Duty drawback rates on export of engineering/metal and allied products
SRO 786(I)/2005Refunds and drawback
SRO 786(I)/2005 is a Customs SRO dated 6 August 2005, listed by FBR as "Duty drawback rates on export of engineering/metal and allied products".
The text below was extracted automatically from the files in the official zip archive. Line breaks and table layout may differ from the original, and where FBR scanned the paper and added a machine-read text layer, that layer can contain misread characters. Check the official file before relying on any wording or figure.
2005sro786.DOC
GOVERNMENT OF PAKISTAN
(REVENUE DIVISION)
CENTRAL BOARD OF REVENUE
*****
Islamabad, the 6th August, 2005.
NOTIFICATION
(CUSTOMS)
S.R.O. 786(I)/2005.- In exercise of the powers conferred by clause (c) of section 21 of the Customs Act, 1969 (IV of 1969), and in supersession of its Notification No. S.R.O. 414(I)/2001, dated the 18th June, 2001, the Central Board of Revenue is pleased to authorize repayment of customs-duties to the extent specified in column (4) of the Schedules below, paid on the importation of the raw materials specified in column (1) of the said Schedules, used in the production or manufacture of the goods specified in column (2) of those Schedules and exported during the period specified in column (3) thereof, subject to the following conditions, namely:-
(i) the manufactured goods are exported out of Pakistan and an application for repayment of customs-duties is presented to the proper officer of Customs within two hundred and ten days of such exportation or within one hundred and eighty days from the date of realization of foreign exchange as shown on Bank Credit Advice issued in accordance with the current directive of the State Bank of Pakistan; and
(ii) the exporter makes a declaration on the face of the original shipping bill and on other export documents to the effect that he would claim repayment of the customs-duties paid on the imported raw materials used in the production or manufacture of the goods being exported.
SCHEDULE I
Raw materials imported. | Goods produced or manufactured. | Period. | Extent of repayment of customs-duties.
(1) | (2) | (3) | (4)
1. Carbon steel. 2. Twist drills. 3. Electroplating polishes. 4. Emery grain. 5. Emery flour. 6. Nickel anode. 7. Felt mop. | 1. Hand tools of carbon steel, nickel or chrome plated, all sorts. | From 06.08.2005 onwards. | 2.08% of the f.o.b. value.
1. Stainless steel. 2. Twist drills. 3. Electroplating polishes. 4. Emery flour. 5. Emery grain. 6. Felt mop. | 2. Hand tools of stainless steel, all sorts. | From 06.08.2005 onwards. | 0.47% of the f.o.b. value.
SCHEDULE II
Raw materials imported | Goods produced or manufactured | Period | Extent of repayment of customs-duties
(1) | (2) | (3) | (4)
1. Carbon steel. 2. Trichloro-ethylene. 3. Titanine thinner. 4. Cellophane rolls. 5. Cellophane sheets. | 1. Shaving blades made of carbon steel. | From 06.08.2005 onwards. | 0.84% of the f.o.b. value.
1. Stainless steel. 2. DS 55 passivation. 3. Grinding wheels. 4. First hone wheels. 5. Final hone wheels. 6. Polytex sheet. 7. 03D oil. 8. Corner grinding wheel. 9. Target rod. 10. Vydax. 11. 03E rust inhibitor. 12. Petroleum jelly. 13. Waxed paper. 14. Hot melt glue. 15. Cellulose film. 16. Wrapper paper. | 2. Shaving blades made of stainless steel/platinum. | From 06.08.2005 onwards. | 4.04% of the f.o.b. value.
1. Steel strip. 2. Polystyrene hi-impact. 3. Polystyrene crystal. 4. Triklon-N. 5. 2-Propanol (IPA). 6. Vacmul O3D. 7. Krytox-2000/IPA. 8. Platinum target. 9. Grinding wheels. 10. Aluminium spacer strip. | 3. Disposable razor. | From 06.08.2005 onwards. | 3.34% of the f.o.b. value.
1. Steel strip. 2. Polystyrene hi-impact. 3. Polystyrene crystal. 4. Triklon-N. 5. 2-Propanol (IPA). 6. Vacmul 03D. 7. Krytox-2000/IPA. 8. Aluminium spacer strip. 9. Platinum target. 10. Grinding wheels. | 4. Twin blade disposable cartridge. | From 06.08.2005 onwards. | 1.97% of the f.o.b. value.
SCHEDULE III
Raw materials imported. | Goods produced or manufactured. | Period. | Extent of repayment of customs-duties.
(1) | (2) | (3) | (4)
1. Syrex SD-7 brand synthetic diaphragms. 2. Side cover post gasket. 3. Copper casing 'O' ring. 4. Index packing. 5. Flag rod packing. 6. Simirit 'O' rings. 7. CKD kit. 8. Index boxes. 9. AIG nipples. 10. Bodies. 11. Front casing. 12. Rear casing. 13. Top covers. | Complete gas meters. | From 06.08.2005 onwards. | 3.46% of the f.o.b. value.
SCHEDULE IV
Raw materials imported. | Goods produced or manufactured. | Period. | Extent of repayment of customs-duties.
(1) | (2) | (3) | (4)
1. Electrical steel sheets. 2. Ball bearing. 3. Copper rod/wire. 4. insulating varnish. 5. Aluminium ingots. 6. Plastic moulding compound (amino resin). 7. Bush. 8. Push button switch. 9. synchronous motor. | Ceiling, pedestal, cabin and exhaust fans of all sizes including such fans in CKD condition. | From 06.08.2005 onwards. | 2.74% of the f.o.b. value.
SCHEDULE V
Raw materials imported. | Goods produced or manufactured. | Period. | Extent of repayment of customs-duties.
(1) | (2) | (3) | (4)
Alloy steel wire rod. | Steel nuts, screws and bolts of all types. | From 06.08.2005 onwards. | 5.43% of the f.o.b. value.
SCHEDULE VI
Raw materials imported. | Goods produced or manufactured. | Period. | Extent of repayment of customs-duties.
(1) | (2) | (3) | (4)
Cold rolled steel strips in coils. | 1. Light cut hand shoe tacks (all sizes). | From 06.08.2005 onwards. | 4.48% of the f.o.b. value.
Iron and steel wire. | 2. Wire nails (all sizes). | From 06.08.2005 onwards. | 3.12% of the f.o.b. value.
Iron or steel wire or bright hard drawn nail wire. | 3. Machine tacks (all sizes) or bifurcated rivet. | From 06.08.2005 onwards. | 3.13% of the f.o.b. value.
SCHEDULE VII
Raw materials imported. | Goods produced or manufactured. | Period. | Extent of repayment of customs-duties.
(1) | (2) | (3) | (4)
1. Electrical steel strips. 2. Paper insulated copper. 3. Insulating tape. 4. Insulating paper crepe. 5. Cork sheet. 6. CRC steel. 7. H.T. bushing. 8. Thermometer. 9. Tap changer. 10. Mono block. 11. CU foil. 12. Press board. 13. Diamond dotted paper. 14. Laminated wood. 15. Buchholz relay. 16. Magnetic oil level indicator. 17. CT 2500/5A 30 V. | Transformers of 25 KVA to 1500 KVA. | From 06.08.2005 onwards. | 8.62% of the f.o.b. value.
SCHEDULE VIII
Raw materials imported. | Goods produced or manufactured. | Period. | Extent of repayment of customs-duties.
