANCY SERVICES FOR STATE GUEST HOUSE & CONFERENCE CENTRE ISLAMABAD
011301- A03    Operating Expenses                               90,012,000
011301- A032   Communications                                         4,000
011301- A038    Travel & Transportation                                  4,000
011301- A039   General                                             90,004,000
011301- A09    Physical Assets                                         2,000
011301- A092   Computer Equipment                                    1,000
011301- A095   Purchase of Transport                                   1,000
011301- A12     Civil works                                           9,983,000
011301- A124    Building and Structures                               9,983,000
011301- A13    Repairs and Maintenance                               3,000
011301- A137   Computer Equipment                                    3,000
        Total- CONSULTANCY SERVICES FOR STATE         100,000,000
          GUEST HOUSE & CONFERENCE
          CENTRE ISLAMABAD
     011301   Total-  Administration                           100,000,000
     0113     Total-  External Affairs                          100,000,000
     011      Total-  Executive & Legislative                   100,000,000
                      Organs,Financial and Fiscal Affairs,
                       External Affairs
     01        Total-  General Public Service                   100,000,000
               Total- ACCOUNTANT GENERAL                  100,000,000
                PAKISTAN REVENUES

Page 546

                                                     4,117

NO. 150.- FC12C15 CAPITAL OUTLAY ON WORKS OF FOREIGN AFFAIRS DIVISION      DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                     CHIEF ACCOUNTS OFFICER (MINISTRY OF FOREIGN AFFAIRS)

01     General Public Service:
011    Executive & Legislative Organs,Financial and Fiscal Affairs, External Affairs:
0113   External Affairs:
011301 Administration  :
HQ3581 REHAB. OF ISS SECTOR F-5/2 ISB.
011301- A03    Operating Expenses                                 1,728,000                                   1,728,000
011301- A039   General                                              1,728,000                                   1,728,000
011301- A09    Physical Assets                                    12,555,000                                 12,555,000
011301- A096   Purchase of Plant and Machinery                    10,175,000                                 10,175,000
011301- A097   Purchase of Furniture and Fixture                     2,380,000                                   2,380,000
011301- A12     Civil works                                         15,491,000                                 15,491,000
011301- A124    Building and Structures                             15,491,000                                 15,491,000
        Total- REHAB. OF ISS SECTOR F-5/2 ISB.               29,774,000                             29,774,000
HQ3685 CONSTRUCTION OF STATE GUEST HOUSE
011301- A01    Employees Related Expenses                       4,360,000
011301- A011   Pay                      10                    3,608,000
011301- A011-1 Pay of Officers                  (4)                  (3,048,000)
011301- A011-2 Pay of Other Staff               (6)                   (560,000)
011301- A012   Allowances                                           752,000
011301- A012-1  Regular Allowances                                (201,000)
011301- A012-2  Other Allowances (Excluding TA)                    (551,000)
011301- A03    Operating Expenses                                 1,202,000
011301- A032   Communications                                     401,000
011301- A038    Travel & Transportation                               301,000
011301- A039   General                                              500,000
011301- A09    Physical Assets                                         3,000
011301- A092   Computer Equipment                                    2,000
011301- A095   Purchase of Transport                                   1,000
011301- A12     Civil works                                         64,235,000
011301- A124    Building and Structures                             64,235,000
011301- A13    Repairs and Maintenance                            200,000
011301- A137   Computer Equipment                                 200,000

Page 547

                                                     4,118

NO. 150.- FC12C15 CAPITAL OUTLAY ON WORKS OF FOREIGN AFFAIRS DIVISION      DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                     CHIEF ACCOUNTS OFFICER (MINISTRY OF FOREIGN AFFAIRS)

        Total- CONSTRUCTION OF STATE GUEST              70,000,000
          HOUSE
     011301   Total-  Administration                            99,774,000                             29,774,000
     0113     Total-  External Affairs                           99,774,000                             29,774,000
     011      Total-  Executive & Legislative                    99,774,000                             29,774,000
                      Organs,Financial and Fiscal Affairs,
                       External Affairs
     01        Total-  General Public Service                    99,774,000                             29,774,000
               Total- CHIEF ACCOUNTS OFFICER                 99,774,000                                 29,774,000
                  (MINISTRY OF FOREIGN
                  AFFAIRS)
          TOTAL - DEMAND                              199,774,000                             29,774,000

Page 548

                                                     4,121

NO. 151.- CAPITAL OUTLAY ON CIVIL WORKS                              DEMANDS FOR GRANTS
                                DEMAND NO. 151
                                                                            ( FC12C28 )
                               CAPITAL OUTLAY ON CIVIL WORKS

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2020 for CAPITAL OUTLAY ON CIVIL
WORKS.

                                Voted           Rs. 3,069,506,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF HOUSING AND WORKS  .

                                                           2018-2019         2018-2019         2019-2020
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
045    Construction and Transport                                 5,940,464,000         4,068,530,000         3,069,506,000
               Total                                               5,940,464,000         4,068,530,000         3,069,506,000
     OBJECT CLASSIFICATION
A03   Operating Expenses                                  154,062,000        248,314,000        114,257,000
A12    Civil works                                          5,786,402,000       3,820,216,000       2,955,249,000
               Total                                         5,940,464,000       4,068,530,000       3,069,506,000

Page 549

                                                     4,122

NO. 151.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS

III.  - DETAILS are as follows :-
                                 No of Posts        2018-2019         2018-2019       2019-2020
                                       2018-19 2019-20       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
04     Economic Affairs:
045    Construction and Transport:
0457   Construction (Works):
045702 Buildings and Structures  :
ID8076 ESTABLISHMENT CHARGES CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD SINDH)
045702- A03    Operating Expenses                                 7,864,000             4,840,000             4,878,000
045702- A039   General                                              7,864,000             4,840,000             4,878,000
        Total- ESTABLISHMENT CHARGES CREDITED           7,864,000           4,840,000           4,878,000
          TO OTHER GOVERNMENT
          DEPARTMENTS (PAK. PWD SINDH)
ID8077 TOOLS AND PLANTS CHARGES CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD SINDH)
045702- A03    Operating Expenses                                 2,359,000             1,452,000             1,463,000
045702- A039   General                                              2,359,000             1,452,000             1,463,000
        Total- TOOLS AND PLANTS CHARGES                  2,359,000           1,452,000           1,463,000
           CREDITED TO OTHER GOVERNMENT
          DEPARTMENTS (PAK. PWD SINDH)
ID8078 INTERIOR (PAK. PWD PUNJAB)
045702- A12     Civil works                                        268,929,000
045702- A124    Building and Structures                            268,929,000
        Total- INTERIOR (PAK. PWD PUNJAB)                268,929,000
ID8079 CIVIL WORKS (PAK. PWD PUNJAB)
045702- A12     Civil works                                       4,093,739,000         2,856,043,000         1,915,502,000
045702- A124    Building and Structures                           4,093,739,000         2,856,043,000         1,915,502,000
        Total-  CIVIL WORKS (PAK. PWD PUNJAB)           4,093,739,000       2,856,043,000       1,915,502,000
ID8081 ESTABLISHMENT DIVISION (PAK. PWD PUNJAB)
045702- A12     Civil works                                        141,256,000                                 94,503,000
045702- A124    Building and Structures                            141,256,000                                 94,503,000
        Total- ESTABLISHMENT DIVISION (PAK. PWD         141,256,000                             94,503,000
           PUNJAB)
ID8082 ESTABLISHMENT CHARGES CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD PUNJAB)
045702- A03    Operating Expenses                               91,378,000          142,802,000            60,500,000
045702- A039   General                                             91,378,000          142,802,000            60,500,000

Page 550

                                                     4,123

NO. 151.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

        Total- ESTABLISHMENT CHARGES CREDITED         91,378,000        142,802,000          60,500,000
          TO OTHER GOVERNMENT
          DEPARTMENTS (PAK. PWD PUNJAB)
ID8083 TOOLS AND PLANTS CHARGES CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD PUNJAB)
045702- A03    Operating Expenses                               27,413,000            42,841,000            18,274,000
045702- A039   General                                             27,413,000            42,841,000            18,274,000
        Total- TOOLS AND PLANTS CHARGES                 27,413,000         42,841,000          18,274,000
           CREDITED TO OTHER GOVERNMENT
          DEPARTMENTS (PAK. PWD PUNJAB)
ID8085 ESTABLISHMENT CHARGES CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD KHYBER
PAKHTUNKHWA).
045702- A03    Operating Expenses                               14,473,000            18,410,000            19,189,000
045702- A039   General                                             14,473,000            18,410,000            19,189,000
        Total- ESTABLISHMENT CHARGES CREDITED         14,473,000         18,410,000          19,189,000
          TO OTHER GOVERNMENT
          DEPARTMENTS (PAK. PWD KHYBER
           PAKHTUNKHWA).
ID8086 TOOLS AND PLANTS CHARGES CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. P.W.D.,
KHYBER PAKHTUNKHWA).
045702- A03    Operating Expenses                                 4,343,000             5,523,000             5,757,000
045702- A039   General                                              4,343,000             5,523,000             5,757,000
        Total- TOOLS AND PLANTS CHARGES                  4,343,000           5,523,000           5,757,000
           CREDITED TO OTHER GOVERNMENT
          DEPARTMENTS (PAK. P.W.D., KHYBER
           PAKHTUNKHWA).
ID8087 INTERIOR (PAK. PWD BALOCHISTAN)
045702- A12     Civil works                                         66,188,000                                 36,416,000
045702- A124    Building and Structures                             66,188,000                                 36,416,000
        Total- INTERIOR (PAK. PWD BALOCHISTAN)           66,188,000                             36,416,000
ID8088 ESTABLISHMENT CHARGES CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD
BALOCHISTAN)
045702- A03    Operating Expenses                                 4,794,000            24,958,000             3,323,000
045702- A039   General                                              4,794,000            24,958,000             3,323,000
        Total- ESTABLISHMENT CHARGES CREDITED           4,794,000         24,958,000           3,323,000

Page 551

                                                     4,124

NO. 151.- FC12C28 CAPITAL OUTLAY ON CIVIL WORKS                       DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

          TO OTHER GOVERNMENT
          DEPARTMENTS (PAK. PWD
           BALOCHISTAN)
ID8089 TOOLS AND PLANTS CHARGES CREDITED TO OTHER GOVERNMENT DEPARTMENTS (PAK. PWD
BALOCHISTAN)
045702- A03    Operating Expenses                                 1,438,000             7,488,000              873,000
045702- A039   General                                              1,438,000             7,488,000              873,000
        Total- TOOLS AND PLANTS CHARGES                  1,438,000           7,488,000            873,000
           CREDITED TO OTHER GOVERNMENT
          DEPARTMENTS (PAK. PWD
           BALOCHISTAN)
ID8092 CIVIL WORKS (PAK.PWD KHYBER PAKHTUNKHWA)
045702- A12     Civil works                                        529,332,000          368,202,000          481,251,000
045702- A124    Building and Structures                            529,332,000          368,202,000          481,251,000
        Total-  CIVIL WORKS (PAK.PWD KHYBER              529,332,000        368,202,000        481,251,000
          PAKHTUNKHWA)
ID8095 CIVIL WORKS (PAK.PWD BALOCHISTAN)
045702- A12     Civil works                                        529,682,000          499,165,000          330,031,000
045702- A124    Building and Structures                            529,682,000          499,165,000          330,031,000
        Total-  CIVIL WORKS (PAK.PWD                      529,682,000        499,165,000        330,031,000
           BALOCHISTAN)
ID8106 CIVIL WORKS
045702- A12     Civil works                                        157,276,000            96,806,000            97,546,000
045702- A124    Building and Structures                            157,276,000            96,806,000            97,546,000
        Total-  CIVIL WORKS                                 157,276,000         96,806,000          97,546,000
     045702   Total-  Buildings and Structures                 5,940,464,000       4,068,530,000       3,069,506,000
     0457     Total-  Construction (Works)                    5,940,464,000       4,068,530,000       3,069,506,000
     045      Total-  Construction and Transport              5,940,464,000       4,068,530,000       3,069,506,000
     04        Total-  Economic Affairs                       5,940,464,000       4,068,530,000       3,069,506,000
               Total- ACCOUNTANT GENERAL                 5,940,464,000         4,068,530,000         3,069,506,000
                PAKISTAN REVENUES
          TOTAL - DEMAND                             5,940,464,000       4,068,530,000       3,069,506,000

Page 552

                                                     4,125

NO. 152.- OTHER EXPENDITURE OF HOUSING & WORKS DIV                    DEMANDS FOR GRANTS
                                DEMAND NO. 152
                                                                            ( FC12Y03 )
                      OTHER EXPENDITURE OF HOUSING & WORKS DIV

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2020 for OTHER EXPENDITURE OF
HOUSING & WORKS DIV.

                                Voted           Rs. 5,000,000,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF HOUSING AND WORKS  .

                                                           2018-2019         2018-2019         2019-2020
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
045    Construction and Transport                                                                             5,000,000,000
               Total                                                                                           5,000,000,000
     OBJECT CLASSIFICATION
A08   Loans and Advances                                                                        5,000,000,000
               Total                                                                                 5,000,000,000

Page 553

                                                     4,126

NO. 152.- FC12Y03 OTHER EXPENDITURE OF HOUSING & WORKS DIV              DEMANDS FOR GRANTS

III.  - DETAILS are as follows :-
                                 No of Posts        2018-2019         2018-2019       2019-2020
                                       2018-19 2019-20       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
04     Economic Affairs:
045    Construction and Transport:
0457   Construction (Works):
045702 Buildings and Structures  :
IB0748 LOW COST SCHEMES
045702- A08    Loans and Advances                                                                        5,000,000,000
045702- A085   Loans to Non Financial Institutions                                                            5,000,000,000
        Total- LOW COST SCHEMES                                                                5,000,000,000
     045702   Total-  Buildings and Structures                                                        5,000,000,000
     0457     Total-  Construction (Works)                                                           5,000,000,000
     045      Total-  Construction and Transport                                                      5,000,000,000
     04        Total-  Economic Affairs                                                               5,000,000,000
               Total- ACCOUNTANT GENERAL                                                             5,000,000,000
                PAKISTAN REVENUES
          TOTAL - DEMAND                                                                    5,000,000,000

Page 554

                                                     4,129

NO. 153.- CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT                    DEMANDS FOR GRANTS
                                DEMAND NO. 153
                                                                            ( FC12C32 )
                         CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2020 to defray the Salaries and Other
Expenses of the CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT.

                                Voted           Rs. 2,343,293,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF INDUSTRIES AND PRODUCTION  .

                                                           2018-2019         2018-2019         2019-2020
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
044    Mining and Manufacturing                                   1,775,205,000          685,289,000         2,343,293,000
               Total                                               1,775,205,000          685,289,000         2,343,293,000
     OBJECT CLASSIFICATION
A01   Employees Related Expenses                         150,612,000         53,699,000        305,405,000
A011  Pay                                                        150,612,000            53,699,000          304,325,000
A011-1 Pay of Officers                                               (129,212,000)           (34,699,000)         (283,075,000)
A011-2 Pay of Other Staff                                              (21,400,000)           (19,000,000)           (21,250,000)
A012  Allowances                                                                                                1,080,000
A012-1 Regular Allowances                                                                                           (1,080,000)
A03   Operating Expenses                                  156,181,000         64,447,000        282,470,000
A05   Grants, Subsidies and Write off Loans                  342,856,000        141,090,000        306,335,000
A09   Physical Assets                                      750,842,000        155,518,000        894,753,000
A12    Civil works                                           370,014,000        270,535,000        538,430,000
A13   Repairs and Maintenance                                4,700,000                             15,900,000
               Total                                         1,775,205,000        685,289,000       2,343,293,000

Page 555

                                                     4,130

NO. 153.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS

III.  - DETAILS are as follows :-
                                 No of Posts        2018-2019         2018-2019       2019-2020
                                       2018-19 2019-20       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
04     Economic Affairs:
044    Mining and Manufacturing:
0441   Manufacturing:
044101 Support for Industrial Development  :
ID9364 DEV. OF MARBLE AND GRANITE SECTOR
044101- A01    Employees Related Expenses                      39,041,000
044101- A011   Pay                     114                   39,041,000
044101- A011-1 Pay of Officers             (114)                (39,041,000)
044101- A03    Operating Expenses                               14,669,000
044101- A032   Communications                                     300,000
044101- A033     Utilities                                               300,000
044101- A037   Consultancy and Contractual Work                   9,000,000
044101- A039   General                                              5,069,000
044101- A05    Grants, Subsidies and Write off Loans             18,590,000
044101- A052   Grants Domestic                                    18,590,000
044101- A09    Physical Assets                                   196,300,000
044101- A091   Purchase of Building                                24,000,000
044101- A092   Computer Equipment                                 2,000,000
044101- A096   Purchase of Plant and Machinery                  168,000,000
044101- A097   Purchase of Furniture and Fixture                     2,300,000
044101- A12     Civil works                                         26,700,000
044101- A124    Building and Structures                             26,700,000
044101- A13    Repairs and Maintenance                            4,700,000
044101- A131   Machinery and Equipment                            4,700,000
        Total- DEV. OF MARBLE AND GRANITE               300,000,000
          SECTOR
ID9365 DEV. NATIONAL PRODUCTIVITY INSTITUTS IN PAKISTAN
044101- A01    Employees Related Expenses                       9,960,000
044101- A011   Pay                      18                    9,960,000
044101- A011-1 Pay of Officers               (18)                  (9,960,000)
044101- A03    Operating Expenses                                 600,000
044101- A033     Utilities                                               600,000