(1) | (2) | (3) | (4)
1. Copper bus bar (different sizes). 2. Heat shrinkable sleeves. 3. Epoxy insulators. 4. MCB (for CB motor drive) 4A. 5. MCB (for trip supply) 6A. 6. MCB (incoming 110V DC) 16A. 7. MCB (incoming 240V AC) 16A. 8. MCB (for alarm circuit) 6A. 9. MCB (for PT protection) 3A. 10. Auxiliary contact block for MCBs. 11. Four pole IDMT relay. 12. One pole IDMT relay. 13. Trip circuit supervision relay. 14. Signaling relay. 15. Auxiliary/magnetic contactor 230V AC. 16. Auxiliary/magnetic contactor 110V DC. 17. Ammeter. 18. Voltmeter. 19. Power factor meter. 20. Circuit breaker 15 KV. 21. Current transformer single and double core. 22. Auxiliary (summation) current transformer. 23. Text block. 24. Combined electronic meter. | Switch gears, all types. | From 06.08.2005 onwards. | 6.90% of the f.o.b. value.
SCHEDULE IX
Raw materials imported. | Goods produced or manufactured. | Period. | Extent of repayment of customs-duties.
(1) | (2) | (3) | (4)
1. Ball clay. 2. Chromium oxide. | 1. High tension and low-tension electrical porcelain insulator and fuse units of all types. | From 06.08.2005 onwards. | 3.37% of the f.o.b. value.
1. Ball clay. 2. Chromium oxide. 3. Cap. 4. Socket key. | 2. Disc insulator for transmission and distribution electrical lines. | From 06.08.2005 onwards. | 3.58% of the f.o.b. value.
SCHEDULE X
Raw materials imported. | Goods produced or manufactured. | Period. | Extent of repayment of customs-duties.
(1) | (2) | (3) | (4)
1. Tin. 2. Lead. | Resin cored non-fluxed solder wires and bars, all sorts. | From 06.08.2005 onwards. | 4.95% of the f.o.b. value.
SCHEDULE XI
Raw materials imported. | Goods produced or manufactured. | Period. | Extent of repayment of customs-duties.
(1) | (2) | (3) | (4)
1. Raw rubber. 2. Calcium carbonate. 3. Zinc oxide. 4. M.B.T.S. 5. Sulphur powder. 6. Stearic acid. 7. Carbon black. | Rubber radiator hoses and rubber hose pipes. | From 06.08.2005 onwards. | 0.90% of the f.o.b. value.
SCHEDULE XII
Raw materials imported. | Goods produced or manufactured. | Period. | Extent of repayment of customs-duties.
(1) | (2) | (3) | (4)
Brass scrap. | Brass hardware and moulded/machined items including brass wire. | From 06.08.2005 onwards. | Rs.6.11 per kilogram.
SCHEDULE XIII
Raw materials imported. | Goods produced or manufactured. | Period. | Extent of repayment of customs-duties.
(1) | (2) | (3) | (4)
Brass scrap. | 1. Handicrafts and musical instruments fully made of brass. | From 06.08.2005 onwards. | 1.14% of the f.o.b. value.
Copper scrap. | 2. Handicrafts and musical instruments fully made of copper. | From 06.08.2005 onwards. | 1.15% of the f.o.b. value.
Aluminium ingots/scrap. | 3. Handicrafts and musical instruments fully made of aluminium. | From 06.08.2005 onwards. | 0.25% of the f.o.b. value.
1. Diamond cutting tools. 2. Polishing materials. | 4. Handicrafts made of onyx or marble. | From 06.08.2005 onwards. | 1% of the f.o.b. value.
SCHEDULE XIV
Raw materials imported. | Goods produced or manufactured. | Period. | Extent of repayment of customs-duties.
(1) | (2) | (3) | (4)
Horn beam wood blocks. | Textile wooden shuttles (all types). | From 06.08.2005 onwards. | 0.80% of the f.o.b. value.
SCHEDULE XV
Raw materials imported. | Goods produced or manufactured. | Period. | Extent of repayment of customs-duties.
(1) | (2) | (3) | (4)
1. Plastic moulding compound-PP. 2. Polyvinyl chloride (PVC). 3. Raw rubber. 4. Iron and steel scrap. 5. Metal sheets C.R.C. | Plastic tricycle, minimum weight 3.6 kilogram each piece. | From 06.08.2005 onwards. | Rs.6.35 per piece.
SCHEDULE XVI
Raw materials imported. | Goods produced or manufactured. | Period. | Extent of repayment of customs-duties.
(1) | (2) | (3) | (4)
1. Movement. 2. Clock hands. 3. Plastic moulding compound. 4. Stamping foil. | Quartz clocks, all sorts. | From 06.08.2005 onwards. | 2.92% of the f.o.b. value.
SCHEDULE XVII
Raw materials imported. | Goods produced or manufactured. | Period. | Extent of repayment of customs-duties.
(1) | (2) | (3) | (4)
1. Stainless steel. 2. Stainless steel screws. 3. Emery powder. 4. Emery grain. 5. Granules or flakes gloss powder. 6. Trichloro-ethylene. 7. Electrolyte salt. 8. Electroplating polishes. 9. Satin finishing wheel. | 1. Annealed surgical and veterinary instruments of stainless steel and non-surgical scissors of stainless steel, all types. | From 06.08.2005 onwards. | 0.90% of the f.o.b. value.
1. Carbon steel. 2. Carbon steel screws. 3. Emery powder. 4. Emery grain. 5. Nickel salt. 6. Nickel anode. 7. Electroplating polishes. | 2. Annealed surgical and veterinary instruments of carbon steel and non-surgical scissors of carbon steel all types. | From 06.08.2005 onwards. | 0.96% of the f.o.b. value.
1. Pig iron. 2. Emery powder. 3. Emery grain. 4. Nickel salt. 5. Nickel anode. 6. Electroplating polishes. | 3. Nickel or chrome plated scissors, annealed surgical or non-surgical items, all types made of cast/pig iron. | From 06.08.2005 onwards. | 1.24% of the f.o.b. value.
1. Brass sheet. 2. Stainless steel screws. 3. Emery powder. 4. Emery grain. 5. Nickel salt. 6. Nickel anode. 7. Electroplating polishes. | 4. Annealed surgical and veterinary instruments all sorts made of brass. | From 06.08.2005 onwards. | 1.59% of the f.o.b. value.
1. Stainless steel forging. 2. Stainless steel screws. 3. Emery powder. 4. Emery grain. 5. Electroplating polishes. 6. Trichloro-ethylene. 7. Electrolyte salt. 8. Satin finishing wheel (grinding wheels). 9. Granules or flakes from glass powder. | 5. Annealed surgical and veterinary instruments of stainless steel all sorts made from duty free imported forging. | From 06.08.2005 onwards. | 0.75% of the f.o.b. value.
SCHEDULE XVIII
Raw materials imported. | Goods produced or manufactured. | Period. | Extent of repayment of customs-duties.
(1) | (2) | (3) | (4)
1. Stainless steel. 2. Luster. 3. Brass wire. 4. Brass (copper-zinc based alloys). 5. Emery grain. 6. Densified wood. 7. Nickel silver (copper-nickel zinc based alloys). 8. Plastic sheet. 9. Trichloro-ethylene. | Stainless steel and carbon steel pocketknives, sportsman knives, hunting knives, key chain pocketknives, swords, meat chopper, kitchen knives, butcher knives, knives all sorts, stainless steel cutlery and table-wares (all sorts). | From 06.08.2005 onwards. | 2.95% of the f.o.b. value.
SCHEDULE XIX
Raw materials imported. | Goods produced or manufactured. | Period. | Extent of repayment of customs-duties.
(1) | (2) | (3) | (4)
1. Aluminium. 2. Bakelite. 3. Sulphuric acid. 4. Phosphoric acid. 5. Nitric acid. 6. Metal powder polish. 7. Luster. 8. Brightener. 9. Lead. 10. Rubber. 11. Brass. 12. Stainless steel. 13. Paint interior. 14. Trichloro-ethylene. | 1. Alloy metal, pressure cooker, gas tanoor, cooking pan, kitchenware (all sizes). | From 06.08.2005 onwards. | 6.27% of the f.o.b. value.