Page 556

                                                     4,131

NO. 153.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES

044101- A05    Grants, Subsidies and Write off Loans              3,920,000
044101- A052   Grants Domestic                                     3,920,000
044101- A09    Physical Assets                                   151,800,000
044101- A091   Purchase of Building                               151,800,000
044101- A12     Civil works                                         33,720,000
044101- A124    Building and Structures                             33,720,000
        Total- DEV. NATIONAL PRODUCTIVITY                200,000,000
            INSTITUTS IN PAKISTAN
     044101   Total-  Support for Industrial Development         500,000,000

     0441     Total-  Manufacturing                           500,000,000
     044      Total-  Mining and Manufacturing                 500,000,000
     04        Total-  Economic Affairs                        500,000,000
               Total- ACCOUNTANT GENERAL                  500,000,000
                PAKISTAN REVENUES

Page 557

                                                     4,132

NO. 153.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

04     Economic Affairs:
044    Mining and Manufacturing:
0441   Manufacturing:
044101 Support for Industrial Development  :
LO0772 HYDERABAD ENGINEERING SUPPORT CENTRE (HESC) (ADB FUNDED)
044101- A01    Employees Related Expenses                       9,500,000             9,500,000             9,500,000
044101- A011   Pay                      31     31            9,500,000             9,500,000             9,500,000
044101- A011-1 Pay of Officers                  (7)    (10)          (4,000,000)          (4,000,000)          (4,000,000)
044101- A011-2 Pay of Other Staff            (24)    (21)          (5,500,000)          (5,500,000)          (5,500,000)
044101- A03    Operating Expenses                                 2,491,000             2,491,000             6,226,000
044101- A039   General                                              2,491,000             2,491,000             6,226,000
044101- A05    Grants, Subsidies and Write off Loans              3,663,000             3,663,000
044101- A052   Grants Domestic                                     3,663,000             3,663,000
044101- A09    Physical Assets                                                                                 4,830,000
044101- A095   Purchase of Transport                                                                            4,800,000
044101- A096   Purchase of Plant and Machinery                                                                  30,000
        Total- HYDERABAD ENGINEERING SUPPORT          15,654,000         15,654,000          20,556,000
          CENTRE (HESC) (ADB FUNDED)
LO0774 PESHAWAR LIGHT ENGINEERING SUPPORT CENTRE (PESC) (ADB FUNDED) KHYBER PAKHTUNKHWA
044101- A01    Employees Related Expenses                      12,500,000            12,500,000            13,500,000
044101- A011   Pay                      31     31           12,500,000            12,500,000            13,500,000
044101- A011-1 Pay of Officers               (10)    (10)          (6,000,000)          (6,000,000)          (6,000,000)
044101- A011-2 Pay of Other Staff            (21)    (21)          (6,500,000)          (6,500,000)          (7,500,000)
044101- A03    Operating Expenses                                 2,508,000             2,508,000            15,238,000
044101- A039   General                                              2,508,000             2,508,000            15,238,000
044101- A05    Grants, Subsidies and Write off Loans              1,634,000             1,634,000                 1,000
044101- A052   Grants Domestic                                     1,634,000             1,634,000                 1,000
044101- A09    Physical Assets                                    12,078,000            12,078,000             4,801,000
044101- A095   Purchase of Transport                                                                            4,800,000
044101- A096   Purchase of Plant and Machinery                    12,040,000            12,040,000                 1,000
044101- A097   Purchase of Furniture and Fixture                       38,000               38,000
        Total- PESHAWAR LIGHT ENGINEERING               28,720,000         28,720,000          33,540,000

Page 558

                                                     4,133

NO. 153.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

          SUPPORT CENTRE (PESC) (ADB
           FUNDED) KHYBER PAKHTUNKHWA
LO1076 LIGHT ENGINEERING UPGRADATION CENTER FOR SMES IN BALOCHISTAN (HUB)
044101- A01    Employees Related Expenses                      12,500,000            12,500,000            11,500,000
044101- A011   Pay                      39     39           12,500,000            12,500,000            11,500,000
044101- A011-1 Pay of Officers                  (9)      (9)          (5,500,000)          (5,500,000)          (4,500,000)
044101- A011-2 Pay of Other Staff            (30)    (30)          (7,000,000)          (7,000,000)          (7,000,000)
044101- A03    Operating Expenses                                 7,682,000             7,682,000             8,865,000
044101- A039   General                                              7,682,000             7,682,000             8,865,000
044101- A05    Grants, Subsidies and Write off Loans                                                         303,000
044101- A052   Grants Domestic                                                                               303,000
044101- A09    Physical Assets                                                                                 2,400,000
044101- A095   Purchase of Transport                                                                            2,400,000
        Total- LIGHT ENGINEERING UPGRADATION            20,182,000         20,182,000          23,068,000
          CENTER FOR SMES IN BALOCHISTAN
            (HUB)
LO1175 NATIONAL BUSSINESS DEVELOPMENT PROGRAMM FOR SME'S
044101- A01    Employees Related Expenses                      40,000,000            12,147,000            44,915,000
044101- A011   Pay                      38     38           40,000,000            12,147,000            44,915,000
044101- A011-1 Pay of Officers               (38)    (38)         (40,000,000)         (12,147,000)         (44,915,000)
044101- A03    Operating Expenses                               49,587,000            20,153,000            33,740,000
044101- A037   Consultancy and Contractual Work                  39,000,000            15,000,000            24,000,000
044101- A039   General                                             10,587,000             5,153,000             9,740,000
044101- A05    Grants, Subsidies and Write off Loans            199,921,000            38,404,000          145,122,000
044101- A052   Grants Domestic                                  199,921,000            38,404,000          145,122,000
044101- A09    Physical Assets                                    38,892,000            31,570,000            22,223,000
044101- A092   Computer Equipment                                 3,500,000             3,500,000             3,500,000
044101- A095   Purchase of Transport                                                                          12,723,000
044101- A097   Purchase of Furniture and Fixture                   19,850,000            14,147,000             1,000,000
044101- A098   Purchase of Other Assets                           15,542,000            13,923,000             5,000,000
044101- A12     Civil works                                         21,600,000            15,373,000             4,000,000
044101- A124    Building and Structures                             21,600,000            15,373,000             4,000,000

Page 559

                                                     4,134

NO. 153.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

        Total- NATIONAL BUSSINESS DEVELOPMENT        350,000,000        117,647,000        250,000,000
         PROGRAMM FOR SME'S
LO1176 FRUIT DEHYDRATION UNIT SWAT
044101- A01    Employees Related Expenses                       5,710,000             3,382,000            10,487,000
044101- A011   Pay                      16     16            5,710,000             3,382,000            10,487,000
044101- A011-1 Pay of Officers                       (16)          (5,710,000)          (3,382,000)         (10,487,000)
044101- A03    Operating Expenses                                 3,956,000             1,721,000             9,601,000
044101- A032   Communications                                       55,000               35,000              110,000
044101- A033     Utilities                                               135,000                                   2,975,000
044101- A037   Consultancy and Contractual Work                    226,000              226,000              500,000
044101- A038    Travel & Transportation                               1,670,000              760,000             1,750,000
044101- A039   General                                              1,870,000              700,000             4,266,000
044101- A09    Physical Assets                                      8,360,000             8,360,000             1,856,000
044101- A096   Purchase of Plant and Machinery                     7,220,000             7,220,000              917,000
044101- A098   Purchase of Other Assets                             1,140,000             1,140,000              939,000
044101- A12     Civil works                                           1,914,000             1,914,000             3,950,000
044101- A124    Building and Structures                               1,914,000             1,914,000             3,950,000
        Total- FRUIT DEHYDRATION UNIT SWAT               19,940,000         15,377,000          25,894,000
LO1180 PRODUCT DEV.CENTRE FOR COMPOSITS BASED SPORTS GOOD SIALKOT
044101- A01    Employees Related Expenses                       1,500,000              430,000             1,800,000
044101- A011   Pay                       9      7            1,500,000              430,000             1,800,000
044101- A011-1 Pay of Officers                  (9)      (7)          (1,500,000)            (430,000)          (1,800,000)
044101- A03    Operating Expenses                               24,240,000            23,122,000             1,300,000
044101- A037   Consultancy and Contractual Work                  22,040,000            22,040,000
044101- A039   General                                              2,200,000             1,082,000             1,300,000
044101- A09    Physical Assets                                    48,180,000              200,000            96,900,000
044101- A092   Computer Equipment                                 5,000,000              200,000              250,000
044101- A095   Purchase of Transport                                2,700,000                                   2,700,000
044101- A096   Purchase of Plant and Machinery                                                               93,950,000
044101- A097   Purchase of Furniture and Fixture                     2,570,000
044101- A098   Purchase of Other Assets                           37,910,000
044101- A12     Civil works                                        126,080,000          123,248,000