1. Aluminium. 2. Bakelite. 3. Lead. 4. Paint interior. 5. Paint exterior. 6. Metal powder polish. 7. Brass. 8. Stainless steel. | 2. Non-stick utensils, all sorts. | From 06.08.2005 onwards. | 6.17% of the f.o.b. value.
1. Aluminium ingot. 2. Langsol. | 3. Aluminium utensils. | From 06.08.2005 onwards. | Rs.3.45 per kilogram.
Stainless steel sheets. | 4. Stainless steel utensils and kitchen ware of various sizes. | From 06.08.2005 onwards. | Rs.2.39 per kilogram.
SCHEDULE XX
Raw materials imported. | Goods produced or manufactured. | Period. | Extent of repayment of customs-duties.
(1) | (2) | (3) | (4)
Tin plate. | 1. Tin containers of capacity below 10 kilogram. | From 06.08.2005 onwards. | Rs.0.68 per container.
2. Tin containers of capacity 10 to 20 kilogram. | From 06.08.2005 onwards. | Rs.2.64 per container.
SCHEDULE XXI
Raw materials imported. | Goods produced or manufactured. | Period. | Extent of repayment of customs-duties.
(1) | (2) | (3) | (4)
1. Steel wire. 2. Nylon thread. 3. Scotch tape. 4. Leveling agent. 5. Acetic acid. 6. Dyes. | Plumages/hackles. | From 06.08.2005 onwards. | 0.19% of the f.o.b. value.
SCHEDULE XXII
Raw materials imported. | Goods produced or manufactured. | Period. | Extent of repayment of customs-duties.
(1) | (2) | (3) | (4)
1. Brass strip 0.20mmx8mm. 2. Brass kar/rod/ profile/ingot. 3. Sodium cyanide granular. 4. Nickel pallets. 5. Nickel sulphate. 6. Nickel chloride. 7. Boric acid. 8. Initial brightener photine CBUS/38. 9. Brightener ZN-1574. 10. Wetting agent ZN-1572. 11. Sulphuric acid extra pure. 12. Chromic acid. 13. Chromic salt additive mach-11. 14. Activax cleaner. | Chromium plated brass flexible tube of all sizes. | From 06.08.2005 onwards. | Re.0.09 per centimeter.
SCHEDULE XXIII
Raw materials imported. | Goods produced or manufactured. | Period. | Extent of repayment of customs-duties.
(1) | (2) | (3) | (4)
1. Key. 2. Insulating sleeve. 3. Insulating paper. 4. Connecting cable. 5. Stator housing. 6. Stator stack. 7. End shield. 8. Terminal cover. 9. Corrugated washer. 10. Plastic fan. 11. Gasket for T. cover. 12. Terminal plate. 13. IP55 Rings (AS/BS). 14. Body feet. 15. BES BS. 16. Cable gland. 17. Nut plate. 18. Electrical steel strip. 19. D. GRV ball bearing. 20. Triflexil. 21. Aluminium ingots. 22. Phasoflex. | Electric motors (all sizes). | From 06.08.2005 onwards. | 1.76% of the f.o.b. value.
SCHEDULE XXIV
Raw materials imported. | Goods produced or manufactured. | Period. | Extent of repayment of customs-duties.
(1) | (2) | (3) | (4)
1. Hot rolled coils. 2. Zinc ingots. | 1. Galvanized pipes all sizes. | From 06.08.2005 onwards. | Rs.1013.16 per metric ton.
Hot rolled coils. | 2. M.S. pipes all sizes. | From 06.08.2005 onwards. | Rs.803.32 per metric ton.
Cold rolled coils. | 3. Steel tubes all sizes. | From 06.08.2005 onwards. | Rs.1806.92 per metric ton.
Note.- Repayment of customs-duties authorized by this Schedule shall only be allowed against showing of documents of imported hot rolled coils and cold rolled coils by the exporters.
SCHEDULE XXV
Raw materials imported. | Goods produced or manufactured. | Period. | Extent of repayment of customs-duties.
(1) | (2) | (3) | (4)
1. Copper tube. 2. Silver solder. 3. Aluminium fins. 4. Galvanized sheet. | 1. Condensers for Air-Conditioners. | From 06.08.2005 onwards. | 2.21% of the f.o.b. value.
1. Copper tube. 2. Silver solder. 3. Aluminium fins. 4. Galvanized sheet. | 2. Condensers for Deep Freezers. | From 06.08.2005 onwards. | 2.36% of the f.o.b. value.
1. Steel tube copper coated. 2. Tin plate. 3. Paint polyester powder. | 3. Condensers for Refrigerator. | From 06.08.2005 onwards. | 2.87% of the f.o.b. value.
1. Copper tube. 2. Silver solder. 3. Aluminium fins. 4. Galvanized sheet. 5. Brass rod. | 4. Evaporators for Air-Conditioners. | From 06.08.2005 onwards. | 2.11% of the f.o.b. value.
1. Copper tube. 2. Silver solder. 3. Aluminium fins. 4. Galvanized sheet. 5. Pain polyester powder. | 5. Condenser for chilling Units. | From 06.08.2005 onwards. | 2.38% of the f.o.b. value.
SCHEDULE XXVI
Raw materials imported | Goods produced or manufactured | Period | Extent of repayment of customs-duties
(1) | (2) | (3) | (4)
1. Electrolytic copper cathode. 2. PVC compound ( cable grade ). | 1. PVC insulated cables (general wiring) ( single core to four core upto 10mmsq ). | From 06.08.2005 onwards. | 12.90% of the f.o.b. value.
1. Electrolytic copper cathode. 2. PVC compound ( cable grade ). 3. Aluminium rod to draw aluminium wire for armouring. 4. Polypropylene film or tape. 5. Polyethylene compound. 6. Polyethylene. 7. Semi conducting tape. 8. Copper foil or tape. 9. Polypropylene filler yarn. 10. DBTDL ( tinstab BL 277 ). 11. Triganox. 12. VTMOS silane A-171. 13. Poly kote. 14. Steel wire. | 2. PVC insulated power cables or armoured power cables for underground installation or power cables insulated with cross-linked polyethylene ( single core to four core over and above 10mmsq ). | From 06.08.2005 onwards. | 6.62% of the f.o.b. value.
1. Electrolytic copper cathode. 2. PVC compound ( cable grade ). | 3. PVC insulated cables (control & special cables). | From 06.08.2005 onwards. | 8.55% of the f.o.b. value.
Note.- Repayment of customs-duties authorized by this Schedule shall only be allowed against showing of documents of imported PVC compound (cable grade).
SCHEDULE XXVII
Raw materials imported. | Goods produced or manufactured. | Period. | Extent of repayment of customs-duties.
(1) | (2) | (3) | (4)
1. Diesel engine. 2. Auto start module . 3. Ammeter. 4. Voltmeter. 5. Frequency meter . 6. Elapsed time meter. 7. Water temperature gauge. 8. Water temperature sender. 9. Pressure gauge. 10. Pressure sender. 11. Fuel gauge. 12. Battery charging ammeter. 13. Magnetic pickup unit. 14. Temperature gauge. 15. Temperature sender. 16. LOP sender. 17. Fuel sender. 18. Fuse. 19. Fuse links. 20. Varistor. 21. Regulator run. 22. Key steel. 23. Pyrometer element. 24. Ball bearing. 25. Voltaflex. 26. Triflexil. 27. Electrical steel. 28. Enameled copper (imported). 29. Enameled flat (imported). 30. Connection cable. 31. D.Grov ball bearing. 32. Permanent magnet. 33. Pyrometer element. 34. Flat copper. 35. Hour counter meter. 36. DC ammeter. 37. Regulator. 38. Switch gauge. 39. Engine controller. | Diesel generating sets. | From 06.08.2005 onwards. | 5.75% of the f.o.b. value.