Page 560

                                                     4,135

NO. 153.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

044101- A124    Building and Structures                            126,080,000          123,248,000
        Total- PRODUCT DEV.CENTRE FOR                  200,000,000        147,000,000        100,000,000
           COMPOSITS BASED SPORTS GOOD
           SIALKOT
LO1182 BUSSINESS SKILL DEV. CENTRE FOR WOMEN AT VARIOUS LOCATION
044101- A01    Employees Related Expenses                       3,240,000             3,240,000              450,000
044101- A011   Pay                      33     11            3,240,000             3,240,000              450,000
044101- A011-1 Pay of Officers               (33)    (11)          (3,240,000)          (3,240,000)            (450,000)
044101- A03    Operating Expenses                                 6,770,000             6,770,000              550,000
044101- A032   Communications                                                                                  10,000
044101- A038    Travel & Transportation                                                                         260,000
044101- A039   General                                              6,770,000             6,770,000              280,000
044101- A09    Physical Assets                                    50,310,000            50,310,000            14,000,000
044101- A091   Purchase of Building                                48,000,000            48,000,000            14,000,000
044101- A092   Computer Equipment                                 2,310,000             2,310,000
044101- A12     Civil works                                         30,000,000            30,000,000
044101- A124    Building and Structures                             30,000,000            30,000,000
        Total- BUSSINESS SKILL DEV. CENTRE FOR           90,320,000         90,320,000          15,000,000
         WOMEN AT VARIOUS LOCATION
LO1190 FRUITS VEGETABLES & CONDIMENTS PROCESSING CENTRE NAUSHEROFEROZE
044101- A05    Grants, Subsidies and Write off Loans             80,000,000            80,000,000
044101- A052   Grants Domestic                                    80,000,000            80,000,000
044101- A09    Physical Assets                                    20,000,000            20,000,000
044101- A096   Purchase of Plant and Machinery                    20,000,000            20,000,000
044101- A12     Civil works                                        100,000,000          100,000,000
044101- A124    Building and Structures                            100,000,000          100,000,000
        Total- FRUITS VEGETABLES & CONDIMENTS         200,000,000        200,000,000
           PROCESSING CENTRE
          NAUSHEROFEROZE
LO1279 DATES PROCESSING PLANT AT VARIOUS LOCATION (PUNJGUR KHAIRPUR & DHARKI)
044101- A05    Grants, Subsidies and Write off Loans             17,389,000            17,389,000
044101- A052   Grants Domestic                                    17,389,000            17,389,000
044101- A09    Physical Assets                                    33,000,000            33,000,000

Page 561

                                                     4,136

NO. 153.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

044101- A091   Purchase of Building                                30,000,000            30,000,000
044101- A092   Computer Equipment                                 3,000,000             3,000,000
        Total- DATES PROCESSING PLANT AT                 50,389,000         50,389,000
           VARIOUS LOCATION (PUNJGUR
           KHAIRPUR & DHARKI)
LO1280 INDUSTRIAL DESIGN AND AUTOMATION CENRE
044101- A01    Employees Related Expenses                       5,400,000                                   4,590,000
044101- A011   Pay                       3      2            5,400,000                                   4,590,000
044101- A011-1 Pay of Officers                  (1)      (2)          (3,000,000)                               (4,590,000)
044101- A011-2 Pay of Other Staff               (2)                  (2,400,000)
044101- A03    Operating Expenses                                 1,600,000                                   2,479,000
044101- A039   General                                              1,600,000                                   2,479,000
044101- A05    Grants, Subsidies and Write off Loans             15,000,000                                 11,256,000
044101- A052   Grants Domestic                                    15,000,000                                 11,256,000
044101- A09    Physical Assets                                    78,000,000                                 81,675,000
044101- A091   Purchase of Building                                23,000,000                                 81,675,000
044101- A096   Purchase of Plant and Machinery                    55,000,000
        Total- INDUSTRIAL DESIGN AND                     100,000,000                            100,000,000
          AUTOMATION CENRE
LO3121 SME BUSSINESS FACILITATION CENTRE (SMEBFC) MULTAN
044101- A01    Employees Related Expenses                                                                   4,919,000
044101- A011   Pay                                 9                                                        4,919,000
044101- A011-1 Pay of Officers                           (9)                                                    (4,919,000)
044101- A03    Operating Expenses                                                                             7,518,000
044101- A039   General                                                                                          7,518,000
044101- A05    Grants, Subsidies and Write off Loans                                                          7,853,000
044101- A052   Grants Domestic                                                                                 7,853,000
044101- A09    Physical Assets                                                                                 7,200,000
044101- A092   Computer Equipment                                                                             1,800,000
044101- A097   Purchase of Furniture and Fixture                                                                 2,400,000
044101- A098   Purchase of Other Assets                                                                        3,000,000
044101- A12     Civil works                                                                                       2,400,000

Page 562

                                                     4,137

NO. 153.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

044101- A125   Other Works                                                                                     2,400,000
        Total- SME BUSSINESS FACILITATION                                                        29,890,000
          CENTRE (SMEBFC) MULTAN
LO9644 NATIONAL STRATEGIC PROGRAM FPR ACQUISTION OF IND TECH-NSPAIT INCLUDING FEASIBILITY-
KNOWLEDGE
044101- A01    Employees Related Expenses                                                               169,268,000
044101- A011   Pay                                81                                                     169,268,000
044101- A011-1 Pay of Officers                       (76)                                                (168,018,000)
044101- A011-2 Pay of Other Staff                       (5)                                                    (1,250,000)
044101- A03    Operating Expenses                                                                           48,669,000
044101- A039   General                                                                                        48,669,000
044101- A05    Grants, Subsidies and Write off Loans                                                      118,746,000
044101- A052   Grants Domestic                                                                             118,746,000
044101- A09    Physical Assets                                                                             622,747,000
044101- A092   Computer Equipment                                                                           43,208,000
044101- A095   Purchase of Transport                                                                          16,200,000
044101- A096   Purchase of Plant and Machinery                                                             551,758,000
044101- A097   Purchase of Furniture and Fixture                                                                 9,781,000
044101- A098   Purchase of Other Assets                                                                        1,800,000
044101- A13    Repairs and Maintenance                                                                     11,900,000
044101- A133    Buildings and Structure                                                                         11,900,000
        Total- NATIONAL STRATEGIC PROGRAM FPR                                               971,330,000
           ACQUISTION OF IND TECH-NSPAIT
           INCLUDING FEASIBILITY- KNOWLEDGE
LO9645 FOOTWEAR CLUSTER DEV THROUGH CAD CAM AND CNC MACHINING LAHORE
044101- A01    Employees Related Expenses                                                                   1,800,000
044101- A011   Pay                                 2                                                        1,800,000
044101- A011-1 Pay of Officers                           (2)                                                    (1,800,000)
044101- A03    Operating Expenses                                                                             1,584,000
044101- A039   General                                                                                          1,584,000
044101- A05    Grants, Subsidies and Write off Loans                                                          2,930,000
044101- A052   Grants Domestic                                                                                 2,930,000
044101- A09    Physical Assets                                                                               19,686,000

Page 563

                                                     4,138

NO. 153.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

044101- A092   Computer Equipment                                                                           16,843,000
044101- A096   Purchase of Plant and Machinery                                                                 2,843,000
044101- A13    Repairs and Maintenance                                                                       4,000,000
044101- A133    Buildings and Structure                                                                           4,000,000
        Total- FOOTWEAR CLUSTER DEV THROUGH                                                  30,000,000
          CAD CAM AND CNC MACHINING
          LAHORE
LO9646 HANDICRAFT DEV AND PROMOTION IN LESS DEVELOPED AREAS OF PAKISTAN
044101- A01    Employees Related Expenses                                                                   3,264,000
044101- A011   Pay                                41                                                        2,184,000
044101- A011-1 Pay of Officers                       (41)                                                    (2,184,000)
044101- A012   Allowances                                                                                       1,080,000
044101- A012-1  Regular Allowances                                                                         (1,080,000)
044101- A03    Operating Expenses                                                                           21,500,000
044101- A033     Utilities                                                                                           1,000,000
044101- A034   Occupancy Costs                                                                                4,423,000
044101- A038    Travel & Transportation                                                                           1,512,000
044101- A039   General                                                                                        14,565,000
044101- A05    Grants, Subsidies and Write off Loans                                                          5,236,000
044101- A052   Grants Domestic                                                                                 5,236,000
        Total- HANDICRAFT DEV AND PROMOTION IN                                                 30,000,000
           LESS DEVELOPED AREAS OF
           PAKISTAN
LO9647 HANDICRAFT EXPORT DEVELOPMENT PROJECT ALL OVER PAKISTAN
044101- A01    Employees Related Expenses                                                                 29,412,000
044101- A011   Pay                                48                                                      29,412,000
044101- A011-1 Pay of Officers                       (48)                                                  (29,412,000)
044101- A03    Operating Expenses                                                                           24,400,000
044101- A032   Communications                                                                               540,000
044101- A033     Utilities                                                                                           2,700,000
044101- A034   Occupancy Costs                                                                                7,500,000
044101- A037   Consultancy and Contractual Work                                                               1,500,000
044101- A038    Travel & Transportation                                                                         848,000