SCHEDULE XXVIII
Raw materials imported. | Goods produced or manufactured. | Period. | Extent of repayment of customs-duties.
(1) | (2) | (3) | (4)
1. PMC (polystrene). 2. Myler. 3. Capacitors. 4. Resistance. 5. Transistors. 6. Printed circuit board. 7. Integrated circuit. 8. Speaker 2.25”. 9. Neon. 10. Switch. 11. Diodes. 12. Wire. 13. Variable. | 1. Electric doorbells. | From 06.08.2005 onwards. | Rs.2.06 per bell.
1. P.M.C. (polystyrene). 2. Wire. | 2. Mechanical doorbells. | From 06.08.2005 onwards. | Rs.1.08 per bell.
1. P.M.C. ( polystyrene ). 3. Myler. 4. Capacitors. 5. Resistance. 6. Connectors. 7. Blister sheet. 8. Line jack. 9. Printed circuit board. 10. Speaker 2.25”. 11. Diode. 12. Integrated circuit. 13. Wire. | 3. Telephone ringer with flasher (voice enhancing unit). | From 06.08.2005 onwards. | Rs.3.09 per unit.
SCHEDULE XXIX
Raw materials imported | Goods produced or manufactured | Period | Extent of repayment of customs-duties
(1) | (2) | (3) | (4)
1. Deep drawn steel scrap. 2. Ferro-Silicon. 3. Carburizer (artificial graphite). 4. Ferro-Silicon magnesium. 5. Ferro-Silicon innoculant. | Wheel hub (all kinds) for automotive use. | From 06.08.2005 onwards. | 0.21% of the f.o.b. value.
SCHEDULE XXX
Raw materials imported | Goods produced or manufactured | Period | Extent of repayment of customs-duties
(1) | (2) | (3) | (4)
1. Aluminium ingots. 2. Roller coating ink. 3. Printing ink. 4. Lacquer. 5. Latex sealing. | 1. Empty aluminium collapsible printed tubes made from aluminium ingots of following sizes, namely:- (i) 12.5 or 13.5mm dia; | From 06.08.2005 onwards. | Rs.17.73 per thousand tubes.
(ii) 16mm dia; | From 06.08.2005 onwards. | Rs.29.69 per thousand tubes.
(iii) 19mm dia; | From 06.08.2005 onwards. | Rs.47.64 per thousand tubes.
(iv) 22mm dia; | From 06.08.2005 onwards. | Rs.96.24 per thousand tubes.
(v) 25mm dia; | From 06.08.2005 onwards. | Rs.118.29 per thousand tubes.
(vi) 28mm dia; | From 06.08.2005 onwards. | Rs.131.70 per thousand tubes.
(vii) 30mm dia; | From 06.08.2005 onwards. | Rs.146.83 per thousand tubes.
(viii) 32mm dia; | From 06.08.2005 onwards. | Rs.174.48 per thousand tubes.
(ix) 35mm dia; | From 06.08.2005 onwards. | Rs.231.25 per thousand tubes.
(x) 37mm dia; and | From 06.08.2005 onwards. | Rs.254.97 per thousand tubes.
(xi) 57mm dia. | From 06.08.2005 onwards. | Rs.350.98 per thousand tubes.
1. Aluminium slugs. 2. Roller coating ink. 3. Printing ink. 4. Lacquer (for inside protection). 5. Latex sealing. | 2. Empty aluminium collapsible printed tubes made from imported aluminium slugs of following sizes, namely:- (i) 12.5 or 13.5mm dia; | From 06.08.2005 onwards. | Rs.47.41 per thousand tubes.
(ii) 16mm dia; | From 06.08.2005 onwards. | Rs.72.44 per thousand tubes.
(iii) 19mm dia; | From 06.08.2005 onwards. | Rs.113.25 per thousand tubes.
(iv) 22mm dia; | From 06.08.2005 onwards. | Rs.169.23 per thousand tubes.
(v) 25mm dia; | From 06.08.2005 onwards. | Rs.247.24 per thousand tubes.
(vi) 30mm dia; and | From 06.08.2005 onwards. | Rs.282.20 per thousand tubes.
(vii) 35mm dia. | From 06.08.2005 onwards. | Rs.407.49 per thousand tubes.
Note:- Repayment of customs-duties authorized by this Schedule shall only be allowed against showing of documents of imported aluminium ingots and slugs.
SCHEDULE XXXI
Raw materials imported | Goods produced or manufactured | Period | Extent of repayment of customs-duties
(1) | (2) | (3) | (4)
1. Raw rubber. 2. SBR 1502. 3. SS 260. 4. Stem coal. 5. Sulphur. 6. Petroleum jelly. 7. T.M.T. 8. MBTS. 9. Zinc oxide. | Container for diesel engine starter battery. | From 06.08.2005 onwards. | 0.92% of the f.o.b. value.
SCHEDULE XXXII
Raw materials imported | Goods produced or manufactured | Period | Extent of repayment of customs-duties
(1) | (2) | (3) | (4)
1. Antimony. 2. Arsenic metal. 3. Salt of C.M.C. 4. Vanisperse. 5. Chopped fibre. 6. Lead ingots. 7. Impregnated paper sheet. 8. Glass fibre sheet. 9. Plastic moulding compound. 10. Tin. | 1. Lead acid battery (automotive), all types. | From 06.08.2005 onwards. | 1.97% of the f.o.b. value.
1. Lead ingots. 2. Antimony. 3. Arsenic metal. 4. Vanilex. 5. Cashmilon susa. 6. Polypropylene. 7. Polymion sheet. 8. Glass fibre sheet. 9. Battery indicator. | 2. Lead acid battery (motorcycle), all types. | From 06.08.2005 onwards. | 0.97% of the f.o.b. value.
SCHEDULE XXXIII
Raw materials imported | Goods produced or manufactured | Period | Extent of repayment of customs-duties
(1) | (2) | (3) | (4)
1. Activated carbon(KX). 2. Aluminium sheet. 3. Dust layer material. 4. Filter paper. 5. Hyperlast 1236 (polyol). 6. Hyperlast 5000 (isocyanate). 7. Netlon. 8. Delrin 500 BK-642. 9. Silica gel. 10. Aluminium bag. | Canister NBC, S10. | From 06.08.2005 onwards. | 5.64% of the f.o.b. value.
SCHEDULE XXXIV
Raw materials imported | Goods produced or manufactured | Period | Extent of repayment of customs-duties
(1) | (2) | (3) | (4)
Urea formaldehyde. | 1. Lamp holders, all types. | From 06.08.2005 onwards. | 3.63% of the f.o.b. value.
2. Ceiling rose. | From 06.08.2005 onwards. | 3.13% of the f.o.b. value.
3. Pin plug. | From 06.08.2005 onwards. | 2.74% of the f.o.b. value.
Note.- The repayment of customs-duties authorized by this Schedule shall only be allowed against showing of documents of imported urea formaldehyde.
SCHEDULE XXXV
Raw materials imported | Goods produced or manufactured | Period | Extent of repayment of customs-duties
(1) | (2) | (3) | (4)
1. Fuwa round 12 ton BSF 10 stud round. 2. Fuwa landing gear. 3. 2” bolt - IN kingpin. 4. Brake kit for trailer (including air tank). 5. Electrical kit for trailer. 6. Wheel rim 7.5x20”. | Autocom trailer. | From 06.08.2005 onwards. | 4.87% of the f.o.b. value.