Page 564

                                                     4,139

NO. 153.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, LAHORE

044101- A039   General                                                                                        11,312,000
044101- A05    Grants, Subsidies and Write off Loans                                                          4,888,000
044101- A052   Grants Domestic                                                                                 4,888,000
044101- A09    Physical Assets                                                                                 1,300,000
044101- A097   Purchase of Furniture and Fixture                                                                 1,300,000
        Total- HANDICRAFT EXPORT DEVELOPMENT                                                 60,000,000
          PROJECT ALL OVER PAKISTAN
     044101   Total-  Support for Industrial Development       1,075,205,000        685,289,000       1,689,278,000

     0441     Total-  Manufacturing                          1,075,205,000        685,289,000       1,689,278,000
     044      Total-  Mining and Manufacturing               1,075,205,000        685,289,000       1,689,278,000
     04        Total-  Economic Affairs                       1,075,205,000        685,289,000       1,689,278,000
               Total- ACCOUNTANT GENERAL                 1,075,205,000          685,289,000         1,689,278,000
                PAKISTAN REVENUES
                  SUB-OFFICE, LAHORE

Page 565

                                                     4,140

NO. 153.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

04     Economic Affairs:
044    Mining and Manufacturing:
0441   Manufacturing:
044101 Support for Industrial Development  :
KA1295 UPGRADATION OF PMTF FACILITIES AND DESIGN CENTRE
044101- A03    Operating Expenses                                 2,078,000
044101- A038    Travel & Transportation                               2,078,000
044101- A09    Physical Assets                                    97,922,000
044101- A096   Purchase of Plant and Machinery                    91,164,000
044101- A097   Purchase of Furniture and Fixture                     1,000,000
044101- A098   Purchase of Other Assets                             5,758,000
        Total- UPGRADATION OF PMTF FACILITIES           100,000,000
          AND DESIGN CENTRE
KA3065 INFRASTRUCTURE DEV. OF EXPORT PROCESSING ZONE AT GAWADAR(CPEC)
044101- A01    Employees Related Expenses                      11,261,000
044101- A011   Pay                      18                   11,261,000
044101- A011-1 Pay of Officers               (18)                (11,261,000)
044101- A03    Operating Expenses                               40,000,000
044101- A037   Consultancy and Contractual Work                  35,000,000
044101- A039   General                                              5,000,000
044101- A05    Grants, Subsidies and Write off Loans              2,739,000
044101- A052   Grants Domestic                                     2,739,000
044101- A09    Physical Assets                                    16,000,000
044101- A092   Computer Equipment                                 2,000,000
044101- A095   Purchase of Transport                              10,000,000
044101- A097   Purchase of Furniture and Fixture                     3,000,000
044101- A098   Purchase of Other Assets                             1,000,000
044101- A12     Civil works                                         30,000,000
044101- A124    Building and Structures                             30,000,000
        Total- INFRASTRUCTURE DEV. OF EXPORT           100,000,000
           PROCESSING ZONE AT
          GAWADAR(CPEC)

Page 566

                                                     4,141

NO. 153.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

     044101   Total-  Support for Industrial Development         200,000,000

     0441     Total-  Manufacturing                           200,000,000
     044      Total-  Mining and Manufacturing                 200,000,000
     04        Total-  Economic Affairs                        200,000,000
               Total- ACCOUNTANT GENERAL                  200,000,000
                PAKISTAN REVENUES
                  SUB-OFFICE, KARACHI

Page 567

                                                     4,142

NO. 153.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

04     Economic Affairs:
044    Mining and Manufacturing:
0441   Manufacturing:
044101 Support for Industrial Development  :
LS0109 ESTABLISHMENT OF HUB SPECIAL ECONOMIC ZONE LASBELA
044101- A03    Operating Expenses                                                                           10,800,000
044101- A032   Communications                                                                               100,000
044101- A037   Consultancy and Contractual Work                                                               8,500,000
044101- A038    Travel & Transportation                                                                           1,000,000
044101- A039   General                                                                                          1,200,000
044101- A09    Physical Assets                                                                               15,135,000
044101- A091   Purchase of Building                                                                           10,000,000
044101- A095   Purchase of Transport                                                                            5,135,000
044101- A12     Civil works                                                                                   374,065,000
044101- A121   Roads Highways and Bridges                                                                 100,636,000
044101- A123   Embankment and Drainage Works                                                            100,000,000
044101- A124    Building and Structures                                                                         11,606,000
044101- A125   Other Works                                                                                 161,823,000
        Total- ESTABLISHMENT OF HUB SPECIAL                                                   400,000,000
          ECONOMIC ZONE LASBELA
QA0419 PROVISION OF INFRASTRUCTURE IN QUETTA INDUSTRIAL & TRADING ESTATE (PHASE-IV)
044101- A12     Civil works                                                                                     18,255,000
044101- A121   Roads Highways and Bridges                                                                     1,687,000
044101- A125   Other Works                                                                                   16,568,000
        Total- PROVISION OF INFRASTRUCTURE IN                                                   18,255,000
          QUETTA INDUSTRIAL & TRADING
           ESTATE (PHASE-IV)
QA0420 ESTABLISHMENT OF INFRASTRUCTURE IN QUETTA INDUSTRIAL & TRADING ESTATE (PHASE-II)
044101- A12     Civil works                                                                                     24,889,000
044101- A121   Roads Highways and Bridges                                                                   12,819,000
044101- A125   Other Works                                                                                   12,070,000
        Total- ESTABLISHMENT OF                                                                   24,889,000

Page 568

                                                     4,143

NO. 153.- FC12C32 CAPITAL OUTLAY ON INDUSTRIAL DEVELOPMENT             DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

           INFRASTRUCTURE IN QUETTA
            INDUSTRIAL & TRADING ESTATE
              (PHASE-II)
QA0536 ESTABLISHMENT OF BOSTAN INDUSTRIAL ESTATE PHASE-I
044101- A12     Civil works                                                                                   110,871,000
044101- A125   Other Works                                                                                 110,871,000
        Total- ESTABLISHMENT OF BOSTAN                                                        110,871,000
            INDUSTRIAL ESTATE PHASE-I
QA9175 FEASIBILITY FOR ESTABLISHMENT OF METAL PARK IN CHAGAI
044101- A03    Operating Expenses                                                                           90,000,000
044101- A037   Consultancy and Contractual Work                                                             90,000,000
044101- A05    Grants, Subsidies and Write off Loans                                                        10,000,000
044101- A052   Grants Domestic                                                                               10,000,000
        Total- FEASIBILITY FOR ESTABLISHMENT OF                                               100,000,000
          METAL PARK IN CHAGAI
     044101   Total-  Support for Industrial Development                                               654,015,000

     0441     Total-  Manufacturing                                                                 654,015,000
     044      Total-  Mining and Manufacturing                                                       654,015,000
     04        Total-  Economic Affairs                                                               654,015,000
               Total- ACCOUNTANT GENERAL                                                             654,015,000
                PAKISTAN REVENUES
                  SUB-OFFICE, QUETTA
          TOTAL - DEMAND                             1,775,205,000        685,289,000       2,343,293,000

Page 569

                                                     4,147

NO. 154.- CAPITAL OUTLAY ON MARITIME AFFAIRS DIVIS ION                   DEMANDS FOR GRANTS
                                DEMAND NO. 154
                                                                            ( FC12C51 )
                        CAPITAL OUTLAY ON MARITIME AFFAIRS DIVIS ION

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2020 to defray the Salaries and Other
Expenses of the CAPITAL OUTLAY ON MARITIME AFFAIRS DIVIS ION.

                                Voted           Rs. 3,600,243,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF MARITIME AFFAIRS  .