SCHEDULE XXXVI
Raw materials imported | Goods produced or manufactured | Period | Extent of repayment of customs-duties
(1) | (2) | (3) | (4)
1. Aluminium billets. 2. P3-Almeco seal. 3. P3-Almeco 46. 4. P3-Almeco 29. 5. P3-Almecolor “L”. 6. P3-Almecolor “S”. 7. Salkoral. 8. Thermosetting powder coating (other polyester). | 1. Aluminium profile sections. | From 06.08.2005 onwards. | 3.66% of the f.o.b. value.
SCHEDULE XXXVII
Raw materials imported | Goods produced or manufactured | Period | Extent of repayment of customs-duties
(1) | (2) | (3) | (4)
1. Aluminium foil PE laminated. 2. Plastic moulding compound. 3. Printing ink. 4. Varnish. | Printed flexible tubes made from aluminium foil PE laminated of following sizes, namely:- 1. Dia 22mm length 80-119mm. | From 06.08.2005 onwards. | Rs.95.23 per 1000 tubes.
2. Dia 22mm length 120-140mm. | From 06.08.2005 onwards. | Rs.117.53 per 1000 tubes.
3. Dia 25mm length 97-129mm. | From 06.08.2005 onwards. | Rs.125.10 per 1000 tubes.
4. Dia 25mm length 130-160mm. | From 06.08.2005 onwards. | Rs.150.19 per 1000 tubes.
5. Dia 30mm length 112-149mm. | From 06.08.2005 onwards. | Rs.163.97 per 1000 tubes.
6. Dia 30mm length 150-185mm. | From 06.08.2005 onwards. | Rs.201.01 per 1000 tubes.
7. Dia 32mm length 125-149mm. | From 06.08.2005 onwards. | Rs.192.31 per 1000 tubes.
8. Dia 32mm length 150-185mm. | From 06.08.2005 onwards. | Rs.224.52 per 1000 tubes.
9. Dia 35mm length 125-159mm. | From 06.08.2005 onwards. | Rs.225.79 per 1000 tubes.
10. Dia 35mm length 160-215mm. | From 06.08.2005 onwards. | Rs.273.35 per 1000 tubes.
SCHEDULE XXXVIII
Raw materials imported | Goods produced or manufactured | Period | Extent of repayment of customs-duties
(1) | (2) | (3) | (4)
1. Completely Knocked Down (CKD) kit . 2. Steel sheet. 3. Vendorized kit. | Pick-up 800cc in Completely Built Up (CBU) condition. | From 06.08.2005 onwards. | 11.45% of the f.o.b. value.
SCHEDULE XXXIX
Raw materials imported | Goods produced or manufactured | Period | Extent of repayment of customs-duties
(1) | (2) | (3) | (4)
Main parts of CKD . 1. Engine assembly. 2. Gearbox assembly. 3. Hand brake. 4. Welding assembly of middle floor. 5. Front floor. 6. Welding assembly wall LH (set of 10 components). 7. Welding assembly wall RH (set of 10 components). 8. Panel assembly front. 9. Panel assembly back. 10. Door assembly front RH. 11. Door assembly front LH. 12. Outer panel skin of selling. 13. Gearbox shifting mechanism. 14. Rear axle shaft. 15. Steering gear assembly. 16. Member assembly table. 17. Glass back window. 18. Sealing strip back window. 19. Glass windshield. 20. Weather strip windshield. Accessories of CKD. 21. Gearbox bracket. 22. Hinge of left covering of engine. 23. Hinge of right covering of engine. 24. Boot control lever. 25. Shifting lever sector. 26. Fuel line (set of 3 hoses). 27. Wire clamp. 28. Bolt. 29. Gasket, exhaust pipe flange. 30. Clutch master cylinder. 31. Rear axle. 32. Frame assembly MD-1031-30001. 33. Seat of U-bolt of rear spring. 34. Front axle assembly (delete drum brake FR/RR). 35. Side ring. 36. Wheel disc assembly. 37. Change gear lever assembly. 38. Steering shaft. 39. Steering column. 40. Brake line (set of 7 pipes). 41. Vacuum line. 42. Headlamp device (sets of 4 lamps). 43. Instrument assembly. 44. Glass run rubber door, LH. 45. Glass run rubber door, RH. 46. Glass assembly door window, LH. 47. Glass assembly door window, RH. 48. Reg assembly FR door, LH. 49. Reg assembly FR door, RH. 50. Fin assembly door, LH. 51. Fin assembly door, RH. 52. Handle pull, LH. 53. Handle pull, RH. 54. Weather trip door inside, LH. 55. Weather trip door inside, RH. 56. Mirror assembly outside, LH. 57. Mirror assembly outside, RH. 58. Mirror assembly inside. 59. Install windshield wiper (set of arm, link and wiper blade). 60. Install windshield washer. 61. Install door lock (set of locks, latches and inner outer handles). 62. Install strip and other. 63. Welt. 64. Spcr-rub, LH. 65. Spcr-rub, RH. 66. Welt door, LH. 67. Welt door, RH. 68. Rig, LH. 69. Rig, RH. 70. Air hose. 71. Bracket, gearbox. 72. Friction disc (set of disc and plate). 73. Pressure plate. 74. Pump, clutch. 75. Fork. 76. Ball head. 77. Grease hose. 78. Block, engine frame. 79. Block, gearbox. 80. Bearing base. 81. Bearing. 82. Cover of fork. 83. Bracket plate. 84. Engine cover. 85. Insert part, single hole. 86. Flexible shaft, odometer. 87. Block, water tank. 88. Hose, air pump. 89. Relay. 90. Block, cabin. 91. Pin, cabin block. 92. Lock, multifunction switch. 93. Steering wheel. 94. Rubber plug. 95. Distribution board. 96. Oil bowl, brake. 97. Switch, brake. 98. Sealing head, rain groove. 99. Self-guard switch. 100. Pin, door. 101. Square clip. 102. Clip, glasses. 103. On-off label. 104. Hook. 105. Dirt-proof boot, hand brake. 106. Plug, hole of sun visor. 107. Iron wiring. 108. Oil hose, model 1605. 109. Clip. 110. Standard parts (set of hardware). 111. Front fog lamp. 112. Bolt, gearbox. 113. Clip, 18#. 114. Clip, 50#. 115. Clip, 65#. 116. Clip, 75#. 117. Clip, 85#. 118. Collar. 119. Rope. 120. Split pin. 121. Clip, water tank. 122. Spring, throttle frame. 123. Release spring, hand brake. 124. Release spring, throttle. 125. Grease fitting. 126. Screw. 127. Engine stopping mechanism. 128. Cover of brake oil tank. 129. Vacuum booster. 130. Heater machine. | Truck chassis, CBU (2600cc diesel engine). | From 06.08.2005 onwards. | 9.18% of the f.o.b. value.
SCHEDULE XL
Raw materials imported | Goods produced or manufactured | Period | Extent of repayment of customs-duties
(1) | (2) | (3) | (4)
1. CKD kit/ components. 2. Steel sheet. 3. Steel plate. 4. Steel bar. 5. Steel pipe. 6. Steel strip. 7. Aluminium bar. 8. Aluminium alloy. 9. Bearings. 10. Cushion parts (set). | 1. Motorcycles model 70 and 80 cc. | From 06.08.2005 onwards. | 11.44% of the f.o.b. value.