                                                           2018-2019         2018-2019         2019-2020
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
017    Research and Development General Public                    27,196,000
       Services
019    General Public Service Not Elsewhere Defined               109,419,000
042    Agriculture,Food,Irrigation,Forestry and Fishing               120,000,000
045    Construction and Transport                                   18,556,000            18,556,000            64,848,000
046    Communications                                            9,843,512,000         2,436,838,000         3,535,395,000
               Total                                              10,118,683,000         2,455,394,000         3,600,243,000
     OBJECT CLASSIFICATION
A01   Employees Related Expenses                           20,752,000           4,681,000         12,872,000
A011  Pay                                                          19,920,000             4,681,000            12,872,000
A011-1 Pay of Officers                                                 (14,104,000)            (3,169,000)            (5,372,000)
A011-2 Pay of Other Staff                                                (5,816,000)            (1,512,000)            (7,500,000)
A012  Allowances                                                    832,000
A012-1 Regular Allowances
A012-2 Other Allowances (Excluding TA)                                 (832,000)
A02    Project Pre-Investment Analysis                       953,525,000         69,420,000         27,156,000
A03   Operating Expenses                                    27,951,000         23,857,000         24,857,000
A06   Transfers                                                2,000,000           2,000,000              1,000
A09   Physical Assets                                      932,840,000            503,000         45,194,000
A12    Civil works                                          8,032,068,000       2,353,930,000       3,489,329,000
A13   Repairs and Maintenance                             149,547,000           1,003,000            834,000
               Total                                        10,118,683,000       2,455,394,000       3,600,243,000
                  (In Foreign Exchange)                              (6,335,260,000)        (1,509,316,000)        (2,550,000,000)

Page 570

(Own Resources)
(Foreign Aid)                                        (6,335,260,000)        (1,509,316,000)        (2,550,000,000)
(In Local Currency)                                  (3,783,423,000)         (946,078,000)        (1,050,243,000)
                                      __________________________________________________

Page 571

                                                     4,148

NO. 154.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVIS ION             DEMANDS FOR GRANTS

III.  - DETAILS are as follows :-
                                 No of Posts        2018-2019         2018-2019       2019-2020
                                       2018-19 2019-20       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

                       ACCOUNTANT GENERAL PAKISTAN REVENUES
04     Economic Affairs:
045    Construction and Transport:
0453   Water Transport:
045301 PORT AND SHIPPPING  :
IB0715 DEV. OF IT INFR. FOR IMP. OF E OFFICE M/O MARITIME AFFAIRS
045301- A01    Employees Related Expenses                                                                 11,000,000
045301- A011   Pay                                 6                                                      11,000,000
045301- A011-1 Pay of Officers                           (2)                                                    (5,000,000)
045301- A011-2 Pay of Other Staff                       (4)                                                    (6,000,000)
045301- A03    Operating Expenses                                                                           500,000
045301- A039   General                                                                                        500,000
045301- A09    Physical Assets                                                                                 9,730,000
045301- A092   Computer Equipment                                                                             9,080,000
045301- A096   Purchase of Plant and Machinery                                                                500,000
045301- A097   Purchase of Furniture and Fixture                                                               150,000
        Total- DEV. OF IT INFR. FOR IMP. OF E OFFICE                                                21,230,000
           M/O MARITIME AFFAIRS
     045301   Total- PORT AND SHIPPPING                                                          21,230,000
     0453     Total-  Water Transport                                                                 21,230,000
     045      Total-  Construction and Transport                                                        21,230,000
     04        Total-  Economic Affairs                                                                 21,230,000
               Total- ACCOUNTANT GENERAL                                                               21,230,000
                PAKISTAN REVENUES

Page 572

                                                     4,149

NO. 154.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVIS ION             DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

01     General Public Service:
017    Research and Development General Public Services:
0171   Research & Dev. General Public Services:
017103 MARINE/ BIOLOGY/ ZOOLOGY  :
KA1310 SURVEYS TO FIND POPULATION DYNAMICS & MANGEMENT OF VERTEBRATE DIVERSITY OF THE
COASTAL AREA OF SINDH&
017103- A01    Employees Related Expenses                      17,066,000
017103- A011   Pay                      15                   16,234,000
017103- A011-1 Pay of Officers               (10)                (11,930,000)
017103- A011-2 Pay of Other Staff               (5)                  (4,304,000)
017103- A012   Allowances                                           832,000
017103- A012-2  Other Allowances (Excluding TA)                    (832,000)
017103- A03    Operating Expenses                                 3,095,000
017103- A032   Communications                                       45,000
017103- A034   Occupancy Costs                                     100,000
017103- A038    Travel & Transportation                               2,000,000
017103- A039   General                                              950,000
017103- A09    Physical Assets                                      6,485,000
017103- A092   Computer Equipment                                 900,000
017103- A095   Purchase of Transport                                2,900,000
017103- A096   Purchase of Plant and Machinery                     2,500,000
017103- A097   Purchase of Furniture and Fixture                     185,000
017103- A13    Repairs and Maintenance                            550,000
017103- A130    Transport                                            250,000
017103- A131   Machinery and Equipment                             100,000
017103- A132    Furniture and Fixture                                  100,000
017103- A137   Computer Equipment                                 100,000
        Total- SURVEYS TO FIND POPULATION                27,196,000
           DYNAMICS & MANGEMENT OF
          VERTEBRATE DIVERSITY OF THE
          COASTAL AREA OF SINDH&
     017103   Total-  MARINE/ BIOLOGY/ ZOOLOGY            27,196,000

Page 573

                                                     4,150

NO. 154.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVIS ION             DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

     0171     Total-  Research & Dev. General Public            27,196,000
                      Services
     017      Total-  Research and Development                27,196,000
                     General Public Services
019    General Public Service Not Elsewhere Defined:
0191  Gen Public Service Not Elsewhere Defined:
019101 ADMINISTRATIVE TRAINING  :
KA1312 PURCHASE OF ECDIS-RADAR- ARPA GMDSS & HIGH VOLTAGE SMULATOR FOR PMA KARACHI
019101- A09    Physical Assets                                    30,000,000
019101- A096   Purchase of Plant and Machinery                    30,000,000
        Total- PURCHASE OF ECDIS-RADAR- ARPA            30,000,000
          GMDSS & HIGH VOLTAGE SMULATOR
          FOR PMA KARACHI
KA1316 REHABILITATION OF ADMIN BLOCK AUDOTORIUM QUARTER DECK OFFICER MESS IN PREMISES OF
PMA
019101- A13    Repairs and Maintenance                          59,566,000
019101- A133    Buildings and Structure                             59,566,000
        Total- REHABILITATION OF ADMIN BLOCK             59,566,000
          AUDOTORIUM QUARTER DECK
           OFFICER MESS IN PREMISES OF PMA
KA1317 CONSTRUCTION/REVNOVATION/REHABILITATION OF SEAMEN HOSTEL KEMARI(PMA CITY CAMPUS
019101- A13    Repairs and Maintenance                          19,853,000
019101- A133    Buildings and Structure                             19,853,000
        Total- CONSTRUCTION/REVNOVATION/REHAB         19,853,000
             ILITATION OF SEAMEN HOSTEL
           KEMARI(PMA CITY CAMPUS
     019101   Total-  ADMINISTRATIVE TRAINING             109,419,000
     0191     Total-  Gen Public Service Not Elsewhere         109,419,000
                      Defined
     019      Total-  General Public Service Not                109,419,000
                    Elsewhere Defined
     01        Total-  General Public Service                   136,615,000
04     Economic Affairs:
042     Agriculture,Food,Irrigation,Forestry and Fishing:
0425   Fishing:

Page 574

                                                     4,151

NO. 154.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVIS ION             DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

042501 ADMINISTRATION  :
KA1313 CONSTRUCTION OF PORT BOUNDRY WALL OF KOFHA KARACHI SINDH
042501- A12     Civil works                                         60,000,000
042501- A124    Building and Structures                             60,000,000
        Total- CONSTRUCTION OF PORT BOUNDRY            60,000,000
          WALL OF KOFHA KARACHI SINDH
KA1315 REPAIR OF JETTY STRUCTURE & PORT INSTALLATION KoFHA KARACHI SINDH
042501- A13    Repairs and Maintenance                          60,000,000
042501- A133    Buildings and Structure                             60,000,000
        Total- REPAIR OF JETTY STRUCTURE & PORT         60,000,000
            INSTALLATION KoFHA KARACHI SINDH

     042501   Total-  ADMINISTRATION                      120,000,000
     0425     Total-  Fishing                                 120,000,000
     042      Total-  Agriculture,Food,Irrigation,Forestry         120,000,000
                   and Fishing
045    Construction and Transport:
0453   Water Transport:
045301 PORT AND SHIPPPING  :
KA1314 ENHANCEMENT OF SEAFARER REPORTING MODULE & INSTALLATION ON NEW COMPUTER HARD/IC
CARD PRINTER
045301- A03    Operating Expenses                               18,556,000            18,556,000            18,556,000
045301- A039   General                                             18,556,000            18,556,000            18,556,000
        Total- ENHANCEMENT OF SEAFARER                 18,556,000         18,556,000          18,556,000
           REPORTING MODULE & INSTALLATION
         ON NEW COMPUTER HARD/IC CARD
           PRINTER
KA9623 PROVIDING AND INSTALLATION OF SECURITY AND STREET LIGHTS IN PREMISES
045301- A09    Physical Assets                                                                               25,062,000
045301- A092   Computer Equipment                                                                             2,207,000
045301- A096   Purchase of Plant and Machinery                                                                 2,101,000
045301- A097   Purchase of Furniture and Fixture                                                               20,754,000
        Total- PROVIDING AND INSTALLATION OF                                                    25,062,000
           SECURITY AND STREET LIGHTS IN

Page 575

                                                     4,152

NO. 154.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVIS ION             DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

           PREMISES
     045301   Total- PORT AND SHIPPPING                   18,556,000         18,556,000         43,618,000
     0453     Total-  Water Transport                          18,556,000         18,556,000         43,618,000
     045      Total-  Construction and Transport                 18,556,000         18,556,000         43,618,000
046    Communications:
0461   Communications:
046101 ADMINISTRATION  :
KA1311 FEASIBILITY STUDY FOR OIL STORAGE CONSTR TION AT OIA KEMARI KARACHI
046101- A02     Project Pre-Investment Analysis                  702,025,000
046101- A021    Feasibility Studies                                 702,025,000
        Total- FEASIBILITY STUDY FOR OIL STORAGE        702,025,000
          CONSTR TION AT OIA KEMARI
           KARACHI
     046101   Total-  ADMINISTRATION                      702,025,000
     0461     Total-  Communications                         702,025,000
     046      Total-  Communications                         702,025,000
     04        Total-  Economic Affairs                        840,581,000         18,556,000         43,618,000
               Total- ACCOUNTANT GENERAL                  977,196,000            18,556,000            43,618,000
                PAKISTAN REVENUES
                  SUB-OFFICE, KARACHI

Page 576

                                                     4,153

NO. 154.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVIS ION             DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

04     Economic Affairs:
046    Communications:
0461   Communications:
046101 ADMINISTRATION  :
GR2015 CONSTRUCTION OF EAST BAY EXPRESSWAY TO LINK GWADAR PORT WITH NATIONAL ROAD
NETWORK GWADAR.
046101- A12     Civil works                                       6,035,260,000         1,508,816,000         2,400,000,000
046101- A121   Roads Highways and Bridges                     6,035,260,000         1,508,816,000         2,400,000,000
        Total- CONSTRUCTION OF EAST BAY               6,035,260,000       1,508,816,000       2,400,000,000
          EXPRESSWAY TO LINK GWADAR PORT
           WITH NATIONAL ROAD NETWORK
          GWADAR.
                  (In Foreign Exchange)                          (5,835,260,000)      (1,508,816,000)      (2,200,000,000)
               (Foreign Aid)                                   (5,835,260,000)      (1,508,816,000)      (2,200,000,000)
                  (In Local Currency)                              (200,000,000)                            (200,000,000)
                                                  __________________________________________________
GR2016 UP GRADATION OF GPA HOUSING COMPLEX
046101- A12     Civil works                                        209,000,000          209,000,000            91,638,000
046101- A124    Building and Structures                            209,000,000          209,000,000            91,638,000
        Total- UP GRADATION OF GPA HOUSING             209,000,000        209,000,000          91,638,000
          COMPLEX
GR2018 FEASIBILITY STUDY FOR CONSTRUCTION OF BR EAK WATERS
046101- A02     Project Pre-Investment Analysis                  194,000,000            69,420,000            27,156,000
046101- A021    Feasibility Studies                                 194,000,000            69,420,000            27,156,000
        Total- FEASIBILITY STUDY FOR                      194,000,000         69,420,000          27,156,000
           CONSTRUCTION OF BR EAK WATERS
GR2019 CAPITAL DREDGING OF BERTHING AREA & CHAN EL FOR ADDITIONAL TERMINAL
046101- A12     Civil works                                        100,000,000
046101- A123   Embankment and Drainage Works                 100,000,000
        Total- CAPITAL DREDGING OF BERTHING            100,000,000
          AREA & CHAN EL FOR ADDITIONAL
           TERMINAL
GR2020 PAK-CHINA TECHNICAL & VOCATIONAL INSTITUTE AT GWADAR
046101- A12     Civil works                                        625,583,000             7,541,000          425,583,000

Page 577

                                                     4,154

NO. 154.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVIS ION             DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

046101- A124    Building and Structures                            625,583,000             7,541,000          425,583,000
        Total- PAK-CHINA TECHNICAL &                     625,583,000           7,541,000        425,583,000
           VOCATIONAL INSTITUTE AT GWADAR
                  (In Foreign Exchange)                           (500,000,000)            (500,000)       (350,000,000)
               (Foreign Aid)                                    (500,000,000)            (500,000)       (350,000,000)
                  (In Local Currency)                              (125,583,000)          (7,041,000)         (75,583,000)
                                                  __________________________________________________
GR2021 ESTABLISHMENT OF CPEC SUPPORT UNIT(CSU) FOR PROJECTS AND ACTIVITES IN GPA
046101- A01    Employees Related Expenses                       3,686,000             4,681,000             1,872,000
046101- A011   Pay                      10      7            3,686,000             4,681,000             1,872,000
046101- A011-1 Pay of Officers                  (3)                  (2,174,000)          (3,169,000)            (372,000)
046101- A011-2 Pay of Other Staff               (7)      (7)          (1,512,000)          (1,512,000)          (1,500,000)
046101- A03    Operating Expenses                                 6,300,000             5,301,000             5,801,000
046101- A036   Motor Vehicles                                       1,000,000             1,000,000             2,000,000
046101- A038    Travel & Transportation                               2,700,000             2,501,000             2,001,000
046101- A039   General                                              2,600,000             1,800,000             1,800,000
046101- A06    Transfers                                             2,000,000             2,000,000                 1,000
046101- A063    Entertainment & Gifts                                 2,000,000             2,000,000                 1,000
046101- A09    Physical Assets                                      502,000              503,000            10,402,000
046101- A092   Computer Equipment                                 500,000              500,000              400,000
046101- A095   Purchase of Transport                                   1,000                 1,000            10,000,000
046101- A096   Purchase of Plant and Machinery                         1,000                 1,000                 1,000
046101- A097   Purchase of Furniture and Fixture                                              1,000                 1,000
046101- A13    Repairs and Maintenance                            1,000,000             1,003,000              834,000
046101- A130    Transport                                             1,000,000             1,000,000              831,000
046101- A131   Machinery and Equipment                                                     2,000                 2,000
046101- A137   Computer Equipment                                                          1,000                 1,000
        Total- ESTABLISHMENT OF CPEC SUPPORT           13,488,000         13,488,000          18,910,000
            UNIT(CSU) FOR PROJECTS AND
            ACTIVITES IN GPA
GR2022 REHABILITATION OF AUCTION HALL OF GAWADAR MINI PORT
046101- A13    Repairs and Maintenance                            8,578,000
046101- A133    Buildings and Structure                               8,578,000

Page 578

                                                     4,155

NO. 154.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVIS ION             DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

        Total- REHABILITATION OF AUCTION HALL             8,578,000
          OF GAWADAR MINI PORT
GR2023 LAND ACUISITION AS PER GAWADAR PORT MASTER PLAN
046101- A09    Physical Assets                                   895,853,000
046101- A091   Purchase of Building                               895,853,000
        Total- LAND ACUISITION AS PER GAWADAR          895,853,000
          PORT MASTER PLAN
GR2024 BUSSINESS COMPLEX R.O PLANT(0.2M/G/D Capicity)
046101- A12     Civil works                                        319,441,000             5,789,000          279,808,000
046101- A124    Building and Structures                            319,441,000             5,789,000          279,808,000
        Total- BUSSINESS COMPLEX R.O                    319,441,000           5,789,000        279,808,000
            PLANT(0.2M/G/D Capicity)
GR2025 FEASIBILITY STUDY OF PERTROLIUM/PETRO CHEMICAL TERMINAL DIRTY DRY BULK TERMINAL
046101- A02     Project Pre-Investment Analysis                   57,500,000
046101- A021    Feasibility Studies                                   57,500,000
        Total- FEASIBILITY STUDY OF                         57,500,000
           PERTROLIUM/PETRO CHEMICAL
           TERMINAL DIRTY DRY BULK TERMINAL
GR2026 DEVELOPMENT & CONSTRUCTION OF PORT ALLIED STRUCTURES IN MULLAH BAND AREA
046101- A12     Civil works                                        682,784,000          622,784,000          292,300,000
046101- A124    Building and Structures                            682,784,000          622,784,000          292,300,000
        Total- DEVELOPMENT & CONSTRUCTION OF         682,784,000        622,784,000        292,300,000
          PORT ALLIED STRUCTURES IN
          MULLAH BAND AREA
     046101   Total-  ADMINISTRATION                     9,141,487,000       2,436,838,000       3,535,395,000
     0461     Total-  Communications                        9,141,487,000       2,436,838,000       3,535,395,000
     046      Total-  Communications                        9,141,487,000       2,436,838,000       3,535,395,000
     04        Total-  Economic Affairs                       9,141,487,000       2,436,838,000       3,535,395,000
               Total- ACCOUNTANT GENERAL                 9,141,487,000         2,436,838,000         3,535,395,000
                PAKISTAN REVENUES
                  SUB-OFFICE, QUETTA
                       (In Foreign Exchange)                          (6,335,260,000)        (1,509,316,000)        (2,550,000,000)
               (Own Resources)