2. Motorcycles model 100 cc. | From 06.08.2005 onwards. | 9.47% of the f.o.b. value.
3. Motorcycles 125 cc. | From 06.08.2005 onwards. | 13.75% of the f.o.b. value.
SCHEDULE XLI
Raw materials imported | Goods produced or manufactured | Period | Extent of repayment of customs-duties
(1) | (2) | (3) | (4)
1. PP resin G 20%. 2. Aluminium strip. | 1. Fan cooling (11 blades) for car. | From 06.08.2005 onwards. | 2.20% of the f.o.b. value.
1. PP resin G 20%. 2. PP resin G 30%. 3. Aluminium strip. | 2. Fan cooling with shroud for car. | From 06.08.2005 onwards. | 2.21% of the f.o.b. value.
PP resin BYH52A. | 3. Bracket condenser for car. | From 06.08.2005 onwards. | 0.35% of the f.o.b. value.
1. Aluminium corrugated fins. 2. Aluminium serpentine tube. 3. Aluminium forging. 4. Aluminium section. 5. Aluminium strip. 6. Aluminium Brazing coil. 7. Nocoflux. | 4. Condenser assembly for car. | From 06.08.2005 onwards. | 3.50% of the f.o.b. value.
SCHEDULE XLII
Raw materials imported | Goods produced or manufactured | Period | Extent of repayment of customs-duties
(1) | (2) | (3) | (4)
Components: 1. Compressor. 2. Stepping motor. 3. A/C valve (1/4, 5/8). 4. Magnetic contactor. 5. Plastic parts set. 6. Indoor unit motor. 7. Installation kit. 8. High-pressure switch. 9. LTB. 10. 4 way valve. 11. Thermostat: i. Switch push. ii. Fuse holder. iii. Fuse glass. iv. Relay. v. Sensor. vi. Capacitor. vii. Transistor. viii. Diode. ix. Resistor. x. L.E.D. xi. I.C. xii. Piezo buzzer. xiii. Resonator. xiv. Transformer. xv. Cable kit. xvi. Thermisters. xvii. Receiver module. xviii. Connectors. xix. Veristor. 12. Remote: i. Soft keypad. ii. Capacitor. iii. Transistor. iv. Resister. v. I.C. vi. Crystal matle. vii. Resonator. viii. Connectors. ix. L.C.D. Raw materials: 13. Electrical steel sheet. 14. R-22 Gas. 15. ABS resin. 16. Aluminium foil. 17. G.I. sheet. 18. M.S. sheet. 19. Brazing ring. 20. Copper tube. | 1-3 HP split type air-conditioner. | From 06.08.2005 onwards. | 3.83% of the f.o.b. value.
SCHEDULE XLIII
Raw materials imported | Goods produced or manufactured | Period | Extent of repayment of customs-duties
(1) | (2) | (3) | (4)
1. Compressor. 2. Thermostat. 3. Filter drier. 4. Copper tube/capillary. 5. Fan motor. 6. Copper strips. 7. PVC coated steel sheet. 8. Electric galvanized steel sheet. 9. Plastic polystyrene. | Electric water cooler, all sizes. | From 06.08.2005 onwards. | 2.89% of the f.o.b. value.
SCHEDULE XLIV
Raw materials imported | Goods produced or manufactured | Period | Extent of repayment of customs-duties
(1) | (2) | (3) | (4)
1. Coal wet. 2. Iron ore. 3. Manganese ore. | 1. Pig iron. | From 06.08.2005 onwards. | 2.79% of the f.o.b. value.
1. Coal wet. 2. Fuel oil (high speed diesel oil). | 2. Coke. | From 06.08.2005 onwards. | 3.70% of the f.o.b. value.
1. Coal wet. 2. Iron ore. 3. Manganese ore. 4. Ferro manganese. 5. Casi (calcium). 6. Ferro silicon. 7. Aluminium. | 3. Hot rolled coils. | From 06.08.2005 onwards. | 1.55% of the f.o.b. value.
SCHEDULE XLV
Raw materials imported | Goods produced or manufactured | Period | Extent of repayment of customs-duties
(1) | (2) | (3) | (4)
High carbon steel wire rod. | 1. Un-galvanized steel wire rope. | From 06.08.2005 onwards. | 2.49% of the f.o.b. value.
1. High carbon steel wire rod. 2. Zinc. | 2. Galvanized steel wire rope. | From 06.08.2005 onwards. | 2.59% of the f.o.b. value.
SCHEDULE XLVI
Raw materials imported | Goods produced or manufactured | Period | Extent of repayment of customs-duties
(1) | (2) | (3) | (4)
1. Penthrite (P.E.T.N.). 2. PVC compound. | 1. Detonating cord. | From 06.08.2005 onwards. | 10.70% of the f.o.b. value.
1. PVC compound. 2. Black powder. | 2. Safety fuse. | From 06.08.2005 onwards. | 5.94% of the f.o.b. value.
1. Wax blended. 2. Emulsifier. 3. Co-emulsifier. 4. Ammonium nitrate. 5. Sodium nitrate. 6. Aluminium powder. 7. Microspheres. | 3. Emulsion explosive. | From 06.08.2005 onwards. | Rs.1.86 per kilogram.
Components: 1. Spring C10 417. 2. Spring C10 774. 3. Spring C10 816. 4. Spring C10 842. Casting or forging: 5. Plunger C70 409. 6. Fastening strip C70 410. 7. Sight slide C70 425. 8. Trigger C70 426. 9. Hammer C70 427. 10. Rear barrel C70 206. 11. Front barrel C70 207. 12. Trigger frame C70 210. | 4. Rocket propelled grenade (RPG-7). | From 06.08.2005 onwards. | 1.20% of the f.o.b. value.
Steel forging: 1. Lever C70 056. 2. Bracket C70 057. 3. Bracket C70 058. 4. Body C70 069. 5. Sleeve C70 060. 6. Lever C70 231. 7. Extractor C70 234. 8. Block C70 235. 9. Housing C70 269. 10. Compression spring C10 030. 11. Chamber C70 040. 12. Tube C70 041. 13. Bushing C70 442. 14. Breach block C70 443. 15. Ring C70 444. 16. Spotting rifle CW2 500. 17. Compression spring C12 181. 18. Compression spring C10 875. 19. Compression spring C35 016. Alloy steel round bar to specification: 20. DIN-37NiCr M07 (BS970 EN24) size 15mm. 21. DIN 31NiCr 14 size 55mm. 22. DIN 31NiCr 14 size 110mm. 23. DIN 31NiCr 14 size 20x65mm. 24. DIN 31NiCr 14 (CS970 EN36) size 60x20mm. | 5. Recoilless rifle 106mm. | From 06.08.2005 onwards. | 0.79% of the f.o.b. value.
Ferrous, non-ferrous castings or forging: 1. Clamping knob C70 281. 2. Fixed socket C70 282. 3. Locking lever C70 289. 4. Dog clutch C70 304. 5. Socket C70 309. 6. Fire pin housing C70 323 or 035. 7. Locking plunger C70 217. 8. Breech block C75 151. 9. Socket C70 249. 10. Upper collar C70 257. 11. Handle wheel knob C70 279. 12. Half upper collar C70 301. 13. Sight housing holder C70 305. 14. Sight housing holder C70 308. 15. Half lower collar C70 302. 16. Knob C70 290. 17. Buffer body C70 306. 18. Knob C70 288. 19. Hand wheel C70 286. 20. Foot C70 287. 21. Hub C70 258. 22. Right support bracket C70 298. 23. Left support bracket C70 310. 24. Fire control knob C70 212. 25. Hub cap C70 291. 26. Right leg clevis C70 293. 27. Left leg clevis C70 294. 28. Muzzle covers C70 216. 29. Arm L or R C70 292. 30. Bracket C70 283. 31. Clamp bracket C70 285. 32. Barrel C70 176. 33. Cross leveling nut C70 284. 34. Body C70 153. Steel round bar: 35. Z10 CSD10 35mm. 36. 30NCD16 16mm. 37. 30NCD16 20mm. 38. 30NCD16 28mm. 39. 35NCD16 42mm. 40. Z40CSD10 24mm. 41. Z40CSD10 28mm. 42. 35NC6 10mm. 43. 30NCD16 22mm. 44. Z410CSD16 35mm. 45. 25CD4 30mm. Components: 46. Spring C11 202. 47. Spring C11 506. 48. Spring C11 511. 49. Spring C11 515. 50. Spring C11 721. 51. Spring C11 581. 52. Spring C11 661. | 6. Mortar 120mm. | From 06.08.2005 onwards. | 0.87% of the f.o.b. value.