Page 579

                                                     4,156

NO. 154.- FC12C51 CAPITAL OUTLAY ON MARITIME AFFAIRS DIVIS ION             DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, QUETTA

                   (Foreign Aid)                                    (6,335,260,000)        (1,509,316,000)        (2,550,000,000)
                       (In Local Currency)                             (2,806,227,000)         (927,522,000)         (985,395,000)
          TOTAL - DEMAND                           10,118,683,000       2,455,394,000       3,600,243,000
                  (In Foreign Exchange)                          (6,335,260,000)      (1,509,316,000)      (2,550,000,000)
            (Own Resources)
               (Foreign Aid)                                   (6,335,260,000)      (1,509,316,000)      (2,550,000,000)
                  (In Local Currency)                             (3,783,423,000)       (946,078,000)      (1,050,243,000)
                                                  __________________________________________________

Page 580

                                                     4,159

NO. 155.- CAPITAL OUTLAY ON PAKISTAN RAILWAYS                        DEMANDS FOR GRANTS
                                DEMAND NO. 155
                                                                            ( FC12C33 )
                           CAPITAL OUTLAY ON PAKISTAN RAILWAYS

             I.     ESTIMATES of the Amount required in the year ending 30 June , 2020 for CAPITAL OUTLAY ON
PAKISTAN RAILWAYS.

                                Voted           Rs. 16,000,000,000

             II.    FUNCTION-cum-OBJECT Classification under which this Grant will be accounted for on behalf of the
MINISTRY OF RAILWAYS  .

                                                           2018-2019         2018-2019         2019-2020
                                                       Budget           Revised           Budget
                                                             Estimate          Estimate           Estimate
                                                    Rs             Rs             Rs
     FUNCTIONAL CLASSIFICATION
014    Transfers                                                 30,411,473,000        22,792,870,000        13,500,000,000
045    Construction and Transport                                 4,000,000,000                               2,500,000,000
               Total                                              34,411,473,000        22,792,870,000        16,000,000,000
     OBJECT CLASSIFICATION
A03   Operating Expenses                                 4,000,000,000                           2,500,000,000
A11   Investments                                        30,411,473,000      22,792,870,000      13,500,000,000
               Total                                        34,411,473,000      22,792,870,000      16,000,000,000
                  (In Foreign Exchange)                             (22,498,000,000)       (12,345,000,000)        (7,850,000,000)
            (Own Resources)                                  (18,498,000,000)       (12,345,000,000)        (5,350,000,000)
               (Foreign Aid)                                        (4,000,000,000)                               (2,500,000,000)
                  (In Local Currency)                                (11,913,473,000)       (10,447,870,000)        (8,150,000,000)
                                                  __________________________________________________
____________________________________________________________________________________________________
      The above estimates do not include recoveries shown below which are adjusted in the accounts in reduction of
Expenditure:
045    Construction and Transport                             -4,000,000,000                           -2,500,000,000
                                                  __________________________________________________
               Total - Recoveries                             -4,000,000,000                           -2,500,000,000
                                                  __________________________________________________

Page 581

                                                     4,160

NO. 155.- FC12C33 CAPITAL OUTLAY ON PAKISTAN RAILWAYS                  DEMANDS FOR GRANTS

III.  - DETAILS are as follows :-
                                 No of Posts        2018-2019         2018-2019       2019-2020
                                       2018-19 2019-20       Budget           Revised         Budget
                                                             Estimate           Estimate        Estimate
                                                    Rs             Rs           Rs

Page 582

                                                     4,161

NO. 155.- FC12C33 CAPITAL OUTLAY ON PAKISTAN RAILWAYS                  DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

               ACCOUNTANT GENERAL PAKISTAN REVENUES SUB-OFFICE, KARACHI

01     General Public Service:
014    Transfers:
0143   Investments:
014302 Non-Financial Institutions  :
KA2216 PAKISTAN RAILWAYS, (LOCAL CURRENCY)
014302- A11    Investments                                    30,411,473,000        22,792,870,000        13,500,000,000
014302- A111   Investment Local                                30,411,473,000        22,792,870,000        13,500,000,000
        Total- PAKISTAN RAILWAYS, (LOCAL              30,411,473,000      22,792,870,000      13,500,000,000
           CURRENCY)
                  (In Foreign Exchange)                         (18,498,000,000)     (12,345,000,000)      (5,350,000,000)
            (Own Resources)                             (18,498,000,000)     (12,345,000,000)      (5,350,000,000)
                  (In Local Currency)                            (11,913,473,000)     (10,447,870,000)      (8,150,000,000)
                                                  __________________________________________________
     014302   Total-  Non-Financial Institutions               30,411,473,000      22,792,870,000      13,500,000,000
     0143     Total-  Investments                          30,411,473,000      22,792,870,000      13,500,000,000
     014      Total-  Transfers                             30,411,473,000      22,792,870,000      13,500,000,000
     01        Total-  General Public Service                 30,411,473,000      22,792,870,000      13,500,000,000
               Total- ACCOUNTANT GENERAL                30,411,473,000        22,792,870,000        13,500,000,000
                PAKISTAN REVENUES
                  SUB-OFFICE, KARACHI
                       (In Foreign Exchange)                         (18,498,000,000)       (12,345,000,000)        (5,350,000,000)
               (Own Resources)                              (18,498,000,000)       (12,345,000,000)        (5,350,000,000)
                   (Foreign Aid)
                       (In Local Currency)                            (11,913,473,000)       (10,447,870,000)        (8,150,000,000)
                              COMMERCIAL DEPARTMENTS

Page 583

                                                     4,162

NO. 155.- FC12C33 CAPITAL OUTLAY ON PAKISTAN RAILWAYS                  DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                              COMMERCIAL DEPARTMENTS

04     Economic Affairs:
045    Construction and Transport:
0454   Railway Trasport:
045401 Railway Trasport  :
HQ1763 PAKISTAN RAILWAYS -(FOREIGN AID PORTION)
045401- A03    Operating Expenses                             4,000,000,000                               2,500,000,000
045401- A039   General                                          4,000,000,000                               2,500,000,000
        Total- PAKISTAN RAILWAYS -(FOREIGN AID         4,000,000,000                           2,500,000,000
            PORTION)
                  (In Foreign Exchange)                          (4,000,000,000)                          (2,500,000,000)
               (Foreign Aid)                                   (4,000,000,000)                          (2,500,000,000)
                                                  __________________________________________________
     045401   Total-  Railway Trasport                       4,000,000,000                           2,500,000,000
     0454     Total-  Railway Trasport                       4,000,000,000                           2,500,000,000
     045      Total-  Construction and Transport              4,000,000,000                           2,500,000,000
     04        Total-  Economic Affairs                       4,000,000,000                           2,500,000,000
               Total- COMMERCIAL DEPARTMENTS           4,000,000,000                               2,500,000,000
                       (In Foreign Exchange)                          (4,000,000,000)                               (2,500,000,000)
               (Own Resources)
                   (Foreign Aid)                                    (4,000,000,000)                               (2,500,000,000)
          TOTAL - DEMAND                           34,411,473,000      22,792,870,000      16,000,000,000
                  (In Foreign Exchange)                         (22,498,000,000)     (12,345,000,000)      (7,850,000,000)
            (Own Resources)                             (18,498,000,000)     (12,345,000,000)      (5,350,000,000)
               (Foreign Aid)                                   (4,000,000,000)                          (2,500,000,000)
                  (In Local Currency)                            (11,913,473,000)     (10,447,870,000)      (8,150,000,000)
                                                  __________________________________________________
  ______________________________________________________________________________________________________________
                           Detail of recoveries adjusted in the accounts in Reduction of Expenditure:-

                              COMMERCIAL DEPARTMENTS

04     Economic Affairs
045    Construction and Transport
0454   Railway Trasport
045401 Railway Trasport
      90001    AMOUNT MET FROM RAILWAYS           -4,000,000,000                           -2,500,000,000

Page 584

                                                     4,163

NO. 155.- FC12C33 CAPITAL OUTLAY ON PAKISTAN RAILWAYS                  DEMANDS FOR GRANTS
                                 No of Posts        2018-2019         2018-2019        2019-2020
                                       2018-19 2019-20       Budget           Revised          Budget
                                                             Estimate           Estimate         Estimate
                                                    Rs             Rs            Rs

                              COMMERCIAL DEPARTMENTS

              FOREIGN AID DEPOSIT ACCOUNTS
                                                  __________________________________________________
     045401      Railway Trasport                           -4,000,000,000                           -2,500,000,000
                                                  __________________________________________________
     Total  -     COMMERCIAL DEPARTMENTS            -4,000,000,000                           -2,500,000,000
                                                  __________________________________________________