Forging or castings: 1. Tube forging C70 120. 2. Breech block forging C70 121. 3. Rotating socket C70 131. 4. Cross leveling nut forging C70 132. 5. Sight housing plate casting C75 023. 6. Gear cage casting C70 133. 7. Yoke body casting C70 122. 8. Traversing nut casting C70 129. 9. Half lower collar casting C70 123. 10. Half upper collar casting C70 124. 11. Fixed socket forging C70 130. Steel round or rect. Bars: 12. Z30C13 22mm. 13. Z40CSD10 24mm. 14. Z30C13 30mm. 15. 25CD4 30mm. 16. Z30C13 24mm. 17. Z30C13 12mm. 18. Z30C13 38mm. 19. Z30C13 45mm. 20. 35CD4, BS970 or EN19B 88x20mm. | 7. Mortar 81mm. | From 06.08.2005 onwards. | 0.59% of the f.o.b. value.
1. Steel forging breech C70 360. 2. Steel casting cradle C70 371. 3. Steel forging tube C70 361. 4. Steel casting fork end C70 362. 5. Steel casting clamp C70 370. | 8. Mortar 60mm. | From 06.08.2005 onwards. | 1.01% of the f.o.b. value.
1. Arming Spring 2. Dashpot Spring 3. Torsion Spring 4. Combined Shutter Cam. 5. Striker O Ring. 6. Spring Seat O Ring. 7. Front Unit O Ring 8. Shutter cam O Ring. 9. Pin of Rear Part. 10. Pin of Plate. 11. Stop Pin. 12. Lock Ball Steel. 13. Shutter Drum. 14. Guide Bush. 15. Fixing Plate. 16. Wedge Adj. Ring. 17. Adj. Ring of Seat. 18. Primer Holder Closing Nut. 19. Body Rear Part. 20. Head of Striker. 21. Nose cone. 22. Front Unit. 23. Striker Pin. 24. Piston. 25. Spring Seat. 26. Primer Key. 27. Primer Holder. 28. Transmitting Tube. 29. Safety Sleeve. | 9. Fuse V19PF1A. | From 06.08.2005 onwards. | 0.12% of the f.o.b. value.
1. Arming spring. 2. Dash pot spring. 3. Torsion spring. 4. Combined shutter cam. 5. Sh. Adj. Screw. 6. Sh. Adj. ‘O’ rings. 7. Sh. Cam screw. 8. Striker ‘O’ ring. 9. Spring seat ‘O’ ring. 10. Front unit ‘O’ ring. 11. Shutter cam ‘O’ ring. 12. Pin of rear part. 13. Pin of plate. 14. Stop pin. 15. Lock ball steel. 16. Shutter drum. 17. Guide bush. 18. Fixing plate. 19. Wedge adj. Ring. 20. Adj. Ring of seat. 21. Primer holder closing nut. 22. Body rear part. 23. Head of striker. 24. Nose cone. 25. Front unit. 26. Striker pin. 27. Piston. 28. Spring seat. 29. Primer key. 30. Primer holder. 31. Transmitting tube. 32. Safety sleeve. 33. Locking plate. | 10. Fuse V19P-A2 (steel fuse) for mortar bomb. | From 06.08.2005 onwards. | 0.24% of the f.o.b. value.
1. Arming spring. 2. Dash pot spring. 3. Torsion spring. 4. Combined shutter cam. 5. Sh. Adj. Screw. 6. Sh. Adj. ‘O’ rings. 7. Sh. Cam screw. 8. Striker ‘O’ ring. 9. Spring seat ‘O’ ring. 10. Front unit ‘O’ ring. 11. Shutter cam ‘O’ ring. 12. Pin of rear part. 13. Pin of plate. 14. Stop pin. 15. Lock ball steel. 16. Shutter drum. 17. Guide bush. 18. Fixing plate. 19. Wedge adj. Ring. 20. Adj. Ring of seat. 21. Primer holder closing nut. 22. Body rear part. 23. Head of striker. 24. Nose cone. 25. Front unit. 26. Striker pin. 27. Piston. 28. Spring seat. 29. Primer key. 30. Primer holder. 31. Transmitting tube. 32. Safety sleeve. 33. Locking plate. | 11. Fuse V19PA-A2 (aluminium fuse) for mortar bomb. | From 06.08.2005 onwards. | 0.24% of the f.o.b. value.
1. Arming spring. 2. Dash pot spring. 3. Torsion spring. 4. Combined shutter cam. 5. Sh. Adj. Screw. 6. Sh. Adj. ‘O’ rings. 7. Sh. Cam screw. 8. Striker ‘O’ ring. 9. Spring seat ‘O’ ring. 10. Front unit ‘O’ ring. 11. Shutter cam ‘O’ ring. 12. Pin of rear part. 13. Pin of plate. 14. Stop pin. 15. Lock ball steel. 16. Shutter drum. 17. Guide bush. 18. Fixing plate. 19. Wedge adj. Ring. 20. Adj. Ring of seat. 21. Primer holder closing nut. 22. Body rear part. 23. Head of striker. 24. Nose cone. 25. Front unit. 26. Striker pin. 27. Piston. 28. Spring seat. 29. Primer key. 30. Primer holder. 31. Transmitting tube. 32. Safety sleeve. 33. Booster socket. 34. Rear ring. 35. Locking plate. | 12. Fuse V19PF-1B for mortar bomb. | From 06.08.2005 onwards. | 0.22% of the f.o.b. value.
1. Carbon steel tube TU52B Q2 27.7x33.6mm. 2. Aluminium fin. 3. Adhesive tube 307 (50ml). 4. Activator tin 747 (16ml). | 13. Tail unit 81mm. | From 06.08.2005 onwards. | 2.45% of the f.o.b. value.
1. Antimony regulus. 2. Arsenic lead. 3. Lead ingot. 4. Strip for primer. 5. Primer CX-2000. 6. Brass headlong. 7. PDPE for tube etc. 8. Brass coated steel strip for head. | 14. 12-Bore cartridges. | From 06.08.2005 onwards. | Rs.0.32 per cartridge.
SCHEDULE XLVII
Raw materials imported | Goods produced or manufactured | Period | Extent of repayment of customs-duties
(1) | (2) | (3) | (4)
1. Aluminium scrap. 2. Zinc scrap. 3. Copper scrap. 4. MEKP (hardener). 5. Nitric acid. 6. Ammonium chloride. 7. Sodium hydroxide. 8. Zinc chloride. 9. Potassium chloride. 10. Boric acid. 11. Potassium carbonate. 12. Resin epoxy. 13. UP resin 268 Qtn. 14. Fiberglass roving. 15. Ball clay. 16. Washed kaolin clay-D. | 1. Dropout cutout. | From 06.08.2005 onwards. | 1.29% of the f.o.b. value.
Copper scrap. | 2. Fuse links (1T to 80T). | From 06.08.2005 onwards. | 1.13% of the f.o.b. value.
1. Aluminium scrap. 2. Zinc scrap. 3. Nitric acid. 4. Hydrofluoric acid. 5. Ammonium chloride. 6. Sodium hydroxide (solid). | 3. P.G. clamps (3-bolt dead end). | From 06.08.2005 onwards. | 2.52% of the f.o.b. value.
1. Copper scrap. 2. Fiberglass roving. 3. Nitric acid. 4. Sodium hydroxide (solid). 5. UP resin 268 Qtn. | 4. Fuse holders (spare). | From 06.08.2005 onwards. | 2.60% of the f.o.b. value.
1. Aluminium scrap. 2. Zinc scrap. 3. Nitric acid. 4. Ammonium chloride. | 5. Strain clamps (4-bolt dead end). | From 06.08.2005 onwards. | 0.75% of the f.o.b. value.
SCHEDULE XLVIII
Raw materials imported | Goods produced or manufactured | Period | Extent of repayment of customs-duties
(1) | (2) | (3) | (4)
1. Aluminium sheets. 2. Sensitizing elms. 3. Organic sulfur com (methoxy-naphthyl-triazine). 4. Organic colour (basonyl blue 636). | Pre-sensitized offset positive printing plates of all sizes. | From 06.08.2005 onwards. | 4.82% of the f.o.b. value.
SCHEDULE XLIX
Raw materials imported | Goods produced or manufactured | Period | Extent of repayment of customs-duties
(1) | (2) | (3) | (4)
1. Low carbon alloy CRC steel sheet. 2. Bearing alloy. 3. Electro-plating chemical. 4. Solder plate. 5. Packing oil. 6. PVC film. 7. Packing material. | Plain shaft bearings (all types). | From 06.08.2005 onwards. | 4.26% of the f.o.b. value.
SCHEDULE L
Raw materials imported | Goods produced or manufactured | Period | Extent of repayment of customs-duties
(1) | (2) | (3) | (4)
1. Components. 2. Hydraulic oil. 3. Steel bar. 4. Steel tube. | 1. Shock absorbers. | From 06.08.2005 onwards. | 4.62% of the f.o.b. value.
Seamless or EWR pipe or EWR cold drawn precision tube. | 2. Hard chrome steel sleeves. | From 06.08.2005 onwards. | 1.92% of the f.o.b. value.
SCHEDULE LI
Raw materials imported | Goods produced or manufactured | Period | Extent of repayment of customs-duties
(1) | (2) | (3) | (4)
1. Polypropylene. 2. ABS acrylonitrile. 3. Butadiene styrene. 4. V-beet SK-30. 5. Varnish. 6. Bearings. 7. Electric silicone steel sheet. 8. Timer. 9. Capacitor. | 1. Washing machine. | From 06.08.2005 onwards. | 2.12% of the f.o.b. value.
1. Polypropylene. 2. G.I. sheet. 3. Varnish. 4. Bearings. 5. Ex. Oxide polyester powder. 6. electric silicone steel sheet. | 2. A.C. electric motor + blower + housing. | From 06.08.2005 onwards. | 1.06% of the f.o.b. value.
SCHEDULE LII
Raw materials imported | Goods produced or manufactured | Period | Extent of repayment of customs-duties
(1) | (2) | (3) | (4)
1. Compressor. 2. Thermostat. 3. Adhesive tape. 4. Aluminium sheet. 5. Baytherm/polyol. 6. Capillary tube. 7. Copper tube. 8. CRC sheets/coils. 9. Desmodur (isocynate). 10. Electric heating elements. 11. Evaporator freezer. 12. Filter drier. 13. Freon. 14. Holt melt. 15. Lamp bulb with holder. 16. Light switches. 17. Magnetic strip. 18. Plastic moulding compound. 19. Plastic resin (soft PVC compound). 20. Powder paint. 21. PVC coating compound. 22. VCM. | Refrigerators. | From 06.08.2005 onwards. | 1.71%% of the f.o.b. value.
SCHEDULE LIII
Raw materials imported | Goods produced or manufactured | Period | Extent of repayment of customs-duties
(1) | (2) | (3) | (4)
1. Connecting cable. 2. Key. 3. Insulating sleeve. 4. Varistor. 5. Voltage regulator. 6. Enameled copper wire. 7. Enameled flat copper. 8. Electrical steel strip. 9. Permanent magnet. 10. Heating element. | DG alternator. | From 06.08.2005 onwards. | 0.65% of the f.o.b. value.
SCHEDULE LIV
Raw materials imported | Goods produced or manufactured | Period | Extent of repayment of customs-duties
(1) | (2) | (3) | (4)
1. Upper/lower bearing. 2. Shafts. 3. Eyelets. 4. Leg plate. 5. Tap screws. 6. Shafts ( for Reg. Assy. ) 7. Adj. Rivets. 8. Snap ring. 9. Gears. 10. Screw ( for Reg. Assy. ) 11. Polycarbonate. 12. Aluminium alloy ingot. 13. Tin antimony lead alloy. 14. Polystyrene. 15. Alnico alloy. 16. Epoxy resin powder (electrostatic) paint. 17. Nylon. 18. Copper wire # 37. 19. Brass strip/sheet. 20. Copper strip/sheet. 21. Silicon steel strip. 22. Aluminium strip/sheet. 23. PPO resin. 24. Stamping foil. 25. Stainless steel. 26. Insulation tape. 27. Low carbon steel. 28. Chemicals. 29. Electrophoretic paint. | 1. Single-phase KWH electric meter type F-72-P 230 V 15/60 A 50 HZ. | From 06.08.2005 onwards. | 9.70% of the f.o.b. value.
1. Aluminium alloy ingot. 2. Alnico alloy. 3. Silicon steel strip. 4. Temperature compensator. 5. Upper bearing screw. | 2. Frame for single phase KWH electric meter type F-72-P 230-V 15/60-A 50 HZ. | From 06.08.2005 onwards. | 2.17% of the f.o.b. value.
SCHEDULE LV
Raw materials imported | Goods produced or manufactured | Period | Extent of repayment of customs-duties
(1) | (2) | (3) | (4)
1. Brass. 2. Iron and steel above 10mm thick. 3. fibre glass. 4. Hydraulic motor pump assembly. 5. Solenoid valve for chair. 6. Solenoid valve for equipment. 7. Pneumatic valve. 8. Gas spring. 9. Gauges. 10. Automatic cup filler assembly. 11. Glass reflector for O.P. light. 12. Compressor motor assembly. 13. Air motor. 14. Air turbine. 15. 3-Way syringe. 16. Scaler electric (piezon kit). 17. Tubing. 18. Knobs. 19. Special pipe. 20. Toggle switch. 21. foot switch (air regulator). 22. Electric relays. 23. Electric switch/on/off switch. 24. Limit switch. 25. Holegan bulb. 26. Filter regulator assembly. 27. Pressure switch. 28. Air filter. 29. Upholstery (Rexene). 30. Honed pipe for hydraulic lift. | Dental unit comprising of dental light, dental chair and hand pieces with or without compressor and stool. | From 06.08.2005 onwards. | 2.05% of the f.o.b. value.
[C.No.3(77)DRD/2005]
(Mohammed Yahya)
Chief (Duty Remission & Drawback)
Related Customs SROs on refunds and drawback
- SRO 837(I)/200617 August 2006This notification allows duty drawback rates on export of textile and allied products
- SRO 787(I)/20056 August 2005Duty drawback rates on export of miscellaneous products
- SRO 785(I)/20056 August 2005Duty drawback rates on export of leather and allied products
- SRO 784(I)/20056 August 2005Duty drawback rates on export of textile and allied products
- SRO 011204b(I)/20041 December 2004No title given by FBR
- SRO 011204(I)/20041 December 2004No title given by FBR